Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “energy uncertainty”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Generalization of the Time-Energy Uncertainty Relation of Anandan-Aharonov Type

A new type of time-energy uncertainty relation was proposed recently by Anandan and Aharonov. Their formula, to estimate the lower bound of time-integral of the energy-fluctuation in a quantum state is generalized to the one involving a set of quantum states. This is achieved by obtaining an explicit formula for the distance between two finitely separated points in the Grassman manifold.

Hirayama, Minoru↗

Squeezed states, time-energy uncertainty relation, and Feynman's rest of the universe

Two illustrative examples are given for Feynman's rest of the universe. The first example is the two-mode squeezed state of light where no measurement is taken for one of the modes. The second example is the relativistic quark model where no measurement is possible for the time-like separation fo quarks confined in a hadron. It is possible to illustrate these examples using the covariant oscillator formalism. It is shown that the lack of symmetry between the position-momentum and time-energy uncertainty relations leads to an increase in entropy when the system is different Lorentz frames.

Han, D.↗

Multistage Stochastic optimization for mid-term integrated generation and maintenance scheduling of cascaded hydroelectric system with renewable energy uncertainty

The uncertainties resulting from the escalating penetration of renewable energy resources pose severe challenges to the efficient operation of modern power systems. Hydroelectricity is characterized by its flexibility, controllability, and reliability, and thus becomes one of the most ideal energy resources to hedge against such uncertainties. This paper studies the mid-term integrated generation and maintenance scheduling of a cascaded hydroelectric system (CHS) consisting of multiple cascaded reservoirs and hydroelectric units. To precisely describe the mid-term water regulation policies, the hydraulic coupling relationship and water-energy nexus of CHS are incorporated into the proposed optimization model. The uncertainties of natural water inflow and the power outputs of wind/solar energy generation are taken into consideration and captured via a stochastic process modeled by a scenario tree. A multistage stochastic optimization (MSO) approach is developed to coordinate the complementary operations of multiple energy resources, by optimizing the mid-term water resource management, generation scheduling, and maintenance scheduling of CHS. The proposed MSO model is formulated as a large-scale mixed-integer linear program that presents significant computational intractability. To address this issue, a tailored Benders decomposition algorithm is developed. Two real-world case studies are conducted to demonstrate the capability and characteristics of the proposed model and algorithm. The computational results show that the proposed MSO model can exploit the flexibility of hydroelectricity to efficiently respond to variable wind and solar power, and reserve water resources for the generation in peak months to reduce the consumption of fossil fuel. Furthermore, the proposed solution approach also exhibits promising computational efficiency when handling large-scale models.

13 HYDRO ENERGY↗

Time-Energy Uncertainty Relation for Noisy Quantum Metrology

Detection of very weak forces and precise measurement of time are two of the many applications of quantum metrology to science and technology. To sense an unknown physical parameter, one prepares an initial state of a probe system, allows the probe to evolve as governed by a Hamiltonian 𝐻 for some time 𝑡, and then measures the probe. If 𝐻 is known, we can estimate 𝑡 by this method; if 𝑡 is known, we can estimate classical parameters on which 𝐻 depends. The accuracy of a quantum sensor can be limited by either intrinsic quantum noise or by noise arising from the interactions of the probe with its environment. In this work, we introduce and study a fundamental trade-off, which relates the amount by which noise reduces the accuracy of a quantum clock to the amount of information about the energy of the clock that leaks to the environment. Specifically, we consider an idealized scenario in which a party Alice prepares an initial pure state of the clock, allows the clock to evolve for a time that is not precisely known, and then transmits the clock through a noisy channel to a party Bob. Meanwhile, the environment (Eve) receives any information about the clock that is lost during transmission. We prove that Bob’s loss of quantum Fisher information about the elapsed time is equal to Eve’s gain of quantum Fisher information about a complementary energy parameter. We also prove a similar, but more general, trade-off that applies when Bob and Eve wish to estimate the values of parameters associated with two noncommuting observables. We derive the necessary and sufficient conditions for the accuracy of the clock to be unaffected by the noise, which form a subset of the Knill-Laflamme error-correction conditions. A state and its local time-evolution direction, if they satisfy these conditions, are said to form a metrological code. We provide a scheme to construct metrological codes in the stabilizer formalism. We show that there are metrological codes that cannot be written as a quantum error-correcting code with similar distance in which the Hamiltonian acts as a logical operator, potentially offering new schemes for constructing states that do not lose any sensitivity upon application of a noisy channel. We discuss applications of the trade-off relation to sensing using a quantum many-body probe subject to erasure or amplitude-damping noise.

metrology↗

Flexibility Requirements for Energy Systems with Renewable Generation under Forecast Uncertainties

Energy systems with high fractions of renewable energy-based resources require adequate assets providing flexibility in electricity usage to maximize the benefits of renewable energy. In this paper, we provide an analytical approach to estimate the flexibility requirements of such energy systems, with forecast uncertainties in both demand and generation. Our analytical results show that even with forecast errors, the expected system operating cost decreases with an increase in the amount of flexibility capacity -- however, there is an inflection point, beyond which addition of further flexibility capacity does not reduce expected system cost any further. Additionally, an enumeration-based approach is presented to estimate the maximum flexibility capacity needed to optimize the operating cost. Numerical experiments conducted on a network-abstracted modified IEEE 30-bus system are used for empirical validation and gaining additional insights on the effect of prosumers' willingness to offer flexibility on the dispatch performance.

Bhattacharya, Saptarshi↗

The energy-time uncertainty principle and the EPR paradox: Experiments involving correlated two-photon emission in parametric down-conversion

The energy-time uncertainty principle is on a different footing than the momentum position uncertainty principle: in contrast to position, time is a c-number parameter, and not an operator. As Aharonov and Bohm have pointed out, this leads to different interpretations of the two uncertainty principles. In particular, one must distinguish between an inner and an outer time in the definition of the spread in time, delta t. It is the inner time which enters the energy-time uncertainty principle. We have checked this by means of a correlated two-photon light source in which the individual energies of the two photons are broad in spectra, but in which their sum is sharp. In other words, the pair of photons is in an entangled state of energy. By passing one member of the photon pair through a filter with width delta E, it is observed that the other member's wave packet collapses upon coincidence detection to a duration delta t, such that delta E(delta t) is approximately equal to planks constant/2 pi, where this duration delta t is an inner time, in the sense of Aharonov and Bohm. We have measured delta t by means of a Michelson interferometer by monitoring the visibility of the fringes seen in coincidence detection. This is a nonlocal effect, in the sense that the two photons are far away from each other when the collapse occurs. We have excluded classical-wave explanations of this effect by means of triple coincidence measurements in conjunction with a beam splitter which follows the Michelson interferometer. Since Bell's inequalities are known to be violated, we believe that it is also incorrect to interpret this experimental outcome as if energy were a local hidden variable, i.e., as if each photon, viewed as a particle, possessed some definite but unknown energy before its detection.

Chiao, Raymond Y.↗

Quantifying Uncertainty in PV Energy Estimates Final Report

Uncertainty in PV energy estimates is "one of the most critical areas of lack of understanding" according to independent engineers, financiers, PV model developers, and other industry stakeholders. The primary problem is a lack of rigorous, transparent, widely accepted methods for quantifying uncertainty in energy production estimates. Uncertainty in energy production estimates arises from variability of the solar resource, inexact PV performance models and their parameters, and system reliability considerations. Uncertainty in annual energy production is frequently calculated for larger projects in order to quantify financial risk. Key statistics for energy, such as the P-values "P50" and "P90" (the annual energy values that are exceeded in future years with 50\% and 90\% probability, respectively) are used by financing institutions to calculate the repayment risk for the project. The current methods to estimate these statistics are typically proprietary, specialized, and involve significant post-processing of commercial performance model results. This black-box approach leads to inconsistent P-value estimates from different parties, which reduces investors' confidence in the results. Since the financial community bases its risk assessment on these estimates, reduced confidence increases perceived project risk, and consequently financing costs. The goal of this project was to establish a set of best practices for quantifying uncertainty in energy production estimates, including identifying what sources of uncertainty must be considered with clear definitions and metrics, determining which sources are the biggest drivers of uncertainty, and providing a computationally efficient framework for combining different sources of uncertainty that is flexible enough to accommodate substitutions of data or methods when better information is available. We engaged a wide set of stakeholders to ensure industry endorsement and adoption, and leveraged complementary projects investigating individual sources of uncertainty in great detail, as well as others' work that started down this path.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

Estimating Travel Energy Consumption Uncertainty Based on Inferred Travel Mode and Sensed Travel Length

To properly inform transport policy and infrastructure changes, transportation related metrics need both measured values and uncertainties of those values. Travel monitoring smartphone apps can record people's travel behavior, but trip data quality is limited by sensor errors, user labeling rates and the accuracy of inference algorithms used for travel diary creation. We discuss the use of phone app recorded travel diary data to estimate energy consumption, and propose the use of propagation of variance to find error bars for such estimates. We define energy consumption for one trip as trip length times the energy intensity per distance unit of the travel mode used. We characterize trip length errors with relative error and inferred trip mode errors with confusion matrix columns. The resulting variances of each measurement are then propagated to the final calculated energy consumption. We tested our uncertainty methods on a dataset that used phone app data combined with prompted recall, consisting of 92,234 labeled trips for over 500,000 miles. Accounting for uncertainty using expected energy intensities and variance propagation gives a dataset-wide aggregate energy consumption percent error of about 8%, within one standard deviation from the truth. Future work could involve applying similar methods to other travel diary based metrics.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Count Every Trip: Finding the Uncertainty in Energy Estimates Made from Inferred Travel Modes

To properly inform transport policy and infrastructure changes, transportation related metrics need both measured values and uncertainties of those values. Travel monitoring smartphone apps can record people's travel behavior, but trip data quality is limited by sensor errors, user labeling rates and the accuracy of inference algorithms used for travel diary creation. We discuss the use of phone app recorded travel diary data to estimate energy consumption, and propose the use of propagation of variance to find error bars for such estimates. We define energy consumption for one trip as trip length times the energy intensity per distance unit of the travel mode used. We characterize trip length errors with relative error and inferred trip mode errors with confusion matrix columns. The resulting variances of each measurement are then propagated to the final calculated energy consumption. We tested our uncertainty methods on a dataset that used phone app data combined with prompted recall, consisting of 92,234 labeled trips for over 500,000 miles. Accounting for uncertainty using expected energy intensities and variance propagation gives a dataset-wide aggregate energy consumption percent error of about 9%, within one standard deviation from the truth. Future work could involve applying similar methods to other travel diary based metrics.

ADVANCED PROPULSION SYSTEMS↗

Count Every Trip: Finding the Uncertainty in Energy Estimates Made from Inferred Travel Modes

To properly inform transport policy and infrastructure changes, transportation related metrics need both measured values and uncertainties of those values. Travel monitoring smartphone apps can record people's travel behavior, but trip data quality is limited by sensor errors, user labeling rates and the accuracy of inference algorithms used for travel diary creation. We discuss the use of phone app recorded travel diary data to estimate energy consumption, and propose the use of propagation of variance to find error bars for such estimates. We define energy consumption for one trip as trip length times the energy intensity per distance unit of the travel mode used. We characterize trip length errors with relative error and inferred trip mode errors with confusion matrix columns. The resulting variances of each measurement are then propagated to the final calculated energy consumption. We tested our uncertainty methods on a dataset that used phone app data combined with prompted recall, consisting of 92,234 labeled trips for over 500,000 miles. Accounting for uncertainty using expected energy intensities and variance propagation gives a dataset-wide aggregate energy consumption percent error of about 9%, within one standard deviation from the truth. Future work could involve applying similar methods to other travel diary based metrics.

ADVANCED PROPULSION SYSTEMS,MATHEMATICS AND COMPUT↗

Biases in preconstruction estimates of wind plant annual energy production

Estimating the energy yield of a wind plant during the preconstruction phase is a historically difficult task, even with industry improvements in these estimations. We build on prior research comparing the realized energy production of wind plants and their estimated annual energy production P50 values (median energy production), using owner-provided energy production and losses. We produced similar results to prior studies but with a slightly increasing bias of overestimating median energy production (a bias between realized and estimated energy production of −7.4 % to −6.6 %, depending on the scenario, as opposed to −6.7 % to −5.5 % from earlier studies). In addition to assessing annual energy production P50 bias, we compared both the 1-year and the long-term annual energy production P90 and uncertainty energy yield assessment estimates to the observed long-term-corrected energy production. We found that neither the energy yield assessment uncertainty nor the P90 is conservative enough compared to the observed distribution of prediction errors, suggesting significant room for improvement in the energy yield assessment process.

17 WIND ENERGY↗

Impact of Uncertainty on Energy Storage Operation Decisions: Motivation and Framework

Energy Storage Systems (ESSs) are gaining great attention, as they can help operate grid power grids more reliably. The ESS acquisition and operation is motivated by the economics revolving around its provided services and revenue streams. These economics are greatly impacted by uncertainties in predicting the parameters which influence the ESS operation. The main goal of this paper is in addressing these uncertainties. We organize sources of uncertainties which directly impact the value-driven operation of the ESS and propose a framework which combines the uncertain requirements from processes both internal and external to ESS.

Hanif, Sarmad↗

Uncertainty in Annual Energy Resulting from Uncertain Irradiance Measurements

We report an analysis quantifying the contribution to uncertainty in annual energy projections from uncertainty in ground-measured irradiance. Uncertainty in measured irradiance is quantified for eight instruments by the difference from a well maintained, secondary standard pyranometer which is regarded as truthful. We construct a statistical model of irradiance uncertainty and apply the model to generate a sample of 100 annual time series of irradiance for each instrument. The sample is propagated through a common performance model for a reference photovoltaic system to quantify variation in annual energy. Although the measured irradiance varies from the reference by a few percent (standard deviation of 1-2%) the uncertainty in annual energy is on the order of a fraction of one percent. We propose a model for a factor that represents uncertainty in modeled annual energy that arises from uncertainty in ground-measured irradiance.

14 SOLAR ENERGY↗

Uncertainty relations, zero point energy and the linear canonical group

The close relationship between the zero point energy, the uncertainty relations, coherent states, squeezed states, and correlated states for one mode is investigated. This group-theoretic perspective enables the parametrization and identification of their multimode generalization. In particular the generalized Schroedinger-Robertson uncertainty relations are analyzed. An elementary method of determining the canonical structure of the generalized correlated states is presented.

Sudarshan, E. C. G.↗

Single Electron Self-coherence and Its Wave/Particle Duality in the Electron Microscope

Intensities in high-resolution phase-contrast images from electron microscopes build up discretely in time by detecting single electrons. A wave description of pulse-like coherent-inelastic interaction of an electron with matter implies a time-dependent coexistence of coherent partial waves. Their superposition forms a wave package by phase decoherence of 0.5 - 1 radian with Heisenbergs energy uncertainty ΔE H = $\hbar$/2 Δt -1 matching the energy loss ΔE of a coherent-inelastic interaction and sets the interaction time Δt. In these circumstances, the product of Planck's constant and the speed of light hc is given by the product of the expression for temporal coherence λ 2 /Δλ and the energy loss ΔE. Experimentally, the self-coherence length was measured by detecting the energy-dependent localization of scattered, plane matter waves in surface proximity exploiting the Goos–Hänchen shift. Chromatic-aberration Cc-corrected electron microscopy on boron nitride (BN) proves that the coherent crystal illumination and phase contrast are lost if the self-coherence length shrinks below the size of the crystal unit cell at ΔE > 200 eV. Finally, in perspective, the interaction time of any matter wave compares with the lifetime of a virtual particle of any elemental interaction, suggesting the present concept of coherent-inelastic interactions of matter waves might be generalizable.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗