Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “function unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

CIT photoheliograph functional verification unit test program

Tests of the 2/3-meter photoheliograph functional verification unit FVU were performed with the FVU installed in its Big Bear Solar Observatory vacuum chamber. Interferometric tests were run both in Newtonian (f/3.85) and Gregorian (f/50) configurations. Tests were run in both configurations with optical axis horizontal, vertical, and at 45 deg to attempt to determine any gravity effects on the system. Gravity effects, if present, were masked by scatter in the data associated with the system wavefront error of 0.16 lambda rms ( = 6328A) apparently due to problems in the primary mirror. Tests showed that the redesigned secondary mirror assembly works well.

Source record↗

Ultrawideband Electromagnetic Interference to Aircraft Radios: Results of Limited Functional Testing With United Airlines and Eagles Wings Incorporated, in Victorville, California

On February 14, 2002, the FCC adopted a FIRST REPORT AND ORDER, released it on April 22, 2002, and on May 16, 2002 published in the Federal Register a Final Rule, permitting marketing and operation of new products incorporating UWB technology. Wireless product developers are working to rapidly bring this versatile, powerful and expectedly inexpensive technology into numerous consumer wireless devices. Past studies addressing the potential for passenger-carried portable electronic devices (PEDs) to interfere with aircraft electronic systems suggest that UWB transmitters may pose a significant threat to aircraft communication and navigation radio receivers. NASA, United Airlines and Eagles Wings Incorporated have performed preliminary testing that clearly shows the potential for handheld UWB transmitters to cause cockpit failure indications for the air traffic control radio beacon system (ATCRBS), blanking of aircraft on the traffic alert and collision avoidance system (TCAS) displays, and cause erratic motion and failure of instrument landing system (ILS) localizer and glideslope pointers on the pilot horizontal situation and attitude director displays. This report provides details of the preliminary testing and recommends further assessment of aircraft systems for susceptibility to UWB electromagnetic interference.

Ely, Jay J.↗

Software error data collection and categorization

Software errors detected during development of an interactive special purpose editor system were studied. This product was followed during nine months of coding, unit testing, function testing, and system testing. A new error categorization scheme was developed.

Ostrand, T. J.↗

Stress Prediction System

NASA wanted to know how astronauts' bodies would react under various gravitational pulls and space suit weights. Under contract to NASA, the University of Michigan's Center for Ergonomics developed a model capable of predicting what type of stress and what degree of load a body could stand. The algorithm generated was commercialized with the ISTU (Isometric Strength Testing Unit) Functional Capacity Evaluation System, which simulates tasks such as lifting a heavy box or pushing a cart and evaluates the exertion expended. It also identifies the muscle group that limits the subject's performance. It is an effective tool of personnel evaluation, selection and job redesign.

Source record↗

Initial Field Deployment Results of Green PCB Removal from Sediment Systems (GPRSS)

The goal of this task order was to complete optimization and development of the Green PCB Remediation from Sediment Systems(GPRSSs) technology, culminating in the production of functioning demonstration test units which would be deployed at a suitable demonstration location. This location would be selected in conjunction with Toxicological & Ecological Associates who have entered into a SAA with NASA to partner with and further develop this technology. The GPRSSs technology was initially developed under ESC Task Order 83 with the purpose of providing a green remediation technology capable of in-situ removal and remediation of polychlorinated biphenyls (PCBs) from contaminated sediments. The core concept of the technology, a polymeric blanket capable of absorbing PCBs when in contact with contaminated sediments was then transitioned to Task Order 165 where the primary objective was to fully design and optimize a functioning test unit capable of testing the theoretical and laboratory scale concepts in a real world situation. Results from both task orders are included in this report for completeness, although Task Order 165 focused on the blanket design and the small scale field demonstration in which is currently still ongoing in Altavista, VA.

Deployment↗

End-to-end test of the electron-proton spectrometer

A series of end-to-end tests were performed to demonstrate the proper functioning of the complete Electron-Proton Spectrometer (EPS). The purpose of the tests was to provide experimental verification of the design and to provide a complete functional performance check of the instrument from the excitation of the sensors to and including the data processor and equipment test set. Each of the channels of the EPS was exposed to a calibrated beam of energetic particles, and counts were accumulated for a predetermined period of time for each of several energies. The counts were related to the known flux of particles to give a monodirectional response function for each channel. The measured response function of the test unit was compared to the response function determined for the calibration sensors from the data taken from the calibration program.

Cash, B. L.↗

Detection and avoidance of errors in computer software

The acceptance test errors of a computer software project to determine if the errors could be detected or avoided in earlier phases of development. GROAGSS (Gamma Ray Observatory Attitude Ground Support System) was selected as the software project to be examined. The development of the software followed the standard Flight Dynamics Software Development methods. GROAGSS was developed between August 1985 and April 1989. The project is approximately 250,000 lines of code of which approximately 43,000 lines are reused from previous projects. GROAGSS had a total of 1715 Change Report Forms (CRFs) submitted during the entire development and testing. These changes contained 936 errors. Of these 936 errors, 374 were found during the acceptance testing. These acceptance test errors were first categorized into methods of avoidance including: more clearly written requirements; detail review; code reading; structural unit testing; and functional system integration testing. The errors were later broken down in terms of effort to detect and correct, class of error, and probability that the prescribed detection method would be successful. These determinations were based on Software Engineering Laboratory (SEL) documents and interviews with the project programmers. A summary of the results of the categorizations is presented. The number of programming errors at the beginning of acceptance testing can be significantly reduced. The results of the existing development methodology are examined for ways of improvements. A basis is provided for the definition is a new development/testing paradigm. Monitoring of the new scheme will objectively determine its effectiveness on avoiding and detecting errors.

Kinsler, Les↗

Vacuum Plasma Spray (VPS) Forming of Solar Thermal Propulsion Components Using Refractory Metals

The Thermal Spray Laboratory at NASA's Marshall Space Flight Center has developed and demonstrated a fabrication technique using Vacuum Plasma Spray (VPS) to form structural components from a tungsten/rhenium alloy. The components were assembled into an absorber cavity for a fully-functioning, ground test unit of a solar then-nal propulsion engine. The VPS process deposits refractory metal onto a graphite mandrel of the desired shape. The mandrel acts as a male mold, forming the required contour and dimensions of the inside surface of the deposit. Tungsten and tungsten/25% rhenium were used in the development and production of several absorber cavity components. These materials were selected for their high temperature (greater than 25000 C [greater than 4530 F]) strength. Each absorber cavity comprises 3 coaxial shells with two, double-helical flow passages through which the propellant gas flows. This paper describes the processing techniques, design considerations, and process development associated with forming these engine components.

Zimmerman, Frank R.↗

Vacuum Plasma Spray (VPS) Forming of Solar Thermal Propulsion Components Using Refractory Metals

The Thermal Spray Laboratory at NASA's Marshall Space Flight Center has developed and demonstrated a fabrication technique using Vacuum Plasma Spray (VPS) to form structural components from a tungsten/rhenium alloy. The components were assembled into an absorption cavity for a fully-functioning, ground test unit of a solar thermal propulsion engine. The VPS process deposits refractory metal onto a graphite mandrel of the desired shape. The mandrel acts as a male mold, forming the required contour and dimensions of the inside surface of the deposit. Tungsten and tungsten/25% rhenium were used in the development and production of several absorber cavity components. These materials were selected for their high temperature (less than 2500 C) strength. Each absorber cavity comprises 3 coaxial shells with two, double-helical flow passages through which the propellant gas flows. This paper describes the processing techniques, design considerations, and process development associated with forming these engine components.

Zimmerman, Frank↗

Unit Testing and Remote Display Development

The Kennedy Space Center is currently undergoing an extremely interesting transitional phase. The final Space Shuttle mission, STS-135, was completed in July of 2011. NASA is now approaching a new era of space exploration. The development of the Orion Multi- Purpose Crew Vehicle (MPCV) and the Space Launch System (SLS) launch vehicle that will launch the Orion are currently in progress. An important part of this transition involves replacing the Launch Processing System (LPS) which was previously used to process and launch Space Shuttles and their associated hardware. NASA is creating the Spaceport Command and Control System (SCCS) to replace the LPS. The SCCS will be much simpler to maintain and improve during the lifetime of the spaceflight program that it will support. The Launch Control System (LCS) is a portion of the SCCS that will be responsible for launching the rockets and spacecraft. The Integrated Launch Operations Applications (ILOA) group of SCCS is responsible for creating displays and scripts, both remote and local, that will be used to monitor and control hardware and systems needed to launch a spacecraft. It is crucial that the software contained within be thoroughly tested to ensure that it functions as intended. Unit tests must be written in Application Control Language (ACL), the scripting language used by LCS. These unit tests must ensure complete code coverage to safely guarantee there are no bugs or any kind of issue with the software.

LCS↗

Electrical Characterization of the RCA CDP1822SD Random Access Memory, Volume 1, Appendix a

Electrical characteristization tests were performed on 35 RCA CDP1822SD, 256-by-4-bit, CMOS, random access memories. The tests included three functional tests, AC and DC parametric tests, a series of schmoo plots, rise/fall time screening, and a data retention test. All tests were performed on an automated IC test system with temperatures controlled by a thermal airstream unit. All the functional tests, the data retention test, and the AC and DC parametric tests were performed at ambient temperatures of 25 C, -20 C, -55 C, 85 C, and 125 C. The schmoo plots were performed at ambient temperatures of 25 C, -55 C, and 125 C. The data retention test was performed at 25 C. Five devices failed one or more functional tests and four of these devices failed to meet the expected limits of a number of AC parametric tests. Some of the schmoo plots indicated a small degree of interaction between parameters.

Klute, A.↗

Command and Control System Automated Testing

The Kennedy Space Center (KSC) has developed its own Command and Control System for the launch of the Space Launch System (SLS) and Orion capsule. The Command and Control System (CCS) is used by console engineers for the launch and system checkout of aerospace vehicles. The CCS allows console engineers to read data from the flight hardware on the launch pad and from the ground control systems and allows console engineers to issue commands, like opening a valve, to the flight hardware and ground control systems. The CCS needs to interact with thousands of devices and hardware controllers for the spacecraft and ground systems, receive data from these devices, distribute the data to console engineers in real-time, and allow console engineers to issue commands to manipulate hardware on the launch pad. The system needs to be robust, fault tolerant, responsive, and fast. In order to keep up with the pace of development of the CCS, a Test Automation System (TAS) is needed to validate the integrity of the system as a whole along with its individual components. Automated tests allow for faster development time, since tests can be ran through a Continuous Integration system and allow developers to check their code faster. Currently, the different modules, classes, and functions that make up the CCS are tested at the unit level, and the system level, with all the modules working together. My project was to implement a system for the data protocol layer of the Command Control System to be tested as a complete functional unit, with all of its classes and functions working together, but independent of the other modules of the CCS.

Automated TestingTest Automation↗

Environmental Test Screening Procedure

This procedure describes the methods to be used for environmental stress screening (ESS) of the Lightning Mapper Sensor (LMS) lens assembly. Unless otherwise specified, the procedures shall be completed in the order listed, prior to performance of the Acceptance Test Procedure (ATP). The first unit, S/N 001, will be subjected to the Qualification Vibration Levels, while the remainder will be tested at the Operational Level. Prior to ESS, all units will undergo Pre-ESS Functional Testing that includes measuring the on-axis and plus or minus 0.95 full field Modulation Transfer Function and Back Focal Length. Next, all units will undergo ESS testing, and then Acceptance testing per PR 460.

Zeidler, Janet↗

Unit Testing for Command and Control Systems

Unit tests were created to evaluate the functionality of a Data Generation and Publication tool for a command and control system. These unit tests are developed to constantly evaluate the tool and ensure it functions properly as the command and control system grows in size and scope. Unit tests are a crucial part of testing any software project and are especially instrumental in the development of a command and control system. They save resources, time and costs associated with testing, and catch issues before they become increasingly difficult and costly. The unit tests produced for the Data Generation and Publication tool to be used in a command and control system assure the users and stakeholders of its functionality and offer assurances which are vital in the launching of spacecraft safely.

testing↗

Performance Testing of a Trace Contaminant Control Subassembly for the International Space Station

As part of the International Space Station (ISS) Trace Contaminant Control Subassembly (TCCS) development, a performance test has been conducted to provide reference data for flight verification analyses. This test, which used the U.S. Habitation Module (U.S. Hab) TCCS as the test article, was designed to add to the existing database on TCCS performance. Included in this database are results obtained during ISS development testing; testing of functionally similar TCCS prototype units; and bench scale testing of activated charcoal, oxidation catalyst, and granular lithium hydroxide (LiOH). The present database has served as the basis for the development and validation of a computerized TCCS process simulation model. This model serves as the primary means for verifying the ISS TCCS performance. In order to mitigate risk associated with this verification approach, the U.S. Hab TCCS performance test provides an additional set of data which serve to anchor both the process model and previously-obtained development test data to flight hardware performance. The following discussion provides relevant background followed by a summary of the test hardware, objectives, requirements, and facilities. Facility and test article performance during the test is summarized, test results are presented, and the TCCS's performance relative to past test experience is discussed. Performance predictions made with the TCCS process model are compared with the U.S. Hab TCCS test results to demonstrate its validation.

Perry, J. L.↗

Initial Field Deployment Results of Green PCB Removal from Sediment Systems (GPRSS)

Purpose of Study: (a) Develop/optimize technology capable of removing PCBs from contaminated sediments; (b) Develop design for functional GPRSS unit; (c) Produce and prove functionality of prototype units in a laboratory settings; (d) Produce fully-functional GPRSS units for testing at a demonstration site in Altavista, VA; and (e) Evaluate efficacy of GPRSS technology for the remediation of PCB-contaminated sediments.

Initial Field↗