Effects of local permitting and interconnection requirements on solar PV installation durations
Not Available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
Disclosed herein are a group anchor system, subsea installation tool and method of install such group anchor systems. The group anchor system includes a template through which a plurality of vertical piles, such as helical piles, are passed, drilled into the seabed at one end and secured to the template at the other to provide a mooring anchor for an offshore asset. The installation tool is a modular tool designed to mate with the group anchor system. Each module including drive mechanism for engaging and driving a pile. The piles may be driven simultaneously, individually, or in groups as required for proper placement and leveling. Methods of using the installation tool are also disclosed.
The beam halo can contribute to beam losses in accelerators and is very difficult to measure. With an increase in beam intensity following the PIP-II upgrade at Fermilab, the beam losses are expected to be higher with some coming from beam halo. Therefore, it is important to measure the sources of beam halo to minimize the beam losses. A modified Halo Monitor developed by J-PARC will be installed in Fermilab MI-8 transfer line to measure the beam halo. In this paper, an update on the beam profile monitor fabrication is covered. The updates include the location selection for the Halo Monitor in the MI-8 transfer line, shielding options for instrumentation, initial testing of equipment, and ray tracing simulations for the Offner optics and the targets used in the monitor.
Building-sited solar photovoltaics (PV) could play a key role in decarbonizing the building sector either through racked and mounted PV or through Building-integrated PV (BIPV). BIPV is installed into the building envelope itself, with solar cells and/or modules forming the outer layer of a building structure, thus transforming a single-purpose structure into one that serves the dual purposes of the building envelope and electricity. BIPV can be applied to building roofs, facades, awnings, pergolas, windows, skylights, balustrades, and other external surfaces. Given BIPV products vary widely, the focus of this research is residential roofing integrated PV (RIPV), where solar is incorporated into or otherwise replaces the roofing material. Previous research suggests that residential RIPV could reduce customer acquisition, labor, supply chain, and equipment costs. These products have yet to realize these cost savings and deployment remains significantly less than conventional rooftop PV as a relative share of the addressable market in the US. One potential barrier to broader residential roofing integrated PV deployment may be higher costs relative to conventional rooftop PV, primarily because the design and installation of these products is still evolving. Here, we explore residential RIPV cost-reduction opportunities by analyzing installation processes. Our study documents residential RIPV installations at 2 reroofing sites and the equivalent of 9 new construction sites in California through a methodology known as time and motion study. We also conducted interviews with subject-matter experts to identify barriers and solutions to maximize these products' market penetration. Our time and motion study breaks the RIPV installation process into four steps: 1) staging, unloading, and roof preparation; 2) fire resistant underlayment(s) (synthetic material laid between roof shingles and roof deck); 3) flashings and PV installation; and 4) wiring and monitoring. We measure the time required for each step in terms of worker-hours, representing an hour of labor from a single worker. We further normalize process time by dividing worker-hours by kilowatt (kW) of system capacity. The most time-intensive step was flashings and PV installation, taking around 2.4 worker-hours per kW on average and accounting for around 60% of the process time for an average installation. The total installation process took on average about 6.4 and 3.5 worker-hours per kW at the reroofing sites and new construction sites, respectively. For comparison, a previous time and motion study documented a time of 6.9 worker-hours per kW for conventional rooftop PV. The shorter RIPV installation times are consistent with previous studies suggesting that RIPV could be installed faster than conventional rooftop PV. The time and motion results and feedback from interviewees provide insights into potential residential RIPV cost reduction opportunities. Several interviewees suggested that these products would be more efficient if PV installation was more fully integrated into the roofing/construction industries, which currently use separate supply chains and skillsets. Further integration could reduce supply chain delays and labor force redundancies. Future research could explore specific ways to integrate these industries to help realize the cost savings potential of RIPV.
To help SETO/DOE achieve its goals, the IBTS team proposed a project addressing system reliability by improving installation standards and quality management. The proposed approach was designed to help achieve measurable reductions in installation defect density and improvements in the performance of PV systems by optimizing design and installation of residential and commercial PV systems. This approach addressed the soft costs associated with installations and quality management. The project demonstrated improved system reliability and reduced PV system installation costs. The software developed improved operations, decreased risk, and increased the overall value of PV systems across their lifecycle. The project used several data collection methods, including extensive industry surveys, face-to-face high-level interviews at industry conferences, stakeholder teleconferences, and in-depth interviews conducted by IBTS staff. Results from the research found the industry needs a uniform assessment method for national providers to be more efficient; the software should support both code officials and installers; most industry stakeholders would find value in a centralized software system that allows them to collect, report, and review information on in-process and completed solar installations; and mobile solutions that bridge existing knowledge gaps with inspectors and integrate with existing methodologies (such as permitting software) are of great value. The software solution developed is web-based, allowing for national access, and is built on a Google Firebase platform that can handle significant users and data. It can be used onsite or remotely, allowing for code compliance to continue despite ongoing pandemic related delays or shutdowns for local economies. The information provided by the software tool allows users to uniformly assess a system for compliance and use that aggregated data to identify training topics or create internal process designed to improving issues and reducing occurrence. This solution has multiple benefits in managing quality at time of use and promoting an increase in future safety and quality through education. Perhaps most importantly, this software increases public safety by ensuring compliance of installed systems and allows for local AHJs to remotely engage specialized and qualified solar specific expertise for oversite of the installation in their jurisdictions. Data analysis provides the quality feedback loop identifying the root cause of failure and drives installation practices to improve through training and education, resulting in systems with higher performance, greater reliability, and reduced operations and maintenance costs. With the successful completion of this project, the industry can expect reduced soft costs and increased performance and safety and will ultimately benefit from longer performing systems that cost less to operate.
Prefabrication promises to industrialize the construction industry. By constructing elements within a manufacturing environment, producers can better control quality and maximize production efficiency. Since the major adoption of prefabrication, a wide variety of prefabricated components have been produced for varying applications such as new construction and exterior wall retrofits. While the production processes of these prefabricated components have seen much innovation, the installation process has remained relatively unchanged for decades. To innovate the installation process with modern technologies, a real-time evaluator (RTE) has been developed to reduce the installation cost of prefabricated components by reducing installation time, decreasing rework, and improving accuracy. The RTE uses developed software solutions with off-the-shelf hardware to assist erectors in completing an installation by measuring the real-time positions of connections and prefabricated components, providing installation guidance through a graphical user interface, and monitoring the accumulated installation errors. An overview of the RTE and proposed workflow is presented. A connection locating system that guides users in expediting the installation of connections is introduced. Laboratory experiments were conducted to determine the accuracy improvement and time savings of the RTE in installing connections for prefabricated components. RTE enabled a time saving of up to 37% compared to traditional connection installation methods using handheld measurement tools.
Abstract Background Distributed wind energy adoption in the United States can contribute to the diverse portfolio of energy technologies needed to achieve ambitious decarbonization goals. However, with limited deployment to date, the current distributed wind market must be better understood; these efforts will support the range of stakeholders who will drive successful deployment. This article first distinguishes three categories of distributed wind from existing literature: (1) behind the meter, (2) intended for explicit local load, and (3) physically distributed. A novel methodology to classify individual wind installations into each of these categories is then presented and applied to two data sets of wind installations in the United States to categorize and illuminate distinct segments in the distributed wind market. Results Physically distributed installations, constituted by small to moderately sized projects serving local loads on distribution systems solely because of their proximity to them, account for the highest amount of capacity but the lowest number of installations out of the three categories. The inverse is true for behind-the-meter installations, which are used to serve on-site loads. Installations intended for explicit local load, which are interconnected on the utility side of the distribution system and intentionally built to provide energy to loads on the same distribution system, rank in the middle for both installed capacity and number of installations. Conclusions Distributed wind energy deployment in the United States is geographically widespread, but the extent to which a single category is developed in each state varies. Policies, wind resources, and broad energy technology trends contribute to these deployment patterns. By identifying the extent to which each category of installations exists, decision-makers are empowered with data necessary to tailor research and development programs and address stakeholder priorities through policy and other means, ultimately supporting future deployment.
As offshore wind energy development grows in the United States, solutions are needed to reduce the underwater noise and substrate vibration generated during fixed-bottom turbine installation to help protect marine life. Monopiles are currently the main turbine foundation type installed globally and impact pile driving, the primary installation method, can be a major source of noise and vibration generation during wind farm construction. Opportunities exist to reduce the amount of noise and vibration produced during future offshore wind farm development. The use of alternative foundation types and installation methods, as well as innovative noise abatement technologies, would help reduce the potential detrimental effects on sensitive marine species. To explore these opportunities, the Department of Energy’s Wind Energy Technologies Office, in collaboration with the Bureau of Ocean Energy Management and the National Oceanic and Atmospheric Administration, funded the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory to organize, host, and facilitate a virtual workshop in December 2022. The goal of the workshop was to gather input from the offshore wind energy community on noise reduction strategies for the installation of fixed-bottom offshore wind turbines in U.S. waters across multiple regions, including the U.S. Atlantic Coast, Gulf of Mexico, and Great Lakes to inform recommendations on future research. The joint lab team convened industry representatives, subject matter experts, and regulators to discuss potential pathways to reduce noise and vibration associated with fixed-bottom turbine installation, including the practicality of using alternative foundations and installation methods, the effectiveness of noise abatement technologies, as well as research and monitoring needs. In preparation for the workshop, the team invited experts to be part of a steering committee and worked with its members to help focus activities to meet the workshop goals. Additional pre-workshop activities included developing the invitee list and workshop agenda, reviewing existing Construction and Operations Plans (COP) for proposed offshore wind projects, distributing a brief questionnaire to industry representatives, and drafting the workshop discussion questions and Mural boards. In total, 128 workshop participants provided over 600 comments in response to the 17 group discussion questions used over two workshop sessions. Overarching recommendations highlighted across themes included future investments to provide data sharing, consistency, transparency, and opportunities for sharing best available science, knowledge, and expertise. The joint lab team synthesized the comments and identified four key research and development themes that could help advance the successful implementation of noise and vibration reduction strategies (see report). This report provides an overview of the workshop goals and scope, reviews the pre-workshop activities, presents brief summaries of participant feedback, and concludes with detailed research themes and recommendations for future investments. Appendix A includes the group discussion questions, Appendix B includes the results of the COP review, and Appendix C includes the results of the industry questionnaire. Overall, there was a high level of interest and engagement in the workshop. The sessions provided an opportunity for significant exchange of information between workshop participants from across sectors. Participants identified a variety of opportunities for next steps towards the noise reduction of offshore wind turbine installation in U.S. waters, including recommendations for future investments to provide certainty in the use of new technologies associated with alternative foundation types, noise abatement systems, and efficacy monitoring.
To gain a better understanding of the complex transients in a utility grid with a large number of solar PV installations coupled by PWM inverters during the protection and restoration period of the power grid, in this project a kW-level experimental system with dominating inverter-based resources and a hardware-in-loop simulation system with transmission and distribution models, as well as several SEL protective relays have been built and used. The major research findings of the project are summarized below in two perspectives: Experimental research: A self-organized ultra-high frequency solitary waveform is discovered and demonstrated in the hardware experimental system. Despite the familiarities, such a solitary waveform is distinct from any harmonics, transient, or resonance waves in that, it is 1) non-dispersive over time and space, 2) not associated with any active source or the linear superposition of sources, 3) half-cycle asymmetric, 4) not responding to filters or change of system characteristic resonance frequency, 5) ubiquitous as it occurs simultaneously everywhere in the system from DC supply, power lines, and the utility grid, and 6) explosive through tripping the protection or damaging susceptible devices or circuits. Analytical study: The nature of such a new waveform and an analytical explanation of its formation are studied based on related physics and non-linear science principles, with the following highlights: 1) such a new waveform follows the solutions to the Non-linear Schrödinger equation, so the classic linear perturbation theory is unable to explain or predict such a unique waveform as confirmed with the research team of RTDS; 2) the critical condition of occurrence of such a waveform is derived, which indicates that the breakings of solitary wave is a system synchronous issue between the utility grid in the 60Hz phasor domain and duty-ratio modulation of DC sources in the inverter switching frequency domain; 3) such a waveform carries energy mass so it could be detrimental; 4) such a waveform is deceiving as it is not readily detectable in the energy propagation direction by the primary protection equipment, while it is detrimental in the perpendicular direction of energy propagation, i.e. voltage direction. Thus, it has more likely challenges to the second primary equipment and devices, particularly at the weakest link and point such as aging insulation and inappropriate setting of susceptible devices. Therefore, such a waveform can be easily ignored in the aftermath investigation. The intellectual merits: The experimental discovery reveals certain unfamiliar transient phenomena that could challenge the integration of large-scale grid-connected solar PV installation during the group ride-through period of solar PV installations, commissioning of large-solar farms, or dramatic change of solar radiation conditions. Particularly, the research findings suggest that the occurrence of the unfamiliar transient phenomena is uniquely associated with the inverter-based solar PV installation, which is less likely to happen for rotary energy systems. The physics and non-linear science-based research work laid down an analytical path to the challenging transient stability problems including those that have been observed currently and future calls. Both experimental and analytical research results explain the limitation of many current research effects including some DoE research undertakings as well as possible solutions. The broader impacts: The research outcome of the project advances the understanding of the possible transient problems for the integration of inverter-based solar PV installation. It also highlights the theoretical and technical barriers for applying the conventional theory and technology to design and implement countermeasures against their adverse impacts of the large-scale solar PV installation and operation on grid reliability and security. More broadly, the research outcomes have shed some light on the open, fundamental challenges in the integration of large-scale solar photovoltaic energy into current and next-generation power grids across the country, and worldwide. The advanced physics and non-linear science-based analysis open up a path to harmonization of the renewables for societal energy needs via building a resilient and sustainable electric power infrastructure.
Nine new lysimeter stations were installed at the E-Area Low Level Waste Facility (ELLWF). Six lysimeter stations were installed near Engineered Trench 3 (ET3), one installed near Slit Trench 8 (ST8), and two installed near Slit Trench 9 (ST9) as shown in Figure ES-1. Two lysimeters were installed at each station at the depths shown in Table ES-1. Lysimeter placements were based on borehole lithology and were comparable to existing nearby lysimeter stations. The deepest lysimeter at each of the new lysimeter stations was designated as the action-level lysimeter. Following installation, the lysimeters were purged and placed under vacuum for sampling. Sampling occurred in April 2023. Analytical results from the sampling will be provided in the Spring 2023 Lysimeter Tritium Data technical memo and the 2023 Annual Summary Report. With the addition of the new lysimeters at ET3, ST8, and ST9, the vadose zone monitoring system is now comprised of 327 active lysimeters at 111 lysimeter stations. There are 102 action-level lysimeters at 111 stations.
Given the high deployment targets for solar photovoltaics (PV) needed to meet U.S. decarbonization goals, and the limited carbon budget remaining to limit global temperature rise, accurate accounting of the energy-use and greenhouse-gas emissions over the life-cycle of PV systems is needed. In the United States, most PV systems are large utility-scale systems which use single-axis trackers and central inverters, which are not commonly examined in existing life-cycle assessment (LCA) literature. In this study, we present a cradle-to-grave LCA of a typical silicon U.S. utility PV (UPV) installation which is consistent with the utility system features documented in the annual NREL PV system cost benchmark reports. We analyze and present results for four main metrics: cumulative energy demand (CED), greenhouse gas (GHG) emissions, energy payback time (EPBT), and carbon payback time (CPBT). We consider six primary manufacturing options: three based on an imported PV module supply chain (comparing low-carbon imports, high-carbon imports, and average imports), and three based on a potential domestic PV module supply chain (comparing low-carbon U.S. regions, high-carbon U.S. regions, and average U.S. regions). These manufacturing options were then paired with installation locations to create six main cases: low-carbon options were installed in Phoenix (Arizona), high-carbon options were installed in Seattle (Washington), and average options were installed in Fredonia (Kansas). These locations were selected to represent a range of irradiance and grid mixes in the United States, in order to illustrate the likely range of EPBTs and CPBTs possible across the United States. For all six cases, a sensitivity analysis for end-of-life (EOL) handling was explored to capture current and future management options: landfilling, partial recycling, and high-quality recycling. For the purposes of this report, the benchmark system was defined to use an average imported supply chain with partial recycling, installed in Fredonia (Kansas). CED results show ratios at or below 0.1 MJ oil-eq /MJgenerated which demonstrates efficient use of primary energy resources (below a 1:1 ratio), and represents a slight improvement over previous results in literature. GHG emissions per kWh range from 10-36 g CO 2 e, which are consistent with or lower than previous results published by NREL and IEA-PVPS. We use a graphical approach for calculating EPBT and CPBT in this report, which improves upon methods typically used in literature by accounting for non-linearity and avoiding data quality issues associated with long-term projections. EPBT was determined to vary from 0.5 to 1.2 years, with a benchmark EPBT of 0.6 years; CPBT was shown to vary from 0.8 to 20 years, with benchmark CPBT of 2.1 years, which is lower than other estimates from recent literature (typically >2 years).
In November 1990, an inspection visit was made to the residential lighting photovoltaic systems that had been installed approximately one year before in the rural communities of the Municipality of Pinotepa de Don Luis, in the State of Oaxaca. The main purpose of the visit was to evaluate the physical and operational status of these systems. The systems typically consist of a photovoltaic module with a capacity of 30 or 35 Watts, an automotive type battery, an indicator of the status of charge of the battery, 3 fluorescent lamps and the corresponding installation, including cables, connection or outlet box and switches. It can be seen that the systems are in good physical condition and do not show any signs of intentionally caused damage. However, the incidence of failures is higher than what had been expected; therefore the operational status of these systems is considered to be below a level that could be accepted, with a tendency to getting worse. The main problem that has been detected is the lack of automatic charge controllers. This problem has caused other important failures. Serious deficiencies were appreciated in the installations, which show evidence of the poor workmanship of the installers. The lack of system standardization is evident, both regarding the components and the installation. As a consequence, there are technical factors which indicate that the installed systems will keep deteriorating at a rate faster than normal, and will stop operating in a short time unless urgent preventive and corrective measures are taken. The attitude of the users with respect to the systems is generally positive. However, there are elements that make the correct operation and maintenance of these systems a very difficult task. The users did not receive any training regarding the best way to operate and take care of their systems, nor any other information in relation to their technical limitations.
This document provides a comprehensive Digital Assurance Checklist for securing behind-the-meter energy assets, focusing on both installers and homeowners. As distributed energy resources (DERs) such as solar PV and battery storage become integral to residential energy systems, cybersecurity emerges as a critical component of reliability and safety. The guide outlines actionable steps for installers during pre-installation, commissioning, and post-installation phases, emphasizing practices like network segmentation, credential management, firmware validation, and homeowner education. For homeowners, the document introduces a tiered approach to cyber hygiene—from essential measures like strong Wi-Fi credentials and automatic updates to advanced strategies such as network segmentation, DNS filtering, and intrusion detection. By adopting these practices, stakeholders can mitigate cyber risks, safeguard energy infrastructure, and ensure resilient, secure operation of DER systems. Additional resources and references to industry standards are included to support implementation.
This document provides a comprehensive Digital Assurance Checklist for securing behind-the-meter energy assets, focusing on both installers and homeowners. As distributed energy resources (DERs) such as solar PV and battery storage become integral to residential energy systems, cybersecurity emerges as a critical component of reliability and safety. The guide outlines actionable steps for installers during pre-installation, commissioning, and post-installation phases, emphasizing practices like network segmentation, credential management, firmware validation, and homeowner education. For homeowners, the document introduces a tiered approach to cyber hygiene—from essential measures like strong Wi-Fi credentials and automatic updates to advanced strategies such as network segmentation, DNS filtering, and intrusion detection. By adopting these practices, stakeholders can mitigate cyber risks, safeguard energy infrastructure, and ensure resilient, secure operation of DER systems. Additional resources and references to industry standards are included to support implementation.
Residential buildings are one of the prime candidates in the United States for reducing energy consumption. Continuous exterior insulation (CEI) is being used increasingly often in residential buildings to improve energy efficiency. Windows constitute 15–40% of a building envelope and are the weakest component in energy performance. The installation of windows in walls with CEI has not been well evaluated. We identified four cases of installing windows in walls with CEI of 25–76 mm (1–3 in.) thickness and analyzed the energy loss between the window and wall interface (flanking loss), structural issues, air leakage, and moisture penetration. Thermal analysis showed that the insulation value (RSI) of the 305 mm (12 in.) perimeter wall surrounding a window decreased by 7.6–34.5% in the four cases when compared with the RSI of the wall without the window. A window installation method is proposed to address the issues likely to occur with installation methods currently being used in the field. An out-of-the-box installation system was also designed to achieve a better thermal performance, cost effectiveness, and structural performance in high-performance residential buildings.
Metal-organic frameworks (MOFs), including MOF-808 present an opportunity for vapor phase installation of reactive centers that may serve as uniform sites for precision catalysis. The mechanism of cobalt installation in MOF-808 through atomic layer deposition (ALD) upon CpCo(CO )2 exposure is investigated through in situ FTIR spectroscopy complemented by density functional theory modeling. The role of subsequent H 2 O exposure in the hydrolysis of carbonyl and cyclopentadienyl ligands to complete the installation is also investigated. In situ FTIR study reveals that upon exposure of CpCo(CO) 2 to MOF-808 at 115 °C, a long-lived, stable intermediate is formed that presents carbonyl stretching vibrations similar to the undissociated precursor that are attributed to multiple chemisorbed carbonyl complexes. In MOF-808, cobalt species are initially absorbed near the BTC linker rather than directly on the nodes, revealing the importance of non-covalent interactions in the installation process. DFT suggests that H 2 O exposure promotes carbonyl elimination but leaves a cyclopentadienyl-capped cobalt that is more stable than the complete hydrolysis product. The simulations are consistent with cobalt installation in MOF-808 using CpCo(CO) 2 and H 2 O at 115 °C and further consistent with the lack of ALD thin film deposition of cobalt oxide thin films on planar supports.
To minimize the contamination of SRF cavities, remote installation techniques are needed during the installation of components. Recent work at Fermilab has been performed to begin the process of developing techniques for assembling cavities using robotics. Multiple alignment methods were prototyped including alignment and computer vision methods. Using a remotely controlled robotic arm, the alignment and installation of couplers have been successfully performed on prototype PIP-II SSR2 cavities in a cleanroom. The installation process will be shown to show to demonstrate the potential of future installations on other cavities and cavity ancillaries.
A method of installing one or more anchors in an underwater substrate in a body of water including installing an anchor into the underwater substrate by rotating an anchor installation vehicle about a central axis Y to drive the anchor coupled to the anchor installation vehicle into the underwater substrate. The anchor installation vehicle includes a vehicle frame having a top end and bottom end, a plurality of arms extending outward from the vehicle frame, one or more rotational thrusters disposed at distal ends of the respective arms, and an anchor system that holds the anchor extending from the bottom end of the vehicle frame with the anchor aligned with a central axis Y.