Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “efficient infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Fabrication Infrastructure to Enable Efficient Exploration and Utilization of Space

Unlike past one-at-a-time mission approaches, system-of-systems infrastructures will be needed to enable ambitious scenarios for sustainable future space exploration and utilization. Fabrication infrastructure will be needed to support habitat structure development, tools and mechanical part fabrication, as well as repair and replacement of ground support and space mission hardware such as life support items, vehicle components and crew systems. The fabrication infrastructure will need the In Situ Fabrication and Repair (ISFR) element, which is working in conjunction with the In Situ Resources Utilization (ISRU) element, to live off the land. The ISFR Element supports the entire life cycle of Exploration by: reducing downtime due to failed components; decreasing risk to crew by recovering quickly from degraded operation of equipment; improving system functionality with advanced geometry capabilities; and enhancing mission safety by reducing assembly part counts of original designs where possible. This paper addresses the fabrication infrastructures that support efficient, affordable, reliable infrastructures for both space exploration systems and logistics; these infrastructures allow sustained, affordable and highly effective operations on the Moon, Mars and beyond.

Howell, Joe T.↗

On-Site Fabrication Infrastructure to Enable Efficient Exploration and Utilization of Space

Unlike past one-at-a-time mission approaches, system-of-systems infrastructures will be needed to enable ambitious scenarios for sustainable future space exploration and utilization. So what do we do when we get to the moon for sustainable exploration. On-site fabrication infrastructure will be needed to support habitat structure development, tools and mechanical part fabrication, as well as repair and replacement of ground support and space mission hardware such as life support items, vehicle components and crew systems. The on-site fabrication infrastructure will need the In Situ Fabrication and Repair (ISFR) element, which is working in conjunction with the In Situ Resources Utilization (ISRU) element, to live off the land. The ISFR element has worked closely with the ISRU element in the past year to assess the ability of using lunar regolith as a viable feedstock for fabrication material. Preliminary work has shown promise and the ISFR Element will continue to concentrate on this activity. Fabrication capabilities have been furthered with the process certification effort that, when completed, will allow for space-qualified hardware to be manufactured. Materials being investigated include titanium and aluminum alloys as well as lunar regolith simulants with binders. This paper addresses the latest advancements made in the fabrication of infrastructures that support efficient, affordable, reliable infrastructures for both space exploration systems and logistics; infrastructures that allow sustained, affordable and highly effective operations on the Moon and beyond.

Howell, Joe T.↗

Enabling Reliable, Fault-Tolerant Autonomous Lunar Habitats with High-Performance Spaceflight Computing

The lunar surface presents unfavorable constraints and harsh living conditions. To address these challenges, autonomous habitats will require complex integrated systems that combine advanced software, high-performance hardware, and cutting-edge sensors to ensure sustainability, safety, and operational efficiency. Consequently, maintaining a sustainable presence on the Moon requires reliable infrastructure and efficient development, precise monitoring, and utilization of resources within a lunar installation. These elements are essential not only to ensure that lunar settlement can be long-term, self-sustaining, and resource-efficient, but also to serve as a foundation for future missions and eventual human habitation on Mars. Humans are not native to the Moon; therefore, our survival and ability to thrive will depend on autonomous systems that can foster safety and resilience through high-availability architectures, graceful degradation, and highly fault-tolerant spaceflight hardware capable of continuing operation during failures. This requires advanced human-rated distributed systems architectures with specialized electronics, scalable capabilities, and an integrated design approach. Unlike current practices focused on short-term missions and regularly maintained components, permanent lunar compute systems must be designed for extended operations beyond mission durations. This paper explores the necessity of transitioning toward fault- tolerant, highly autonomous hardware systems designed for multi-year missions. It also identifies critical subsystems that require high levels of autonomy, supported by radiation-hardened processors and extreme thermal loads, which are essential to mitigate long-term degradation and ensure sustainable lunar habitation. Finally, the paper aligns with NASA’s identified Civil Space Shortfalls, particularly in high-performance onboard computing, advanced data acquisition, extreme-environment avionics, radiation monitoring and countermeasures, and autonomous health management. It proposes NASA’s new High-Performance Spaceflight Computing (HPSC) processor as a turnkey solution, delivering 100 times the performance-per-watt of legacy rad-hard CPUs and enabling onboard AI, edge computing, and fault-tolerant features essential for sustained lunar autonomy and beyond.

Sarkis S Mikaelian↗

Evolution of A Distributed Live, Virtual, Constructive Environment for Human in the Loop Unmanned Aircraft Testing

NASA's Unmanned Aircraft Systems Integration in the National Airspace System Project is conducting human in the loop simulations and flight testing intended to reduce barriers associated with enabling routine airspace access for unmanned aircraft. The primary focus of these tests is interaction of the unmanned aircraft pilot with the display of detect and avoid alerting and guidance information. The projects integrated test and evaluation team was charged with developing the test infrastructure. As with any development effort, compromises in the underlying system architecture and design were made to allow for the rapid prototyping and open-ended nature of the research. In order to accommodate these design choices, a distributed test environment was developed incorporating Live, Virtual, Constructive, (LVC) concepts. The LVC components form the core infrastructure support simulation of UAS operations by integrating live and virtual aircraft in a realistic air traffic environment. This LVC infrastructure enables efficient testing by leveraging the use of existing assets distributed across multiple NASA Centers. Using standard LVC concepts enable future integration with existing simulation infrastructure.

UAS in the NA↗

Evolution of A Distributed Live, Virtual, Constructive Environment for Human in the Loop Unmanned Aircraft Testing

NASA's Unmanned Aircraft Systems Integration in the National Airspace System Project is conducting human in the loop simulations and flight testing intended to reduce barriers associated with enabling routine airspace access for unmanned aircraft. The primary focus of these tests is interaction of the unmanned aircraft pilot with the display of detect and avoid alerting and guidance information. The project's integrated test and evaluation team was charged with developing the test infrastructure. As with any development effort, compromises in the underlying system architecture and design were made to allow for the rapid prototyping and open-ended nature of the research. In order to accommodate these design choices, a distributed test environment was developed incorporating Live, Virtual, Constructive, (LVC) concepts. The LVC components form the core infrastructure support simulation of UAS operations by integrating live and virtual aircraft in a realistic air traffic environment. This LVC infrastructure enables efficient testing by leveraging the use of existing assets distributed across multiple NASA Centers. Using standard LVC concepts enable future integration with existing simulation infrastructure.

LVC↗

Message Latency Characterization of a Distributed Live, Virtual, Constructive Simulation Environment

A distributed test environment incorporating Live, Virtual, Constructive, (LVC) concepts was developed to execute standalone and integrated simulations and flight-tests that support unmanned aircraft research for NASA’s Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) Project. The LVC components form the core infrastructure that supports simulation of UAS operations by integrating live and virtual aircraft in a realistic air traffic environment. This LVC infrastructure enables efficient testing by leveraging the use of existing distributed assets. The LVC concepts used for the UAS in the NAS project include live aircraft, flight simulators, and virtual air traffic control assets operating at facilities distributed across multiple NASA Centers. With a distributed network, however, there is a concern that message latency could impact the realism of a simulation and its data. The latencies associated with sending data among these distributed facilities were, therefore, measured to ensure that they fall within acceptable parameters. Several live and virtual test assets were integrated into the LVC infrastructure including NASA Armstrong’s Ikhana MQ-9 unmanned aircraft, NASA Glenn’s S3-B manned aircraft, and the B747 flight simulator at NASA Ames. Average latencies from 100 to 150 milliseconds were observed between the LVC System running at NASA Ames and each of the participating NASA Centers under a light-to-moderate (fifty aircraft) traffic sample.

Murphy, James R.↗

Barotropic Tidal Predictions and Validation in a Relocatable Modeling Environment

Under funding from the Office of Naval Research (ONR), and the Naval Oceanographic Office (NAVOCEANO), the Mississippi State University Center for Air Sea Technology (CAST) has been working on developing a Relocatable Modeling Environment(RME) to provide a uniform and unbiased infrastructure for efficiently configuring numerical models in any geographic/oceanic region. Under Naval Oceanographic Office (NAVO-CEANO) funding, the model was implemented and tested for NAVOCEANO use. With our current emphasis on ocean tidal modeling, CAST has adopted the Colorado University's numerical ocean model, known as CURReNTSS (Colorado University Rapidly Relocatable Nestable Storm Surge) Model, as the model of choice. During the RME development process, CURReNTSS has been relocated to several coastal oceanic regions, providing excellent results that demonstrate its veracity. This report documents the model validation results and provides a brief description of the Graphic user Interface (GUI).

Mehra, Avichal↗

Barotropic Tidal Predictions and Validation in a Relocatable Modeling Environment

Under funding from the Office of Naval Research (ONR), the Mississippi State University Center for Air Sea Technology (CAST) has been working on developing a Relocatable Modeling Environment (RME) to provide a uniform and unbiased infrastructure for efficiently configuring numerical models in any geographic or oceanic region. Under Naval Oceanographic Office (NAVOCEANO) funding, the model was implemented and tested for NAVOCEANO use. With our current emphasis on ocean tidal modeling, CAST has adopted the Colorado University's numerical ocean model, known as CURReNTSS (Colorado University Rapidly Relocatable Nestable Storm Surge) Model, as the model of choice. During the RME development process, CURReNTSS has been relocated to several coastal oceanic regions, providing excellent results that demonstrate its veracity. This report documents the model validation results and provides a brief description of the Graphic user Interface.

Mehra, Avichal↗

Sensor Selection and Data Validation for Reliable Integrated System Health Management

For new access to space systems with challenging mission requirements, effective implementation of integrated system health management (ISHM) must be available early in the program to support the design of systems that are safe, reliable, highly autonomous. Early ISHM availability is also needed to promote design for affordable operations; increased knowledge of functional health provided by ISHM supports construction of more efficient operations infrastructure. Lack of early ISHM inclusion in the system design process could result in retrofitting health management systems to augment and expand operational and safety requirements; thereby increasing program cost and risk due to increased instrumentation and computational complexity. Having the right sensors generating the required data to perform condition assessment, such as fault detection and isolation, with a high degree of confidence is critical to reliable operation of ISHM. Also, the data being generated by the sensors needs to be qualified to ensure that the assessments made by the ISHM is not based on faulty data. NASA Glenn Research Center has been developing technologies for sensor selection and data validation as part of the FDDR (Fault Detection, Diagnosis, and Response) element of the Upper Stage project of the Ares 1 launch vehicle development. This presentation will provide an overview of the GRC approach to sensor selection and data quality validation and will present recent results from applications that are representative of the complexity of propulsion systems for access to space vehicles. A brief overview of the sensor selection and data quality validation approaches is provided below. The NASA GRC developed Systematic Sensor Selection Strategy (S4) is a model-based procedure for systematically and quantitatively selecting an optimal sensor suite to provide overall health assessment of a host system. S4 can be logically partitioned into three major subdivisions: the knowledge base, the down-select iteration, and the final selection analysis. The knowledge base required for productive use of S4 consists of system design information and heritage experience together with a focus on components with health implications. The sensor suite down-selection is an iterative process for identifying a group of sensors that provide good fault detection and isolation for targeted fault scenarios. In the final selection analysis, a statistical evaluation algorithm provides the final robustness test for each down-selected sensor suite. NASA GRC has developed an approach to sensor data qualification that applies empirical relationships, threshold detection techniques, and Bayesian belief theory to a network of sensors related by physics (i.e., analytical redundancy) in order to identify the failure of a given sensor within the network. This data quality validation approach extends the state-of-the-art, from red-lines and reasonableness checks that flag a sensor after it fails, to include analytical redundancy-based methods that can identify a sensor in the process of failing. The focus of this effort is on understanding the proper application of analytical redundancy-based data qualification methods for onboard use in monitoring Upper Stage sensors.

Garg, Sanjay↗

NASA Langley Distributed Propulsion VTOL Tilt-Wing Aircraft Testing, Modeling, Simulation, Control, and Flight Test Development

Control of complex Vertical Take-Off and Landing (VTOL) aircraft traversing from hovering to wing born flight mode and back poses notoriously difficult modeling, simulation, control, and flight-testing challenges. This paper provides an overview of the techniques and advances required to develop the GL-10 tilt-wing, tilt-tail, long endurance, VTOL aircraft control system. The GL-10 prototype's unusual and complex configuration requires application of state-of-the-art techniques and some significant advances in wind tunnel infrastructure automation, efficient Design Of Experiments (DOE) tunnel test techniques, modeling, multi-body equations of motion, multi-body actuator models, simulation, control algorithm design, and flight test avionics, testing, and analysis. The following compendium surveys key disciplines required to develop an effective control system for this challenging vehicle in this on-going effort.

Rothhaar, Paul M.↗

A Comparison of a Solar Power Satellite Concept to a Concentrating Solar Power System

A comparison is made of a solar power satellite (SPS) concept in geostationary Earth orbit to a concentrating solar power (CSP) system on the ground to analyze overall efficiencies of each infrastructure from solar radiance at 1 AU to conversion and transmission of electrical energy into the power grid on the Earth's surface. Each system is sized for a 1-gigawatt output to the power grid and then further analyzed to determine primary collector infrastructure areas. Findings indicate that even though the SPS concept has a higher end-to-end efficiency, the combined space and ground collector infrastructure is still about the same size as a comparable CSP system on the ground.

Smitherman, David V.↗

A Comparison Of A Solar Power Satellite Concept To A Concentrating Solar Power System

A comparison is made of a Solar Power Satellite concept in geostationary Earth orbit to a Concentrating Solar Power system on the ground to analyze overall efficiencies of each infrastructure from solar radiance at 1 AU to conversion and transmission of electrical energy into the power grid on the Earth's surface. Each system is sized for a 1-gigawatt output to the power grid and then further analyzed to determine primary collector infrastructure areas. Findings indicate that even though the Solar Power Satellite concept has a higher end-to-end efficiency, that the combined space and ground collector infrastructure is still about the same size as a comparable Concentrating Solar Power system on the ground.

Smitherman, David V.↗

Advances Made in the Next Generation of Satellite Networks

Because of the unique networking characteristics of communications satellites, global satellite networks are moving to the forefront in enhancing national and global information infrastructures. Simultaneously, broadband data services, which are emerging as the major market driver for future satellite and terrestrial networks, are being widely acknowledged as the foundation for an efficient global information infrastructure. In the past 2 years, various task forces and working groups around the globe have identified pivotal topics and key issues to address if we are to realize such networks in a timely fashion. In response, industry, government, and academia undertook efforts to address these topics and issues. A workshop was organized to provide a forum to assess the current state-of-the-art, identify key issues, and highlight the emerging trends in the next-generation architectures, data protocol development, communication interoperability, and applications. The Satellite Networks: Architectures, Applications, and Technologies Workshop was hosted by the Space Communication Program at the NASA Lewis Research Center in Cleveland, Ohio. Nearly 300 executives and technical experts from academia, industry, and government, representing the United States and eight other countries, attended the event (June 2 to 4, 1998). The program included seven panels and invited sessions and nine breakout sessions in which 42 speakers presented on technical topics. The proceedings covers a wide range of topics: access technology and protocols, architectures and network simulations, asynchronous transfer mode (ATM) over satellite networks, Internet over satellite networks, interoperability experiments and applications, multicasting, NASA interoperability experiment programs, NASA mission applications, and Transmission Control Protocol/Internet Protocol (TCP/IP) over satellite: issues, relevance, and experience.

Bhasin, Kul B.↗

Re-engineering NASA's space communications to remain viable in a constrained fiscal environment

Along with the Red and Blue Teams commissioned by the NASA Administrator in 1992, NASA's Associate Administrator for Space Communications commissioned a Blue Team to review the Office of Space Communications (Code O) Core Program and determine how the program could be conducted faster, better, and cheaper. Since there was no corresponding Red Team for the Code O Blue Team, the Blue Team assumed a Red Team independent attitude and challenged the status quo, including current work processes, functional distinctions, interfaces, and information flow, as well as traditional management and system development practices. The Blue Team's unconstrained, non-parochial, and imaginative look at NASA's space communications program produced a simplified representation of the space communications infrastructure that transcends organizational and functional boundaries, in addition to existing systems and facilities. Further, the Blue Team adapted the 'faster, better, cheaper' charter to be relevant to the multi-mission, continuous nature of the space communications program and to serve as a gauge for improving customer services concurrent with achieving more efficient operations and infrastructure life cycle economies. This simplified representation, together with the adapted metrics, offers a future view and process model for reengineering NASA's space communications to remain viable in a constrained fiscal environment. Code O remains firm in its commitment to improve productivity, effectiveness, and efficiency. In October 1992, the Associate Administrator reconstituted the Blue Team as the Code O Success Team (COST) to serve as a catalyst for change. In this paper, the COST presents the chronicle and significance of the simplified representation and adapted metrics, and their application during the FY 1993-1994 activities.

Hornstein, Rhoda Shaller↗

A Comprehensive and Cost-Effective Computer Infrastructure for K-12 Schools

Since 1993, NASA Langley Research Center has been developing and implementing a low-cost Internet connection model, including system architecture, training, and support, to provide Internet access for an entire network of computers. This infrastructure allows local area networks which exceed 50 machines per school to independently access the complete functionality of the Internet by connecting to a central site, using state-of-the-art commercial modem technology, through a single standard telephone line. By locating high-cost resources at this central site and sharing these resources and their costs among the school districts throughout a region, a practical, efficient, and affordable infrastructure for providing scale-able Internet connectivity has been developed. As the demand for faster Internet access grows, the model has a simple expansion path that eliminates the need to replace major system components and re-train personnel. Observations of optical Internet usage within an environment, particularly school classrooms, have shown that after an initial period of 'surfing,' the Internet traffic becomes repetitive. By automatically storing requested Internet information on a high-capacity networked disk drive at the local site (network based disk caching), then updating this information only when it changes, well over 80 percent of the Internet traffic that leaves a location can be eliminated by retrieving the information from the local disk cache.

Warren, G. P.↗

Space-based Networking Technology Developments in the Interplanetary Network Directorate Information Technology Program

Described recent development of communications protocols, services, and associated tools targeted to reduce risk, reduce cost and increase efficiency of IND infrastructure and supported mission operations. Space-based networking technologies developed were: a) Provide differentiated quality of service (QoS) that will give precedence to traffic that users have selected as having the greatest importance and/or time-criticality; b) Improve the total value of information to users through the use of QoS prioritization techniques; c) Increase operational flexibility and improve command-response turnaround; d) Enable new class of networked and collaborative science missions; e) Simplify applications interfaces to communications services; and f) Reduce risk and cost from a common object model and automated scheduling and communications protocols. Technologies are described in three general areas: communications scheduling, middleware, and protocols. Additionally developed simulation environment, which provides comprehensive, quantitative understanding of the technologies performance within overall, evolving architecture, as well as ability to refine & optimize specific components.

scheduling↗

Scaleup of Microwave Powder Bed Fusion for Lunar Infrastructure Construction

NASA and its partners are seeking to establish a sustainable and permanent presence on the Moon. Like explorers on Earth, making use of natural resources upon arrival at the destination will be paramount. In-situ resource utilization of the lunar regolith will enable efficient construction of lunar infrastructure. Transforming the granular regolith into a solid can be achieved in many ways. One method is to use microwave energy to sinter the regolith into various structures. The lunar regolith has a low thermal conductivity, but microwaves can volumetrically heat it to bind the granular particles together in an energy efficient manner. One concept that is being developed and evaluated to sinter the regolith into infrastructure uses the Moon’s surface as a powder bed. Regolith would be added to the sintered lunar structure to build up layers to create structures such as landing pads, blast shields, roads, etc. Microwave systems, concept of operations, and sintering protocols are being developed to create a sub-element structure targeted for a lunar demonstration mission.

microwave↗

NASA Power: Global Solar Insolation, Meteorological Parameter Data, and Web Services to Support Sustainable Building Design and Operations

The buildings industry is currently striving to adopt green solutions to make infrastructure more energy-efficient in order to meet the 2050 net-zero climate goals. This planning requires reliable environmental datasets that are crucial in designing, building, and maintaining our world’s-built environment, as well as other energy-related processes and investments. This webinar for the National Institute of Building Sciences provides an overview of NASA’s Prediction Of Worldwide Energy Resources (POWER) Project that informs decision-making and development for sustainable building design and operations by enabling public open discovery, efficient access, and convenient distribution of NASA’s Earth Observations and global atmospheric model datasets. POWER’s datastore is comprised of solar radiation and surface meteorology parameters, spanning nearly 40 years of hourly data, that are easily accessible via several access methods and tools to support three focus areas: 1) renewable energy deployment and management, 2) sustainable infrastructure, and 3) agroclimatology applications. POWER and NASA Earth Science both plan future data parameters, updated tools, and improved observations that could directly support U.S. and international sustainable development goals, climate strategies, and building information modeling. To this end, solar data from several NASA projects and meteorological data from NASA assimilation models have already been reformatted and disseminated to the public via a user-friendly web GIS-enabled based data portal through the POWER Project. POWER data is analysis-ready and accessible through an Application Programming Interface (API), ArcGIS Image Services, and the project’s Data Access Viewer enhanced (DAVe), an interactive online tool. The POWER DAVe also features data consistent with ASHRAE Climate Design Conditions and has developed web image services showing Building Climate Zones and their variability. Through those tools, the data can be downloaded into multiple formats that support the infrastructure community, including CSV and Energy Plus Weather (EPW). POWER’s entire data product catalog is available through Amazon Web Services (AWS) Open Data Registry (ODR) via a free and publicly accessible Simple Storage Service (S3). This webinar provides a full overview of the NASA POWER Project's data and services developed in collaboration with the sustainable infrastructure community. Examples of how the renewable energy and building communities have utilized POWER data products to make decisions and a preview of future data product expansion, including climate projections, and web services will also be provided. Additionally, use case stories from our broad community of users will be presented.

Paul W. Stackhouse↗