Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “environmental monitoring and surveillance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Use of Remote Sensing Surveillance to Monitor Environmental Parameters Associated with Mosquito Abundance and Vector-borne Diseases

Lymphatic filariasis persists as a major cause of clinical morbidity and a significant impediment to socioeconomic development in various parts of the world including Egypt. In Egypt, filariasis has been endemic since time immemorial. Early epidemiologic studies identified Culex pipiens L. as the main vector of the disease and also showed that the geographic distribution of the disease is highly focal and concentrated in lower Egypt. Between 1950 and 1965, a large scale filariasis control program was carried out by the Egyptian Ministry of Health (EMOH) in the endemic areas. Control efforts led to a steady decrease of the disease in areas of the country previously identified as endemic. However, spot surveys conducted in various parts of the Nile Delta during the 1970's and 1980's revealed that the downward trend of the disease had stopped and that the prevalence and intensity of microfilaraemia had increased.

Source record↗

EMP - Environmental Radiological Air Monitoring Plan: PNNL Operations in Washington

The Environmental Radiological Air Monitoring Plan (EMP) for Pacific Northwest National Laboratory (PNNL) describes systems/processes/practices related to radiological operations in Richland and Sequim, Washington, that are associated with environmental radiological air monitoring and surveillance activities. The activities described support the lab’s responsibility to maintain safe operations and minimize negative impacts to both onsite and offsite persons and environment. Dose assessments required by regulations and DOE Orders for the public and biota are described. PNNL conducts environmental air surveillance monitoring as part of the PNNL Site Radioactive Air Emissions License (RAEL)-005 for Richland Campus, issued in 2010 with its most recent renewal effective in January 2021. The radioactive air emissions license for the PNNL-Sequim campus (RAEL-014) was issued to the U.S. Department of Energy in 2012 with its most recent renewal effective in January 2023. The EMP is a compilation of the following four documents: - Environmental Radiological Air Monitoring Plan (this main document) (PNNL-20919) - Sampling and Analysis Plan (Attachment 1) (PNNL-20919-1) - Data Management Plan (Attachment 2) (PNNL-20919-2) - Dose Assessment Guidance (Attachment 3) (PNNL-20919-3).

40 CFR 61 Subpart H↗

Annual Site Environment Report for Calendar Year 2023 - Princeton Plasma Physics Laboratory

This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2023 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2023. This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2023 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2023. In 2023, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for non-radiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2023, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council on July 27, 2023.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

SRS 2022 Annual Site Environmental Report (ASER)

ASER stands for the Annual Site Environmental Report and is the primary document that the U.S. Department of Energy uses to inform the public of environmental performance and conditions at SRS. • ASERs are required by U.S. Department of Energy to provide the public and stakeholders information on: – Environmental program performance – Site wide environmental monitoring and surveillance effectiveness – Compliance status with environmental standards and requirements • SRS published its first ASER in 1959

DAVIS, COLLEEN↗

2021 Annual Site Environmental Report

This report provides the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. The results of PPPL’s 2021 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2021. PPPL’s on-site operations were significantly curtailed in 2021 due to the global coronavirus pandemic. PPPL has engaged in fusion energy research since 1951. The Laboratory’s mission is to develop the scientific knowledge and advanced engineering to enable fusion to power the U.S. and the world, and to developing the understanding of plasmas from the nano- to the astrophysical scale. PPPL’s primary experiment, the National Spherical Torus Experiment-Upgrade (NSTX-U) is a collaboration among national laboratories, universities, and national and international research institutions and is a major element in the US Fusion Energy Sciences Program. Its design tests the physics principles of spherical torus (ST) plasmas, playing an important role in the development of smaller, more economical fusion reactors. Due to previous operational issues, NSTX-U did not operate in 2021. PPPL is engaged in a project to replace key NSTX-U components and systems to enable operation of this international fusion user facility. In 2021, PPPL’s radiological environmental monitoring program measured tritium in the air at the NSTX-U Stack and at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of an in-stack monitor located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for non-radiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2021, PPPL complied with permit limits for surface and sanitary discharges. PPPL was honored with awards for EPEAT-certified electronics purchasing and use of peracetic acid as an alternative water treatment chemical in its non-potable process water systems an NJDEP recycling award.

54 ENVIRONMENTAL SCIENCES↗

2022 Annual Site Environment Report, Princeton Plasma Physics Laboratory

This report provides the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2022 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2022. PPPL’s on-site operations started to be restored in 2022, following curtailments in 2020 and 2021 for the global coronavirus (COVID-19) pandemic. PPPL has engaged in fusion energy research since 1951 and at its current locations since 1958. The Laboratory’s mission is to develop the scientific knowledge and advanced engineering to enable fusion to power the U.S. and the world, and to develop the understanding of plasmas from the nano- to the astrophysical scale. PPPL’s primary experiment, the National Spherical Torus Experiment-Upgrade (NSTX-U) is a collaboration among national laboratories, universities, and national and international research institutions and is a major element in the US Fusion Energy Sciences Program. Its design tests the physics principles of spherical torus (ST) plasmas, playing an important role in the development of smaller, more economical fusion reactors. Due to previous operational issues, NSTX-U did not operate in 2022. PPPL is engaged in a project to replace key NSTX-U components and systems to enable the operation of this international magnetic fusion user facility. In 2022, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for non-radiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2022, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council.

54 ENVIRONMENTAL SCIENCES↗

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 2024

This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2024 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2024. PPPL has engaged in fusion energy research since 1951 and at its current locations since 1958. The Laboratory’s mission is to develop the scientific knowledge and advanced engineering to enable fusion to power the US and the world, and to develop the understanding of plasmas from the nano- to the astrophysical scale. PPPL’s primary experiment, the National Spherical Torus Experiment-Upgrade (NSTX-U) is a collaboration among national laboratories, universities, and national and international research institutions and is a major element in the US Fusion Energy Sciences Program. Its design tests the physics principles of spherical torus (ST) plasmas, playing an important role in the development of smaller, more economical fusion reactors. Due to previous operational issues, NSTX-U did not operate in 2024. PPPL is engaged in a project to replace key NSTX-U components and systems to enable the operation of this international magnetic fusion user facility. In 2024, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for nonradiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2024, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council on July 25, 2024.

54 ENVIRONMENTAL SCIENCES↗

The FAO/NASA/NLR Artemis system - An integrated concept for environmental monitoring by satellite in support of food/feed security and desert locust surveillance

The African real time environmental monitoring using imaging satellites (Artemis) system, which should monitor precipitation and vegetation conditions on a continental scale, is presented. The hardware and software characteristics of the system are illustrated and the Artemis databases are outlined. Plans for the system include the use of hourly digital Meteosat data and daily NOAA/AVHRR data to study environmental conditions. Planned mapping activities include monthly rainfall anomaly maps, normalized difference vegetation index maps for ten day and monthly periods with a spatial resolution of 7.6 km, ten day crop/rangeland moisture availability maps, and desert locust potential breeding activity factor maps for a plague prevention program.

Hielkema, J. U.↗

EMP, Attachment 2: Data Management Plan

This Data Management Plan (DMP) is an attachment to the Pacific Northwest National Laboratory Environmental Radiological Air Monitoring Plan (EMP). PNNL is a U.S. Department of Energy Office of Science national laboratory. Radioactive effluent monitoring and environmental surveillance for PNNL operations in Washington State are the responsibility of the PNNL Environmental Protection and Regulatory Programs division and are conducted by the Environmental Radiation Task staff. This DMP describes the data management processes for PNNL radioactive air emissions (stack) monitoring and environmental radiological ambient air surveillance activities.

40 CFR 61 Subpart H↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; Title 40 of the U.S. Code of Federal Regulations Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247: Radiation Protection – Air Emissions and 173-480: Ambient Air Quality Standards and Emission Limits for Radionuclides were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated off-site doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL–Richland campus) and in Sequim, Washington, (PNNL–Sequim campus). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in January 2024 for calendar year ending 2023.

40 CFR 61 Subpart H↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; 40 CFR Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247 and 173-480 were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated off-site doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL-Richland Campus) and in Sequim, Washington, (PNNL-Sequim Campus, which formerly was known as the Marine Sciences Laboratory). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in January 2021 for calendar year ending 2020.

40 CFR 61 Subpart H↗

Use Attainability Analysis for Upper Sandia Canyon

This document presents a use attainability analysis (UAA) for the perennial segment of Upper Sandia Canyon, which is located within the Los Alamos National Laboratory (LANL) property near Los Alamos, New Mexico.1 This UAA is consistent with 20.6.4.15 New Mexico Administrative Code (NMAC) (New Mexico Environment Department [NMED] 2011c), which describes the perennial segment as “Sandia Canyon from Sigma Canyon upstream to LANL [National Pollutant Discharge Elimination System] NPDES outfall 001.” The perennial segment’s designated uses are coldwater aquatic life, livestock watering, wildlife habitat, and secondary contact. 40 Code of Federal Regulations (CFR) § 131.10(g) permits a state to remove a designated use that is not an existing use (as defined in 40 CFR §131.3), if a UAA demonstrates that naturally occurring pollutant concentrations prevent the attainment of the use or if physical conditions related to the natural features of the water body preclude the attainment of the aquatic life protection use. This UAA considers whether natural physical conditions in Upper Sandia Canyon, specifically air and/or water temperatures, prevent the designated aquatic life use water temperature limits (i.e., coldwater) from being attained in the perennial segment. The weight of evidence presented in this UAA supports the conclusion that, based on air-water temperature modeling and instream thermograph data, the coolwater aquatic life designated use is currently the attainable use. Accordingly, it is recommended that the coolwater aquatic life designated use replace the coldwater aquatic life designated use in the Upper Sandia Canyon assessment unit (AU).

54 ENVIRONMENTAL SCIENCES↗

Los Alamos National Laboratory Floodplain Assessment for the High Explosive Transfer Facility Blast Radius Fence Project at Technical Area 08

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing to take action at Los Alamos National Laboratory (LANL) within the upper Pajarito Canyon 100-year (yr.) floodplain at Technical Area (TA) 08. This action consists of installation of a 3-strand smooth wire fence to create an operational boundary in a radius of 1250 feet (ft.) from the TA-08 High Explosive (HE) Transfer Facility (Figure 1). The proposed fence is intended to provide a barrier between the public and direct access to the HE Transfer Facility.

54 ENVIRONMENTAL SCIENCES↗

Los Alamos National Laboratory Floodplain Assessment for the West Road Post and Cable Fencing Project

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing to take action at Los Alamos National Laboratory (LANL) to install post and cable or in-kind barriers along West Road at selected locations near the Los Alamos County ice-skating rink in Los Alamos Canyon (Figure 1). The proposed project is intended to improve vehicular and pedestrian safety on West Road by reducing traffic hazards associated with unsafe roadside parking and reduce wildland fire hazards associated with vehicles driving and parking on vegetation. West Road crosses approximately 0.35 miles (mi.) (1,900 feet (ft.)) of the Los Alamos Canyon floodplain at the bottom of Los Alamos Canyon. Project activities within the floodplain include blocking access to the informal roadside parking along either side of West Road in Los Alamos Canyon.

42 ENGINEERING↗

Use Attainability Analysis Aquatic Life Uses for Perennial Reach of Sandia Canyon [Slides]

The following information will be presented during the February 23, 2022 Accord Pueblos Technical Meeting. The purpose of the study is to determine if natural thermal conditions are preventing the attainment of Coldwater Aquatic Life Use in the perennial reach of the upper Sandia Canyon Assessment Unit (Sandia AU). The New Mexico Water Quality Standards allow for a change in the designated use if a Use Attainability Analysis (UAA) demonstrates that the use is not attainable due to one or more of six factors listed in 40 CFR 131.10(g), including naturally occurring pollutant concentrations. The Sandia AU is located in a perennial reach of upper Sandia Canyon between Sigma Canyon and NPDES Outfall 001. The classified Segment 20.6.4.126 NMAC comprises perennial waters within Los Alamos National Laboratory boundaries and includes the Sandia AU. Persistent surface flows originate from NPDES permitted effluent releases. These releases have occurred since the early 1950’s and continue today. The UAA examines several lines of evidence. NMED’s Air-Water Temperature Correlation (AWTC) model is used for identifying appropriate stream classifications and attainable aquatic life use subcategories. The model correlates between July average air temperatures (ATEMP) and maximum weekly average stream temperatures. Air temperatures are obtained from PRISM and LANL Meteorological Towers and used to derive ATEMP. Thermographs were placed in the Sandia AU to obtain measured stream temperatures during summer months when stream temperatures are the highest. Measured data is used with AWTC modeled data to determine if the Sandia AU is meeting its natural air temperature driven thermal condition.

54 ENVIRONMENTAL SCIENCES↗

Los Alamos National Laboratory Floodplain Assessment for the Technical Area 72 Outdoor Live Fire Range Gate Installation Project

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing new construction in lower Sandia Canyon at Technical Area (TA) 72 at the Outdoor Live Fire Range facility at Los Alamos National Laboratory (LANL). The proposed upgrades are intended to improve range safety.

54 ENVIRONMENTAL SCIENCES↗

2021 Idaho National Laboratory Site Environmental Report

The INL Site’s operations, as well as the ongoing cleanup, necessarily involve a commitment to environmental stewardship and full compliance with environmental protection laws. As part of this commitment, the INL Site Environmental Report is prepared annually to inform the public, regulators, stakeholders, and other interested parties of the INL Site’s environmental performance during the year. This report is published for the DOE-ID in compliance with DOE O 231.1B, “Environment, Safety and Health Reporting.” Its purpose is to: • Present the INL Site, mission, and programs • Report compliance status with applicable federal, state, and local regulations • Describe the INL Site environmental programs and activities • Summarize results of environmental monitoring • Discuss potential radiation doses to the public residing in the vicinity of the INL Site • Report on ecological monitoring and research conducted by contractors and affiliated agencies and by independent researchers through the Idaho National Environmental Research Park • Describe quality assurance methods used to ensure confidence in monitoring data • Provide supplemental technical data and reports that support the INL Site Environmental Report (https://idahoeser.inl.gov/publications.html).

99 GENERAL AND MISCELLANEOUS↗

Los Alamos National Laboratory Floodplain Assessment for the Technical Area 8 to Technical Area 22 Natural Gas Line Replacement Project

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing new construction that crosses through upper Pajarito Canyon and upper Starmer Canyon from Technical Area (TA) 8 to TA-22 at Los Alamos National Laboratory (LANL). The project proposes to install a new 12 inch natural gas line to replace the existing 70+ year old natural gas line. Replacement will prevent loss of service to several LANL TAs and Bandelier National Monument. The project activities within the 100- year floodplains include 1) new natural gas line installation to replace and existing aging gas line, 2) relocating a section of fence and 3) three construction equipment and materials storage areas. NNSA has prepared this floodplain assessment in accordance with 10 Code of Federal Regulations (CFR) Part 1022 Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR Part 1022) (CFR 2003) which was promulgated to implement DOE requirements under Executive Order 11988 Floodplain Management (EO 1977). A floodplain is defined in 10 CFR 1022 as “the lowlands adjoining inland and coastal waters and relatively flat areas and flood prone areas of offshore islands,” and a base floodplain as “the 100-year floodplain, that is, a floodplain with a 1.0 percent chance of flooding in any given year (CFR 2003).” This floodplain assessment evaluates potential impacts to floodplain values and functions from implementation of the proposed action, identifies alternatives to the Proposed Action, and allows for meaningful public comment.

54 ENVIRONMENTAL SCIENCES↗