Engineering PapersSearch

SEARCH · Engineering Papers

Results for “ground source heat pumps”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Coalition for Community-Supported Affordable Geothermal Energy Systems (C2SAGES)

The C2SAGES project evaluated the feasibility of a community geothermal system for the planned Windy Ridge affordable housing development in Hinesburg, Vermont. Led by GTI Energy with Vermont Gas Systems, LN Consulting, NREL, and Frontier Energy, the work assessed technical design, energy performance, costs, business models, community engagement, maintenance, workforce development, and permitting. The proposed system was designed to serve 100% of the development’s heating, cooling, and domestic hot water loads. Compared with a baseline using air-source heat pumps and natural gas water heating, the geothermal system was estimated to reduce HVAC and domestic hot water energy use by about 45% to 48%, lower operating and maintenance costs, and reduce 30-year life-cycle costs by 37% for Phase 1 and 10% for Phase 2. Technical testing and modeling indicated that the Windy Ridge site is suitable for a community-scale geothermal system. The project also developed borehole field layouts, piping concepts, pump house designs, controls, maintenance plans, and supporting engineering drawings. The business model analysis found that first cost, ownership structure, and customer affordability remain major deployment challenges. Utility-led maintenance and operation were viewed favorably, but traditional utility cost-recovery models may require subsidy or revised financing structures to be practical for affordable housing. Community engagement highlighted the need for clear public education, transparent financing, reliable long-term maintenance, trained technicians, and the potential to pair geothermal systems with weatherization. Overall, the report concludes that community geothermal is technically feasible and offers meaningful energy, emissions, and life-cycle cost benefits, but broader deployment will depend on workable financing models and workforce readiness.

15 GEOTHERMAL ENERGY

Preliminary Assessment for the Electric Load Shifting Potential of Integrating Thermal Energy Storage with Heat Pumps in Residential Buildings in Texas of United States

The widespread adoption of electric-driven heat pumps for heating and cooling is expected to significantly increase electric demand. Cooling electric demand will result in an increase in peak hours electric loads, placing additional strain on the grid during peak hours. This challenge, combined with the current rapidly increasing demand from data centers, exacerbates the electric demand duck curve problem. Integrating thermal energy storage (TES) with heat pump can shift electric use for heating and cooling from peak to off-peak hours of the electric grid, which can help flatten the daily electric demand profile of a building. This paper presents a novel design that integrates heat pump with TES (HP-TES), which uses phase change materials (PCM). Heat pump charges TES by melting or freezing PCM during off-peak hours when there is no thermal demand from the building. TES is then discharged (i.e., by freezing or melting PCM) during peak hours to provide a more favorable heat source or heat sink for the heat pump to meet the thermal demand of the building with lower electricity use than conventional air-source heat pumps. Computer simulations were developed to predict the performance of HP-TES applied to a typical single-family house in the US. The building-level simulation results were scaled up to preliminarily assess the aggregated impacts of deploying HP-TES across all single-family houses in Texas of the United States, including reduction of peak demand of the electric grid.

Anees, Fady [ORNL]

Plant Engineers Solar Energy Handbook: Southern California Region

Discussed in order after the introduction are solar components and systems (collectors, storage, service hot water systems, space heating with liquid and air systems, space cooling, heat pumps and controls); computer programs for system optimization; local solar and weather data; a description of buildings and plants in Southern California applying solar technology; current Federal and California solar legislation; standards, codes and performance testing information; a listing of manufacturers, distributors, and professional services available in Southern California region; and information access. Finally, solar design check lists for those engineers who wish to design their own systems. The program for the Solar Workshop for the Plant Engineer, March 30, 1978, Los Angeles, California is included.

14 SOLAR ENERGY

Ductless Heat Pump Program

The Verde Ductless Heat Pump (DHP) Program expanded access to high-efficiency electric heating and cooling technologies for households in priority communities within the Portland Metro area. Funded by the U.S. Department of Energy’s Building Technologies Office (DE-EE0010132), the program combined residential ductless heat pump deployment with community-based outreach, participant support, contractor partnerships, and system development to improve program delivery.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

ResStock Measure Documentation: Residential Two-Stage Geothermal Heat Pump (4.0 COP, 20.5 EER) With Light Envelope Improvements

This report is part of series describing a variety of different ResStock(TM) measures. "Measures" refers to energy efficiency retrofits that can be applied to buildings during modeling. This documentation covers the "Residential Two-Stage Geothermal Heat Pump (4.0 COP, 20.5 EER) With Light Envelope Improvements" measure upgrade methodology and briefly discusses key results. All results can be accessed on the ResStock Open Energy Data Initiative "End-Use Load Profiles for the U.S. Building Stock" data lake and on the data viewer at resstock.nlr.gov.

15 GEOTHERMAL ENERGY

ResStock Measure Documentation: Residential Variable-Speed Geothermal Heat Pump (4.4 COP, 30.9 EER) With Light Envelope Improvements

This report is part of series describing a variety of different ResStock™ measures. "Measures" refers to energy efficiency retrofits that can be applied to buildings during modeling. This documentation covers the "Residential Variable-Speed Geothermal Heat Pump (4.4 COP, 30.9 EER) with Light Envelope Improvements" measure upgrade methodology and briefly discusses key results. All results can be accessed on the ResStock Open Energy Data Initiative "End-Use Load Profiles for the U.S. Building Stock" data lake and on the data viewer at resstock.nlr.gov.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Case Study of Integrating High-Temperature Heat Pump with LiBr-H2O Absorption Chiller for Data Center Liquid Cooling

Data centers (DCs) are physical infrastructures that support artificial intelligence workloads. The rapid growth of artificial intelligence is putting substantial pressure on the US power grid. Most of electricity consumed by IT equipment, accounting for 50%-60% of total DC power, ultimately becomes waste heat. This heat is dissipated by DC’s cooling facilities, accounting for an additional 30%-40% of total DC power. Recovering and repurposing this waste heat offers a significant opportunity to enhance energy efficiency and reduce operating costs of DCs. One potential pathway is converting heat to cold using thermal-driven absorption chillers, therefore, reducing the power consumption in DC cooling facilities. Existing studies mainly demonstrate the technical and economic feasibility of repurposing DC’s waste heat for cooling applications but provide limited technical details on how to integrate the thermal-driven absorption chillers with DC cooling systems. In addition, the low-grade waste heat available from DCs must be upgraded to higher temperatures suitable for absorption chillers. This paper presents a case study on integrating high-temperature heat pumps with a LiBr-H2O absorption chiller to use DC waste heat for cooling. A thermodynamic model of single-effect, LiBr-H2O absorption chiller and an empirical model of high-temperature heat pumps were built. The case study considers ASHRAE W17 liquid-cooled DC, with facility service water supplied at 17.0℃ and returned at 25.3℃. The thermal behaviors of absorption chiller components were predicted for the generation temperature ranging from 75.0℃ to 115.0℃. Based on the available waste heat in the integrated system, two waste heat recovery strategies were evaluated: a facility service water-based strategy and cooling water-based strategy. Results indicated that the cooling water-based strategy achieves higher Coefficient of Performance (COPs) than the facility service water-based strategy. The relatively low cooling COPs of single-effect LiBr-H2O absorption chillers could be offset by high heating COP of high temperature heat pumps. The maximum cooling COP of absorption chiller and the overall COP of integrated systems occur at lower generation temperatures, but these conditions also yield lower cooling capacities. In practice, system operation should balance the trade-off between the COP and cooling capacity

Wang, Pengtao [ORNL] (ORCID:0000000214713429)

Time evolution of a pumped molecular magnet—A time-resolved inelastic neutron scattering study

Introducing an experimental technique of time-resolved inelastic neutron scattering (TRINS), we explore the time-dependent effects of resonant pulsed microwaves on the molecular magnet Cr 8 F 8 Piv 16 . The octagonal rings of magnetic Cr 3+ atoms with antiferromagnetic interactions form a singlet ground state with a weakly split triplet of excitations at 0.8 meV. A 4.6 tesla field was applied to tune the splitting between two members of the triplet excited level |1$\rangle$ ↔ |2$\rangle$ to resonance with 105 GHz (0.434 meV) microwaves. The time-dependent occupations of the ground state |0$\rangle$, lower lying levels |1$\rangle$ and |2$\rangle$, and higher energy states |λ ≥ 3$\rangle$ were extracted during and after 20 s long microwave pulses incident along the (101) direction of a Cr 8 F 8 Piv 16 crystal held at 1.9 K. At significantly elevated spin temperatures, we found underpopulation relative to thermal equilibrium of |2$\rangle$ and spin-lattice thermalization time scales ranging from 1.6(2) s to 5.7(2) s depending on the power level. This contrasts with the relaxation time τ 1 (T → 0) = 27(5) 𝛍 s inferred for |2$\rangle$ from in situ Electron Spin Resonance measurements. By probing a broad range of excited states during intense microwave pumping, TRINS thus provides a first view of long lived excited states in a molecular antiferromagnet.

Science & Technology - Other Topics

Evaluating alternative steam generation pathways in the food industry

Steam generation in the food sector requires substantial energy and cost expenditures, requiring nearly half of its energy intake. Here, we used life cycle assessment and life cycle cost assessment to investigate the cost and energy impacts of steam generating alternatives: NG, biomass and hydrogen boilers and grid-supplied and self-generated electric steam generation systems (electric boilers, renewable thermal energy storage and industrial heat pumps). The analysis starts with a set of average U.S. conditions, where biomass boilers are the most cost-competitive alternative to NG. In a series of scenarios beyond average conditions, the analysis shows energy procurement costs dominate the total life cycle cost for all technologies and, unfortunately, are highly variable geographically and temporally, significantly affecting the viability of the alternatives. Results show that site-energy consumption ranges from 0.3 MMBtu/klb for industrial heat pumps to 1.6 MMBtu/klb for biomass boilers, with heat pumps achieving up to 78% lower energy use compared to natural gas systems. For the steam costs, the results show a range between $\$$8 and $\$$50/klb for NG, with biomass following closely ($\$$11 – $\$$44/klb) and grey hydrogen and IHP next ($\$$13 – $\$$33/klb and $\$$6 - $\$$78/klb), with cost reductions if IHP's cooling is utilized. Factors like operating hours, the need for cooling, and the ability to negotiate utility rates complicate the decision, making site-specific analyses critical. Therefore, we present a decision-making matrix to help manufacturers identify which steam generating technology is the best business decision for their situation. Overall, these results highlight the importance of steam generation for the facility's organizational goals, as well as the criticality of conducting individual site analyses.

Biomass boilers

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Ultrafast low-temperature metal–insulator interface phonon dynamics and heat transport in a Pt/Gd 3 Fe 5 O 12 heterostructure

Interfacial thermal and acoustic phenomena have an important role in quantum science and technology, including in spintronic and spincaloritronic materials and devices. Simultaneous measurements of the low-temperature thermal and acoustic properties of a metal/insulator heterostructure reveal distinct dynamics in the characteristic phonon frequency ranges of acoustic and thermal transport. The measurements probed a heterostructure consisting of a thin film of Pt on the ferrimagnetic insulator gadolinium iron garnet (Gd 3 Fe 5 O 12 , GdIG) grown epitaxially on a gadolinium gallium garnet substrate. Ultrafast structural dynamics within the Pt layer were tracked using time-resolved ultrafast x-ray diffraction and analyzed to probe interfacial acoustic and thermal properties. The rapid heating of the Pt layer by a 400 nm wavelength femtosecond-duration optical pulse produced transient structural changes that provided the stimulus for these measurements. Rapid heating produced a broadband acoustic pulse that was partially reflected by the Pt/GdIG interface. Temporal frequencies up to 740 GHz, corresponding to angular frequencies of several THz, were detected in a wavelet analysis of the acoustic oscillations of the strain in the Pt layer. The structural results were analyzed to determine (i) the acoustic damping coefficient and phonon mean free path in Pt at frequencies of hundreds of GHz and (ii) the Grüneisen anharmonicity parameter. The thermal conductance of the Pt/GdIG interface was tracked using the slower, tens-of-picosecond-scale, dynamics of the initial cooling of the heated Pt layer. Analysis using a model based on the Boltzmann transport equation shows that the phonon transmission is lower at the phonon frequencies relevant to thermal transport than for subterahertz regime acoustics.

Acoustic phenomena

Metrology for femtosecond pulsed x-ray heating in diamond anvil cell experiments at the European XFEL: Revisiting the iron phase diagram up to 150 GPa

The development of pulsed intense x-ray sources, such as free electron laser, offers new avenues for high pressure experiments. Here, we study the feasibility and metrology of x-ray heating in diamond anvil cells at the European x-ray free electron laser. This method enables one to volumetrically heat the sample while inhibiting chemical migration and probing the crystallographic structure of the sample throughout the heating with a high repetition rate. We focus our study on iron, whose phase diagram is well established up to 100 GPa, to explore the possibilities and limitations of this technique. We volumetrically heat iron samples at starting pressures ranging from 10 to 138 GPa, using the x-ray beam pulsed at 4.5 MHz in a serial pump-and-probe experimental design. Experimental challenges arise from temperature gradients within the sample, changes in temperature at the 100 ns timescale, the difficulty of direct temperature estimates, the effect of thermal pressure, and the presence of metastable crystallites due to rapid cycles of heating and cooling. Hence, we develop a multi-crystal-like data processing method that allows us to account for sample heterogeneity in probed conditions. We then calibrate our measurements using known physical properties of iron under pressure. Thermal pressure in our experiments increases from 4% of the isochoric prediction at 10 GPa to 23% at 138 GPa, and we show that our data are in agreement with most previous observations of iron in this pressure range. The method can now be implemented at higher pressures and temperatures and on materials with unknown phase diagrams.

Materials science

Technoeconomic Studies for the Rorex Creek Pumped Storage Hydro Project: An Evaluation of New Pumped Storage Hydro in the Tennessee Valley Authority System

This report evaluates the economic viability of the proposed 1,200 MW, 23,365 MWh Rorex Creek Pumped Storage Hydro (PSH) plant that would be located near Pisgah, Alabama. In addressing this question, this study has developed processes, models and data that better value PSH from a utility perspective, more specifically a vertically integrated utility, enabling optimal PSH design and deployment. This study is designed to enhance TVA’s toolset in making PSH investment decisions and contribute to the design of a more cost-effective, stable future grid. These techniques can then be applied to a broader range of assets and utilities.

Cohen, Stuart

Techno-Economic Evaluation of a 600MW Pumped Storage Hydropower Plant using the Pumped Storage Hydropower Valuation Tool

This paper presents a techno-economic evaluation of the proposed 600 MW, 8-hour Craig – Hayden pumped storage hydropower project using the U.S. Department of Energy’s Pumped Storage Hydropower Valuation Tool. The analysis integrates plant technical characteristics, regional grid conditions, and market-based operating assumptions to quantify stacked value streams from energy arbitrage, capacity, ancillary services, transmission congestion relief, and reliability. Both price taker and price influencer frameworks are applied to examine the impact of market participation and system interactions on lifecycle economic performance using Benefit - Cost Analysis and Multi - Criteria Decision Analysis. The results show that the price taker approach provides higher revenue estimates based on exogenous price signals, while the price influencer approach captures production cost savings, renewable curtailment reduction, and market price formation, yielding more conservative but system-representative outcomes. The study demonstrates the strategic value of long-duration PSH for enhancing operational flexibility, resource adequacy, and grid reliability in a high-renewable Western Interconnection.

Bhattacharyya, Arjun [ORNL] (ORCID:000900060976046

Self‐Propelling Macroscale Sheets Powered by Enzyme Pumps

Nanoscale enzymes anchored to surfaces act as chemical pumps by converting chemical energy released from enzymatic reactions into spontaneous fluid flow that propels entrained nano‐ and microparticles. Enzymatic pumps are biocompatible, highly selective, and display unique substrate specificity. Utilizing these pumps to trigger self‐propelled motion on the macroscale has, however, constituted a significant challenge and thus prevented their adaptation in macroscopic fluidic devices and soft robotics. Using experiments and simulations, we herein show that enzymatic pumps can drive centimeter‐scale polymer sheets along directed linear paths and rotational trajectories. In these studies, the sheets are confined to the air/water interface. With the addition of appropriate substrate, the asymmetric enzymatic coating on the sheets induces chemically driven, buoyancy flows that controllably propel the sheet's motion on the air/water interface. The directionality and speed of the motion can be tailored by changing the pattern of the enzymatic coating, type of enzyme, and nature and concentration of the substrate. This work highlights the utility of biocompatible enzymes for generating motion in macroscale fluidic devices and robotics and indicates their potential utility for in vivo applications.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH