Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “electricity transmission grid”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Component Assessment of the Electric Transmission Grid to Hurricanes

The increased frequency and intensity of extreme weather events from climate change necessitates understanding impacts on critical infrastructure, particularly electrical transmission grids. One of the foundational concepts of a grid's resilience is its robustness to extreme weather events, such as hurricanes. Resilience of the electric grid to high wind speeds is predicated upon the location and physical characteristics of the system components. Previous modeling assessments of electric grid failure were done at the systems level with assumptions on location and type of specific components. To facilitate more explicit adaptation metrics, accurate component-level information is needed. In this study, we build and utilize a data set of location, physical characteristics, and age of transmission structures for nine counties in the Florida Panhandle. These component characteristics were then simulated for failure under a variety of scenarios using fragility curves. Eight hurricanes were modeled using Hazus from the Federal Emergency Management Administration and the resulting impact to the network was assessed. The network was generated using the transmission lines and towers, showing increasing impacts to network efficiency with larger storms. Although modern transmission structures are built under the more stringent extreme wind loading construction standards, the prevalence of older, wooden transmission structures throughout the region poses a substantial risk to reliable electricity transmission during tropical cyclone events from the Gulf of Mexico.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment of Electric Grid Transmission System Simulator for Human Factors Research

Over the past decades, various technologies have been developed for electric grid operations to support clean energy, meet rising electricity demands, and address infrastructure concerns. However, the human factors aspect is often overlooked during rapid integration. Questions persist about how these technologies impact human performance. Simulators play a critical role in supporting investigation of human factors design concepts and conducting comprehensive usability testing to evaluate human performance and assess human reliability. This paper aims to address human factors research simulator requirements and conduct a comparative study of six different simulators. A detailed evaluation reveals that the evaluated simulators lack the ability to customize user interfaces. Additionally, their user interface designs do not fulfill the basic human factors design principles, potentially leading to increased response variability and reduced statistical power when conducting controlled experimental research. In the future, it is essential to develop scripting tools to integrate customizable user interfaces and simulation models, ensuring meeting research requirements.

Li, Ruixuan↗

Transmission Innovation Symposium: Modernizing the U.S. Electrical Grid

The foundation of the United States Department of Energy (DOE) Transmission Reliability research program was established 20 years ago by a series of commissioned white papers. Those white papers described the dramatic institutional and regulatory changes that the U.S. electricity transmission grid was undergoing at the time and articulated the technical challenges that these changes created. The challenges outlined in the white papers were the basis for the initial research goals of the DOE Transmission Reliability program. To a large extent, the reliability research needs outlined in the original white papers have now been met. As a result, now is an appropriate time to step back and review the technical challenges that the industry currently faces and to use those challenges as the basis for identifying the next set of targets for DOE’s transmission-related research and development (R&D) programs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy transport corridors: the potential role of Federal lands in states identified by the Energy Policy Act of 2005, section 368(b).

On August 8, 2005, the President signed the Energy Policy Act of 2005 (EPAct) into law. In Subtitle F of EPAct, Congress set forth various provisions that would change the way certain federal agencies (Agencies) coordinate to authorize the use of land for a variety of energy-related purposes. As part of Subtitle F of EPAct, Section 368 addresses the issue of energy transportation corridors on federal land for oil, gas, and hydrogen pipelines, as well as electricity transmission and distribution facilities. Because of the critical importance of improving the nation's electrical transmission grid, Congress recognized that electricity transmission issues should receive added attention when the Agencies address corridor location and analysis issues. In Section 368, Congress specifically directed the Agencies to consider the need for upgraded and new facilities to deliver electricity: In carrying out [Section 368], the Secretaries shall take into account the need for upgraded and new electricity transmission and distribution facilities to (1) improve reliability; (2) relieve congestion; and (3) enhance capability of the national grid to deliver electricity. Section 368 does not require the Agencies to consider or approve specific projects, applications for rights-of-way (ROWs), or other permits within designated energy corridors. Importantly, Section 368 does not direct, license, or otherwise permit any on-the-ground activity of any sort. If an applicant is interested in obtaining an authorization to develop a project within any corridor designated under Section 368, the applicant would have to apply for a ROW authorization and applicable permits. The Agencies would consider each application by applying appropriate project-specific reviews under requirements of laws and related regulations, including, but not limited to, the National Environmental Policy Act (NEPA), the Clean Water Act, the Clean Air Act, Section 7 of the Endangered Species Act (ESA), and Section 106 of the National Historic Preservation Act (NHPA). Under Section 368, Congress divided the United States into two groups of states: the 11 contiguous western states and the remaining states. Direction for energy transportation corridor analysis and selection in the 11 western states was addressed in Section 368(a) of EPAct, while direction for energy transportation corridor analysis and selection in all other states was addressed under Section 368(b) of EPAct. It was clearly the priority of Congress to conduct corridor location studies and designation first on federal lands in the western states. Under Section 368(a), the Agencies produced a programmatic environmental impact statement (EIS), Designation of Energy Corridors on Federal Land in the 11 Western States (DOE and DOI 2008), that was used in part as the basis for designating more than 6,000 mi (9,656 km) of energy transportation corridors on federal land in 11 western states. Under Section 368(a) of EPAct, Congress clearly stated the Agencies needed to (1) designate energy transportation corridors on federal land, (2) conduct the necessary environmental review of the designated corridors, and (3) incorporate the designated corridors into the appropriate land use plans. Congressional direction under Section 368(b) of EPAct differs from that provided under Section 368(a). Specifically, Section 368(b) requires the secretaries of the Agencies, in consultation with the Federal Energy Regulatory Commission (FERC), affected utility industries, and other interested persons, to jointly: (1) Identify corridors for oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities on federal land in states other than the 11 western states identified under Section 368(a) of EPAct, and (2) Schedule prompt action to identify, designate, and incorporate the corridors into the applicable land use plans. While Section 368(a) clearly directs designation as a necessary first step for energy transportation corridors in the 11 western states, Section 368(b) directs the Agencies to first identify corridors and then schedule prompt action to identify, designate, and incorporate the corridors into applicable land use plans. To comply with the congressional direction provided in Section 368(b), the Agencies investigated corridor identification issues in the Section 368(b) states; this report to Congress provides information that could be relevant to possible future designation of energy corridors. Future designations, if appropriate and necessary, would occur when the Agencies undertake revisions and/or updates to land use plans that guide management decisions on lands located within individual administrative units, such as specific National Forests, National Parks, or Wildlife Refuges. At this time, the Agencies are not proposing any actions or decisions related directly or indirectly to designating energy corridors on federal land under Section 368(b) of EPAct.

08 HYDROGEN↗

Multidisciplinary Design, Analysis, and Optimization (MDO) for Co-Designed Transmission & Distribution Electric Grid Planning

This paper describes early experiences and example use cases applying multi-disciplinary design analysis and optimization (MDO) to the integrated design of power grids. Adapted from aerospace, MDO enables combining multiple existing tools into a coordinated optimization. Here we use MDO to simultaneously capture integrated transmission-distribution and investment-engineering trade-offs in an automated framework. Example use cases showcase prototype interactions among existing grid models using MDO and hint at the types of integrated analyses enabled by this approach. In addition, we share experiences and thoughts on grid-specific challenges and opportunities to help advance further work in this area.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Placing power linres : GIS helps site energy corridors.

Turn the lights on when you enter a room, then turn the lights off when you leave. Most of us repeat this sequence many times each day, and never give it another thought. But that seemingly simple light switch on the wall connects us to one of the most complex systems in the world: the electrical grid. Most of the United States is served by a highly reliable and adequate supply of electrical power, which is distributed through a grid of thousands of miles of electricity-transmission lines. However, as the electricity-supply infrastructure ages and consumer demand for electricity grows, the capacity to deliver electrical power hasn't kept pace with demand, and upgrading the electrical-transmission grid has become a more pressing need. From 1988-1998, demand for transmission grew by 30 percent while transmission grew by only 15 percent. From 1999-2009, demand grew by 20 percent and transmission by only 3 percent Despite a short-term decline related to the economic downturn and improved efficiency, U.S. energy consumption is expected to increase by 14 percent between 2008 and 2035. This growth will drive the need to develop viable routes for new transmission lines. Because transmission lines extend over large distances, they typically cross many federal, tribal, state, local and private land jurisdictions, each with a complex and varying set of siting issues and land-management practices. And as the existing grid needs improvement to meet growing demand, the U.S. is rapidly developing renewable energy sources, particularly solar and wind energy, often in areas far removed from existing electricity-transmission infrastructure and energy-consumption areas.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems, e.g., emergency asset management. Included is an example case study: Hurricane Dolly damaging a synthetic 2000-bus test system during its landing in Southern Texas. We perform statistical analysis of damages and discuss topological effects on the example synthetic grid. Also, we include a cursory evaluation of impacts using simplified operational models. Finally, we discuss how our method can be extended to use even higher-fidelity meteorological data sets and suggest directions for future work.

contingencies↗

Technical Impacts of Light-Duty and Heavy-Duty Transportation Electrification on a Coordinated Transmission and Distribution System

In this study, we propose a strategy to model the required spatiotemporal charging demand from light-duty (LD) and medium- and heavy-duty (MHD) electric vehicles (EVs) using actual transportation data by mapping the demand for the required EV charging to a realistic and coordinated distribution and transmission electric grid at the predicted times of the day to study their impact on the power system in a variety of load, weather, and EV penetration scenarios. This work is the first study that includes the actual weather data and transportation data with realistic and coordinated distribution and transmission grid data in a large industry-scale level study. The main goal of this study is to identify possible issues and required upgrades in the electric grid, caused by an increase in EV integration. The transmission case study is a large grid with 6717 buses over a Texas footprint, and the distribution grid is over Houston, a city in Texas, covering over three million customers. The resulting overloads and voltage violations experienced in the system are discussed, and required planning upgrades to avoid these issues are suggested.

AC optimal power flow (AC-OPF)↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources: Preprint

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Included is an example case study: Hurricane Dolly damaging a synthetic 2000 bus test system during its landing in Southern Texas. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems including emergency asset management. We perform statistical analysis of damages and quantify topological effects on example synthetic grid. Also, we investigate loss-of-load events during two-day economic dispatch experiment. Finally, we point out various shortcomings of our method and suggest how it can be improved.

contingencies↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Included is an example case study: Hurricane Dolly damaging a synthetic 2000 bus test system during its landing in Southern Texas. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems including emergency asset management. We perform statistical analysis of damages and quantify topological effects on example synthetic grid. Also, we investigate loss-of-load events during two-day economic dispatch experiment. Finally, we point out various shortcomings of our method and suggest how it can be improved.

data-driven forecasting↗

Developing a Power Plant Suitability Model for the Energy Zones Mapping Tool

This report provides an example of designing, developing, and running a power plant suitability model in the Energy Zones Mapping Tool (EZMT), a public, web-based mapping tool with a large spatial database focused on energy infrastructure, energy resources, and related siting factors. The example focuses on natural gas combined cycle (NGCC) power plants, which have several unique and interesting characteristics. NGCC plants typically provide peaking power to the electrical grid. Such plants can be started or stopped relatively quickly and are often used to supplement base load plants (such as nuclear or coal) during times of peak electrical consumption or to counterbalance lulls in variable power generation (such as wind or solar). Due to these and other factors, NGCC plants have been projected to increase in number under energy planning studies such as Hadley et al. The scope of the Hadley et. al. study is the Eastern Interconnection (EI), the electrical transmission grid serving much of the United States and Canada east of the Rocky Mountains. Results in the study are organized according to 22 Multi-region National—North American Electricity and Environment Model (NEEM) regions within the EI. NGCC plants usually have lower water requirements than other thermoelectric power plants they may replace; therefore, they are expected to have an interesting role in reducing the overall water requirements of energy generation.

20 FOSSIL-FUELED POWER PLANTS↗

Trunkline Construction

The materials used for the construction of a trunkline that connects an electric power plant to the main electricity transmission grid. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=51581F06-6C08-4379-8E3D-2B7EBA1B9CCD

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling Power Plant Siting Opportunities and Constraints in the Eastern Interconnection

The electrical transmission grid is a critical part of the U.S. national infrastructure, and its modernization is a U.S. Department of Energy (DOE) priority. We describe the Energy Zones Mapping Tool (EZMT), a unique, powerful, and public web-based system with multi-criteria decision analysis (MCDA) models for more than 20 power plant technologies and many other capabilities. Through a case study on natural gas combined cycle (NGCC) power plants in the Eastern Interconnection (EI), we provide an example of incorporating an EZMT MCDA model into a larger planning context, with projections of interconnection-level capacity expansion, thermoelectric power plant retirements, and water availability. Our results provide insights on candidate NGCC site distributions and the criteria influencing them. The case study provides both an efficient methodology for performing similar analyses and hundreds of candidate NGCC power plant sites that can be studied in more detail as potential project sites.

20 FOSSIL-FUELED POWER PLANTS↗

Impact assessment of geomagnetic induced current neutral blocking devices with power electronics sources on distance relay for 230 kV transmission lines

Electrical grids increased the integration of power electronics sources onto transmission lines. In addition, recent reports show a significant rise in geomagnetic storms occurring in 2024. These geomagnetic storms can affect transmission lines by inducing electrical currents within them, potentially causing power outages due to overloaded power transformers. Geomagnetic induced current neutral blocking devices (GIC-NBDs) are capacitors on the ground of wye power transformers, to avoid damage caused by geomagnetic storms. The integration of distance relays and transmission lines with power electronics sources and GIC-NBDs needs to be studied to observe if GIC-NBDs and power electronics sources could adversely affect operation of the electrical grid. In this analysis, the effect of 2 MW power electronics sources and GIC-NBDs on distance relays is assessed for different 230 kV transmission line lengths in radial and nonradial power systems. The simulations measured the apparent impedances, with different electrical faults. Results for a typical 2,650 μF GIC-NBD application were presented on impedance plots, and the distance relay model operations were assessed. In conclusion, the tests for radial and nonradial power systems showed the behavior of the distance elements and source impedance ratios, assessing the effect of power electronics sources and GIC-NBDs on 230 kV transmission lines.

Distance relays↗

Measurement placement in electric power transmission and distribution grids: Review of concepts, methods, and research needs

Sensing and measurement systems are quintessential to the safe and reliable operation of electric power grids. Their strategic placement is of ultimate importance because it is not economically viable to install measurement systems on every node and branch of a power grid, though they need to be monitored. An overwhelming number of strategies have been developed to meet oftentimes multiple conflicting objectives. The prime challenge in formulating the problem lies in developing a heuristic or an optimisation model that, though mathematically tractable and constrained in cost, leads to trustworthy technical solutions. Further, large-scale, long-term deployments pose additional challenges because the boundary conditions change as technologies evolve. For instance, the advent of new technologies in sensing and measurement, as well as in communications and networking, might impact the cost and performance of available solutions and shift initially set conditions. Also, the placement strategies developed for transmission grids might not be suitable for distribution grids, and vice versa, because of unique characteristics; therefore, the strategies need to be flexible, to a certain extent, because no two power grids are alike. Despite the extensive literature on the present topic, the focus of published works tends to be on a specific subject, such as the optimal placement of measurements to ensure observability in transmission grids. There is a dearth of work providing a comprehensive picture for developing optimal placement strategies. Because of the ongoing efforts on the modernisation of electric power grids, there is a need to consolidate the status quo while exposing its limitations to inform policymakers, industry stakeholders, and researchers on the research-and-development needs to push the boundaries for innovation. Accordingly, this paper first reviews the state-of-the-art considering both transmission and distribution grids. Then, it consolidates the key factors to be considered in the problem formulation. Finally, it provides a set of perspectives on the measurement placement problem, and it concludes with future research directions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic Line Rating Oncor Electric Delivery Smart Grid Program

Electric transmission lines are the lifeline of the electric utility industry, delivering its product from source to consumer. This critical infrastructure is often constrained such that there is inadequate capacity on existing transmission lines to efficiently deliver the power to meet demand in certain areas or to transport energy from high-generation areas to high-consumption regions. When this happens, the cost of the energy rises; more costly sources of power are used to meet the demand or the system operates less reliably. These economic impacts are known as congestion, and they can amount to substantial dollars for any time frame of reference: hour, day or year. There are several solutions to the transmission constraint problem, including: construction of new generation, construction of new transmission facilities, rebuilding and reconductoring of existing transmission assets, and Dynamic Line Rating (DLR). All of these options except DLR are capital intensive, have long lead times and often experience strong public and regulatory opposition. The Smart Grid Demonstration Program (SGDP) project co-funded by the Department of Energy (DOE) and Oncor Electric Delivery Company developed and deployed the most extensive and advanced DLR installation to demonstrate that DLR technology is capable of resolving many transmission capacity constraint problems with a system that is reliable, safe and very cost competitive. The SGDP DLR deployment is the first application of DLR technology to feed transmission line real-time dynamic ratings directly into the system operation’s State Estimator and load dispatch program, which optimizes the matching of generation with load demand on a security, reliability and economic basis. The integrated Dynamic Line Rating (iDLR)1 collects transmission line parameters at remote locations on the lines, calculates the real-time line rating based on the equivalent conductor temperature, ambient temperature and influence of wind and solar radiation on the stringing section, transmits the data to the Transmission Energy Management System, validates its integrity and passes it on to Oncor and ERCOT (Electric Reliability Council of Texas) respective system operations. The iDLR system is automatic and transparent to ERCOT System Operations, i.e., it operates in parallel with all other system status telemetry collected through Supervisory Control and Data Acquisition (SCADA) employed across the company.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Small Hydropower Interconnections: State Interconnection Processes

Small hydropower projects with rated power output between 0 to 20 MW have been the predominant source of hydropower growth over the past decade in the United States (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier. Interconnection of an electricity generating unit is overseen by the distribution or transmission owner, who use interconnection standards and requirements that vary by state. The differences between standards in standards may affect the final cost, timeline, and success of a small hydropower project. Small hydropower project developers across the United States have found interconnection procedures to be fraught with cost surprises and schedule overruns. System operators have struggled to understand impacts to overburdened or rapidly evolving transmission and distribution grids. The results of these shortcomings have been stranded costs and unrealized small hydropower potential. Though regulatory actions and policy recommendations at the state level have increased the situational awareness of interconnection challenges, the remote locations of small hydropower resources and the relatively small revenues associated with energy production through small hydropower facilities continue to make interconnection processes and requirements confusing and costly. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. The second in a series, this paper investigates the interconnection process in each state in the U.S. to compare their attributes. Subsequent papers in the series will analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”) and present best practices (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development. The first paper in the series examined the state of small hydropower projects in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”) to understand the industry characteristics.

13 HYDRO ENERGY↗