Results for “interconnection agreements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION

Advanced-Research-on-Integrated-Energy-Systems-Based Analysis to Support Resilient System Upgrades: Energy to Communities Energyshed In-Depth Partnership with Molokai, Hawaii

The Molokai, Hawaii, Energy to Communities (E2C) Energyshed project represents a collaborative effort between the National Laboratory of the Rockies, Shake Energy Collaborative, the Molokai Clean Energy Hui, Sustainable Molokai, and Ho'ahu Energy Cooperative Molokai to advance Molokai's Community Energy Resilience Action Plan (CERAP). Supported by Hawaiian Electric Company and the Hawaii State Energy Office, the initiative aims to develop a community-defined portfolio of renewable energy solutions that enhance energy resilience while aligning with the Hawaiian Electric Integrated Grid Plan (IGP) and Molokai's energy goals. Phase 1 focused on technical analyses and community engagement to co-design feasible energy scenarios. Challenges such as grid upgrades, storage sizing, and inverter ride-through standards were addressed to align technical and operational requirements with community preferences. The project equips Molokai with actionable data and insights to implement energy initiatives while ensuring resilient and culturally informed solutions. Future efforts aim to finalize project designs, secure interconnection agreements, and deploy energy projects that reflect community priorities and technical feasibility.

24 POWER TRANSMISSION AND DISTRIBUTION

Data Centers and Digital Assurance Workshop 3 – Mitigations for Digital Assurance Risks

The third session of the TADA (Technical Assistance for Digital Assurance) Data Centers Cohort, held on November 18, 2025, focused on developing mitigation strategies for digital assurance risks identified in previous workshops. Hosted by Idaho National Laboratory (INL) and ScottMadden, the session emphasized the application of Cyber-Informed Engineering (CIE) to data center infrastructure, particularly at the utility–data center interface. Participants revisited and ranked key digital assurance risks, including architecture and interface weaknesses, governance gaps, and AI-enabled threats. The workshop introduced the 12 principles of CIE, advocating for consequence-focused design, engineered controls, and secure information architecture to proactively reduce cyber-physical vulnerabilities. These principles were applied to critical data center systems such as power distribution, UPS, cooling, SCADA/BMS, and grid-forming batteries. The session also addressed governance challenges at the interconnection boundary, highlighting the need for clear roles in telemetry sharing, firmware management, and trip settings. Special attention was given to emerging risks from behind-the-meter (BTM) generation, including reverse-power flow and the integration of small modular reactors (SMRs), which shift data centers from large loads to complex generation nodes. Participants explored how interconnection agreements can serve as enforceable instruments for digital assurance, and reviewed gaps in current standards such as NERC CIP, IEC 62443, and IEEE 1547. The workshop concluded with pathways to standardization, including model agreement language, state-level programs, and expanded NERC guidance. INL also presented tools and frameworks for secure procurement and supplier risk management, reinforcing the need for integrated engineering and policy solutions to secure the evolving data center–grid ecosystem. Session 3 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION

Large Load Integration - Task List and Overview

Large Load Integration Tasks: Task 1 – Workshops Support stakeholder engagement across industry to promote collaboration and identify solutions to challenges that will guide other work Task 2 – Ancillary Services Characterize different types of large loads to assess under what conditions they may be utilized to provide grid stability services Task 3 – Communications Explore the cybersecurity and communications infrastructure required to enable large loads to interface with grid operations to provide ancillary services Task 4 – Nuclear Integration Explore risks and methods for supporting large load energy needs with SMRs and incorporating them into the wider power system Task 5 – Decision Support and TA Provide support to stakeholders through the creation of planning tools and direct technical assistance.

24 - POWER TRANSMISSION AND DISTRIBUTION

Data Center Cybersecurity, Supply Chain Risk Management, and Emerging Regulation Cohort Summary: Takeaways and Action Plans

This report summarizes the outcomes of the Data Center Cohort under the Department of Energy’s Technical Assistance for Digital Assurance (TADA) initiative, aimed at enhancing grid resilience through cybersecurity, supply chain risk management (SCRM), and Cyber-Informed Engineering (CIE). The cohort engaged 17 organizations across utilities, data center operators, vendors, and technology providers in three sessions combining presentations, discussions, and exercises. Key topics included AI-driven load behavior, cybersecurity vulnerabilities in UPS/BESS and cooling systems, governance gaps at utility–data center boundaries, and supply chain integrity. Five cross-cutting themes emerged: interconnection architecture vulnerabilities, fragmented governance, AI-driven stability risks, lack of regulatory frameworks, and long-term supply chain concerns. Actionable recommendations were developed, including implementing DMZ segmentation, formalizing vendor access agreements, designing AI workload limits, and advancing standards through NERC and state-level programs. These strategies aim to strengthen resilience, clarify responsibilities, and ensure secure integration of data centers into the grid.

24 - POWER TRANSMISSION AND DISTRIBUTION

Access of solar protons to the earth's polar caps.

Energetic solar proton observations in the interplanetary medium by Explorer 33 and Explorer 35 and over the polar caps by Injun 5 during the period from September 1968 through March 1970 have been examined in detail. The solar proton intensities observed over the polar regions were compared with the interplanetary intensities on an absolute basis. The high polar latitude (HPL) proton intensities tracked the magnetic field aligned interplanetary intensities well (solar-antisolar intensities as determined from the sectored Explorer data). The tracking was in agreement with the open magnetosphere model about 90% of the time - i.e., the intensities observed on the HPL magnetic lines of force, which would be connected to magnetic lines of force from the sun in an interconnected geomagnetic and interplanetary magnetic field, were in agreement with the maximum intensity of the interplanetary proton pitch angle distribution. The intensities observed at the HPL region of the opposite polar cap were in agreement with the minimum intensity of the interplanetary pitch angle distribution. The low polar latitude intensities generally tracked the maximum interplanetary intensity very well.

Fennell, J. F.

Phase-field modeling of thermally-grown oxide and damage evolution in environmental barrier coatings

Silicon carbide-based ceramic matrix composites protected by environmental barrier coatings (EBCs) present a promising materials solution for next-generation gas turbines. Developing more robust and efficient EBCs is therefore of significant technological importance. During the service in high-temperature oxidative environments, there is a thermally grown oxide (TGO) layer, spontaneously formed in the EBC system. TGO is recognized as a critical factor for the degradation and failure of EBCs, yet the detailed mechanisms of TGO growth and its effect on EBC failure remain unclear. In this study we develop a comprehensive chemo-mechano-phase-field model to simulate growth of the TGO in EBCs, factoring in creep and deformation, and especially the cracking behaviors. The volume expansion due to TGO growth and the resulting large inelastic deformation are addressed by using our recently developed, so-called incremental realization of inelastic deformation (IRID) algorithm, in combination with an adapted Hu-Chen spectral solver for elasticity. Simulations of TGO growth are performed considering different growth modes of TGOs determined mainly by the ratio of oxidant permeability in the topcoat to that in the TGO itself. Large-scale three-dimensional (3D) simulations are performed to model the formation of interconnecting vertical/channel cracks (often called ‘mud cracks’). The simulated crack morphology are in excellent agreement with the experimental observations from the literature. The simulations also provide insights into the cracking of EBCs and its dependence on the structure and constituent properties of the coating system. Furthermore, these results demonstrate the developed damage model can be a useful tool for design of more durable EBCs.

Cracking

Observability and Estimation of Distributed Space Systems via Local Information-Exchange Networks

Spacecraft formation flying involves the coordination of states among multiple spacecraft through relative sensing, inter-spacecraft communication, and control. Most existing formation-flying estimation algorithms can only be supported via highly centralized, all-to-all, static relative sensing. New algorithms are proposed that are scalable, modular, and robust to variations in the topology and link characteristics of the formation exchange network. These distributed algorithms rely on a local information exchange network, relaxing the assumptions on existing algorithms. Distributed space systems rely on a signal transmission network among multiple spacecraft for their operation. Control and coordination among multiple spacecraft in a formation is facilitated via a network of relative sensing and interspacecraft communications. Guidance, navigation, and control rely on the sensing network. This network becomes more complex the more spacecraft are added, or as mission requirements become more complex. The observability of a formation state was observed by a set of local observations from a particular node in the formation. Formation observability can be parameterized in terms of the matrices appearing in the formation dynamics and observation matrices. An agreement protocol was used as a mechanism for observing formation states from local measurements. An agreement protocol is essentially an unforced dynamic system whose trajectory is governed by the interconnection geometry and initial condition of each node, with a goal of reaching a common value of interest. The observability of the interconnected system depends on the geometry of the network, as well as the position of the observer relative to the topology. For the first time, critical GN&C (guidance, navigation, and control estimation) subsystems are synthesized by bringing the contribution of the spacecraft information-exchange network to the forefront of algorithmic analysis and design. The result is a formation estimation algorithm that is modular and robust to variations in the topology and link properties of the underlying formation network.

Fathpour, Nanaz

The role of unneutralized surface ions in negative potential arcing

The observed arcing on negatively biased solar arrays exposed to plasma environments is shown to be due to an effective charge layer on the interconnect formed by ion collection from the plasma. Time scales to form this layer are shown to be in agreement with experimental observations. A quantitative theory is presented which predicts arcing threshold dependence on plasma density and external potentials. After breakdown, the discharge process is modeled as space charge limited transport to nearby coverslips. Peak currents and decay times predicted by this model are compared with experimental observations.

Jongeward, G. A.

Mechanically verified hardware implementing an 8-bit parallel IO Byzantine agreement processor

Consider a network of four processors that use the Oral Messages (Byzantine Generals) Algorithm of Pease, Shostak, and Lamport to achieve agreement in the presence of faults. Bevier and Young have published a functional description of a single processor that, when interconnected appropriately with three identical others, implements this network under the assumption that the four processors step in synchrony. By formalizing the original Pease, et al work, Bevier and Young mechanically proved that such a network achieves fault tolerance. We develop, formalize, and discuss a hardware design that has been mechanically proven to implement their processor. In particular, we formally define mapping functions from the abstract state space of the Bevier-Young processor to a concrete state space of a hardware module and state a theorem that expresses the claim that the hardware correctly implements the processor. We briefly discuss the Brock-Hunt Formal Hardware Description Language which permits designs both to be proved correct with the Boyer-Moore theorem prover and to be expressed in a commercially supported hardware description language for additional electrical analysis and layout. We briefly describe our implementation.

Moore, J. Strother

Quantitative model of magnetic coupling between solar wind and magnetosphere

Preliminary results are presented of a quantitative three-dimensional model of an open steady-state magnetosphere configuration incorporating a normal-component distribution corresponding to the subsolar merging-line hypothesis. The distribution of the normal magnetic-field component at the magnetopause is used as input and is used to calculate an interconnection magnetic field that links the internal and external fields. The interconnected field is then used to map the solar-wind electric field onto the polar cap. The resulting polar-cap flow patterns are found to be in agreement with observations.

Toffoletto, F. R.

Sharing the Sun: Community Solar Deployment and Subscriptions (As of January 2026)

The community solar market analysis presented here is based primarily on data collected through Sharing the Sun, an initiative of the National Community Solar Partnership+ (NCSP+). Sharing the Sun data collection and analysis are conducted by the National Laboratory of the Rockies (NLR) as part of its support for implementation of NCSP+. NLR first released a dataset of community solar projects in 2018 and updates it biannually. The January 2026 dataset, data collection methodology, and all the previous datasets are available from NLR's Data Catalog: https://data.nlr.gov/submissions/244. The dataset presents project-level information including location, capacity, operating utility, and year of interconnection. The dataset is created from multiple data sources such as utility data, public utility commissions, project developer websites, media releases, primary data collection by NLR, and data provided by developers under nondisclosure agreements. This presentation builds on a previous analysis of the community solar project dataset, Sharing the Sun: Community Solar Deployment and Subscriptions (as of June 2024). Dr. Gabriel Chan and his team at the University of Minnesota contribute to this effort. NCSP+ is led and funded by U.S. Department of Energy's Integrated Energy Systems Office (IESO).

14 SOLAR ENERGY

Nine Canyon Long-Duration Energy Storage: A Feasibility Study

The Nine Canyon Long Duration Energy Storage (LDES) Feasibility Study explores the technical and economic viability of deploying advanced energy storage technologies at Energy Northwest's (EN) Nine Canyon (9C) Wind Project site in Benton County, Washington. Supported by the Washington State Department of Commerce and the U.S. Department of Energy’s Office of Electricity under its LDES Voucher Program, the study represents a collaborative effort between EN, Pacific Northwest National Laboratory (PNNL), and ARES North America. At the core of this effort is the development of a generalized techno-economic modeling framework and evaluation tool designed to assess the value proposition of LDES projects across a variety of contexts. The modeling tool is technology-agnostic and accommodates user-defined parameters such as rated power, energy duration, round-trip efficiency, capital and operational costs, and dispatch constraints. It also integrates economic inputs, including market prices, energy revenue structures, and financing parameters to evaluate performance through key metrics. The tool provides utilities with a transparent, adaptable platform to support decision-making, investment prioritization, and portfolio planning for various storage technologies. To guide scenario design and interpretation, the study first surveyed the LDES technology landscape, including lithium-ion batteries, flow batteries, non-hydro gravity storage, and thermo-mechanical systems, comparing cost trajectories, technical performance, safety and hazards, materials sourcing and recyclability, and spatial/siting considerations. This literature-grounded review highlights technology trade-offs and reinforces the need to align technology choice with site characteristics, use cases, and project objectives. A companion chapter examines ownership structures (EN ownership, third-party ownership, shared models) and offtake options (energy marketing, capacity/energy PPAs, time-of-use PPAs, block-delivery PPAs, and tolling), where PPAs (power purchase agreements) represent contractual arrangements for buying and selling electricity. The chapter also highlights implications for risk allocation, capital access, operational control, and revenue certainty. The study also evaluates supervisory control and data acquisition (SCADA) and transmission interconnection pathways, options include upgrading the existing SCADA or deploying a dedicated LDES controller, with attention to protection schemes, data telemetry, cybersecurity, and regulatory coordination with BPA. In addition, an ARES-specific geotechnical and hydrology assessment presented in the appendix screens multiple corridors for slope stability, bearing capacity, cut-and-fill magnitude, and stormwater behavior.

25 ENERGY STORAGE

Lessons Learned for Transmission Cost Allocation in U.S. Regional Markets

Expanding electric transmission can facilitate generator interconnection and improve grid reliability. Assigning costs for new transmission infrastructure is highly contentious because these costs can have a direct impact on energy prices and ratepayer bills. In this report, we evaluate what factors influence successful transmission cost allocation agreements. Through a review of legal disputes, existing cost allocation practices, and regional case studies, we identify potential strategies to minimize cost allocation disputes for future projects. The report also highlights the processes by which regions can update their cost allocation methods. While we do not consider cost allocation methods currently under development for compliance with FERC Order 1920, the trends and lessons learned identified in this report can inform discussions on effective cost allocation methods to reduce barriers for transmission development.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Reaction of cobalt in SO2 atmospheric at elevated temperatures

The reaction rate of cobalt in SO2 argon environments was measured at 650 C, 700 C, 750 C and 800 C. Product scales consist primarily of an interconnected sulfide phase in an oxide matrix. At 700 C to 800 C a thin sulfide layer adjacent to the metal is also observed. At all temperatures, the rapid diffusion of cobalt outward through the interconnected sulfide appears to be important. At 650 C, the reaction rate slows dramatically after five minutes due to a change in the distribution of these sulfides. At 700 C and 750 C the reaction is primarily diffusion controlled values of diffusivity of cobalt (CoS) calculated from this work show favorable agreement with values of diffusivity of cobalt (CoS) calculated from previous sulfidation work. At 800 C, a surface step becomes rate limiting.

Jacobson, N. S.

Reaction of cobalt in SO2 atmospheres at elevated temperatures

The reaction rate of cobalt in SO2 argon environments was measured at 650 C, 700 C, 750 C and 800 C. Product scales consist primarily of an interconnected sulfide phase in an oxide matrix. At 700 C to 800 C, a thin sulfide layer adjacent to the metal is also observed. At all temperatures, the rapid diffusion of cobalt outward through the interconnected sulfide appears to be important. At 650 C, the reaction rate slows dramatically after five minutes due to a change in the distribution of these sulfides. At 700 C and 750 C, the reaction is primarily diffusion controlled; values of diffusivity of cobalt (CoS) calculated from this work show favorable agreement with values of diffusivity of cobalt (CoS) calculated from previous sulfidation work. At 800 C, a surface step becomes rate limiting. Previously announced in STAR as N83-35104

Jacobson, N. S.

Mapping of the solar wind electric field on the earth's polar caps

A quantitative model of a magnetically interconnected (open) magnetosphere is developed as a perturbation of Voight's closed magnetosphere model with a given magnetopause shape. The model is shown to give a reasonable representation of the open magnetosphere configuration and is especially useful in testing the magnetospheric consequences of various merging theories. The convection pattern obtained for southward IMF is in reasonable agreement with observations, especially in the manifestation of a convection 'throat' near noon. For northward IMF, this region of constricted flow is rotated in local time in the direction of the IMF, also in accordance with observations.

Toffoletto, F. R.