Engineering PapersSearch

SEARCH · Engineering Papers

Results for “financial”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Integrated Financial Management Program

Having worked in the Employees and Commercial Payments Branch of the Financial Management Division for the past 3 summers, I have seen the many changes that have occurred within the NASA organization. As I return each summer, I find that new programs and systems have been adapted to better serve the needs of the Center and of the Agency. The NASA Agency has transformed itself the past couple years with the implementation of the Integrated Financial Management Program (IFMP). IFMP is designed to allow the Agency to improve its management of its Financial, Physical, and Human Resources through the use of multiple enterprise module applications. With my mentor, Joseph Kan, being the branch chief of the Employees and Commercial Payments Branch, I have been exposed to several modules, such as Travel Manager, WebTads, and Core Financial/SAP, which were implemented in the last couple of years under the IFMP. The implementation of these agency-wide systems has sometimes proven to be troublesome. Prior to IFMP, each NASA Center utilizes their own systems for Payroll, Travel, Accounts Payable, etc. But with the implementation of the Integrated Financial Management Program, all the "legacy" systems had to be eliminated. As a result, a great deal of enhancement and preparation work is necessary to ease the transformation from the old systems to the new. All this work occurs simultaneously; for example, e-Payroll will "go live" in several months, but a system like Travel Manager will need to have information upgraded within the system to meet the requirements set by Headquarters. My assignments this summer have given me the opportunity to become involved with such work. So far, I have been given the opportunity to participate in projects resulting from a congressional request, several bankcard reconciliations, updating routing lists for Travel Manager, updating the majordomo list for Travel Manager approvers and point of contacts, and a NASA Headquarters project involving improper payments on firm fixed price contracts. Each of the projects that I have worked on this summer presents a different aspect of the work performed on a regular basis by members of this branch. Not only do I get to see the "big picture" of what occurs within the organization, but I also get to experience the "little stuff" that goes on here and throughout the NASA Agency.

Pho, Susan

Financial issues for commercial space ventures: Paying for the dreams

Various financial issues involved in commercial space enterprise are discussed. Particular emphasis is placed on the materials processing area: the current state of business plan and financial developments, what is needed for enhanced probability of success of future materials development efforts in attracting financial backing, and finally, the risks involved in this entire business area.

Egan, J. J.

A study of the financial history of the U.S. scheduled airlines and the improvement of airline profitability through technology

The financial history of the U.S. scheduled airline industry was investigated to determine the causes of the erratic profit performance of the industry and to evaluate potential economic gains from technology advances of recent years. Operational and economic factors affecting past and future profitability of the industry are discussed, although no attempt was made to examine the profitability of individual carriers. The results of the study indicate that the profit erosion of the late 1960's and early 1970's was due more to excess capacity than to inadequate fare levels, but airline problems were severely compounded by the rapid fuel price escalation in 1974 and 1975. Near-term solutions to the airline financial problems depend upon the course of action by the industry and the CAB and the general economic health of the nation. For the longer term, the only acceptable alternative to continued fare increases is a reduction in unit operating costs through technological advance. The next generation of transports is expected to incorporate technologies developed under Government sponsorship in the 1960's and 1970's with significant improvements in fuel consumption and operating costs.

Wilcox, D. E.

Need for, and financial feasibility of, satellite-aided land mobile communications

Questions regarding the role of a mobile-satellite system in augmenting the terrestrial communications system are considered, and a market assessment study is discussed. Aspects of an investment analysis are examined, taking into account a three phase financial study of four postulated land Mobile Satellite Service (LMSS) systems, project profitability evaluation methods, risk analysis methods, financial projections, potential investor acceptance standards, and a risk analysis. It is concluded that a satellite augmented terrestrial mobile service appears to be economically and technically superior to a service depending exclusively on terrestrial systems. The interest in the Mobile Satellite Service is found to be worldwide, and the ground equipment market is potentially large.

Castruccio, P. A.

User's operating procedures. Volume 2: Scout project financial analysis program

A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

Harris, C. G.

Analysis of the financial factors governing the profitability of lunar helium-3

Financial factors influencing the profitability of the mining and utilization of lunar helium-3 are examined. The analysis addressed the following questions: (1) which financial factors have the greatest leverage on the profitability of He-3; (2) over what range can these factors be varied to keep the He-3 option profitable; and (3) what ultimate effect could this energy source have on the price of electricity for U.S. consumers. Two complementary methods of analysis were used in the assessment: rate of return on incremental investment required and reduction revenue requirements (total cost to customers) achieved. Some of the factors addressed include energy demand, power generation costs with and without fusion, profitability for D-He(3) fusion, annual capital and operating costs, launch mass and costs, He-3 price, and government funding. Specific conclusions are made with respect to each of the companies considered: utilities, lunar mining company, and integrated energy company.

Kulcinski, G. L.

Application of the Hilbert-Huang Transform to Financial Data

A paper discusses the application of the Hilbert-Huang transform (HHT) method to time-series financial-market data. The method was described, variously without and with the HHT name, in several prior NASA Tech Briefs articles and supporting documents. To recapitulate: The method is especially suitable for analyzing time-series data that represent nonstationary and nonlinear phenomena including physical phenomena and, in the present case, financial-market processes. The method involves the empirical mode decomposition (EMD), in which a complicated signal is decomposed into a finite number of functions, called "intrinsic mode functions" (IMFs), that admit well-behaved Hilbert transforms. The HHT consists of the combination of EMD and Hilbert spectral analysis. The local energies and the instantaneous frequencies derived from the IMFs through Hilbert transforms can be used to construct an energy-frequency-time distribution, denoted a Hilbert spectrum. The instant paper begins with a discussion of prior approaches to quantification of market volatility, summarizes the HHT method, then describes the application of the method in performing time-frequency analysis of mortgage-market data from the years 1972 through 2000. Filtering by use of the EMD is shown to be useful for quantifying market volatility.

Huang, Norden

Financial feasibility of water conservation in agriculture

Global water use for food production needs to be reduced to remain within planetary boundaries, yet the financial feasibility of crucial measures to reduce water use is poorly quantified. Here, we introduce a novel method to compare the costs of water conservation measures with the added value that reallocation of water savings might generate if used for expansion of irrigation. Based on detailed water accounting through the use of a high-resolution hydrology-crop model, we modify the traditional cost curve approach with an improved estimation of demand, increasing marginal cost per water conservation measure combination and add a correction to control for impacts on downstream water availability. We apply the method to three major river basins in the Indo-Gangetic plain (Indus, Ganges and Brahmaputra), a major global food producing region but increasingly water stressed. Our analysis shows that at basin level only about 10% (Brahmaputra) to just over 20% (Indus and Ganges) of potential water savings would be realised; the equilibrium price for water is too low to make the majority of water conservation measures cost effective. The associated expansion of irrigated area is moderate, about 7% in the Indus basin, 5% in the Ganges and negligible in the Brahmaputra, but farmers' gross profit increases more substantially, by 11%. Increasing the volumetric cost of irrigation water influences supply and demand in a similar way and has little influence on water reallocation. Controlling for the impact on return flows is important and more than halves the amount of water available for reallocation.

Geography / Land Utilization

Airport Economics: Management Control Financial Reporting Systems

The development of management control financial reporting systems for airport operation is discussed. The operation of the system to provide the reports required for determining the specific revenue producing facilities of airports is described. The organization of the cost reporting centers to show the types of information provided by the system is analyzed.

Buchbinder, A.

Detailed requirements document for the Interactive Financial Management System (IFMS), volume 1

The detailed requirements for phase 1 (online fund control, subauthorization accounting, and accounts receivable functional capabilities) of the Interactive Financial Management System (IFMS) are described. This includes information on the following: systems requirements, performance requirements, test requirements, and production implementation. Most of the work is centered on systems requirements, and includes discussions on the following processes: resources authority, allotment, primary work authorization, reimbursable order acceptance, purchase request, obligation, cost accrual, cost distribution, disbursement, subauthorization performance, travel, accounts receivable, payroll, property, edit table maintenance, end-of-year, backup input. Other subjects covered include: external systems interfaces, general inquiries, general report requirements, communication requirements, and miscellaneous. Subjects covered under performance requirements include: response time, processing volumes, system reliability, and accuracy. Under test requirements come test data sources, general test approach, and acceptance criteria. Under production implementation come data base establishment, operational stages, and operational requirements.

Dodson, D. B.

An approach to improve management visibility within the procurement and financial group at Goldstone

Improvements in the operational efficiency of the data management systems at the Goldstone Deep Space Communications Complex (GDSCC) are discussed. This addresses the existing procurement and financial management data system at GDSCC, identifies management requirements for better visibility, describes a proposed computerized data management system, summarizes results to data, and identifies plans for future development.

Maiocco, F. R.

An automated library financial management system

A computerized library acquisition system developed for control of informational materials acquired at NASA Ames Research Center is described. The system monitors the acquisition of both library and individual researchers' orders and supplies detailed financial, statistical, and bibliographical information. Applicability for other libraries and the future availability of the program is discussed.

Dueker, S.

Government financial support for civil aircraft research, technology and development in four European countries and the United States

Data on the levels of government financial support for civil aircraft airframe and engine (CAAE) research and technology (R&T) in the United States and Europe (United Kingdom, West Germany, France and The Netherlands) and means of comparing these levels are provided. Data are presented for the years 1974-1977. European R&T expenditure data were obtained through visits to each of the four European countries, to the Washington office of the European Communities, and by a search of applicable literature. CAAE R&T expenditure data for the United States were obtained from NASA and Federal Aviation Administration (FAA).

Chandler, B.

Recommendations for an Executive Information System (EIS) for the NASA Accounting and Financial Information System (NAFIS)

The objectives were to: (1) survey state-of-the-art computing architectures, tools, and technologies for implementing an Executive Information System (EIS); (2) review MSFC capabilities and efforts in developing an EIS for Shuttle Projects Office and the Payloads Project Office; (3) review management reporting requirements for the NASA Accounting and Financial Information System (NAFIS) Project in the areas of cost, schedule, and technical performance, and insure that the EIS fully supports these requirements; and (4) develop and implement a pilot concept for a NAFIS EIS. A summary of the findings of this work is presented.

Goss, Ernest Preston

Financial options methodology for analyzing investments in new technology

The evaluation of investments in longer term research and development in emerging technologies, because of the nature of such subjects, must address inherent uncertainties. Most notably, future cash flow forecasts include substantial uncertainties. Conventional present value methodology, when applied to emerging technologies severely penalizes cash flow forecasts, and strategic investment opportunities are at risk of being neglected. Use of options evaluation methodology adapted from the financial arena has been introduced as having applicability in such technology evaluations. Indeed, characteristics of superconducting magnetic energy storage technology suggest that it is a candidate for the use of options methodology when investment decisions are being contemplated.

Wenning, B. D.

The Role of Capital Productivity in British Airways' Financial Recovery

British Airways (BA) was privatised in 1987, but its financial recovery occurred a number of years earlier. This recovery was sustained throughout the early 1990s economic recession, a period when few major airlines were operating profitably. This paper examines the role of productivity developments at British Airways from the early 1980s through 1996. The emphasis is on capital productivity and investment, but changes in capital intensity and labour productivity are also evaluated. Various measures are considered for both capital and labour productivity: outputs are measured in available tonne-kms (ATKS) and revenue tonne-kms (RTKs), with the former preferred over the latter two measures, after adjustment for work performed by BA for others. Capital inputs are measured in equivalent lease costs adjusted to constant prices with a different treatment of flight and ground equipment or assets. Labour inputs are derived from total payroll costs deflated by a UK wage price index. The airline made considerable capital investments over the period and at the same time went through two major processes of labour restructuring. This resulted in a gradual increase in capital intensity, relative high labour productivity growth, but poor capital productivity performance. However, capital investment played an important role in the airline's sustained labour and total factor productivity over the whole period.

Morrell, Peter