Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “environmental review”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Systems Innovation: Modernization & Efficiencies for ESH&Q Reviews

Environmental compliance reviews at INL have traditionally been managed through fragmented systems, relying on multiple spreadsheets and manual processes. This inefficiency led to time-consuming status updates and redundant tasks, such as manually sending reminder emails and transferring data from Excel to the Environmental Review Process (ERP). Initial attempts to streamline these processes using Power Automate and Excel revealed significant limitations, necessitating a more comprehensive solution. To address these immediate inefficiencies, automated workflows were developed using Power Automate. These workflows were designed to send scheduled status update reminders and capture responses through standardized forms, with submitted data flowing directly into centralized Excel trackers. This automation reduced the administrative burden, improved data accuracy, and enabled faster, more consistent reporting. Specifically, email automation achieved a 65% efficiency gain, while data integration saw a 48% improvement, resulting in 91% of project statuses being updated within two months. Despite the improvements brought by Power Automate, the fragmented nature of the review processes persisted. To further enhance efficiency and accuracy, the Integrated Review Tool (IRT) was developed. The IRT aims to centralize review initiation and connect team systems, creating an interconnected data infrastructure that preserves team autonomy while enhancing overall efficiency. This tool automates email reminders, centralizes reviews, and streamlines data integration, significantly improving the accuracy and efficiency of environmental compliance reviews. The design and development of the IRT involved advanced systems methodology, process mapping, project management, and collaboration with subject matter experts. The minimum viable product design is 100% complete, and system development is currently underway, with expected outcomes including a centralized entry point for all ESH&Q reviews, automated routing, real-time tracking and analytics, AI integration, and a user-friendly interface. This project demonstrates the potential of leveraging automation and integrated systems to enhance efficiency, accuracy, and decision-making in environmental reporting and compliance processes at INL.

99 - GENERAL AND MISCELLANEOUS↗

Non-Technical Barriers to Geothermal Development in California and Nevada

Geothermal project development in the United States may be subject to numerous permits, authorizations, and other regulatory requirements at the federal, state, and local level, which are necessary to address potential environmental and resource impacts at geothermal project sites. This report presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Non-Technical Barriers to Geothermal Development in California and Nevada [Slides]

This presentation presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Dataset for report: Non-Technical Barriers to Geothermal Development in California and Nevada

In California and Nevada, geothermal projects are subject to non-technical barriers, which may create development delays leading to higher project costs and risks and decreased competitiveness with other electricity generation technologies. These non-technical barriers may include federal and state permits, authorizations, environmental reviews, and other regulatory requirements that are applicable throughout different phases of geothermal project development. The 2022 National Renewable Energy Laboratory (NREL) report, "Non-Technical Barriers to Geothermal Development in California and Nevada" presents findings of a study on non-technical barriers that may influence geothermal project development. The set of data resources relied upon for the report includes: 1) interviews conducted with relevant geothermal stakeholders including regulators and project developers, 2) federal and state environmental review documents developed for specific projects, 3) a techno-economic analysis conducted using the NREL Annual Technology Baseline (ATB) framework, and 4) an analysis of the impacts of site-specific land access and permitting considerations on project development readiness conducted using the Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT) Socioeconomic Assessment Tool (SEAT).

15 GEOTHERMAL ENERGY↗

Environmental Impacts of Closed-Loop Pumped Storage Hydropower

The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community involved in closed-loop pumped storage hydropower permitting and licensing process, focus the scope of environmental reviews, and more quickly identify impacts with project nexus and potential mitigation measures for these impacts. Pumped storage hydropower (PSH) is an energy storage technology that uses energy to pump water up from a lower reservoir to an upper reservoir where water is stored until electricity is needed and the water is released to a lower reservoir passing through turbines. Closed-loop PSH—PSH that is not continuously connected to a naturally flowing water feature—is one of the lowest greenhouse gas emitting energy storage technologies and is therefore a critical part of the transition to renewable energy (Simon et al. 2023). Proposals for closed-loop PSH facilities in the United States currently account for more than 40% of original licenses and 99% of potential generation capacity in the Federal Energy Regulatory Commission (FERC) hydropower licensing pipeline (Johnson et al. 2023). While closed-loop PSH facilities can have lower environmental impacts than open-loop PSH facilities, no closed-loop facilities have been constructed in the United States to enable direct accounting of project impacts and efficacy of mitigations. Many proposals for closed-loop PSH submitted to FERC are abandoned early in the permitting and licensing process prior to license applications and environmental assessments, so there is little documentation describing potential project impacts and proposed mitigations. The newness of closed-loop PSH proposals in the United States may mean that tribal, federal, and state agencies with authorities for cultural and natural resources protection and management involved in the FERC licensing process may not have experience with closed-loop PSH regulation. Moreover, many proposed closed-loop PSH facilities are in areas that do not have high concentrations of conventional hydropower, so these agencies may also be unfamiliar with the FERC hydropower licensing process. The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community focus the scope of environmental review for the closed-loop PSH development, licensing, and federal authorization process enabling quicker identification of potential impacts, mitigations, and situations where mitigation may not be possible. We found that environmental impacts of closed-loop PSH are highly site-specific, and generalizations about the types of environmental impacts across closed-loop PSH projects are difficult to make. Environmental impacts of closed-loop PSH are like those for open-loop PSH with a few exceptions including water sourcing, which can lead to delays and contention due to potential complexities with water rights, impacts to aquatic resources, and greenhouse gas emission potential. Cultural resource impacts were commonly reported in National Environmental Policy Act (NEPA) documents reviewed and discussed in interviews, but in many cases such impacts cannot be mitigated.

13 HYDRO ENERGY↗

Bioproducts from high-protein algal biomass: An economic and environmental sustainability review and risk analysis

This report has High-protein algal biomass as an important bio-commodity that has the potential to provide a new source of sustainable protein products. Herein is a critical review that identifies 1) the most relevant sustainability findings related to the processing of proteinaceous algal biomass to higher value protein products and 2) the potential pathways to improve life cycle assessment (LCA) and techno-economic analysis (TEA) metrics, including life-cycle carbon dioxide equivalent (CO 2 eq), life cycle energy, and minimum selling price (MSP) of these products. The critical review of the literature revealed a large variation in model input parameters relating to these metrics. Therefore, a Monte Carlo analysis was conducted to assess the risk associated with these input variations. To understand the uncertainties that propagate into high-protein algae to products’ systems, we reviewed more than 20 state-of-the-art unit operations for algal biomass processing., including cell disruption, protein solubilization, protein precipitation and purification, and protein concentration. We evaluated displacement of proteinaceous products by algal-bioproducts, including ruminant feed, aquaculture feed, protein tablets, and biopolymers and biopolyesters, with prices in the market ranging from 1.9 to 120 $\$$ kg -1 protein. This review realized that the MSP of ruminant and non-ruminant feed ranges from 0.65±0.56 to 2.9±1.1 $\$$ kg -1 protein, and bioplastics’ MSP ranges from 0.97 to 7.0 $\$$ kg -1 protein. Regarding LCA metrics, there is limited research on life cycle energy in proteinaceous biomass concentration and bioproduct systems, reported at 32.7 MJ kg protein -1 , for animal feed displacement. Animal feed emissions in the literature report negative fluxes, representing environmental benefits, as low as -3.7 kgCO 2 eq kg -1 protein and positive fluxes, i.e., global warming potential, as high as 12.8 kgCO 2 eq kg -1 protein. There is limited research on bioplastics life cycle emissions reported at 0.6 kgCO 2 eq kg -1 protein. In general, the studies to date of algae-derived protein bioproducts showed similar life cycle emissions to soybean meals, nylon, polymers, and polystyrenes. Our risk analysis realized that more than 50% of scenarios can result in negative-net life cycle CO 2 eq emissions. This review and risk analysis assess and demonstrate the scenarios that improve economic and environmental sustainability metrics in high-protein algal bioproducts systems.

09 BIOMASS FUELS↗

Synthesis and Review: African Environmental Processes and Water-Cycle Dynamics

Africa's vast landmass harbors a variety of physical processes that affect the environment and the water cycle. This focus issue on the "African Environmental Processes and Water-Cycle Dynamics" contains eight articles that address these phenomena from different but complementary perspectives. Fires used for agricultural and related purposes play a major role in land-cover change, surface albedo modifications, and smoke emission; all of which affect the environment and the water cycle in different ways. However, emissions of aerosols and trace gases are not restricted to fires, but also emanate from other natural and human activities. The African water cycle undergoes significant perturbations that are attributable to several factors, including the aforesaid environmental processes. These changes in the water cycle have produced severe drought and flooding events in recent decades that affect societal wellbeing across sub-Saharan Africa. The combined effects of the environmental processes and water-cycle dynamics affect and are affected by climate variability and can be propagated beyond the continent. Future studies should utilize the wealth of observations and modeling tools that are constantly improving to clearly elucidate the interrelationships between all of these phenomena for the benefit of society.

Water cycle dynamics↗

NASA’s PACE Ocean Color Instrument Thermal Design Evolution: from Goddard’s Instrument Design Lab through Flight Development

NASA’s Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission, set to launch in 2024, seeks to provide data continuity for the ocean color, aerosol and cloud measurements acquired by NASA’s on-orbit Earth Science observatories since the 1990s. It will accomplish this through its Ocean Color Instrument (OCI), an optical spectrometer being developed for hyper-spectral measurements in the ultraviolet-to-near-infrared band between 340 nm and 2260 nm. Although OCI’s instrument architecture will provide greater insight and resolution than its predecessors in this wavelength range, the engineering required to achieve this also poses a greater challenge. In thermal engineering, this translates to a more complex thermal control approach to address high heat dissipations, stringent stabilities, the volume of heat that requires transport, and changing thermal environments due to tilting of the entire instrument ±20° twice per orbit. This current work explores how the PACE OCI instrument design has evolved from its initial conception in NASA Goddard’s Instrument Design Laboratory (IDL) to the current iteration of its flight design. The IDL studies explored three separate instrument configurations and two spatial resolutions per configuration, which were then down selected to a single instrument type and spatial resolution for flight instrument development. OCI subsequently went through major project milestones, including Preliminary Design Review (PDR), Critical Design Review (CDR), Pre-Environmental Review (PER) and Pre-Ship Review (PSR), with significant design updates along the way. This paper aims to provide a comprehensive account of OCI’s thermal control architecture evolution and the engineering drivers that have shaped it, with the goal of identifying trends spanning the full instrument development timeline to inform and advance future instrument thermal designs.

PACE↗

NASA’s PACE Ocean Color Instrument Thermal Design Evolution: from Goddard’s Instrument Design Lab through Flight Development

NASA’s Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission, set to launch in 2024, seeks to provide data continuity for the ocean color, aerosol and cloud measurements acquired by NASA’s on-orbit Earth Science observatories since the 1990s. It will accomplish this through its Ocean Color Instrument (OCI), an optical spectrometer being developed for hyper-spectral measurements in the ultraviolet-to-near-infrared band between 340 nm and 2260 nm. Although OCI’s instrument architecture will provide greater insight and resolution than its predecessors in this wavelength range, the engineering required to achieve this also poses a greater challenge. In thermal engineering, this translates to a more complex thermal control approach to address high heat dissipations, stringent stabilities, the volume of heat that requires transport, and changing thermal environments due to tilting of the entire instrument ±20° twice per orbit. This current work explores how the PACE OCI instrument design has evolved from its initial conception in NASA Goddard’s Instrument Design Laboratory (IDL) to the current iteration of its flight design. The IDL studies explored three separate instrument configurations and two spatial resolutions per configuration, which were then down selected to a single instrument type and spatial resolution for flight instrument development. OCI subsequently went through major project milestones, including Preliminary Design Review (PDR), Critical Design Review (CDR), Pre-Environmental Review (PER) and Pre-Ship Review (PSR), with significant design updates along the way. This paper aims to provide a comprehensive account of OCI’s thermal control architecture evolution and the engineering drivers that have shaped it, with the goal of identifying trends spanning the full instrument development timeline to inform and advance future instrument thermal designs.

PACE↗

Mapping Support for Targeted Critical Minerals Exploration and Extraction

The United States’ dependency on imported minerals poses significant risks to economic stability and national security due to potential supply disruptions. Recognizing the strategic importance of critical minerals, the Department of Energy (DOE) emphasizes the need for a secure and resilient supply chain to support emissions reduction, technology development, and capitalization on clean energy opportunities. The DOE’s Office of Manufacturing and Energy Supply Chains (MESC), in collaboration with the Office of Policy (OP), addresses these vulnerabilities by focusing on upstream domestic critical minerals production, balancing extraction with social and environmental goals, including conservation, environmental justice, and respect for Tribal sovereignty. This report showcases a collaborative effort involving Idaho National Laboratory (INL), Argonne National Laboratory (Argonne), National Renewable Energy Laboratory (NREL), and the U.S. Geological Survey (USGS) to map mineral development potential along with key social and environmental datasets. A geographical information system (GIS)-based web map application was developed as a preliminary tool for environmental analysis, integrating 158 geospatial data layers such as critical habitat, land ownership, economic indicators, and environmental concerns. Data were sourced from agencies like the Bureau of Land Management (BLM) and USGS and processed using GIS technology to enhance visualization and analysis. The proposed analysis framework categorizes areas into high, mid, and low concern based on withdrawn lands, special status species, the Economic Development Capacity Index (EDCI) Mining Composite Index, and the Climate and Economic Justice Screening Tool (CEJST). While the application provides broad visualizations, it is not a substitute for detailed environmental reviews required under the National Environmental Policy Act (NEPA). Users must conduct further analyses and engage with tribal entities and other stakeholders for comprehensive planning. A case study of the Idaho Cobalt Belt (ICB) in Lemhi County, Idaho, has been provided in the report to illustrate the tool's practical use. This report introduces a GIS application and framework to support stakeholders in identifying and prioritizing areas for critical mineral exploration, promoting secure supply chains, and advancing the nation's energy independence through responsible resource stewardship.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of Alkaline Cleaner Materials

Alkaline cleaners used to process aluminum substrates have contained chromium as the corrosion inhibitor. Chromium is a hazardous substance whose use and control are described by environmental laws. Replacement materials that have the characteristics of chromated alkaline cleaners need to be found that address both the cleaning requirements and environmental impacts. This report will review environmentally friendly candidates evaluated as non-chromium alkaline cleaner replacements and methods used to compare those candidates one versus another. The report will also list characteristics used to select candidates based on their declared contents. It will also describe and evaluate methods used to discriminate among the large number of prospective candidates.

Partz, Earl↗

Market Analysis of Solar Photovoltaic Development Potential on Bureau of Land Management Land in Arizona

This report explores the magnitude of the potential buildout of new solar development on Bureau of Land Management (BLM) land in Arizona based on market conditions in 2023. The BLM currently has 18 solar energy zones (SEZs), including three in Arizona, where land has undergone preliminary reviews and is suitable for expedited environmental review and permitting for solar energy projects. The BLM also administers variance areas that are outside SEZs and may consider right-of-way (ROW) applications for utility-scale solar development on such variance lands. Within variance areas in Arizona, the BLM has further identified Renewable Energy Development Area (REDA) lands that are likely well suited to solar or wind development. The purpose of the analysis reported here is to explore the anticipated extent of new solar development on BLM land in the state by 2035.

14 SOLAR ENERGY↗

Assessment of Economic Impact of Permitting Timelines on Produced Geothermal Power in Imperial County, California

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. Our study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive. In this study, we conducted economic analysis to assess the impact of permitting timelines on cost of produced electricity from geothermal resources using data from existing geothermal plants as well as prospective sites. In this paper, we present collected timelines data, approach, and results of economic impact of permitting timelines on geothermal power. We evaluated the various environmental management and permit review processes by considering a hypothetical geothermal project in the Salton Sea Known Geothermal Resource Area. Because of the variety of the biological and environmental issues and the involvement of local, state, and federal agencies with overlapping jurisdictions, this project could go through one of the many California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) review scenarios that range from the least to the most complex in its circumstances. The fastest CEQA/NEPA review timelines would have the project completed in six years. In contrast, the project would substantially need longer time to complete if it were located in an area with significant environmental resources or cultural issues that required permitting from various agencies. With increasing project completion timelines, the simplified levelized cost of electricity (sLCOE) can be 4 to 11% higher with longer CEQA/NEPA review timelines than the sLCOE value with the fastest CEQA/NEPA review timeline. Lengthier CEQA/NEPA review timelines could also result in loss of $64 million to $227 million in potential revenue. Such significant economic impacts could determine the success of a geothermal project.

15 GEOTHERMAL ENERGY↗

Economic Impact of Permitting Timelines on Geothermal Power in California, Nevada, and Utah

The United States has great geothermal power potential; however, only a small fraction of this resource has been utilized for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to the lower penetration of geothermal energy into the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This document provides an assessment of the potential economic impact of permitting costs and timelines on geothermal power in California, Nevada, and Utah. Development of geothermal resources requires multi-layered regulatory permitting by local, state, and federal agencies. In this study, we collected and reviewed permit timelines and associated cost data for several existing geothermal power plants as well as for geothermal projects currently undergoing permitting processes for exploration and development activities in California, Nevada, and Utah. We interviewed several geothermal developers and staff from multiple permitting agencies to obtain insight from both sides (i.e., people applying for permits and people processing those applications for California Environmental Quality Act [CEQA] and National Environmental Policy Act [NEPA] reviews and other regulatory compliance). The intent of this project was also to identify informative pathways for the geothermal stakeholder community by which the permitting process could be streamlined.

15 GEOTHERMAL ENERGY↗

Results from conceptual design study of potential early commercial MHD/steam power plants

This paper presents conceptual design information for a potential early MHD power plant developed in the second phase of a joint study of such plants. Conceptual designs of plant components and equipment with performance, operational characteristics and costs are reported on. Plant economics and overall performance including full and part load operation are reviewed. Environmental aspects and the methods incorporated in plant design for emission control of sulfur and nitrogen oxides are reviewed. Results from reliability/availability analysis conducted are also included.

Hals, F.↗