Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “independent system operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

DSO+T: Valuation Methodology and Economic Metrics (DSO+T Study: Volume 4)

This report summarizes a rigorous valuation analysis methodology used by the Distribution System Operator with Transactive (DSO+T) study to estimate the financial benefits and costs of adopting Transactive Energy coordination of distributed energy resources for key stakeholders (for example distribution system operators and customers). This was achieved by modeling the value exchanges between stakeholders and determining the annualized costs and revenues experienced by stakeholders, enabling the evaluation of overall impact on stakeholder’s annualized cash flow. Extensive work was conducted developing methods to estimate the operating costs of distribution system operators at a level of granularity that would allow the financial impact of implementing a transactive energy approach to be estimated. This work included developing parametric models for labor and software costs, distribution system capital and maintenance costs, growth rates, and factors to determine annualized costs of capital investments. Simulation results were used to calculate wholesale energy costs and revenues from retail sales. Valuation analysis methods were also developed for other stakeholders including customers, the transmission system operator, independent system operator, and generators. The resulting capability allows a complete mapping of the flow of financial value between stakeholders that can be directly integrated with the results of demand flexibility simulations. Example results are provided for a business-as-usual case and compared to a transactive energy case as well as to actual cost data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solar, Wind, and Load Forecasting Dataset for MISO, NYISO, and SPP Balancing Areas

The Performance-based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) program is an initiative intended to foster "a fundamental shift in grid management rooted in an understanding of asset risk and system risk" (ARPA-E 2020). Launched by the Advanced Research Projects Agency-Energy (ARPA-E), the program supports efforts to incorporate uncertainty in electric power decision making. In support of PERFORM, the National Renewable Energy Laboratory (NREL) has produced a set of time-coincident forecasts of solar, wind, and load profiles. As part of Phase I of the PERFORM effort, NREL created a dataset that consists of one year of time-coincident load, wind, and solar actuals and probabilistic forecasts based on data from the Electric Reliability Council of Texas (ERCOT) (Bryce et al. 2023). In Phase II, NREL developed similar datasets for three other U.S. Independent System Operators (ISO): the Midcontinent Independent System Operator (MISO), the New York Independent System Operator (NYISO), and the Southwest Power Pool (SPP).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Economic viability of using thermal energy storage for flexible carbon capture on natural gas power plants

Fossil fuel-based power plants generate 80% of the electricity in the United States and provide a reliable generation source for both base and peak power demands. These plants are expected to adapt to changes in environmental policies that will require carbon management with carbon capture and storage (CCS) representing a possible solution. Current solvent-based CCS has a detrimental impact on a power plant's performance due to large heat loads required for carbon capture solvent regeneration. This parasitic load restricts the power plant's output and operation flexibility. Therefore, this study evaluates the feasibility of using thermal storage technologies for natural gas combined cycle (NGCC) power plants coupled with CCS to minimize the impact of solvent regeneration and enable the plant to operate at peak power output. Thermal storage can minimize the impact of CCS on the power plant by providing the heat load required for solvent regeneration during times of peak demand which will allow the plant to operate unrestricted and at full power. In total, fifteen unique thermal storage configurations were evaluated from three thermal storage categories: Brayton cycle heat pump, vapor compression heat pump, and heat recovery steam generator steam extraction for storage. The viability of these systems was determined by evaluating each configuration on thousands of real-world Locational Marginal Pricing (LMP) profiles from the New York Independent System Operator and California Independent System Operator electricity markets using a techno-economic analysis. Afterwards, results were compared to the performance of a base power plant (NGCC with CCS and no thermal storage) to determine the impact of thermal storage on power plant economics. Overall, six of the thermal storage configurations performed better than base CCS enabled power plant on between 11.5% and 38.7% of the LMP signals evaluated. The best performing configuration was a vapor compression heat pump that used flue gas as the working fluid and had both hot and cold thermal storage units. This configuration performed better than the base CCS power plant on 38.7% of the LMP profiles. The results of this study show thermal storage can mitigate the economic impact of carbon capture solvent regeneration on NGCC power plants. Discussion focuses on the impact of electricity pricing on the optimal thermal storage system, the advantages and disadvantages of the systems evaluated, and identifies limitations with the study.

25 ENERGY STORAGE↗

LAF-Net: A Deep Residual and Cross-Attention Framework for Day-Ahead Load Forecasting: Preprint

Accurate day-ahead load forecasting is essential for reliable power system operations and market efficiency. System operators such as the Midcontinent Independent System Operator (MISO) rely on forecasts from multiple vendors, yet combining them effectively remains a persistent challenge due to vendor-specific biases. This paper presents a novel LSTM-Attention Fusion Network with Error Representation (LAF-Net) that enhances day-ahead hourly load forecasting through deep residual learning and multi-modal cross-attention. The proposed model builds a historical error memory from past vendor performance and dynamically queries it with future hour context to generate adaptive, hour-specific trust weights for each vendor. A bounded residual correction further refines forecasts by mitigating systematic and temporally localized errors. Tested on real MISO LBA data with multi-vendor forecasts, LAF-Net consistently outperforms the best vendor baseline across all 38 LBAs, achieving more than a 40% reduction in system-level mean absolute error (MAE) during peak load hours relative to the best vendor baseline.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of Wildfires on Solar Generation, Reserves and Energy Prices

Wildfire seasons in the Western U.S. become more prolonged and intense in recent years bringing significant variability and uncertainty of solar generation. It greatly challenges the bulk power system and electricity market operation managed by California Independent System Operator (CAISO) as California leads both the wildfire records and the solar power integration. This study presents a screening-level analysis of the impact of wildfires on solar generation, operating reserve and energy prices applying historical real-world wildfire and market operation data. To the best of the authors knowledge, it is a first-of-its-kind study and will lay the foundation for market impact quantification and wildfire mitigation strategies design based on projected wildfire activities in future years.

electricity price↗

Use of Machine Learning on PMU Data for Transmission System Fault Analysis

Synchrophasor technology has been used for monitoring, control, and protection of bulk power system for over 10 years. Deployment of phasor measurement units (PMUs) in the USA power system has surpassed 3000 units installed in the transmission substations as stand-alone intelligent electronic devices (IEDs) or as a software add-on to other devices such as digital protective relays (DPRs) or digital fault recorders (DFRs). By now, thousands of terabytes of PMU data may have been captured and stored by various transmission system operators (TSOs) and independent system operators (ISOs). This creates an opportunity to deploy advanced machine learning (ML) techniques to detect and classify faults recorded by PMUs automatically to be used by the system operators for rapid, critical decision-making when manual analysis of the past or unfolding events is not feasible. In this paper we offer a brief background on how the automated fault analysis may be done using DPR and/or DFR data, and compare some of the legacy approaches to the new ML approaches in the context of the system-wide PMU recordings. We then offer insights from developing practical ML solutions that have been applied on field recordings captured by close to 450 PMUs from all three US interconnections (Western, Eastern and ERCOT) over two years (2016-2017). We identify and illustrate ML challenges we addressed: inaccurate data, data with scarce and temporally imprecise fault labels, data recorded by PMUs sparsely located at substations resulting in the fault records taken afar from the ends of the faulted lines, data containing only positive sequence values, and data taken at different voltage levels. We then illustrate the ML model results for fault analysis under different application scenarios. The novelty of this study is not only in the design, implementation, and performance analysis of the ML algorithms, but also in the use of advanced fault modelling and simulation approaches to improve the training results when developing supervised ML models for fault detection and classification. Extensive simulations of faults were conducted on a 14-bus power system to create a training dataset with over 1400 accurately labelled faults. This dataset was applied to enhance the accuracy of fault detection and classification of machine learning-based models trained with small number of labelled faults in large datasets recorded in the grid interconnections ranging from 5,000 to 70,000 buses.

Synchrophasors, Machine Learning, Fault Analysis, ↗

Providing Ramping Service with Wind to Enhance Power System Operational Flexibility

This project develops an innovative, integrated, and transformative approach to mitigate the impact of wind ramping by providing flexible ramping products from wind power. The project will significantly contribute to the reduction of wind integration costs by making wind power dispatchable and allowing the efficient management of wind ramping characteristics. In addition, we collaborated with industry to test and validate the methodology, considering economic and reliability goals, by integrating the proposed methodology into the simulated market frameworks of two independent system operators: California Independent System Operator and the Electric Reliability Council of Texas.

17 WIND ENERGY↗

Co-simulation Framework for Community-scale Building-grid Integration [SWR-21-75]

Distributed energy resources (DERs), including rooftop solar, energy storage, and flexible loads, are gaining popularity as costs decline and as building owners and utilities realize their benefits. DERs can improve distribution system efficiency, help prevent the need for expensive grid upgrades, and increase the resilience of local communities. However, they can also cause difficulties in grid operations and can require controls to achieve their benefits. To address this challenge, NREL researchers have developed a community-scale solution that assesses the impacts of DERs and their control strategies on a distribution system. The framework has been shown to reduce solar photovoltaic (PV) curtailment to 0%, mitigate the adverse impact of solar variability on the distribution voltage, and provide up to 5-day critical load support during emergency events. Utilizing 5 different modules representing the feeder, buildings, home energy management systems, an aggregator, and a utility controller, NREL expects this simulation technology to play a critical role in the continued integration of DERs. According to the Energy Information Administration (EIA), solar curtailments accounted for 94% of the total energy curtailed in the California Independent System Operator (CAISO) in 2020. By enabling Independent System Operators (ISOs) and utility operators to bring solar curtailments to 0%, the electrical grid can become less dependent on fossil-fueled power generation sources. NREL's co-simulation framework contains five major components: Distribution Feeder Model: describes the distribution feeder topology using OpenDSS, including the locations of all DERs. Residential Building Model: simulates a large number of buildings at a high resolution using OCHRETM. The model is equipped to control equipment based on signals from an external module. The model includes major household appliances such as HVAC and a water heater, non-dispatchable load models, a distributed PV system, and a home battery system. Home Energy Management System: optimizes the controls for the devices in a home using foreseeTM. The control can adjust based on the user preferences including cost, comfort, and convenience. In hierarchical control scenarios, where the houses follow signals from an aggregator, the home energy management system provides a flexibility band with a range of power and follows the dispatch signals received from aggregator. Community-Level Aggregator: solves for optimal energy dispatch based on the flexibility bands received from each home and the grid service signal received from the utility controller. Utility-Level Controller: provides grid signals for voltage control using Distributed Energy Resources (DERs), such as solar systems, in the community.

Balamurugan, Sivasathya Pradha↗

Electricity Market of the Future: Potential North American Designs Without Fuel Costs

Electricity markets across the United States and Canada have evolved since their inception in the late 1990s and early 2000s. Not all states and provinces moved toward restructured organized electricity markets, but rather those that have belonged to markets operated by independent system operators (ISOs) and regional transmission organizations, with designs developed through stakeholder processes and approved through state, provincial, or federal agencies, such as the Federal Energy Regulatory Commission (FERC).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Solar and Load Forecasting Incorporating HD Sky Imaging (Phase III)

Due to rapidly changing sky conditions, the available solar irradiance for energy generation is subject to wide swings in amplitude. As the market penetration of solar energy continues to increase rapidly, these variations in solar power generation are beginning to have an impact on grid stability and increased wear on power switches. Solar power forecasting plays a critical role in operations for Independent System Operators (ISOs) and utilities. Accurate forecasts help maintain grid reliability, optimize generation from renewables, and reduce operating costs. Of particular interest to the ISOs and utilities are sudden changes in solar irradiance, termed “ramp events,” due to the movement of clouds. One significant impact of ramp events on the grid is additional ancillary service requirements necessary to manage such variability. Ramp events can also cause voltage fluctuations in the distribution grids and trigger actions of automated line equipment (e.g., tap changers), leading to additional maintenance costs. In high penetration solar regions, forecasts must be made for both transmission-connected and distribution-connected resources – either behind the meter or in front of it. Particularly for distributed solar energy resources, forecasting can be a challenge due to the lack of visibility of the energy resource. Brookhaven National Laboratory (BNL) has been working towards nowcasting Global Horizontal Irradiance (GHI) using low-cost technologies for several years now. The Solar NowCasting technology being developed by BNL is a 0 – 30 min solar “nowcasting” technology applicable to a scale covering both large generating facilities and residential, distributed solar installations that relies on a network of ground-based high-definition (HD) cameras and surface pyranometers. GHI forecasts are being produced for both regions using 8 ground-based HD cameras and at least 2 surface pyranometers. When stitched together, the camera images can be used to forecast the impact of clouds on available solar irradiance over a domain of ~50 km 2 . Phase I of the project was the engineering scale up conceptual design stage. Phase II was the initial field test and demonstration, in which the technology was scaled up by a factor of 20 times and successfully demonstrated in eastern Long Island. In Phase III, an additional forecasting network was added in upstate NY and both networks are currently being operated until at least a full year of data is gathered by the Albany network to allow for the collection of sufficient data to evaluate performance against the persistence and smart persistence models using the Solar Arbiter.

14 SOLAR ENERGY↗

Deployment Feasibility Futures Analysis of Natural Gas Combined Cycle with Carbon Capture in Five U.S. Regions

A broad suite of technologies will be required to enable the United States to meet the current goal of a zero-carbon power sector by 2035, while continuing to provide the U.S. consumer with reliable, secure, stable, and affordable electricity. This study was conducted to evaluate the competitiveness of a natural gas combined cycle (NGCC) with carbon capture and storage (CCS) in five independent system operating areas, the PJM interconnection (PJM) regional transmission organization, Midcontinent Independent System Operator (MISO), Western Electricity Coordinating Council’s (WECC) Northwest Power Pool (NWPP) region, the Electric Reliability Council of Texas (ERCOT) and the SERC Reliability Corporation (SERC) in the 2030 to 2035 time horizon. The modeling and simulation efforts focused on determining the dispatch characteristics and the economic feasibility of constructing an NGCC plant with CCS in each of those regions. The analysis indicates that a NGCC system with CCS can be economically viable in the ERCOT and PJM regions. Additional revenue stream and/or capacity payments are required in MISO, NWPP, and SERC to enable successful commercial deployment of a NGCC with CCS.

Pickenpaugh, Gavin↗

Los Angeles Air Force Base Vehicle-to-Grid Demonstration (Final Project Report)

Electrification of non-tactical vehicle fleets represents a key efficiency and energy security objective for the United States Department of Defense. To achieve electrification, the department targeted vehicle-to-grid services as a way to decrease the overall cost of operating the vehicle fleet and achieve rough parity with traditional internal combustion engine vehicle fleets. This report describes efforts to aggregate a fleet of bi-directional electric vehicles and charging stations to provide regulation up and regulation down in the California Independent System Operator ancillary services market. A 29-vehicle electric vehicle demonstration fleet, consisting of mixed purpose and duty vehicles such as sedans, pickups, vans, and medium-duty trucks, was deployed at the Los Angeles Air Force base. The fleet provided frequency regulation to the California Independent System Operator’s wholesale electricity market to determine the capability of recouping some of the additional costs of procuring electric vehicles and their supporting infrastructure. Lawrence Berkeley National Laboratory, with its partner Kisensum, LLC, developed the fleet scheduling, optimization, and control software to allow the vehicle fleet at the air force base to participate in the ancillary services markets. This report focuses on the control software and market interactions, the significant challenges faced and solutions devised to address them, and examines the potential of using the electric vehicle fleet as an energy storage resource for the base buildings, an application known as vehicle-tobuilding, in providing demand response and emergency backup power. The report discusses key findings related to providing frequency regulation to the California Independent System Operator market, electric vehicle fleet performance, compatibility of varying resource parameters of vehicle fleet aggregation, the need for automated methods for communicating hour-ahead energy bidding, challenges related to battery capacity and charge/discharge rates, and monthly settlement revenue.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Grid Edge Visibility: Gaps and a Road Map

Behind-The-Meter (BTM) resources at the grid edge are rapidly becoming an important component of the electric grid, requiring a substantial reconfiguration of traditional grid practices, such as policy changes, market redesign, and infrastructure upgrades. This adjustment is challenged by the fact that, by definition, grid edge elements are not easily observable by grid control entities. Increasing the visibility of these resources is therefore an important goal, one that is experiencing much research and discussion by various power system stakeholders. For example, policy makers are analyzing the tradeoffs of using grid edge meters to impose charges on grid edge electricity generation. System operators, such as the Midcontinent Independent System Operator (MISO) in the United States, can identify visibility information on the electrical location and the size of the grid edge resources as a critical consideration across the transmission-and-distribution (T&D) spectrum. This article summarizes the challenges and needs of grid entities resulting from the introduction of grid edge resources as well the gaps in the extant grid edge visibility frameworks.

behind-the-meter↗

Modeling and Optimizing Pumped Storage in a Multi-stage Large Scale Electricity Market under Portfolio Evolution

To leverage the fast-ramping capability of resources to provide great value to the grid, electricity system operators such as the Midcontinent Independent System Operator (MISO) continue to evolve their approaches for integrating energy storage resources, including pumpedstorage hydro (PSH), into the electricity markets. However, new challenges arise in modeling and optimizing these energy-limited resources across multiple market clearing processes and planning studies with uncertainties and imperfect information. For instance, current market practices of PSH owners specifying pumping/generating hours can result in sub-optimal generation dispatch. Letting grid operators optimize PSH with the consideration of multiple operating modes and energy limitation constraints can potentially bring economic benefits to both the system and the PSH owners. However, in multi-stage clearing process of electricity markets, utilizing the PSH flexibility to deal with realized uncertainties can cause deviation in the multi-stage scheduling processes. The resulting financial risks from the schedule deviation may not be acceptable to PSH owners. In addition, to effectively utilize this energy limited resource, the state of charge (SOC) constraints of PSH needs to be continuously optimized and the marginal cost of deviation need to reflect the expected cost to purchase or sell energy at future times to compensate for deviations. This project aims to develop a prototype enhanced PSH model and improved price signals in the multi-stage market clearing process with proper consideration of the unique characteristics of PSH, in order to better align underlying PSH capabilities with evolving grid needs, particularly including the needs for more frequent and larger cycling to manage variability and uncertainty from renewables.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DSO+T: Transactive Energy Coordination Framework (DSO+T Study: Volume 3)

This report describes a transactive energy coordination scheme designed to integrate into existing day-ahead and real-time wholesale energy markets. This scheme was evaluated in the Distribution System Operator with Transactive (DSO+T) study to assess the engineering and economic performance of the transactive energy coordination of a large-scale deployment of distributed energy resources (DER). Transactive agents were developed for a range of DERs (heating, ventilation, and air conditioning units, water heaters, batteries, and electric vehicles) that optimize flexibility over a 48-hour horizon and adjust their strategy in response to changes in real-time prices. A transactive energy coordination scheme, executed by a DSO retail market operator, aggregates these DER bids from participating customers and clears them against a DSO supply curve using a double auction market mechanism. The process of constructing the price-quantity DSO supply curve includes distribution-level transportation constraints (for example, substation congestion limits) and forecast locational marginal price of the DSO’s connected transmission node. The resulting day-ahead and real-time quantities are then bid into a competitive wholesale market operated by an independent system operator. This report also details additional capabilities for proper marketplace simulation such as wholesale price, weather, and load forecasting. The report concludes with a discussion of lessons learned and key design features required to ensure successful operation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗