In an open-loop groundwater heat pump (GHP) system, groundwater is extracted, run through a heat exchanger, and injected back into the ground, resulting in no mass balance changes to the flow system. Although the groundwater use is non-consumptive, the withdrawal and injection of groundwater may cause negative hydraulic and thermal impacts to the flow system. Because GHP is a relatively new technology and regulatory guidelines for determining environmental impacts for GHPs may not exist, consumptive use metrics may need to be used for permit applications. For consumptive use permits, a radius of influence is often used, which is defined as the radius beyond which hydraulic impacts to the system are considered negligible. In this paper, the hydraulic radius of influence concept was examined using analytical and numerical methods for a non-consumptive GHP system in southeastern Washington State. At this location, the primary hydraulic concerns were impacts to nearby contaminant plumes and a water supply well field. The results of this study showed that the analytical techniques with idealized radial flow were generally unsuited because they over predicted the influence of the well system. The numerical techniques yielded more reasonable results because they could account for aquifer heterogeneities and flow boundaries. In particular, the use of a capture zone analysis was identified as the best method for determining potential changes in current contaminant plume trajectories. The capture zone analysis is a more quantitative and reliable tool for determining the radius of influence with a greater accuracy and better insight for a non-consumptive GHP assessment.
Purpose: To counter the deleterious effects of weightlessness on the cardiopulmonary system, astronauts living on the International Space Station exercise on a variety of countermeasure equipment including the Cycle Ergometer Vibration Isolation and Stabilization System (CEVIS). Operational since 2001, the onboard CEVIS will be replaced by a new model, known as Teal CEVIS (TC). As a part of ground evaluation, TC hardware underwent human-in-the-loop (HITL) testing to verify the TC hardware produces workloads that elicit physiologic responses comparable to a laboratory cycle ergometer (LAB). Methods: Seven subjects (5 M/2 F) performed submaximal cycle ergometer testing with indirect calorimetry measures on TC and LAB on separate test days. Testing consisted of graded 30 watt increases in workload until subjects reached 85% of age-predicted max heart rate (HR). Exercise outcomes included rate of oxygen uptake (VO2; liters/min), rate of energy expenditure (REE; kcal/min), and HR (beats/min). Linear mixed models (LMM) were fitted to compare VO2, REE, and HR responses between devices across power outputs with fixed effects for power (P) and device (D) and with random effects for subject. LMM effect coefficients (β), std errors (SE), pseudo-partial R2 of effects (pR2), and model likelihood ratio statistics (χ2, Pr(> chisq); α<.05) are provided. Results: LMM main effects for P and D were observed for VO2 (βp=.0107, SE = .0002, pR2=0.97; βd = -0.075, SE = 0.019, pR2=0.14; χ2(1)= 13.57, p<.001), such that VO2 was higher across stages on TC. Main effects of P and D were observed for REE (βp= .0586, SE = 0.001, pR2= 0.97; βd = -0.33208, SE = 0.099, pR2= 0.056; χ2(1)=10.481, p < .01), such that REE was higher across power outputs on TC. A P x D interaction was observed for HR, along with main effects for P and D (βp x d =-0.048, SE = 0.02, pR2=0.048; βp= 0.42, SE = 0.016, pR2=0.87; χ2(1) = 5.398, p = 0.02), such that higher workloads elicited a greater difference in HR between devices. Conclusions: HITL results show, TC elicits greater physiologic responses across power outputs compared to LAB. However, pR2 for device effects show small differences between devices. Therefore, TC can be expected to provide appropriate physiological stimulus across workloads and be considered a reliable tool to mitigate the effects of weightlessness.
Systems for very long-duration human missions to Mars will be designed to operate reliably for many years and many of these systems will never be returned to Earth. The need for high reliability is driven by the requirement for safe functioning of remote, long-duration crewed systems and also by unsympathetic abort scenarios. Abort from a Mars mission could be as long as 450 days to return to Earth. The key to developing a human-in-the-loop architecture is a development process that allows for a logical sequence of validating successful development in a stepwise manner, with assessment of key performance parameters (KPPs) at each step; especially important are KPPs for technologies evaluated in a full systems context with human crews on Earth and on space platforms such as the ISS. This presentation will explore the implications of such an approach to technology development and validation including the roles of ground and space-based testing necessary to develop a highly reliable system for long duration human exploration missions. Historical development and systems testing from Mercury to the International Space Station (ISS) to ground testing will be reviewed. Current work as well as recommendations for future work will be described.
This paper is concerned with the application of optimal estimation and control concepts to the ground alignment of inertial platforms subjected to random sway motion. A seventh-order Kalman filter has been designed for estimating the platform misalignments and sway motion. Using the linear quadratic optimal regulator techniques, feedback controller gains have been designed to drive the initial misalignments to a small value. A reconfiguration of the filter controller scheme has been proposed and verified by Monte Carlo simulation for improving the speed of alignment without changing the alignment accuracy.
PhD project update for Graduate advisor at Texas Tech University.
This report presents a cold-climate project that examines an alternative approach to ground source heat pump (GSHP) ground loop design. The innovative ground loop design is an attempt to reduce the installed cost of the ground loop heat exchange portion of the system by containing the entire ground loop within the excavated location beneath the basement slab.
This report presents a cold-climate project that examines an alternative approach to ground source heat pump (GSHP) ground loop design. The innovative ground loop design is an attempt to reduce the installed cost of the ground loop heat exchange portion of the system by containing the entire ground loop within the excavated location beneath the basement slab.
This paper presents monthly performance metrics of a 7.56 kW (2.16 ton) GSHP serving the space conditioning loads of a 251m2 (2700ft2) residential home with a phase change material in its envelope, and a single vertical-bore 94.5m (310 ft) ground loop. The same ground loop also serviced a ground source heat pump water heater. Envelope characteristics are discussed briefly in the context of reducing thermal losses. Data on entering water temperatures, energy extracted from the ground, energy delivered/removed, compressor electricity use, COP, GSHP run times (low and high compressor stages), and the impact of fan and pump energy consumption on efficiency are presented for each month. Both practical as well as research and development issues are discussed. The findings suggest that GSHPs represent a practical technology option to reduce source energy reduction and greenhouse emissions under the IECC 2012 Standard, as well as the European Union (EU) 2020 target of generating over 25% of heat consumed in the EU from renewable energy.
The problem of electromagnetic interference in scientific instruments is compounded for high-power plasma experiments by the large currents and voltages as well as by the broad bandwidths of the instruments. Ground loops are known to allow stray magnetic fields to drive large ground currents that can induce spurious signals and damage electronics. Furthermore, even when a ground loop is broken, capacitive coupling can still permit the flow of radio-frequency current, resulting in high-frequency spurious signals that can overwhelm the desired signal. We present the effects of RF ground loops on the output of vacuum photodiodes used in the Caltech Solar Loop Experiment and demonstrate the elimination of the spurious signals by diverting the ground currents away from the most vulnerable point of the signal line. Techniques for identifying the RF ground loops are also discussed. These techniques should be valuable in many high-power systems where interference from spurious coupling is an issue.
This data submission includes simulation results for ground loop heat pump systems located in 6 different cities across the United States. The cities are Boston, MA, Dayton, OH, Omaha, NE, Orlando, FL, Sacramento, CA, and St. Paul, MN. These results were obtained from the two-dimensional geothermal computer code called GEO2D. GEO2D was written as part of this DOE funded grant. The results included in this submission for each of the 6 cities listed above are: 1) specific information on the building being heated or cooled by the ground loop geothermal system, 2) some extreme values for the building heating and cooling loads during the year, 3) the inputs required to carry out the simulation, 4) a plot of the hourly building heating and cooling loads throughout the year, 5) a plot of the fluid temperature exiting the ground loop for a 20 year period, 6) a plot of the heat exchange between the ground loop and the ground for a 20 year period, and 7) ground and ground loop temperature contour plots at different times of the year for the 20 year period.
The goal of this project was to assess the feasibility of utilizing mine water as a heat sink for a geothermal heat pump system to heat and cool the 74,000 sq. ft. Illinois National Guard State Headquarters’ building in Springfield Illinois. If successful, this type of system would be less expensive to install than a traditional closed loop geothermal (ground source) heat pump system by significantly reducing the size of the well field, thus shortening or eliminate the payback period compared to a conventional system. In the end, a conventional ground loop was used for the project.
This project team analyzed supplemental heat rejection/recovery (SHR) devices or systems that could be used in hybrid ground source heat pump (HGHP) systems located in arid or semi-arid regions in southwestern U.S. Identification of effective SHR solutions would enhance the deployment of ground source heat pumps (GHP) in these regions. In a parallel effort, the team developed integrated GHP models that coupled the building load, heat pump, and ground loop subsystems and which could be applied to residential and commercial office buildings. Then GHP and HGHP performances could be compared in terms of operational performance and life-cycle costs. Several potential SHR devices were analyzed by applying two strategies: 1) to remove heat directly from the water in the ground loop before it enters the ground and 2) to remove heat in the refrigerant loop of the vapor compression cycle (VCC) of the heat pump so less heat is transferred to the water loop at the condenser of the VCC. Cooling towers, adsorption coolers, and thermoelectric liquid coolers were included in strategy 1, and expanded desuperheaters, thermosyphons, and an optimized VCC were included in strategy 2. Of all SHR devices analyzed, only the cooling tower provided a cost-effective performance enhancement. For the integrated GHP model, the project team selected the building load model HAMBASE and its powerful computational Simulink/MatLab platform, empirical performance map models of the heat pumps based upon manufacturers’ performance data, and a ground loop model developed by Oklahoma State University and rewritten for this project in Simulink/MatLab. The design process used GLHEPRO, also from Oklahoma State University, to size the borehole fields. The building load and ground loop models were compared with simulations from eQuest, ASHRAE 140-2008 standards, EnergyPlus, and GLHEPRO and were found to predict those subsystems’ performance well. The integrated GHP model was applied to a 195m 2 (2100ft 2 ) residential building and a 4,982m 2 (53,628ft 2 ) three-story commercial office building, and it ran 10-15 year simulations. The integrated GHP model and its Simulink platform provided residential data, ranging from seconds to years, and commercial office building data, ranging from minutes to years. A cooling tower model was coupled to the base case integrated GHP model for the residential building and the resulting HGHP system provided a cost-effective solution for the Austin, TX location. Simulations for both the residential and commercial building models were run with varying degrees of SHR (device/system not identified) and the results were found to significantly decrease installation costs, increase heat pump efficiency (lower entering water temperature), and prolong the lifetime of the borehole field. Lifetime cycle costs were estimated from the simulation results. Sensitivity studies on system operating performance and lifetime costs were performed on design parameters, such as construction materials, borehole length, borehole configuration and spacing, grout conductivity, and effects of SHR. While some of the results are intuitive, these studies provided quantitative estimates of improved performance and cost. One of the most important results of this sensitivity study is that overall system performance is very sensitive to these design parameters and that modeling and simulation are essential tools to design cost-effective systems.
The report presents the results of the development and field testing of a mobile test facility based on a helical magnetic cumulative generator (MCGTF). The system is designed for full-scale modeling of lightning currents to study the safety of power plants of any type, including nuclear power plants. Advanced technologies of high-energy physics for solving both engineering and applied problems underlie this pilot project. The energy from the magnetic cumulative generator (MCG) is transferred to a high-impedance load with high efficiency of more than 50% using pulse transformer coupling. Modeling of the dynamics of the MEG that operates in a circuit with lumped parameters allows one to apply the law of inductance output during operation of the MCG, thus providing the required front of the current pulse in the load without using any switches. The results of field testing of the MCGTF are presented for both the ground loop and the model load. The ground loop generates a load resistance of 2–4 Ω. In the tests, the ohmic resistance of the model load is 10 Ω. It is shown that the current pulse parameters recorded in the resistive-inductive load are close to the calculated values.
The ground source heat pump (GSHP) system is one of the most energy efficient HVAC technologies in the current market. However, the heat imbalance may degrade the ability of the ground loop heat exchanger (GLHX) to absorb or reject heat. The hybrid GSHP system, which combines a geothermal well field with a supplemental boiler or cooling tower, can balance the loads imposed on the ground loop heat exchangers to minimize its size while retaining superior energy efficiency. This paper presents a recent simulation-based study with an intention to compare multiple common control strategies used in hybrid GSHP systems, including fixed setpoint, outside air reset, load reset, and wetbulb reset. A small office in Oklahoma City conditioned by a hybrid GSHP system was simulated with the latest version of eQUEST 3.7[1]. The simulation results reveal that the hybrid GSHP system has the excellent capability to meet the cooling and heating setpoints during the occupied hours, balance thermal loads on the ground loop, as well as improve the thermal comfort of the occupants with the undersized well field.
The ground source heat pump (GSHP) system is one of the most energy efficient HVAC technologies in the current market. However, the heat imbalance may degrade the ability of the ground loop heat exchanger (GLHX) to absorb or reject heat. The hybrid GSHP system, which combines a geothermal well field with a supplemental boiler or cooling tower, can balance the loads imposed on the ground loop heat exchangers to minimize its size while retaining superior energy efficiency. This paper presents a recent simulation-based study with an intention to compare multiple common control strategies used in hybrid GSHP systems, including fixed setpoint, outside air reset, load reset, and wetbulb reset. A small office in Oklahoma City conditioned by a hybrid GSHP system was simulated with the latest version of eQUEST 3.7 [1]. In the end, the simulation results reveal that the hybrid GSHP system has the excellent capability to meet the cooling and heating setpoints during the occupied hours, balance thermal loads on the ground loop, as well as improve the thermal comfort of the occupants with the reduced size well field.
This project was initiated at a time when ground coupled heat pump systems in this region were limited in size and quantity. There were economic pressures with costs for natural gas and electric utilities that had many organizations considering ground coupled heat pumps; The research has added to the understanding of how ground temperatures fluctuate seasonally and how this affects the performance and operation of the heat pumps. This was done by using a series of temperature sensors buried within the middle of one of the vertical bore fields with sensors located at various depths below grade. Trending of the data showed that there is a lag in ground temperature with respect to air temperatures in the shoulder months, however as full cooling and heating season arrives, the heat rejection and heat extraction from the ground has a significant effect on the ground temps; Additionally it is better understood that while a large community geothermal bore field serving multiple buildings does provide a convenient central plant to use, it introduces complexity of not being able to easily model and predict how each building will contribute to the loads in real time. Additional controllers and programming were added to provide more insight into this real time load profile and allow for intelligent shedding of load via a dry cooler during cool nights in lieu of rejecting to the ground loop. This serves as a means to ‘condition’ the ground loop and mitigate thermal creep of the field, as is typically observed; and It has been observed when compared to traditional heating and cooling equipment, there is still a cost premium to use ground source heat pumps that is driven mostly by the cost for vertical bore holes. Horizontal loop systems are less costly to install, but do not perform as well in this climate zone for heating mode