AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Report for Task 11 & 12: Components and Capabilities of the Resiliency Driven Outage Management and Feeder Restoration System (Deliverable D8))

This report provides progress update for the development of a outage management, feeder restoration, and restoration action feasibility check modules as part of the AGGREGATE project. Details for integration with controllability module, data driven situational awareness of network and distributed energy resources as well cyber security plan for these modules integrated with GE ADMS are also presented in the report. These three modules for outage management, feeder restoration, and restoration action feasibility check modules are developed in MATLAB and validated with a modified IEEE 123-node feeder. Results demonstrate ability of these new modules to improve the restoration process post-disaster to enhance the system resilience.

42 ENGINEERING↗

FIDVR Capability of Hybrid Grid-Forming PV Power Plants During Feeder Restoration

Grid-forming inverters must optimally transfer power from dc-coupled photovoltaic arrays and batteries into an ac grid. Further, they must be able to restore single-phase induction motors (SPIMs) and withstand fault-induced delayed voltage-recovery (FIDVR) events. These resilience and reliability challenges are addressed here by: (i) engineering a controller to optimally operate dc-coupled hybrid resources; (ii) modeling residential air-conditioning compressors for restoration/FIDVR studies; and (iii) analyzing SPIM thermal-relay performance under limited inverter currents and designing an electronic protection for stalled SPIMs. Furthermore, these contributions are demonstrated via electromagnetic-transient simulations and can be helpful to understand recommendations by the North American Electric Reliability Corporation.

14 SOLAR ENERGY↗

Critical Load Restoration using Distributed Energy Resources for Resilient Power Distribution System

Extreme weather events have a significant impact on the aging and outdated power distribution infrastructures. These high-impact low-probability (HILP) events often result in extended outages and loss of critical services, thus, severely affecting customers' safety. This calls for the need to ensure resilience in distribution networks by quickly restoring the critical services during a disaster. This paper presents an advanced feeder restoration method to restore critical loads using distributed energy resources (DERs). A resilient restoration approach is proposed that jointly maximizes the amount of restored critical loads and optimizes the restoration times by optimally allocating grid's available DER resources. The restoration problem is modeled as a mixed-integer linear program with the objective of maximizing the resilience to post-restoration failures while simultaneously satisfying grid's critical connectivity and operational constraints and ensuring a radial operation for a given open-loop feeder configuration. Simulations are performed to demonstrate the effectiveness of the proposed approach using IEEE 123-node feeder with 5 DERs supplying 11 critical loads and IEEE 906-bus feeder with 3 DERs supplying 17 critical loads. The impacts of DER availability and fuel reserve on restored networks are assessed and it is shown that the proposed approach is successfully able to restore a maximum number of critical loads using available DERs.

resilience, microgrids, reactive power, energy res↗

Novel Real- Time EMT- TS Modeling Architecture for Feeder Blackstart Simulations

This paper presents the development and benchmarking of a novel real-time electromagnetic-transient and transient-stability (EMT-TS) modeling architecture for distribution feeder restoration studies. The work presents for the first time in the literature a real-time EMT-TS testbed in which the grid-forming unit is simulated in EMT domain, operating as the slack bus of the phasor domain while including unbalanced voltage conditions. To evaluate the performance and limitations of the proposed model, an equivalent EMT testbed is developed to serve as a benchmark. First, the co-simulation framework and the domain coupling methodology are introduced. Next, the steady state operation of the EMT-TS and EMT models are matched. Then, tests are conducted to analyze the transient performance of the proposed EMT-TS model when compared to its EMT benchmark. Results reveal that when utilizing a battery energy storage system (BESS) as the grid-forming unit, the EMT-TS testbed can maintain high accuracy for typical load steps.

Paduani, Victor↗

A two-stage service restoration method for electric power distribution systems

Improving the reliability of power distribution systems is critically important for both utilities and customers. This calls for an efficient service restoration module within a distribution management system to support the implementation of self-healing smart grid networks. Although the emerging smart grid technologies, including distributed generators (DGs) and remote-controlled switches, enhance the self-healing capability and allow faster recovery, they still pose additional complexity to the service restoration problem, especially under cold load pickup (CLPU) conditions. Herein, a novel two-stage restoration framework is proposed to generate a restoration solutions with a sequence of control actions. The first stage generates a restoration plan that supports both the traditional service restoration using feeder reconfiguration and the grid-forming DG-assisted intentional islanding methods. The second stage generates an optimal sequence of switching operations to bring the outaged system quickly to the final restored configuration. The problem is formulated as a mixed-integer linear program that incorporates system connectivity, operating constraints, and the CLPU models. It is demonstrated that on using a multi-feeder test case, the proposed framework is effective in utilizing all available resources to quickly restore the service and generate an optimal sequence of switching actions to be used by the operator to reach the desired optimal configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Generalized Framework for Service Restoration in a Resilient Power Distribution System

An electric power grid is one of the complex infrastructures, and because of its complex nature, there is simply no way that outages can be completely avoided. Thus, a modern society that depends on reliable electric supply requires a resilient electric system that can recover from disruptions while integrating emerging smart grid technologies. Here, this article presents a novel approach for service restoration in a modern power distribution system with controllable switches and distributed generation (DG) resources for any kind of outage. The proposed framework supports both the traditional service restoration using feeder reconfiguration and the grid-forming DG-assisted intentional islands that are dynamically sized using algorithms based on the fault scenario, available resources, and priority of loads. The problem is formulated as a mixed-integer linear program that incorporates critical system connectivity and operating constraints. Simulations are performed to demonstrate the effectiveness of the proposed approach using a large-scale four-feeder 1069-bus three-phase unbalanced distribution test system. It is demonstrated that the framework is effective in utilizing all available resources in quickly restoring the power supply to improve resiliency during extreme events and is scalable for a large-scale unbalanced power distribution system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Smart distribution systems

The increasing importance of system reliability and resilience is changing the way distribution systems are planned and operated. To achieve a distribution system self-healing against power outages, emerging technologies and devices, such as remote-controlled switches (RCSs) and smart meters, are being deployed. The higher level of automation is transforming traditional distribution systems into the smart distribution systems (SDSs) of the future. The availability of data and remote control capability in SDSs provides distribution operators with an opportunity to optimize system operation and control. In this paper, the development of SDSs and resulting benefits of enhanced system capabilities are discussed. A comprehensive survey is conducted on the state-of-the-art applications of RCSs and smart meters in SDSs. Specifically, a new method, called Temporal Causal Diagram (TCD), is used to incorporate outage notifications from smart meters for enhanced outage management. To fully utilize the fast operation of RCSs, the spanning tree search algorithm is used to develop service restoration strategies. Optimal placement of RCSs and the resulting enhancement of system reliability are discussed. Distribution system resilience with respect to extreme events is presented. Furthermore, test cases are used to demonstrate the benefit of SDSs. Active management of distributed generators (DGs) is introduced. Future research in a smart distribution environment is proposed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Blockchain for Fault-Tolerant Grid Operations Version 2.0

This report explores the potential of distributed ledger technology (DLT) as a transformative tool to enhance fault-tolerant operations in electrical distribution systems. Leveraging DLT's core attributes, including an immutable decentralized ledger, distributed consensus mechanisms, and state replication capabilities, this study focuses on three critical use cases. A central aspect of this research centers on the utilization of a consensus-driven ledger, providing actors within the system, such as distributed resources, with access to a reliable data repository. This empowers these actors to collaborate effectively and make informed decisions, all securely recorded on the blockchain. The first use case concentrates on data configuration, utilizing mathematical criteria---particularly, the chi-squared test for gross error detection---to identify trustworthy sensors for advanced decision-making. Building upon this foundation of trust, the second use case, topology identification, accurately determines circuit breaker states, unveiling the distribution network's topology. Ultimately, the third use case leverages this trust to execute switching actions, reconfiguring feeders and restoring power to disconnected customers after fault events. The concept of trust serves as a cornerstone in this approach, marking a departure from traditional fault location, isolation, and service restoration (FLISR) methods. Additionally, the blockchain-based architecture introduces decentralization, empowering disconnected areas to make autonomous decisions, even when communication with a central control center is disrupted. The primary contributions of this report are twofold: (1) a novel approach for evaluating distribution system voltage areas while preserving data ownership and (2) the implementation of interactions between distribution network areas using the actor model. Unlike the previous sequential approach for evaluating the area connection voltages, which required a radial network topology, this study's area model reduction enables a more versatile approach. The area model reduction addresses issues of prolonged data waiting times and multiple points of failure within the previous approach. Notably, the presented evaluation for the reduced network model area connection reveals a significant increase in the differences in voltage magnitudes. Simulation and evaluation of area agents across four distinct cases elucidate the area-level interaction behavior during a fault event. Simulations demonstrate that the proposed distributed FLISR (DFLISR) approach can successfully restore service to an affected area. Varying message delays and message loss probabilities in each simulation case underscore their impacts on restoration times, ranging from 3 min and 32 s to 6 min and 19 s. In contrast, power is not restored in an area in one of our simulation cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Load Switching Group based Feeder-level Microgrid Energy Management Algorithm for Service Restoration in Power Distribution System

This paper presents a load switching group based energy management system (LSG-EMS) for operating microgrids on a distribution feeder powered by one or multiple grid-forming distributed energy resources. Loads on a distribution feeder are divided into load switching groups that can be remotely switched on and off. The LSG-EMS algorithm, formulated as a mixed-integer linear programming (MILP) problem, has an objective function of maximizing the served loads while minimizing the total number of switching actions. A new set of topology constraints are developed for allowing multiple microgrids to be formed on the feeder and selecting the optimal supply path. Customer comfort is accounted for by maximizing the supply duration in the customer preferred service period and enforcing a minimum service duration. The proposed method is demonstrated on a modified IEEE 33-bus system using actual customer data. Simulation results show that the LSG-EMS successfully coordinates multiple grid-forming sources by selecting an optimal supply topology that maximizes the supply period of both the critical and noncritical loads while minimizing customer service interruptions in the service restoration process.

Hu, Rongxing↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating the Magnitude and Duration of Cold Load Pick-up on Residential Distribution Feeders Using Multi-State Load Models

The increased level of demand that is associated with the restoration of service after an outage, Cold Load Pick-Up (CLPU), can be significantly higher than pre-outage levels, even exceeding the normal distribution feeder peak demand. These high levels of demand can delay restoration efforts and in extreme cases damage equipment. The negative impacts of CLPU can be mitigated with strategies that restore the feeder in sections, minimizing the load current. The challenge for utilities is to manage the current level on critical equipment while minimizing the time to restore service to all customers. Accurately modeling CLPU events is the first step in developing improved restoration strategies that minimize restoration times. This paper presents a new method for evaluating the magnitude of the CLPU peak, and its duration, using multi-state load models. The use of multi-state load models allows for a more accurate representation of the end-use loads that are present on residential distribution feeders.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Microgrids for Service Restoration to Critical Load in a Resilient Distribution System

icrogrids can act as emergency sources to serve critical loads when utility power is unavailable. This paper proposes a resiliency-based methodology that uses microgrids to restore critical loads on distribution feeders after a major disaster. Due to limited capacity of distributed generators (DGs) within microgrids, dynamic performance of the DGs during the restoration process becomes essential. In this paper, the stability of microgrids, limits on frequency deviation, and limits on transient voltage and current of DGs are incorporated as constraints of the critical load restoration problem. The limits on the amount of generation resources within microgrids are also considered. By introducing the concepts of restoration tree and load group, restoration of critical loads is transformed into a maximum coverage problem, which is a linear integer program (LIP). The restoration paths and actions are determined for critical loads by solving the LIP. A 4-feeder, 1069-bus unbalanced test system with four microgrids is utilized to demonstrate the effectiveness of the proposed method. The method is applied to the distribution system in Pullman, WA, resulting in a strategy that uses generators on the Washington State University campus to restore service to the Hospital and City Hall in Pullman.

Xu, Yin (ORCID:0000000209459024)↗

Black-Starting Microgrids Using Inverter-Based Distributed Energy Resources

Recent trends in power systems show increasing deployment of inverter-based distributed energy resources (DERs) at the distribution level. Efforts have also been made to use inverter-based DERs for system restoration of critical sections of distribution feeders. In the past few years, there has been active consideration of using local grid-forming (GFM) DERs, which can form their own voltage and frequency, to black-start microgrids instead of waiting for the bulk system for supply restoration. However, using current-limited inverter-based DERs for black-start operations with high inrush currents can pose some technical challenges. This paper presents detailed electromagnetic transient studies on a digital real-time simulator to assess the operational feasibility of using local inverter-based GFM DERs for microgrid black-start operations as a bottom-up approach instead of a top-down approach where the substation is used to restore critical sections of the feeder. The paper presents key modeling details for distribution system components for studying GFM DER-based microgrid black-start operations. The paper presents simulation results comparing different black-start approaches using GFM DERs for two test systems: i) a simple test microgrid and ii) a real-world utility microgrid currently being designed and deployed by Holy Cross Energy in Colorado.

black start↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal distribution system restoration using PHEVs

Power outages cost billions of dollars every year and jeopardise the lives of hospital patients. Traditionally, power distribution system takes a long time to recover after a major blackout, due to its top-down operation strategy. New technologies in modern distribution systems bring opportunities and challenges to distribution system restoration. As fast response energy resources, plug-in hybrid electric vehicles (PHEVs) can accelerate the load pickup by compensating the imbalance between available generation and distribution system load. This study provides a bottom-up restoration strategy to use PHEVs for reliable load pickup and faster restoration process. The optimisation problem of finding load pickup sequence to maximise restored energy is formulated as a mixed integer linear programming (MILP) problem. Moreover, the coordination between transmission and distribution restoration is developed to efficiently restore the entire system back to normal operating conditions. Simulation results on one 100-feeder test system demonstrate the efficiency of MILP-based restoration strategy and the benefit from PHEVs to restore more energy in given restoration time. The proposed restoration strategy has great potential to facilitate system operators to achieve efficient system restoration plans. It also provides incentives to deploy a large amount of PHEVs to improve system resiliency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Restoration of hair-inductive activity of cultured human follicular keratinocytes by co-culturing with dermal papilla cells

Highlights: • Monocultured human ORS cells lose hair-inductive activity (trichogenicity). • The trichogenicity of human ORS cells can be restored by co-culturing with human DP cells. • Human DP cells regulate expression of a number of genes in co-cultured ORS cells. Hair follicle outer root sheath (ORS) cells can be expanded in vitro, but often lose receptivity to hair-inducing dermal signals. Recent studies have shown hair-inductive activity (trichogenicity) can be restored in rat ORS cells expanded with a fibroblast feeder by co-culturing with rat vibrissae dermal papilla (DP) cells. In this study, we investigated whether the trichogenicity of human ORS cells can be restored by co-culturing with human DP cells. ORS cells from human scalp hair follicles were cultured independently or with DP cells for 5 days and implanted into nude mice alongside freshly isolated neonatal mouse dermal cells. Although there was no hair induction when monocultured ORS cells were implanted, it was observed in co-cultured ORS cells. We also observed differential regulation of a number of genes in ORS cells co-cultured with DP cells compared to monocultured ORS cells as examined by microarray. Taken together, our data strongly suggest that human DP cells restore the trichogenicity of co-cultured ORS cells by influencing ORS gene expression through paracrine factors.

60 APPLIED LIFE SCIENCES↗

Autonomous Microgrid Restoration Using Grid-Forming Inverters and Smart Circuit Breakers

The proliferation of distributed inverter-based resources (IBRs) raises the questions if these IBRs can be used to blackstart microgrids and distribution feeders after major outages. In this paper, we propose and evaluate an autonomous microgrid restoration concept using grid-forming (GFM) IBRs and smart circuit creakers (SCBs). The concept is first explored in simulation platform and then a hardware testbed containing actual GFM inverters is developed to demonstrate these functionalities. A combination of dispatchable virtual oscillator control (dVOC) and droop-based control schemes have been designed for GFM inverter controls in the software simulations and hardware testbed. Subsequently, operation of SCBs using two distinct principles have been demonstrated that can restore or connect portions of the network.

black start↗