Operations analysis of gravity assisted rapid transit
Gravity assisted rapid transit (GART) with 6 percent grades before and after each station are compared with conventional systems in terms of energy consumption, run time, line capacity and schedule stability under abnormal circumstances. Parametric analyses of run times and energy consumption include the impact of alternate accelerating and braking levels. The capcity analysis uses a network simulation program to determine the location and severity of all signal delays. Based on results of initial simulations, the block design was revised to eliminate bottlenecks in normal operations. The systems are then compared at headways of 80 to 180 seconds. One month of incidence reports of a modern operating transit system are reviewed to determine the failures to be simulated. The impact of failures resulting in station delays (30 to 360 seconds), speed limit reduction (20 mph and 30 mph to one or more trains), vehicle performance (75 percent acceleration) are compared at scheduled headway of 90 to 180 seconds.