Engineering PapersSearch

SEARCH · Engineering Papers

Results for “golden eagles”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Movement Models to Predict Low‐Altitude Flight of Soaring Birds Using Look‐Ahead Environmental Factors

Advances in fine-scale movement modeling of soaring birds can aid efforts to understand and resolve the impacts of anthropogenic activities on such birds. Soaring birds often rely on underlying terrain and low-altitude updrafts to govern their flights at rotor-swept altitudes (≤ 200 m above ground level), which puts them at risk of collision with wind turbines. We developed a data-driven Markov model at 1-s resolution that predicts the fine-scale flight behavior of golden eagles (Aquila chrysaetos) as a function of ecological covariates at the current location as well as those within an eagle's line of sight. We only considered ecological covariates that are readily available in real-time (ground elevation and wind conditions). Latent factors (age, sex, species, behavioral intent, migratory status) were intentionally left out of the model. We calibrated the model using golden eagle telemetry data collected in two different ecoregions of the United States. Given a starting location, the calibrated model simulates multiple stochastic 3D paths to produce a time-explicit and spatially explicit risk map of turbine collisions. We discovered an empirical relation between the rate of change of heading and the orographic updraft conditions within an eagle's line of sight. Our model performed most effectively when predicting predominantly-soaring flights at rotor-swept altitudes during wind conditions in which turbines are likely to be operational. The calibrated model could be used in concert with automated eagle detection and turbine curtailment technologies. Specifically, once an eagle is detected by those systems, our model could then provide accurate predictions of turbines the eagle is likely to interact with in the near term.

17 WIND ENERGY

Accelerating technology development to monitor and minimize effects from land‐based wind energy on birds and bats

While wind energy is a key sector of domestic energy production for the United States, operation of wind turbines directly and indirectly adversely affects certain species of birds and bats. The cumulative effect of wind turbine strikes can have both biological and regulatory consequences, and, in some cases, delay permitting and construction or affect ongoing operations. Technology can help quantify and minimize these effects, but the pace of development, acceptance, and adoption of technological solutions is slow. Although adopting cost‐effective technologies may reduce negative effects on wildlife and help achieve both energy production and conservation goals, consensus is lacking among developers, regulators, and the conservation community regarding how to define technology effectiveness and acceptance and how to develop a standardized process for doing so. Removing barriers to technology advancement requires deviating from the status quo. Changes include 1) creating incentives to mitigate impacts, 2) establishing options for research as mitigation, 3) rethinking how research is funded, 4) increasing stakeholder coordination, and 5) increasing the efficiency of research and development. We recommend the creation of a national framework to establish clear criteria and protocols for technology evaluation and adoption.

17 WIND ENERGY

Floating Photovoltaics in Hydropower Reservoirs in the United States

This report presents a comprehensive analysis of the feasibility of floating photovoltaics (FPV) in federally regulated reservoirs within the continental United States (CONUS) and to present a methodology for capturing the true costs of deployment, potential environmental impacts, and regulatory pathways for open-loop hydropower reservoirs. It is intended for stakeholders who may not be solar industry experts but who are interested in exploring the potential for FPV in their reservoirs. While there are promising opportunities, particularly in enhancing dissolved oxygen (DO) levels and potentially improving compliance with existing hydropower licenses, the current capital costs of FPV are not yet competitive with traditional land-based solar installations at the utility-scale when comparing the LCOE results. A competitive financial outlook is achievable when applying a 30% Investment Tax Credit (ITC) and considering a 5% reduction from the baseline capital expenditures (CapEx) at the Tuckertown Reservoir in North Carolina case study. The study is structured around three key pillars of research: technical potential, environmental impacts and regulatory considerations, and technoeconomic analysis. This report provides a nationwide assessment of the opportunities for FPV in terms of capacity, measured in direct current megawatts (MWDC), in reservoirs managed by the U.S. Bureau of Reclamation (USBR), the U.S. Army Corps of Engineers (USACE), and the Federal Energy Regulatory Commission (FERC). Additionally, the report introduces a heuristic model for estimating the CapEx of utility-scale FPV projects (1–100 MW), offering a baseline cost estimate for stakeholders. Finally, the report applies these models to a case study of a hydropower reservoir in North Carolina to present site-specific results.

13 - HYDRO ENERGY

On the optimal sizing of power take-off systems for wave energy converters

The power take-off (PTO) system in a wave energy converter (WEC) is the means by which the energy in an ocean wave is converted into useful energy. There has been a general lack of technology convergence in the wave energy industry and PTO design has been largely device-specific with the design process determined by the WEC developer. An optimized PTO design can significantly affect the efficiency, reliability, performance, and overall cost and viability of a device. There remains a need in the marine energy industry for best practices and efficient design processes to be identified as it could greatly benefit developers and researchers in designing an optimal WEC PTO. This research utilizes the open-source Matlab-Simulink based software, WEC-Sim, which was developed by the National Renewable Energy Laboratory, and the Eagle, a high-performance computing system, to model and optimize two WECs of different archetypes and then investigates if any trends exist that can be exploited for greater efficiency in optimal PTO design. The results from this research indicate that there may be an optimal sizing for WEC PTOs for both power and PTO force rating and that substantial reductions can be made in the cost of a device without significant loss in the energy produced. Furthermore this optimal sizing may be independent of WEC type and deployment location. With an optimal, or near optimal, approach to WEC PTO sizing demonstrated, a methodology is proposed to address the challenge of nameplate ratings in the wave energy industry.

13 HYDRO ENERGY

Validation of the NLR Pumped Storage Hydropower Cost Model

The National Laboratory of the Rockies (NLR) first released its pumped storage hydropower (PSH) cost model in 2023 as the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The PSH cost model cannot replace detailed site-level studies and design, but it is important to validate it against other industry PSH cost estimates. The initial model methodology report validated the cost model for a single proposed site, the Eagle Mountain Project in California. This slide deck documents an expanded validation exercise using cost data from six other sites: Goldendale (Washington), Seminoe (Wyoming), Gordon Butte (Montana), Swan Lake (Oregon), White Pine (Oregon), and Lewis Ridge (Kentucky). It compares itemized costs from Federal Energy Regulatory Commission (FERC) applications and other reported costs with NLR PSH cost model outputs after customizing inputs for each site. The validation exercise finds that the NLR model's conservative indirect cost assumptions often drive overall cost overestimation, with direct cost comparisons typically agreeing more closely. All cost model estimates are well within an Association for the Advancement of Cost Engineering (AACE) Class 5 estimation range (-50% to +100%), with five within the AACE Class 4 range (-30% to +50%) and four being within 15%. This result is considered reasonable performance for a parametric model applied at a preliminary design stage.

13 HYDRO ENERGY