Machine Learning-Based PV Reserve Determination Strategy for Frequency Control on the WECC System: Preprint

Frequency control from Photovoltaic (PV) plants has great potential to address the frequency response challenge of the power system with high renewable penetration. However, using model-based approaches to determine the optimal PV headroom reserve requires significant online computation and is intractable for an interconnection level system. This paper proposes a machine learning based strategy, that is suitable for real-time operation, to determine the optimal PV reserve for frequency control. The proposed machine learning algorithm is trained and tested on 1,987 offline simulations of a 60% renewable penetration Western Electricity Coordinating Council (WECC) system. Furthermore, the proposed reserve determination strategy is applied on a realistic one-day operation profile of the WECC system and demonstrates over 40% PV headroom saving compared to a conservative approach. It is evident that the proposed strategy can efficiently and effectively determine the optimal PV frequency control reserve for realistic interconnection systems.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Distribution Feeder-Scale Fast Frequency Response via Optimal Coordination of Net-load Resources Part II: Large-Scale Demonstration

This work is the second of a two-part series in which we develop and experimentally demonstrate a hierarchical control solution for optimally coordinating thousands of deferrable loads and distributed energy resources (DERs) to provide fast frequency response (FFR) from an entire distribution feeder. In Part I, we developed and proved practical algorithms for fast, cost-based optimal dispatch and for determining the optimal amount of headroom to operate solar inverters with to support FFR dispatch while minimizing opportunity cost. Simulation results in Part I demonstrated the advantages of the hierarchical dispatch approach in being able to maintain fast solution times needed for FFR even when the problem size increases. In Part II, we implement the algorithms developed in Part I in a novel, large-scale power hardware-in-the-loop experiment including embedded controllers and more than 100 powered appliance loads and DER connected to a simulated real-world distribution system with more than 10,000 controlled devices. Experimental results from multiple scenarios confirm that the optimal FFR dispatch approach scales well and can optimally coordinate more than 10,000 net-load resources across a distribution network while achieving hardware response times within 500 ms, which is not possible using state-of-the-art optimal coordination approaches.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Regional Real-Time PV Spinning Reserve Estimator

Curtailed photovoltaic (PV) generation is a zero-marginal-cost spinning reserve that can be used for a number of active power control services. Unlike traditional spinning reserve providers, however, i.e., fossil-fueled generators, which have well-defined operating characteristics, e.g., available headroom or potential high limit (PHL), PV plants have by nature variable and uncertain operating characteristics. To ensure the effective coordination between PV plants and the system operator during an active power control event, accurate knowledge of the PV PHL is essential. It ensures that enough headroom is reserved by the PV plants to deliver the award services in real time and informs feasible dispatch decisions made by the market operator. To tackle this challenge, a novel reference-control grouping-based PV plant reserve estimation method has been proposed by the National Renewable Energy Laboratory under past projects funded by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office. The estimation method separates inverters within a plant into two groups: a control group and a reference group. While the reference group is reserved to operate at its PHL, the control group can be curtailed to provide the grid services. Real-time outputs from the reference inverters are used to estimate the PHL for the whole plant based on the ratio between capacities of the reference group and of the plant. This work further enhances the methodology by (1) improving the model accuracy through machine learning; (2) automating the reference inverter selection through correlation analysis; (3) considering estimation look-ahead windows; and (4) applying to regional spinning reserve estimation. Significant performance improvement has been observed based on real-world data collected by CAISO, Southern Company, and Terabase Energy. Compared with the original scaling method, the newly proposed machine learning-based approach reduces the estimation errors by 30% and 13% at the plant level and region level, respectively. Results obtained from this project are intended to be used by grid operators, market operators, balancing authorities, and PV plant owners and operators to facilitate PV participation in ancillary service markets. Regulators, policymakers, and system planners can also consider the results of this work in their decision-making processes. In addition to the performance improvement on the existing reference-control based grouping method, we also investigated how the variability of PV generation from a single PV inverter can be used to represent the variability of PV generation at the plant level.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution Feeder-Scale Fast Frequency Response via Optimal Coordination of Net-load Resources Part I: Solution Design

This work is the first of a two-part series that develops and experimentally demonstrates a first-of-its-kind hierarchical control solution for optimally dispatching thousands of deferrable loads and distributed energy resources (DERs) across a distribution feeder to provide fast frequency response (FFR) within 500 ms to the bulk power system. This approach rapidly coordinates resources online after a frequency event occurs, allowing fast-changing, behind-the-meter (BTM) resources to be incorporated and aggregate FFR power set points to be achieved more quickly and accurately than existing approaches. We also present a solution for determining the optimal amount of headroom to operate solar inverters with to minimize opportunity cost while ensuring the FFR response viability of a building with the inverter and deferrable loads. In Part I, we develop practical algorithms for fast, cost-based optimal dispatch at multiple aggregation scales (single building, multiple buildings, and full distribution feeder), establish their optimality, and demonstrate via simulation that they are faster than state-of-the-art, coordinated frequency response approaches. In Part II, the entire platform is implemented and experimentally verified using a unique power hardware-in-the-loop demonstration, including more than 100 powered loads and DERs connected to a real-world distribution network model and over 10,000 net-load resources dispatched.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance Evaluation of Intelligent Solar Control Software Through Hardware-in-the-Loop (CRADA Final Report)

Recent research has highlighted the potential for solar to act as a zero-marginal-cost and zero-emission flexibility resource on the bulk power system when operated with advanced control systems. To increase the performance of these systems, leading technologies, including machine learning (ML) and hierarchical inverter set point allocation, have been developed by Latimer Controls, Inc. to estimate the headroom of large PV plants for grid operation and control; however, these technologies lack comprehensive validation under real-world application scenarios. Latimer Controls, Inc. received two voucher awards for research at a national laboratory from the Department of Energy American Made Solar Prize Round 6. The National Renewable Energy Laboratory (NREL) was selected to collaborate with Latimer staff to conduct a performance evaluation of Latimer PV control software. The NREL team will develop a hardware-in-the-loop (HIL) testbed to perform testing and validation of the Latimer PV control technology in a de-risked yet realistic testbed environment. Latimer and NREL worked together to analyze the test data, draw conclusions from the results, and disseminate the resulting scientific findings. In this CRADA work, we propose to test and validate the real-world application of the Latimer Control solution in an HIL environment. We evaluate the performance of different flexible solar technologies in responding to automatic generation control signals in a closed-loop fashion. In particular, a data-driven potential high limit (PHL) estimation is developed for large solar plants to accurately estimate their headroom so that they have fast and short-time regulation and control capability to participate in grid services and respond to grid signals in real time (e.g., AGC). This PHL estimation algorithm is embedded in a hardware power plant controller (PPC) and tested with an IEEE-39 bus system model developed in RTDS. To account for the varying cloud conditions and diverse inverter dispatches, we developed a 135-MW PV plant with detailed modeling of 27 individual PV modules and inverters using RTDS. The real-world communications used in such big plants, such as ModBus TCP/IP for inverter level and DNP3 for plant level, were developed to emulate the real-world applications in big PV plants. The ML-based PHL estimation method is tested under nine separate weather scenarios against the ‘reference-control’ solution, hereafter referred to as the baseline solution. The baseline method reserves a subset of inverters (reference group) to operate at their PHL at all times and dispatches only the remaining inverters (control group) at curtailed levels to fulfill the flexibility need. Despite being successfully piloted by NREL in California in 2017 and Chile in 2020, there exist two gaps in the state of the art to fully unlock the flexibility of PV plants: a. There is a trade-off between the PHL estimation accuracy and the flexibility range. b. There lacks granularity in the PHL estimation to capture the variation across inverters. The Latimer solution seeks to address these gaps by applying machine learning methods to improve PHL estimation accuracy while accounting for variability at every inverter. Performance metrics were taken from the 2023 Georgia Power CARES utility-scale RFP. The results demonstrate that the ML-based approach outperforms the traditional baseline method in PHL estimation accuracy for 7 of 9 scenarios. The average PHL error across the nine scenarios was 7.40% for the ML-based method, 2.06% less than the 9.46% PHL error average across scenarios that was exhibited by the baseline method. Additionally, the PHL error was below 5% for at least 95% of the testing interval for 3 of 9 tested intervals with the ML approach, whereas it did not achieve this metric for any of the baseline tests. Overall, simulation results indicate the superior performance of an ML-based approach compared to the conventional baseline reference-control approach, showcasing its potential to support grid stability and operational efficiency. This laboratory HIL testing using real PPC, representative power system simulation models in real-time with detailed PV plant and inverter models, and real-world communication protocols gives us confidence that this machine learning based PHL estimation algorithm works well in the hardware PPC and therefore de-risks future field commissioning. The end goal of this project is to advance grid technology to address the grid operation challenges brought by solar plant’s variability and uncertainties in power generation.

14 SOLAR ENERGY↗

On Secured Spinning Reserve Deployment of Energy-Limited Resources Against Contingencies

Featured with fast response abilities and high ramp rates, energy storage systems (ESS), such as pumped-storage hydropower (PSH) plants and battery storage systems (BSS), are considered as key first-responders to provide spinning reserve in response to system contingencies. However, ESSs are energy-limited resources, and their sustained spinning reserve deployment is restricted by the stored energy and available capacity. Indeed, the spinning reserve deployment against contingencies may deviate actual state-of-charge (SOC) from the scheduled value, inducing potential SOC boundary violations and non-dispatchability in later hours. This paper proposes the post-contingency operation model and the spinning reserve secure constraints to address these issues. The post-contingency operation model describes that spinning reserve from ESSs is promptly deployed when contingency occurs, and then gradually substituted by quick-start units when they are switched online. By leveraging this operation strategy, spinning reserve secure constraints in terms of SOC headrooms are adopted to guarantee its deplorability. Furthermore, a modified IEEE 118-bus system with multiple PSHs and BSSs is used to verify the proposed approach.

13 HYDRO ENERGY↗