Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “duty cycles”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

An experimental program with high duty-cycle polarized and unpolarized positron beams at Jefferson Lab

Positron beams, both polarized and unpolarized, are identified as important ingredients for the experimental programs at the next generation of lepton accelerators. In the context of the hadronic physics program at Jefferson Lab (JLab), positron beams are complementary, even essential, tools for a precise understanding of the electromagnetic structure of nucleons and nuclei, in both the elastic and deep-inelastic regimes. For instance, elastic scattering of polarized and unpolarized electrons and positrons from the nucleon enables a model independent determination of its electromagnetic form factors. Also, the deeply-virtual scattering of polarized and unpolarized electrons and positrons allows unambiguous separation of the different contributions to the cross section of the lepto-production of photons and of lepton-pairs, enabling an accurate determination of the nucleons and nuclei generalized parton distributions, and providing an access to the gravitational form factors of the energy-momentum tensor. Furthermore, positron beams offer the possibility of alternative tests of the Standard Model of particle physics through the search of a dark photon, the precise measurement of electroweak couplings, and the investigation of charged lepton flavor violation. This document discusses the perspectives of an experimental program with high duty-cycle positron beams at JLab.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Automatic control of clock duty cycle

In general, this disclosure is directed to a duty cycle correction (DCC) circuit that adjusts a falling edge of a clock signal to achieve a desired duty cycle. In some examples, the DCC circuit may generate a pulse in response to a falling edge of an input clock signal, delay the pulse based on a control voltage, adjust the falling edge of the input clock signal based on the delayed pulse to produce an output clock signal, and adjust the control voltage based on the difference between a duty cycle of the output clock signal and a desired duty cycle. Since the DCC circuit adjusts the falling edge of the clock cycle to achieve a desired duty cycle, the DCC may be incorporated into existing PLL control loops that adjust the rising edge of a clock signal without interfering with the operation of such PLL control loops.

Feng, Xiaoxin↗

SU-E-J-186: Using 4DCT-Based Motion Modeling to Predict Motion and Duty Cycle On Successive Days of Gated Radiotherapy

Purpose: To determine if 4DCT-based motion modeling and external surrogate motion measured during treatment simulation can enhance prediction of residual tumor motion and duty cycle during treatment delivery. Methods: This experiment was conducted using simultaneously recorded tumor and external surrogate motion acquired over multiple fractions of lung cancer radiotherapy. These breathing traces were combined with the XCAT phantom to simulate CT images. Data from the first day was used to estimate the residual tumor motion and duty cycle both directly from the 4DCT (the current clinical standard), and from external-surrogate based motion modeling. The accuracy of these estimated residual tumor motions and duty cycles are evaluated by comparing to the measured internal/external motions from other treatment days. Results: All calculations were done for 25% and 50% duty cycles. The results indicated that duty cycle derived from 4DCT information alone is not enough to accurately predict duty cycles during treatment. Residual tumor motion was determined from the recorded data and compared with the estimated residual tumor motion from 4DCT. Relative differences in residual tumor motion varied from −30% to 55%, suggesting that more information is required to properly predict residual tumor motion. Compared to estimations made from 4DCT, in three out of four patients examined, the 30 seconds of motion modeling data was able to predict the duty cycle with better accuracy than 4DCT. No improvement was observed in prediction of residual tumor motion for this dataset. Conclusion: Motion modeling during simulation has the potential to enhance 4DCT and provide more information about target motion, duty cycles, and delivered dose. Based on these four patients, 30 seconds of motion modeling data produced improve duty cycle estimations but showed no measurable improvement in residual tumor motion prediction. More patient data is needed to verify this Result. I would like to acknowledge funding from MRA, VARIAN Medical Systems, Inc.

60 APPLIED LIFE SCIENCES↗

A W-Geometry Ortho-TOF MS with High Resolution and Up to 100% Duty Cycle for MS/MS

Orthogonal injection time-of-flight (orthoTOF) mass spectrometry (MS) is the most prevalent form of TOFMS, owing to its greater control over incoming ion energy, the ability to correct for aberrations in incoming ion velocity and position, and its ability to provide an entire mass spectrum within a single scan. However, the duty cycle of orthoTOFMS is low compared with scanning analyzers, which can have 100% duty cycle when measuring a single type of ion. Typical duty cycles for orthoTOFMS range from 1% to 30%, depending on instrument geometry. Generally, as instrument resolution increases, duty cycle decreases. Additionally, the greatest duty cycle is achieved for the highest m/z ion recorded in the spectrum, and decreases for all other ions as a function of m/z. In a prior publication [Loboda, A.V.; Chernushevich, I.V. J. Am. Soc. Mass Spectrom. 20, 1342–1348 (20)], a novel trapping/release method for restoring the duty cycle of a V-geometry orthoTOFMS to near 100% (referred to as “Zeno pulsing”) was presented. Here, we apply that method to a W-TOF geometry analyzer with analog detection. Across a m/z range of 100–2000, sensitivity gains of ~5–20 are observed, for total ion currents approaching ~10{sup 7} ions·s{sup −1}. Zeno pulsing, or similar strategies for restoring duty cycle, will continue to be important as instrument resolution in orthoTOFMS is increased through the use of ion mirrors. .

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Evaluating ZEBRA Battery Module under the Peak-Shaving Duty Cycles

With the recent rapid increase in demand for reliable, long-cycle life, and safe battery technologies for large-scale energy-storage applications, a battery module based on ZEBRA battery chemistry is extensively evaluated for its application in peak shaving duty cycles. First, this module is tested with a full capacity cycle consisting of a charging process (factory default) and a discharging process with a current of 40 A. The battery energy efficiency (discharge vs. charge) is about 90%, and the overall energy efficiency is 80.9%, which includes the auxiliary power used to run the battery management system electronics and self-heating to maintain the module operating temperature (265 °C). Generally, because of the increased self-heating during the holding times that exist for the peak shaving duty cycles, the overall module efficiency decreases slightly for the peak-shaving duty cycles (70.7–71.8%) compared to the full-capacity duty cycle. With a 6 h, peak-shaving duty cycle, the overall energy efficiency increases from 71.8% for 7.5 kWh energy utilization to 74.1% for 8.5 kWh. We conducted long-term cycling tests of the module at a 6 h, peak-shaving duty cycle with 7.5 kWh energy utilization, and the module exhibited a capacity degradation rate of 0.0046%/cycle over 150 cycles (>150 days).

25 ENERGY STORAGE↗

Duty-Cycle Predictive Control of Quasi-Z-Source Modular Cascaded Converter Based Photovoltaic Power System

A duty-cycle predictive control is proposed for dc grid integration of front-end isolated quasi-Z-source modular cascaded converter (qZS-MCC) photovoltaic (PV) power system. The post-stage qZS half-bridge dc-dc converter deals with PV maximum power point tracking, dc grid integration, and dc-link voltage balance; whereas, the front-end isolation converters operate at a constant duty cycle of 50%. Thus, it saves control hardware resources while overcoming challenges from PV-panel voltage variations and dc-bus voltage limit. The proposed control uses the derived circuit model to predict the global active-state duty cycle for grid-connected current control and predict the shoot-through duty cycles for dc-link voltage balance, achieving a fast and accurate tracking target. The proposed control method has advantages of: i) eliminating weighting factors that exist in conventional model predictive control (MPC), ii) no sophisticated loop parameters design that exists in proportional-integral (PI) control, iii) operating at constant switching frequency that is different from the conventional MPC with variable switching frequency. Simulation and experimental tests are carried out to verify the effectiveness of the proposed control method and compare with the PI-based control system.

42 ENGINEERING↗

High-brightness electron injectors for high-duty cycle X-ray free electron lasers

The successful development in the last two decades of X-ray free electron lasers (FELs) with their revolutionary brightness performance has been tightly dependent on the parallel development of electron guns and injectors capable of providing the high-brightness electron beams required by FELs lasing at these short wavelengths. The ultimate brightness delivered by a linear accelerator (linac) is already set at its injector and the remaining part of the accelerator can be only designed to preserve the injector performance. The technology to be used for the accelerator part of an X-Ray FEL strongly depends on the duty-cycle at which the FEL operates. Normal-conducting, room-temperature, copper-based radio frequency (RF) technology is typically used for low duty-cycles of up to approximately 10 −3 . For higher duty-cycles and up to continuous wave (CW) operation, the linac must rely on superconductive RF technology because, with the higher duty-cycle, the increasingly higher power dissipated in normal conducting RF structures becomes excessive for the warm technology. The situation changes in the lower energy part of the accelerator, where injector schemes, based on direct current, normal-conducting, and superconducting RF electron guns, are demonstrating the beam quality performance required by high-duty-cycle X-ray FELs. In this paper we start with a description of the requirements for such injectors, followed by an overview of the pursued technologies and schemes, and by a discussion on the main differences in terms of beam dynamics between low and high duty-cycle injectors.

Sannibale, Fernando↗

Optimal flash rate and duty cycle for flashing visual indicators.

This experiment examined the ability of observers to determine, as quickly as possible, whether a visual indicator was steadily on or flashing. Six flash rates (periods) were combined factorially with three duty cycles (on-off ratios) to define 18 ?types' of intermittent signals. Experimental sessions were divided into six runs of 100 trials, each run utilizing one of the six flash rates. On any given trial in a run, the probability of a steady signal occurring was 0.5 and the probability of a flashing signal occurring was 0.5. A different duty cycle was employed daily for each experimental session. In all, 400 trials were devoted to each of the flash rates at each duty cycle. Accuracy and latency of response were the dependent variables of interest. The results show that the observers view the light for an interval of time appropriate to the expected flash rate and duty cycle; whether they judge the light to be steady or intermittent depends upon whether the light is extinguished during the predetermined waiting period. Adoption of this temporal criterion delays responding in comparison to those tasks involving responses to light onset. The decision or response criteria held by the observers are also sensitive to the parameters of the flashing light: observers become increasingly willing to call a flashing light ?steady' as flash duration increases.

Markowitz, J.↗

Medium- and Heavy-Duty Truck Duty Cycles

This dataset provides second-by-second duty cycle data for Class 6 and Class 8 diesel trucks in Texas, including key vehicle metrics, engine-related data, and GPS data (excluding GPS latitude and longitude to ensure confidentiality). The data were collected via tablets installed on the trucks and organized into daily datasets, each associated with a unique vehicle ID and date. There are 12 daily datasets for Class 6 diesel trucks (three unique vehicle IDs) and 43 daily datasets for Class 8 diesel trucks (six unique vehicle IDs). The units associated with each column are included in the name. The engine performance data include columns such as engine speed, engine percent torque, and engine fuel rate. Road grade (%/100) was estimated using the GPS altitude and wheel-based vehicle speed, which is used as an input for FASTSim. Cumulative distance was also calculated using the wheel-based vehicle speed. Additional columns include: - Engine Speed (RPM): Removed inaccurate readings and used to calculate angular velocity (radians/second). - Torque (N·m): Calculated using engine percent torque, nominal friction percent torque, and engine reference torque values (those columns were removed from dataset), then normalized to express as torque (%). - Flywheel Power (%): Calculated using the angular velocity and torque (in kW), then normalized as a percentage of the maximum value. - Engine Fuel Rate (%) and Torque (%): Both metrics were normalized by dividing by their respective maximum values within each dataset to express them as percentages. The datasets were analyzed to assess the energy impact of various driving behaviors, simulate energy efficiency, and recommend optimal routes for diesel trucks using NLR’s tool called RouteE. For driver coaching, factors like speed and acceleration limits were considered, and idle periods were reduced (assuming the engine was off during idling) to adjust each drive cycle. These adjusted drive cycles were then simulated in FASTSim to evaluate their effect on fleet energy consumption and estimate potential energy savings. The original cycles are available for download on this page ![image](CoVaR_Image_for_Data_Page_Kenworth_Truck.jpg)

1Hz↗

The Study of TeV Variability and the Duty Cycle of Mrk 421 from 3 Yr of Observations with the Milagro Observatory

TeV-flaring activity with timescales as short as tens of minutes and an orphan TeV flare have been observed from the blazar Markarian 421 (Mrk 421). The TeV emission from Mrk 421 is believed to be produced by leptonic synchrotron self-Compton (SSC) emission. In this scenario, correlations between the X-ray and the TeV fluxes are expected, TeV orphan flares are hardly explained, and the activity (measured as duty cycle) of the source at TeV energies is expected to be equal to or less than that observed in X-rays if only SSC is considered. To estimate the TeV duty cycle of Mrk 421 and to establish limits on its variability at different timescales, we continuously observed Mrk 421 with the Milagro observatory. Mrk 421 was detected by Milagro with a statistical significance of 7.1 standard deviations between 2005 September 21 and 2008 March 15. The observed spectrum is consistent with previous observations by VERITAS. We estimate the duty cycle of Mrk 421 for energies above 1 TeV for different hypotheses of the baseline flux and for different flare selections and we compared our results with the X-ray duty cycle estimated by Resconi et al. The robustness of the results is discussed.

observations↗

Effect of pulse duty cycle on Inconel 718 laser welds

Crack sensitive Inconel 718 was laser pulse welded using a 3.0 kW CO2 laser. Weld shape, structure, and porosity were recorded as a function of the pulse duty cycle. Within the matrix studied, the welds were found to be optimized at a high (17 ms on, 7 ms off) duty cycle. These welds were superior in appearance and lack of porosity to both low duty cycle and CW welds.

McCay, M. H.↗

Medium- and Heavy-Duty Vehicle Duty Cycles for Electric Powertrains

NREL's Fleet Test and Evaluation group has extensive in-use vehicle data demonstrating the importance of understanding the vocational duty cycle for appropriate sizing of electric vehicle (EV) and power electronics components for medium- and heavy-duty EV applications. This presentation includes an overview of recent EV fleet evaluation projects that have valuable in-use data that can be leveraged for sub-system research, analysis, and validation. Peak power and power distribution data from in-field EVs are presented for four different vocations, including class 3 delivery vans, class 6 delivery trucks, class 8 transit buses, and class 8 port drayage trucks, demonstrating the impacts of duty cycle on performance requirements.

33 ADVANCED PROPULSION SYSTEMS↗

Development of a frequency regulation duty-cycle for standardized energy storage performance testing

The US DOE Protocol for uniformly measuring and expressing the performance of energy storage systems, first developed in 2012 through inclusive working group activities, provides standardized methodologies for evaluating an energy storage system’s ability to supply specific services to electrical grids. This article elaborates on the data and decisions behind the duty-cycle used for frequency regulation in this protocol. Analysis of a year of publicly available frequency regulation control signal data from a utility was considered in developing the representative signal for this use case. Moreover, this showed that signal standard deviation can be used as a metric for aggressiveness or rigor. From these data, we select representative 2 h long signals that exhibit nearly all of dynamics of actual usage under two distinct regimens, one for average use and the other for highly aggressive use. Our results were combined into a 24-h duty-cycle comprised of average and aggressive segments. The benefits and drawbacks of the selected duty-cycle are discussed along with its potential implications to the energy storage industry.

25 ENERGY STORAGE↗

Determination of Duty Cycle for Energy Storage Systems in a PV Smoothing Application

This report supplements the document, "Protocol for Uniformly Measuring and Expressing the Performance of Energy Storage Systems," issued in a revised version in April 2016 (see [4]), which will include the photovoltaic (PV) smoothing application for an energy storage system (ESS). This report provides the background and documentation associated with the determination of a duty cycle for an ESS operated in a PV smoothing application for the purpose of measuring and expressing ESS performance in accordance with the ESS performance protocol. ACKNOWLEDGEMENTS The authors gratefully acknowledge the support of Dr. Imre Gyuk, program manager for the DOE Energy Storage Systems Program. The authors would also like to express their appreciation to all the stakeholders who participated as members of the PV Smoothing Subgroup. Without their thoughtful input and recommendations, the definitions, metrics, and duty cycle provided in this report would not have been possible. A complete listing of members of the PV Smoothing Subgroup appears in the first chapter of this report. Special recognition should go to the staffs at Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) in collaborating on this effort. In particular, Mr. David Conover and Dr. Vish Viswanathan of PNNL and Dr. Summer Ferreira of SNL were especially helpful in their suggestions for the determination of a duty cycle for the PV Smoothing application.

25 ENERGY STORAGE↗

Valve Regulated Lead Acid Battery Evaluation under Peak Shaving and Frequency Regulation Duty Cycles

This work highlights the performance metrics and the fundamental degradation mechanisms of lead-acid battery technology and maps these mechanisms to generic duty cycles for peak shaving and frequency regulation grid services. Four valve regulated lead acid batteries have been tested for two peak shaving cycles at different discharge rates and two frequency regulation duty cycles at different SOC ranges. Reference performance and pulse resistance tests are done periodically to evaluate battery degradation over the time. The results of the studies are expected to provide a valuable understanding of lead acid battery technology suitability for grid energy-storage applications.

25 ENERGY STORAGE↗

Low duty cycle pulsed UV technique for spectroscopy of aluminum monochloride

We present what we believe to be a novel technique to minimize UV-induced damage in experiments that employ second-harmonic generation cavities. The principle of our approach is to reduce the duty cycle of the UV light as much as possible to prolong the lifetime of the used optics. The low duty cycle is achieved by ramping the cavity into resonance for a short time during the experimental cycle when the light is used and tuning it to an off-resonant state otherwise. The necessary fast ramp and length-stabilization control of the cavity is implemented with the FPGA-based STEMlab platform. We demonstrate the utility of this method by measuring the isotope shift of the electronic transition (X 1 Σ ← A 1 Π) in AlCl at 261.5 nm in a pulsed molecular beam experiment.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗