Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “environmental remediation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Environmental remediation with functional aerogels and xerogels

Several different types of aerogel and/or xerogel scaffolds have been demonstrated as effective sorbents for the capture and immobilization of radionuclides in gaseous form [e.g., iodine gas or I2(g), Xe] as well as ionic form (e.g., Ce4+, Cs+, I–, IO3-, Rb+, Sr2+, 99Tc7+, and U6+). These scaffolds have unique properties, which include high specific surface areas, high pore volumes, varieties of pore sizes, and functionalities that provide methods for binding radionuclides through physisorption, chemisorption, or a combination thereof. This combination of properties and functionalities make these types of materials ideal scaffolds for use as sorbents for capturing radionuclides. The primary base materials that will be discussed in this chapter include Ag0-functionalized silica aerogels, Ag+-impregnated aluminosilicate aerogels, Ag0-functionalized aluminosilicate aerogels, metal-impregnated (non-Ag) aluminosilicate aerogels and xerogels, sulfide-based aerogels, and carbon-based aerogel composites. For the capture of I2(g), the materials reported herein show some of the highest iodine loadings ever reported for inorganic sorbents. For the capture of ionic species, these materials also show promise to be some of the next generations of materials for active radionuclide remediation. This progress report will describe how these materials are fabricated, the general properties of these materials, as well as an overview of how they have been used for different applications in environmental remediation of radionuclides.

aerogel, xerogel, iodine, radionuclide remediation↗

An Overview of Nanomaterials for Environmental Remediation Applications

The environmental remediation capabilities of nanoparticles were reviewed and evaluated. Nanoparticles (NPs) have been used to remediate various forms of environmental contamination. Various materials, morphologies, and conditions are required to remediate different contaminants. Nanoparticles may have benefits and/or limitations compared with traditional remediation methods. New techniques are being applied to mitigate the limitations of NPs. Nanomaterials are a promising technology for the environmental remediation. NPs have been used for the remediation of aqueous and atmospheric contaminants. Nanoparticles have been used to sequester contaminants toxic to human and environmental health. Various materials, morphologies, and conditions are necessary for the remediation of different contaminants. The remediation of heavy metals is of significant concern. Contaminants may be remediated by means of sorption or reduction. The remediation capability of nanoparticles is promising due to their high surface area and reactivity. Reaction kinetics are, therefore, notably fast. These characteristics make NPs attractive for environmental remediation. Various NPs have been used as sequestering agents for environmental contaminants. NPs have been used to remediate heavy metals as well as organic contaminants. Technical Objectives: Assess viability of nanoparticles (NPs) for environmental remediation; Review benefits and limitations of NPs; Design future experiments to test remediation capabilities of NPs. Future Plans: Create NP filters for remediation - Grow Au NPs on Stainless Steel Wool: Stainless steel wool has many defects and crevices allowing the Au NPs to grow on the surface; Stainless steel wool will not react with the heavy metal contaminants tested; NPs are embedded, so they do not have to be removed from solution. Test sorption capabilities with heavy metal contaminants in aqueous solution. Benefits of Gold NPs: Corrosion/oxidation resistant; Exhibit visible/near IR plasmon resonance; Can be synthesized by solution chemistry: cost efficient and easily scalable. Surfactants: Used to lower surface energy and prevent aggregation; Sodium citrate: anionic surfactant (-); Cetyltrimethylammonium bromide (CTAB): cationic surfactant (+); Ionic surfactants create charged NPs; Charged NPs can be used to sequester ionic contaminants (eg. heavy metals)

54 ENVIRONMENTAL SCIENCES↗

Panel Session 26: Risk-Based Approaches to Environmental Remediation and Adaptive Site Management

This panel discussed the needs and importance of developing risk-based approaches to environmental remediation that will enable complex sites to be adaptively managed by applying cost-effective remedies that are protective of human health and the environment. The discussion emphasized risk-based approaches within decision processes and subsequent incorporation into regulatory decision documents. Remedy approaches, remediation exit strategies, and long-term monitoring plans that support risk-based end-states for difficult-to-remediate sites were discussed Panelists with presentations: Risk-Informed Approaches to Environmental Remediation and Adaptive Site Management (Vicky Freedman); ITRC Adaptive Site Management Perspective (Michael Truex); Optimization During Operations and Maintenance Phase at the Hanford Site 200-ZP-1 Groundwater Operable Unit (Emerald Laija, Kate Amrhein, Michael Truex); Adaptive Management: EPA Overview (Benjamin Simes); Decommissioning and Environmental Remediation Section Division of Nuclear Fuel Cycle and Waste Technology (Horst Monken Fernandes)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Complex Environmental Remediation amidst Aggressive Facility Revitalization Milestones

Unlike the final closure projects at Rocky Flats and Fernald, many of the Department of Energy's future CERCLA and RCRA closure challenges will take place at active facilities, such as the Oak Ridge National Laboratory (ORNL) central campus. ORNL has aggressive growth plans for a Research Technology Park and cleanup must address and integrate D and D, soil and groundwater remediation, and on-going and future business plans for the Park. Different planning and tracking tools are needed to support closures at active facilities. To support some large Airport redevelopment efforts, we created tools that allowed the Airline lease-holder to perform environmental remediation on the same schedule as building D and D and new building construction, which in turn allowed them to migrate real estate from unusable to usable within an aggressive schedule. In summary: The FIM and OpenGate{sup TM} spatial analysis system were two primary tools developed to support simultaneous environmental remediation, D and D, and construction efforts at an operating facility. These tools helped redevelopers to deal with environmental remediation on the same schedule as building D and D and construction, thereby meeting their goals of opening gates, restarting their revenue streams, at the same time complying with all environmental regulations. (authors)

54 ENVIRONMENTAL SCIENCES↗

International Training to Promote Successful Environmental Remediation Projects - 18636

The International Atomic Energy Agency (IAEA) supports the efforts of its Member States to manage their nuclear and radiological liabilities, including radioactive waste management, decommissioning of facilities, and remediation of contaminated sites. As part of a project addressing Constraints in Decommissioning and Environmental Remediation (the CIDER Project), the IAEA is developing initiatives to further support capacity development specifically to promote implementation of safe, appropriate, and cost-effective environmental remediation (ER) projects. The IAEA sponsors numerous initiatives to provide its Member States training on important topics related to ER. It has become clear in recent years, however, that the existing training should be augmented with more in-depth training to provide for the development of the critical expertise needed to address significant ER challenges. ER projects typically are very complex, requiring the integration of numerous scientific and engineering disciplines, along with effective project planning and management. There are many examples of ER projects where considerable work has been completed, qualified technical staff are available, and adequate funding has been obtained, yet actual progress towards a final solution has been limited. In such cases, it appears that a key barrier is the lack of capacity to develop strategies, make fully informed decisions, plan for and manage activities, and implement successful ER actions. In light of the above, the IAEA has placed a priority on capacity development across the broad spectrum of ER project implementation. Efforts are underway to develop a new training program to develop capacity at the institutional and individual levels to equip course graduates to effectively integrate all areas of expertise in the planning and execution of ER projects. The target audience includes decision-makers; project managers, planners, and implementers; and academics. The core capabilities to be developed via this program include knowledge and skills related to: (1) radiation issues and radionuclide behavior; (2) health and safety protection principles and requirements; (3) identification, evaluation, and selection of ER technologies and approaches; (4) ongoing, constructive dialogue with stakeholders; (5) project planning, management, and communication; (6) cost estimation and funding development; and (7) implementation of appropriate site monitoring activities. The IAEA is collaborating with multiple organizations to develop and implement this training program, to leverage existing training programs and materials, and to coordinate on the development of sustainable training solutions. This paper will present the status of this initiative and work accomplished thus far. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Remediation of Waste Management Areas at Chalk River Laboratories - 19130

The Government of Canada's nuclear legacy liabilities have resulted from ∼70 years of nuclear research and development (R and D). The majority of these liabilities are located at the CRL Site and consist of shutdown research buildings (including prototype and research reactors), plus a wide variety of buried and stored wastes, and contaminated lands. The Environmental Remediation Projects (ERP) branch are assessing the waste inventory in the Chalk River Laboratories Waste Management Areas in order to make informed and risk based decisions on remediating affected lands. This paper provides examples of contaminated sites at CRL that require remediation as well as examples of remediation activities already complete. The environmental remediation process followed at CRL and the development of the CRL site cleanup plan are outlined. Until suitable disposal facilities are available ERP will continue to characterize and assess contaminated sites, monitoring and managing the risks in place while preparing for full-scale remediation activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Excavation Volume Growth Factors at Environmental Remediation Sites - 20318

The U.S. Army Corps of Engineers (USACE) manages numerous environmental remediation projects in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, otherwise known as CERCLA. These include projects for the Formerly Utilized Sites Remedial Action Program (FUSRAP). Utilizing the CERCLA framework to address these projects requires detailed cost estimates and a significant portion of costs are associated with the volume of material to be excavated and that material's final disposition. Accordingly, understanding the expected volumes and uncertainty associated with those volumes is vital to project cost estimating. These estimates are completed at various stages of the CERCLA process, thus the project team has varying degrees of information available from which to develop these estimates depending on how far along the project is. Understanding the factors contributing to volume growth (increase in volume of material from that originally estimated) is a crucial element to determining volume and cost uncertainty. This paper presents a case study of a FUSRAP site which involves excavation and offsite disposal of contaminated soils from complex commercial, industrial, and residential properties. Original volume estimates were compared to post excavation volumes on a property by property basis. Reasons for differences are determined along with magnitude of impacts to cost estimating. For both residential and commercial property types, volume estimating factors, uncertainty considerations, and methods to account for each are discussed with emphasis on volume growth considerations. Cost estimating model input considerations are discussed with specific emphasis on accounting for volume uncertainty at the Feasibility Study (FS) phase of CERCLA. Underestimating or overestimating costs at the FS phase has repercussions under CERCLA that may impact project close out or completion schedule. Discussions presented will be helpful to both reviewers and preparers of cost estimates involving excavations. Additionally, project planners may be able to use the information to plan for volume growth contingencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An IAEA Initiative to Provide Effective Stakeholder Support Services for International Decommissioning and Environmental Remediation - 17341

The International Atomic Energy Agency (IAEA) has initiated a collaborative effort to promote stakeholder support activities through a stakeholder engagement advisory program (SEAP) as part of Phase II of the Constraints to Implementing Decommissioning and Environmental Remediation (CIDER II) program. CIDER II is a collaborative project involving a broad range of Member States, large and small, with ongoing and/or planned decommissioning and environmental remediation (D and ER) programs. The intent of this sub-group of CIDER II is to facilitate better sharing of information and knowledge in areas of stakeholder communication, engagement and participation, and a framework for directly using stakeholder input in the decision making process. The goal is to support trust building in D and ER decisions for radioactive contamination and facilities. A main premise of the CIDER II program is that stakeholder acceptance is necessary for successful D and ER decisions to be made. This paper introduces some of the major challenges to implementing such a broad scale of support for stakeholder engagement, and approaches to overcoming those challenges. Major challenges include the need to address D and ER decision making in different countries with their different languages, cultures, religions, management structures, and politics. For example, in some cases it might be important strategically to first garner support from upper levels of social, management or political hierarchies, including for example, approaching community leaders, and allowing those leaders to directly address their community. Other sites might have more success, for example, if stakeholder interaction starts with the community members. A specific project strategy also probably depends on who makes the request for stakeholder support services. Once the CIDER II SEAP gains traction, there will be a need to prioritize requests from Member States for assistance in connection with specific D and ER projects. A prioritization tool will be developed based on stakeholder engaged structured decision making (SDM). The projects in which support will initially be focused will span a wide range of D and ER problems, types of stakeholder groups, and technical issues such as potential risk to human health and the environment. A database management system will also be designed to capture information from the different proposed projects and will be expanded to house implemented projects for future reference. The case study database will be an integral part of a web-based system that also contains technical approaches for stakeholder involvement depending on the situational environment. A community of practice will be formed that will involve technical experts in stakeholder engagement and structured decision making, and informed representatives from Member States. This will address the need for SEAP to build capacity and provide education for solving D and ER problems. The web-based system will include technical tools for use by the projects, such as: identification of stakeholder groups; social network analysis (how stakeholders are connected); case study forms; best practice forms; information sheets; and 4tools that will directly support optimization of stakeholder guided solutions to D and ER problems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative mathematical modeling in environmental remediation

There are two different ways to model reactive transport: ad hoc and innovative reaction-based approaches. The former, such as the Kd simplification of adsorption, has been widely employed by practitioners, while the latter has been mainly used in scientific communities for elucidating mechanisms of biogeochemical transport processes. It is believed that innovative mechanistic-based models could serve as protocols for environmental remediation as well. This paper reviews the development of a mechanistically coupled fluid flow, thermal transport, hydrologic transport, and reactive biogeochemical model and example-applications to environmental remediation problems. Theoretical bases are sufficiently described. Four example problems previously carried out are used to demonstrate how numerical experimentation can be used to evaluate the feasibility of different remediation approaches. The first one involved the application of a 56-species uranium tailing problem to the Melton Branch Subwatershed at Oak Ridge National Laboratory (ORNL) using the parallel version of the model. Simulations were made to demonstrate the potential mobilization of uranium and other chelating agents in the proposed waste disposal site. The second problem simulated laboratory-scale system to investigate the role of natural attenuation in potential off-site migration of uranium from uranium mill tailings after restoration. It showed inadequacy of using a single Kd even for a homogeneous medium. The third example simulated laboratory experiments involving extremely high concentrations of uranium, technetium, aluminum, nitrate, and toxic metals (e.g.,Ni, Cr, Co).The fourth example modeled microbially-mediated immobilization of uranium in an unconfined aquifer using acetate amendment in a field-scale experiment. The purposes of these modeling studies were to simulate various mechanisms of mobilization and immobilization of radioactive wastes and to illustrate how to apply reactive transport models for environmental remediation.The second problem simulated laboratory-scale system to investigate the role of natural attenuation in potential off-site migration of uranium from uranium mill tailings after restoration. It showed inadequacy of using a single Kd even for a homogeneous medium.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3-D Radiation Mapping and Data Fusion for Environmental Remediation and Cleanup - 18449

Recent developments in radiation detection and imaging in combination with the enormous advances in computer vision and data processing enable new and improved means in the assessment of radiological contamination relevant for environmental remediation. We have developed a new concept called 3-D Scene Data Fusion (SDF) that allows us to map scenes in three dimensions and fuse this scene data with nuclear radiation data in near real time while the instrument is freely moving through the scene. This new technology provides more accurate radio-isotopic mapping at higher speed than currently possible. SDF is designed to be independent of the deployment platform and can be implemented with gamma-ray imaging and non-imaging instruments. We have demonstrated this concept in a large range of configurations on unmanned aerial and ground-based systems, in hand-portable configurations or mounted on cars or manned helicopters. While it can be utilized in a wide range of applications, this paper focuses on the mapping of radiological and nuclear materials in the context of environmental remediation and clean-up specifically in urban environments. We show results from measurements in the evacuated areas in the Fukushima Prefecture to demonstrate the new concept in the mapping of contamination and hot spots and the verification of decontamination activities in urban environments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

25 Years Of Environmental Remediation In The General Separations Area Of The Savannah River Site: Lessons Learned About What Worked And What Did Not Work In Soil And Groundwater Cleanup

The Savannah River Site (SRS) is owned and administered by the US Department of Energy (DOE). SRS covers an area of approximately 900 square kilometers. The General Separation Area (GSA) is located roughly in the center of the SRS and includes: radioactive material chemical separations facilities, radioactive waste tank farms, a variety of radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the GSA from the mid-1950s through the mid-1990s. Radioactive operations at the F Canyon began in 1954; radioactive operations at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground (ORWBG) began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility (MWMF) and Low Level Radioactive Waste Disposal Facility (LLRWDF) received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970s, 1980s, and 1990s led to changes in waste management and environmental cleanup practices at SRS. The US Congress passed the Clean Air Act in 1970, and the Clean Water Act in 1972; the Resource Conservation and Recovery Act (RCRA) was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980; the Federal Facilities Compliance Act (FFCA) was signed into law in 1992. Environmental remediation at the SRS essentially began with a 1987 Settlement Agreement between the SRS and the State of South Carolina (under the South Carolina Department of Health and Environmental Control - SCDHEC), which recognized linkage between many SRS waste management facilities and RCRA. The SRS manages several of the larger groundwater remedial activities under RCRA for facilities recognized early on as environmental problems. All subsequent environmental remediation projects tend to be managed under tri-party agreement (DOE, Environmental Protection Agency, and SCDHEC) through the Federal Facilities Agreement. During 25 years of environmental remediation SRS has stabilized and capped seepage basins, and consolidated and capped waste units and burial grounds in the GSA. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Over the last 25 years concentrations of contaminants in the aquifers beneath the GSA and in surface water streams in the GSA have dropped significantly. Closure of 65 waste sites and 4 RCRA facilities has been successfully accomplished. Wastes have been successfully isolated in place beneath a variety of caps and cover systems. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. SRS operated two very large pump and treat systems at the F and H Seepage Basins to attempt to limit the release of tritium to Fourmile Branch, a tributary of the Savannah River. The systems were designed to extract contaminated acidic groundwater, remove all contamination except tritium (not possible to remove the tritium from the water), and inject the tritiated groundwater up-gradient of the source area and the plume. The concept was to increase the travel time of the injected water for radioactive decay of the tritium. The two systems were found to be non-effective and potentially mobilizing more contamination. SRS invested approximately $50 million in construction and approximately $100 million in 6 years of operation. The H Seepage Basin pump and treat system was replaced by a series of subsurface barriers that alters the groundwater velocity; the F Seepage Basin pump and treat system was replaced by subsurface barriers forming a funnel and gate augmented by chemical treatment within the gates. These replacement systems are mostly passive and cost approximately $13 million to construct, and have reduced the tritium flux to Fourmile Branch, in these plumes, by over 70%. SRS manages non-acidic tritiated groundwater releases to Fourmile Branch from the southwest plume of the MWMF with a forest irrigation system. Tritiated water is captured with a sheetpile dam below the springs that caused releases to Fourmile Branch. Water from the irrigation pond is pumped to a filter plant prior to irrigation of approximately 26 hectares of mixed forest and developing pine plantation. SRS has almost achieved a 70% reduction in tritium flux to the Branch from this plume. The system cost approximately $5 million to construct with operation cost of approximately $500K per year. In conclusion, many lessons have been learned in 25 years of relatively aggressive remedial activities in the GSA. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. In water management situations with non-accumulative contaminants (tritium, VOCs, etc.) irrigation in a forest setting can be very effective.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overcoming the barriers to implementation of decommissioning and environmental remediation projects, the CIDER project - 15160

Much remains to be done in terms of addressing the legacies from the early development of nuclear energy, including the dismantling of redundant research and fuel cycle facilities, research reactors, and power plants, and the remediation of sites affected by past uranium mining and processing operations. Long-term solutions still need to be found for management of the resulting waste, including development of disposal facilities that meet public acceptance and safety requirements. Some countries are moving forward with dealing with these legacies, and accordingly have built up appropriate technical resources and expertise, but many national programmes still face very significant challenges. Many are the factors that constrain progress in addressing past legacies. It is recognized the importance of early implementation of decommissioning and environmental remediation (D and ER) programmes in order to safeguard people and the environment from the undesirable effects of ionizing radiation and other hazards associated with these sites. There is also an urgent need to better understand the global status of these activities and to establish mechanisms to analyze and report the barriers impeding the implementation of D and ER programmes, with the aim of outlining actions that may improve the current situation. The IAEA has thus launched the CIDER Project (Constraints to Implementing Decommissioning and Environmental Remediation) with the broad aim of contributing to improve current levels of performance on D and ER programmes through promoting greater cooperation amongst its Member States and relevant international organizations. This paper provides early results from the first phase of the project. During this phase, a survey on the global situation of D and ER was undertaken in order to better understand why these programmes proceed faster in some countries than in others; to identify major constraining factors that affect the implementation of D and ER programmes and how these impediments might be overcome. The paper aims to address policy-level issues, regulatory aspects, technological aspects, and stakeholder involvement in the decision-making process. In the next phase of the project it is intended that specific actions and/or innovative approaches will be proposed at international, regional, or national levels with the goal of facilitating progress in programme implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

25 years of environmental remediation in the general separations area of the Savannah river site: lessons learned about what worked and what did not work in soil and groundwater cleanup - 15270

The Savannah River Site, which is owned and administered by the US Department of Energy, covers approximately 900 square kilometers. The General Separation Area is located in the center of the site and includes: radioactive material chemical separations facilities, radioactive waste tank farms, radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the General Separation Area from the mid-1950's through the mid-1990's. Operations at the F Canyon began in 1954 and at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility and Low Level Radioactive Waste Disposal Facility received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970's through 1990's led to changes in waste management and environmental cleanup practices. The US Congress passed the Clean Air Act in 1970 and the Clean Water Act in 1972; the Resource Conservation and Recovery Act was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act was enacted by Congress in 1980; and the Federal Facilities Compliance Act was signed into law in 1992. Environmental remediation at the Savannah River Site essentially began with a 1987 Settlement Agreement between the Savannah River Site and the State of South Carolina. The site manages several of the larger groundwater remedial activities under the Resource Conservation and Recovery Act for facilities recognized early on as environmental problems. All subsequent remediation projects are managed under a tri-party agreement (Department of Energy, Environmental Protection Agency, and South Carolina Department of Health and Environmental Control) through the Federal Facilities Agreement. Environmental remediation activities during the past 25 years have stabilized and capped seepage basins as well as consolidated and capped waste units and burial grounds in the General Separation Area. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Concentrations of contaminants in the aquifers beneath the General Separation Area and in surface water streams in the General Separation Area have decreased over the past 25 years. Closure of 65 waste sites and 4 Resource Conservation and Recovery Act facilities has been successfully accomplished. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process of remediating the General Separations Area. Geo-textile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive and enhanced natural processes to address contamination are much more cost effective than pump and treat systems. Forest irrigation can be very effective in water management situations with non-accumulative contaminants such as tritium and volatile organic contaminants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experience in environmental remediation of radioactively contaminated site in waste disposal area in Istanbul - 15011

In this paper specific environmental remediation examples of method applications are given. Radiological contaminated site was created by non-nuclear industry in Turkey. This is designated as a contaminated site and can ultimately lead to undesired health effects for residents. Appropriate actions have been taken to protect human and environment from contaminated site. As every site has its own characteristics, contaminated area was examined by sampling and surveying works. Before taken into action, remediation actions need to be justified and optimized. Radiation levels and homogeneity of contamination was investigated. Remediation program was established and taken into action in parallel two main works. First one covers all actions to the contamination itself. The site was isolated properly and all equipment was deployed. Working methods for segregation of contaminated material from the soil were determined. Besides, risk evaluation was carried out. Pathways between the contaminated soil and people were taken into account. Groundwater samples were taken and analyzed. According to these results, evacuation, area isolation or changing land use options were evaluated. Isolation of the site and removal of radioactive materials were determined as appropriate actions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electrospun and oxidized cellulose materials for environmental remediation of heavy metals in groundwater

This chapter focuses on the use of modified cellulosic materials in the field of environmental remediation. Two different chemical methods were involved in fabricating oxidized cellulose (OC), which has shown promise as a metal ion chelator in environmental applications. Electrospinning was utilized to introduce a more porous structure into an oxidized cellulose matrix. FTIR and Raman spectroscopy were used to study both the formation of OC and its surface complexation with metal ions. IR and Raman spectroscopic data demonstrate the formation of characteristic carboxylic groups in the structure of the final products and the successful formation of OC-metal complexes. Subsequent field tests at the Field Research Site at Oak Ridge National Laboratory confirmed the value of OC for sorption of both U and Th ions.

54 ENVIRONMENTAL SCIENCES↗

Environmental Remediation Technologies Derived from Space Industry Research

Beginning in the 1950s and 1960s, an abundance of effort and initiative was focused on propelling the space industry outward for planetary exploration and habitation. During these early years, the push to take space science to new levels indirectly contributed to the evolution of another science field that would not fully surface until the early 1980s, environmental remediation. This field is associated with the remediation or cleanup of environmental resources such as groundwater, soil, and sediment. Because the space-exploration initiative began prior to the establishment of the U.S. Environmental Protection Agency (EPA) in December of 1970, many NASA Centers as well as space-related support contractors allowed for the release of spent chemicals into the environment. Subsequently, these land owners have been directed by the EPA to responsibly initiate cleanup of their impacted sites. This paper will focus on the processes and lessons learned with the development, testing, and commercialization initiatives associated with four remediation technologies. The technologies include installation techniques for permeable reactive barriers (PRBs), the use of ultrasound to improve long-term performance of PRBs, emulsified zero-valent iron for product-level solvent degradation, and emulsion technologies for application to metal and polychlorinated biphenyl contaminated media. Details of the paper cover technology research, evaluation, and testing; contracts and grants; and technology transfer strategies including patenting, marketing, and licensing.

Quinn, Jacqueline↗