Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “factory construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Bottleneck Detection in Modular Construction Factories Using Computer Vision

The construction industry is increasingly adopting off-site and modular construction methods due to the advantages offered in terms of safety, quality, and productivity for construction projects. Despite the advantages promised by this method of construction, modular construction factories still rely on manually-intensive work, which can lead to highly variable cycle times. As a result, these factories experience bottlenecks in production that can reduce productivity and cause delays to modular integrated construction projects. To remedy this effect, computer vision-based methods have been proposed to monitor the progress of work in modular construction factories. However, these methods fail to account for changes in the appearance of the modular units during production, they are difficult to adapt to other stations and factories, and they require a significant amount of annotation effort. Due to these drawbacks, this paper proposes a computer vision-based progress monitoring method that is easy to adapt to different stations and factories and relies only on two image annotations per station. In doing so, the Scale-invariant feature transform (SIFT) method is used to identify the presence of modular units at workstations, and the Mask R-CNN deep learning-based method is used to identify active workstations. This information was synthesized using a near real-time data-driven bottleneck identification method suited for assembly lines in modular construction factories. This framework was successfully validated using 420 h of surveillance videos of a production line in a modular construction factory in the U.S., providing 96% accuracy in identifying the occupancy of the workstations and an F-1 Score of 89% in identifying the state of each station on the production line. The extracted active and inactive durations were successfully used via a data-driven bottleneck detection method to detect bottleneck stations inside a modular construction factory. The implementation of this method in factories can lead to continuous and comprehensive monitoring of the production line and prevent delays by timely identification of bottlenecks.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Monitoring installation of partially occluded subassemblies in modular construction factories using BIM, ray tracing, and computer vision

Modular and offsite construction methods are being increasingly adopted due to the advantages they offer in terms of project completion time, quality, and energy-efficiency. Despite these advantages, the current state of monitoring systems in modular construction factories highly relies on labor-intensive, subjective, and error-prone observational methods. A large body of research has aimed to automate the monitoring process using an array of sensors, such as IMUs and RFIDs, during the past two decades. Recently, computer vision-based methods have gained increasing interest as a non-intrusive technology to monitor the process inside modular construction factories. However, partial occlusion challenges have impeded their practical application on a large scale. This challenge is specifically important for monitoring the installation of subassemblies since they can obstruct the view of the monitoring camera, especially those that enable long-term monitoring like closed-circuit television (CCTV) fixed-view surveillance cameras. Here, this paper aims to address this challenge by proposing a novel computer vision-based method to monitor the installation of new subassemblies inside modular factories in highly occluded scenes. The proposed methodology identifies the subassemblies in the CCTV video footage using computer vision, analyzes the occlusions using BIM and ray casting techniques, and estimates the progress of assembly by comparing the BIM model with the detected subassemblies in the video. The proposed methodology was successfully validated on surveillance videos captured from a volumetric modular construction factory in the U.S., achieving 93% accuracy in identifying the installation of subassemblies. The results from this research show that the integration of BIM and computer vision is a promising method for monitoring the installation processes inside modular factories under severe occlusion.

97 MATHEMATICS AND COMPUTING↗

Automated Progress Monitoring in Modular Construction Factories Using Computer Vision and Building Information Modeling

Modular construction methods have recently gained interest due to the advantages offered in terms of safety, quality, and productivity for projects. In this method, a significant portion of the construction is performed off-site in factories where modular components are built in different workstations, assembled on the production line, and shipped to the site for installation. Due to the labor-intensive nature of tasks, cycle times in modular construction factories are highly variable, which commonly leads to major bottlenecks and delays in construction projects. To remedy this effect, recent methods rely on sensors such as RFID to monitor the production process, which is reportedly expensive, and intrusive to the work process. Recently, computer vision-based methods have been proposed to track the production process in modular construction factories. However, these methods overlook monitoring the assembly process on the production line. Therefore, this paper presents a method to monitor the assembly process by integrating computer vision-based methods with Building Information Modeling (BIM). The proposed method detects the modular units using object segmentation; superimposes the installation area with the corresponding 2D region using BIM, and identifies the installation of the components using image processing techniques. The proposed method has been validated using surveillance videos captured from a modular construction factory in the US. Successful implementation of the proposed method can lead to timely identification of delays during the assembly process and reduce delays in modular integrated construction projects.

building information modeling↗

Automated Assembly Progress Monitoring in Modular Construction Factories Using Computer Vision-Based Instance Segmentation

Modular construction has recently gained interest as a transformative construction method. In this method, a large portion of the construction is performed inside factories, where processes are fast-paced and interdependent; therefore, any deviation from the schedule can delay the production. Such deviations are frequent in modular factories due to the labor-intensive nature of the tasks. This propagation of delays can be mitigated by continuously monitoring each process; however, current manual monitoring methods are laborious, and recently proposed contact sensor-based methods are intrusive to the work. In addition, recent computer vision-based monitoring methods inside factories are limited to detection algorithms that fail to provide the pixel-level accuracy required for assembly progress monitoring in highly occluded factory scenes, and they require a large number of manual annotations. Therefore, this paper proposes a method to monitor the installation of subassemblies in modular construction factories using mask R-CNN instance segmentation and improves the data efficiency of the model using a copy-paste augmentation method. This method was validated on the CCTV videos captured from a modular construction factory in the US, resulting in a 9% mAP improvement in segmentation.

computer vision↗

The Circular Home: Development and Demonstration of a Net Negative Carbon, Reusable Residence

This project started the development of an innovative modular building system intended for residential construction. The project was centered around single-family homes that were carbon-negative cradle-to-grave over a 100 year time frame, which is approximately double the current standard for operational life. The project sought to accomplish this objective by designing the modular home in a manner that ensures circularity, where the main house components can be used over several consecutive 50-year lifespans. To accomplish these objectives, this project utilized integrated design with the inclusion of life-cycle assessment to design the single-family house for architectural, structural, energy, mechanical, thermal, and moisture demands, while ensuring carbon negativity and annual net-zero energy use. The core technology of this project was the use of cross-laminated timber and biogenic materials, such as wood-fiber insulation, in the construction of the modular building units. The robustness and factory manufacturing ability of cross-laminated timber allow for factory construction of most of the home, which minimizes on-site time, saving money and reducing construction waste. During this project, initial milestones were met that delivered the architectural plans for the circular home and an initial structural testing matrix. Compared to current code-built homes, which average 13 kg CO2eq. / ft2 and are demolished at their end of life, the circular home has an estimated -30 kg CO2eq. / ft2 of embodied carbon emissions during its first build iteration. It is estimated that approximately 60%-70% of the total building mass could be reused and/or recycled during subsequent rebuilds. This project was concluded at approximately the 1/3 point and a separate project was established to conclude the remaining milestones. This project promises to benefit the public by delivering another option for single-family, and eventually multi-family, housing using a novel building construction system. The system of reusable modular construction facilitates not only lower emissions during the first building iteration, but also lower emissions during subsequent iterations that drastically reduce waste and help society meet its climate goals. Many other industries, such as clothing and technology sectors, are starting to focus on circularity and this project adds the residential building construction industry to that list.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Multifamily Air Leakage Evaluation: A Modular Case Study

The purpose of this case study is to compare the air leakage rates of modular and site-built multifamily dwelling units. The methods, materials, and equipment were observed to be very similar in the modular and site-constructed units in this case study. The installation quality of building envelope measures such as insulation and air barrier appeared to be better for modular construction, because they were installed in a controlled, factory setting. Through field observations, we identified cosmetic damage to the envelope of modular units following transport to the building site, but with no resulting significant air leakage pathways. However, we did see air leakage pathways resulting from field modifications to the envelope of modular units to accommodate structural and mechanical connections. We found that the extensive use of through-wall HVAC systems, combined with the transport, placement, and rework of modular units may compromise the high-quality envelope installation and airtightness observed in the factory without careful planning and/or design. Opportunities for improvement identified from the tested modular dwelling units include minimizing and optimally locating penetrations, pre-cutting and detailing penetrations at the factory where possible, properly sealing field modifications, and using split HVAC systems in place of through-wall packaged systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Transformative Efficiency and Automation in Modular Homes (TEAMH)

This report documents the Transformative Efficiency and Automation in Modular Homes (TEAMH) project, which evaluates the integration of advanced building envelope technologies and automation-assisted modular construction to improve residential energy performance and construction efficiency. The study investigates high-performance insulation systems, including vacuum insulation panels (VIPs), combined with light gauge steel (LGS) modular construction and factory automation. Laboratory testing, whole-building energy modeling across multiple climate zones, and factory demonstrations were conducted to assess thermal performance, energy savings, and production efficiency. Results indicate that upgraded envelope assemblies can achieve up to ~50% heating and ~34% cooling energy savings relative to IECC 2018 code-compliant homes, while automation-assisted construction can reduce wall assembly time by 24%–46% compared to conventional wood framing. The findings demonstrate the potential for scalable, high-performance modular homes that deliver significant energy savings with competitive projected costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Accelerating Optimal Integration of Energy Efficiency Strategies with Industrialized Modular Construction: Preprint

The National Renewable Energy Laboratory's (NREL's) Industrialized Construction Innovation team first introduced the Industrialized Construction Assessment Framework to achieve affordable, net-zero energy (NZE) modular multifamily buildings in the 2020 ACEEE paper "Integrating Energy Efficiency Strategies with Industrialized Construction for our Clean Energy Future." Since then, NREL has continued to drive the ambitious plan to accelerate optimal integration of energy efficiency strategies during industrialized construction with little or no additional cost, labor, and production time. This follow-on paper introduces the Energy in Modular (EMOD) buildings method and presents NREL's research efforts over the last two years in collaboration with industry, including affordable housing partners. NREL has developed an idealized NZE modular multifamily building design that incorporates five energy efficiency strategies well suited for industrialized construction in factories: (1) envelope thermal control, (2) envelope infiltration control, (3) mechanical, electrical, and plumbing systems, (4) smart controls, and (5) solar plus storage. This paper highlights results from leveraging design for manufacturing and assembly principles, testing, and validation pilots with factory partners; demonstrating pod prototypes in test stand at NREL; and performing simulations. Overall, these research efforts address barriers to whole-building system integration, such as poor installation quality of thermal and air barriers; lack of unitized systems for space conditioning, energy recovery and ventilation, and water heating; problematic on-site installation, commissioning, and configuration of controls; and lack of cost-effective integration for grid-friendly design and emerging technologies. Conclusively, the paper delineates next steps for future work with NREL's partners toward developing a transformational pathway for our clean energy future.

affordable housing↗

Summary of Factory Fueling and Testing Risks to Support the Transformation of Regulatory Requirements for Microreactors

Microreactors have the potential to open new markets and applications for nuclear energy. New manufacturing and operational regimes, such as factory fueling and testing prior to site installation, are being proposed to meet these new markets. The radiological hazards associated with traditional commercial power reactors are not the same as the hazards of a reactor being constructed in a factory. Currently, a reactor operating license specified under 10 CFR Part 50, Part 52, or (in the near future) Part 53 is required prior to loading fuel in the reactor. This is logical for plants that are immediately to begin full-power operations soon after fuel loading. However, for microreactors, this may not be the case. Some deployment concepts may stage reactors as “ready to go” in a factory prior to site installation and startup. This approach is being considered in the case of diesel generator replacements, mobile or roaming mining operations, and emergency response situations, such as after a major disaster event. Therefore, it is necessary to evaluate hazards assuming low power operation for a short irradiation time. This report investigates the primary hazards unique to microreactors associated with low power reactor and physics tests necessary to confirm core safety assumptions, neutronic and core design performance parameters, and other assumptions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

How the Modular Construction Industry Is Changing the Construction Workforce [Slides]

564,000 - that's the number of construction workers the United States lacked in 2023. This is not a new or unfamiliar problem, but high interest rates, housing shortages, and an aging workforce are amplifying the pressure to build faster and recruit new talent. Panelized and modular construction are often touted as a solution to this workforce challenge and have seen year over year increases in market share. While research confirms industrialized construction can increase building efficiencies, researchers at the National Renewable Energy Laboratory (NREL), RMI, Washington State University, Dodge Construction Network and Guidehouse were curious how workers are being impacted both on construction sites, at factories, and all the stages in between.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Engineering peroxisomal biosynthetic pathways for maximization of triterpene production in Yarrowia lipolytica

Constructing efficient cell factories for product synthesis is frequently hampered by competing pathways and/or insufficient precursor supply. This is particularly evident in the case of triterpenoid biosynthesis in Yarrowia lipolytica, where squalene biosynthesis is tightly coupled to cytosolic biosynthesis of sterols essential for cell viability. Here, we addressed this problem by reconstructing the complete squalene biosynthetic pathway, starting from acetyl-CoA, in the peroxisome, thus harnessing peroxisomal acetyl-CoA pool and sequestering squalene synthesis in this organelle from competing cytosolic reactions. This strategy led to increasing the squalene levels by 1,300-fold relatively to native cytosolic synthesis. Subsequent enhancement of the peroxisomal acetyl-CoA supply by two independent approaches, 1) converting cellular lipid pool to peroxisomal acetyl-CoA and 2) establishing an orthogonal acetyl-CoA shortcut from CO 2 -derived acetate in the peroxisome, further significantly improved local squalene accumulation. Using these approaches, we constructed squalene-producing strains capable of yielding 32.8 g/L from glucose, and 31.6 g/L from acetate by employing a cofeeding strategy, in bioreactor fermentations. Our findings provide a feasible strategy for protecting intermediate metabolites that can be claimed by multiple reactions by engineering peroxisomes in Y. lipolytica as microfactories for the production of such intermediates and in particular acetyl-CoA-derived metabolites.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

A New State of the Art: Zero Energy Modular Multifamily Construction

In 2020, the U.S. Department of Energy's Building Technologies Office (BTO) launched the Advanced Building Construction (ABC) Initiative. This initiative aimed to integrate energy efficiency into high-production construction practices. One focus area of the initiative is off-site construction, an approach that may achieve scalable, efficient, and high-performing construction buildings through process standardization. This report presents the findings and recommendations from our ABC Initiative project: A New State of the Art: Zero-Energy Modular Multifamily Construction System. The objectives of the BTO-funded project are to: 1) Achieve energy performance 50% better than the 2018 International Energy Conservation Code (IECC). 2) Achieve this level of energy performance at no additional cost VEIC worked with Louisiana State University (LSU), National Renewal Energy Lab (NREL), [the project team], and industry partners at the Mod Coach, KBS, and Solar Home Factory to identify and analyze multifamily business designs and modular construction practices. These designs and processes hold the promise of achieving the goals set out by the DOE.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enhancing Worker Safety During Off-Site Construction of Energy-Efficient, Low-Carbon Exterior Envelope

The construction industry is not doing enough to embrace off-site modular construction. It is a missed opportunity for optimized energy efficiency because prefabricated exterior wall envelopes are lower in cost and faster and easier to install. Factory off-site construction offers improved safety for construction workers because work is done in a controlled environment, but lack of intent, understanding, and data is also a missed opportunity for enhancing worker safety. This research looks specifically at the prefabricated wall exterior envelope in the context of safety. The research question is "off-site factories build with ease of energy efficiency and lowered carbon emissions, but is the process safer?" This research was funded by NREL Student Training in Applied Research (STAR) program, University Partnerships Program, and Wells Fargo Bank. Key finding is that modular and prefabricated construction are perceived to be safer, but the accident rates are much higher than in the general construction and manufacturing industries. Proposed solutions to decrease accidents in off-site prefabricated construction includes safety training for workers, provide movable kiosks with PPE at workstations, ensure tools are well-maintained and place safety posters in visible locations. Future work includes improving worker safety to increase worker productivity, perform pilot demonstration, work with factory designers for new modular layout for worker safety, i.e., easy access to PPE kiosks, and work closely with OSHA so that they take notice of this safety niche.

drywall↗

Efficient phase-space generation for hadron collider event simulation

We present a simple yet efficient algorithm for phase-space integration at hadron colliders. Individual mappings consist of a single t-channel combined with any number of s-channel decays, and are constructed using diagrammatic information. The factorial growth in the number of channels is tamed by providing an option to limit the number of s-channel topologies. We provide a publicly available, parallelized code in C++ and test its performance in typical LHC scenarios.

47 OTHER INSTRUMENTATION↗

Integration of a real-time orientation measurement system for a real-time evaluator (RTE) to measure the position and orientation of crane-lifted components

Prefabrication of building components holds the potential to revolutionize the construction industry. Prefabrication consists of manufacturing building components, modules, and other elements in a factory to be shipped and installed on a construction site. Prefabricated components have been produced for various applications including precast concrete panels for new construction and exterior wall retrofits. The manufacturing process has seen much innovation in recent years; however, the installation process has seen minimal advancements. A real-time evaluator (RTE) was developed to reduce the installation cost of prefabricated components by reducing installation time, decreasing rework, and improving accuracy. The RTE uses off-the-shelf hardware and novel algorithms to assist erectors with component installation by measuring the real-time positions of connections and prefabricated components, providing installation guidance through a graphical user interface, and monitoring the accumulated installation errors. An overview of the RTE and the proposed workflow is presented. Previous on-site demonstrations provided valuable feedback from users on the potential areas for improvement of the system. One common request was real-time measurement of component orientation during lifting, a process that previously required that the component remain stationary while the laser tracker cycled through target prisms. This paper will present the incorporation and testing of a real-time orientation measurement system as it was implemented into the RTE, allowing for measurement of component orientation during movement.

Selvakumar, Balaji [ORNL]↗

High-Field Magnets for Future Hadron Colliders

Recent strategy updates by the international particle physics community have confirmed strong interest in a next-generation energy frontier collider after completion of the High-Luminosity LHC program and construction of a e + e - Higgs factory. Both hadron and muon colliders provide a path toward the highest energies, and both require significant and sustained development to achieve technical readiness and optimize the design. For hadron colliders, the energy reach is determined by machine circumference and the strength of the guiding magnetic field. To achieve a collision energy of 100 TeV while limiting the circumference to 100 km, a dipole field of 16 T is required and is within the reach of niobium–tin magnets operating at 1.9 K. Magnets based on high-temperature superconductors may enable a range of alternatives, including a more compact footprint, a reduction of the cooling power, or a further increase of the collision energy to 150 TeV. The feasibility and cost of the magnet system will determine the possible options and optimal configurations. In this article, I review the historical milestones and recent progress in superconducting materials, design concepts, magnet fabrication, and test results and emphasize current developments that have the potential to address the most significant challenges and shape future directions.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Construction Methodology Transformation for the Benefit of Workforce Development

Construction is a key economic engine driving both national and global economies. While manual, onsite construction methods dominate the U.S. construction industry, a major shift towards offsite methods has been underway due to its efficiency, speed, and potential cost savings. The workforce necessary for offsite construction growth does not exist in its current form because of the focus on onsite methodologies and the lack of exposure to offsite building methods at all levels of a student’s learning journey. The growth of the U.S. construction industry and competitiveness in an increasingly global construction market over the coming decades can only be supported by a dramatic increase in the use of offsite methods, which requires ramping up workforce training for certain skillsets. The goal of Construction Methodology Transformation for the Benefit of Workforce Development was to understand the opportunities and barriers in both education and industry and to identify best practices for offering curriculum and training to educators, industry, and students that would support skills needed for careers in offsite construction. Our team proposed combining three offsite construction workforce development needs: content development, exposure and training, and job placement - under a single Platform model that would increase experience and career opportunities for students and help match them with potential industry members. Through our proposed solution we expected to see: developed offsite curriculum being utilized by educators and students; an increase in the identification of construction technology and offsite construction methods; an average increase in knowledge gain of at least 25% after participation in pilots; better equipped candidates who are prepared for jobs in offsite construction; and a beta workforce development platform that helps build more pathways for students looking for careers in offsite construction. The two pilots included almost 250 students and resulted in an average knowledge gain of 37 percent. Our research has identified areas of opportunity, for both education and industry to make collaborative training programs more efficient and successful. The chosen techniques for this program are extremely effective when both the school and factory have solid processes and cultures in place to accept students into training programs. This project serves as an important stepping stone to industrywide collaboration to move workforce development for offsite construction forward across the country. With continued collaboration programs like this can provide much needed early exposure and training in offsite construction and we can begin to fill important positions for the future of construction.

99 GENERAL AND MISCELLANEOUS↗

Open Architecture for Cost Savings in Advanced Nuclear Reactors

Recently, nuclear power plant build projects in the West have run over budget due to high capital costs and schedule overruns. Compared to other sources of energy, nuclear power plants have higher capital costs. Reactors are often different at every site, resulting in a lack of standardization. Nuclear is expected to compete with other low carbon sources of energy which have lower capital costs making it essential for nuclear to develop ways of reducing costs. Strategies such as standardization, learning rates, modularization, and schedule reduction in advanced reactors can reduce nuclear costs by about 40%. Standardization as a way of cutting capital costs has been explored even in large nuclear power plants. Standardization of certain plant components can result in lower component and installation costs and higher learning from experience. Standardization can be achieved by adopting a criterion of key performance indicators and general design principles for a specific system or component such as the balance of plant. Modularization allows the construction of certain components of SMRs in a factory, which saves time, increases productivity, and encourages higher learning rates. Production learning decreases the time and the cost related to an activity. The potential for modularized components of advanced reactors to be manufactured in factories makes it conducive to achieving higher learning rates. Developing large-capacity nuclear programs through sequential builds cultivates a higher learning rate, which in effect may reduce schedule overruns. Open architecture has been identified as a way to drive standardization among advanced reactor designs and result in cost savings. Open architecture (OA) is defined as a design enabling a diverse supply chain by defining and publishing requirements of systems or equipment in functional and/or interface terms, utilizing technical standards in widespread use. Currently, the nuclear industry’s approach is to use closed architecture, making most designs proprietary. However, collaboration between various advanced reactor vendors and suppliers utilizing the concept of open architecture can result in modular and standardized architecture of subsystems or subcomponents of a nuclear power plant. Completely standardizing nuclear power plants may be impossible, however, certain common subsystems amongst the various reactor designs could be standardized and/or access a wider supply chain and leverage existing learning from other sectors. Open architecture will save time and allocate resources to the parts of the plants that have the most unique features. A key advantage of open architecture is its ability to improve production learning across advanced reactors (AR) types in the industry, by providing and utilizing the same kind of component. Sodium fast reactor (SFR), High Temperature Gas Reactor (HTGR) and Molten Salt Reactor (MSR) are the advanced reactors considered for this project. This paper aims to determine the cost savings in advanced reactor programs due to open architecture learning rate. This work is an extension of work done on light water reactor small modular reactors; the cost methodology was utilized to investigate the impact of open architecture on advanced reactors with a particular focus on sodium fast reactors. The cost data on sodium fast reactors used in the model presented the most adequate information required for the analysis.

Advanced Nuclear Reactors↗