Demonstrating the data center as a flexible grid asset using a C-HIL setup

Increasing data center demand is outpacing grid infrastructure development. Artificial intelligence workloads and hyperscale cloud growth are creating unprecedented demand for power, while traditional grid expansion faces multiyear development timelines. Verrus is developing an innovative datacenter solution for this challenge, data centers that act as active grid-supportive assets rather than passive loads. Our approach integrates a novel grid-aware power flow management system with battery energy storage systems(BESS) into a microgrid-controlled, medium-voltage power distribution architecture that delivers critical capabilities, such as: * Fast response to grid disturbances such over/ under voltage or over/ under frequency * Demand flexibility that can service requests from the utility within 10 s * Uninterrupted transition to islanded operation during grid outages * Continuous uptime assurance for compute loads while maintaining all customer service level agreements. Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), these capabilities were validated using NREL's Advanced Research on Integrated Energy Systems (ARIES) virtual emulation environment to model a 70-MW grid-interactive data center. This paper outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can provide both critical load resilience and ancillary grid support without compromising uptime requirements. Specifically, we present a digital real time simulation of a 70 MW data center integrated with a physical microgrid controller, and demonstrate the data center response in the event of a grid voltage and frequency event, utility demand response request and utility outage.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Crossing the Barriers: An Analysis of Permitting Barriers to Geothermal Development and Potential Improvement Scenarios

Developers have identified many non-technical barriers to geothermal power development, including permitting. Activities required for permitting, such as the associated environmental reviews, can take a considerable amount of time and delay project development. This paper discusses the impacts to geothermal development timelines due to the permitting challenges, including the regulatory framework, environmental review process, and ancillary permits. We identified barriers that have the potential to prevent geothermal development or delay timelines and defined improvement scenarios that could assist in expediting geothermal development and permitting timelines and lead to the deployment of additional geothermal resources by 2030 and 2050: (1) the creation of a centralized federal geothermal permitting office and utilization of state permit coordination offices as well as (2) an expansion of existing categorical exclusions applicable to geothermal development on Bureau of Land Management public lands to include the oil and gas categorical exclusions passed as part of the Energy Policy Act of 2005. We utilized the Regional Energy Deployment System (ReEDS) and the Geothermal Electricity Technology Evaluation Model (GETEM) to forecast baseline geothermal deployment based on previous analysis of geothermal project development and permitting timelines. The model results forecast that reductions in geothermal project timelines can have a significant impact on geothermal deployment. For example, using the ReEDS model, we estimated that reducing timelines by two years, perhaps due to the creation of a centralized federal geothermal permitting office and utilization of state permit coordination offices, could result in deployment of an additional 204 MW by 2030 and 768 MW by 2050 - a 13% improvement when compared to the business as usual scenario. The model results forecast that a timeline improvement of four years - for example with an expansion of existing categorical exclusions coupled with the creation of a centralized federal geothermal permitting office and utilization of state permit coordination offices - could result in deployment of an additional 2,529 MW of geothermal capacity by 2030 and 6,917 MW of geothermal capacity by 2050 - an improvement of 116% when compared to the business as usual scenario. These results suggest that reducing development timelines could be a large driver in the deployment of geothermal resources.

15 GEOTHERMAL ENERGY↗

Strategic styles of hardware product development could accelerate commercialization in cleantech startups

Hardware-based startups risk having longer times-to-market, deterring investment in the clean technologies that are critical to a sustainable future. We interviewed 55 leaders at hardware startups, 20 of which are cleantech, mapped their development timelines, and found prototyping to be the longest development step (median of 19 weeks per prototype) regardless of prototype complexity or iteration. Qualitative interview analysis reveals the prototyping team’s choice of development style is a major factor affecting timeline. We define two development styles: natural and structured, typified by free-form exploration and rule-based execution, respectively. On average, natural development takes 35% less time than structured, and is thus preferred for early iterations, but adopting structure at strategic points is needed for timely commercialization. Critical points of transition to a structured style include adding new team members or engaging external partners, which demand clear communication and expectations. When pivoting to a new product or market, returning to a natural style is beneficial.

Looney, Erin (ORCID:0000000168959312)↗

Refining the Definition of a Geothermal Exploration Success Rate

The geothermal exploration process impacts project development timelines, costs, and overall perceived risk. However, the success in the exploration phase of a geothermal project - and the calculation of a success rate - is universally ill-defined. In previous studies, the success of a geothermal process is loosely defined as the number of wells that result in commercially-viable production. This work focuses on refining the definition of success for the exploration process to represent an upper bound to the likelihood a project will proceed into commercial production. This research examines the topic of success from both a top-down and bottom-up approach: a review of previous assessments of success rate that identifies common conditions leading to successful exploration, and a project-level review of geothermal sites in the western United States focused on decision points in the geothermal exploration process. The analysis not only considers the impact of factors outside of the geothermal reservoir (i.e. delays due to financing or permitting), but also touches on the length of the exploration process and the symbiosis between exploration methods. Using a combination of these analyses, future work will investigate which levers within the geothermal exploration process have the strongest influence on overall project success.

15 GEOTHERMAL ENERGY↗

Perceived Conflicts of Systems Engineering in Early-Stage Research and Development 1

Early Systems Research and Development (ESR&D) is one of the most crucial phases in the product development process. It both blends and blurs the lines between science and engineering, and requires a risk-based, disciplined, and graded approach to effectively manage scope, cost, and complexity of the final product. Many leaders, program managers, and scientists are unwilling to involve systems engineering because of the perception that systems engineering is heavily process oriented, adds unnecessary costs, and should be applied only to mature technologies. The value of systems engineering as applied to ESR&D is unclear to these key individuals. The unfortunate result is that system engineering is not applied to ESR&D. This results in R&D efforts that may have solved the wrong problem, selected the wrong architecture, require technical rework, have difficulty transitioning later maturity levels, and result in higher R&D costs and extended development timelines. This work discusses the difficulty of introducing systems engineering to the research and early development process and their inclination perspectives of researchers, engineers, and managers. The article shall offer potential means to manage the cultural transformation of early adoption of right-sized systems engineering in ESR&D and reverse the attitudinal positions.

42 ENGINEERING↗

The waterSHED Model: User Guide

The ideal design and operation of small hydropower plants is a complex optimization problem with economic, social, and environmental objectives. The waterSHED (Water Allocation Tool Enabling Rapid Small Hydropower Environmental Design) model is a user-friendly tool that allows hydropower stakeholders to model the trade-offs among these objectives using the Standard Modular Hydropower (SMH) framework. The SMH framework employs modular technologies that can be represented as blackbox objects and combined within a river to create a hydropower facility. For a given site, the waterSHED model aims to determine which modules should be placed in a facility and how those modules should be operated. This user guide describes how to use the graphical user interface and related functionalities. This document also summarizes the background research and mathematical formulations that are explained indepth in the accompanying doctoral dissertation. This model is an early step toward a new hydropower design process that employs standardization and modularity to reduce costs, development timelines, and challenges regarding social and environmental mitigation measures for low-head, small hydropower development. The waterSHED model is a Python application that will require the ability to download a GitHub repository, import the necessary packages, and run a set of Python script files using an integrated development environment. The script produces a graphical user interface to coordinate inputs, simulate operation, and visualize results, so no coding experience is needed once the script is running. Additionally, the waterSHED Workbook is a Microsoft Excel file that works with the Python script to facilitate data entry

13 HYDRO ENERGY↗

Development of a Multi-Robot System for Autonomous Inspection of Nuclear Waste Tank Pits

This paper introduces the overall design plan, development timeline, and preliminary progress of the Autonomous Pit Exploration System project. This project aims to develop an advanced multi-robot system for the efficient inspection of nuclear waste-storage tank pits. The project is structured into three phases: Phase 1 involves data collection and interface definition in collaboration with Hanford Site experts and university partners, focusing on tank riser geometry and hardware solutions. Phase 2 includes the selection of sensors and robot components, detailed mechanical design, and prototyping. Phase 3 integrates all components into a cohesive system managed by a master control package which also incorporates digital twin and surrogate models, and culminates in comprehensive testing and validation at a simulated tank pit at the Idaho National Laboratory. Additionally, the system’s communication design ensures coordinated operation through shared data, power, and control signals. For transportation and deployment, an electric vehicle (EV) is chosen to support the system for a full 10 h shift with better regulatory compliance for field deployment. A telescopic arm design is selected for its simple configuration and superior reach capability and controllability. Preliminary testing utilizes an educational robot to demonstrate the feasibility of splitting computational tasks between edge and cloud computers. Successful simultaneous localization and mapping (SLAM) tasks validate our distributed computing approach. More design considerations are also discussed, including radiation hardness assurance, SLAM performance, software transferability, and digital twinning strategies.

Nuclear waste management↗

Vulcan Test Platform: Demonstrating the Data Center as a Flexible Grid Asset

Explosive data center demand is outpacing grid infrastructure development. AI workloads and hyperscale cloud growth are creating unprecedented power requirements, while traditional grid expansion faces multi-year development timelines, regulatory hurdles, and decarbonization challenges. Sidewalk Infrastructure Partners recognized this impending crisis years ago and founded Verrus to develop an innovative solution: data centers that function as grid assets rather than passive loads. The Verrus approach integrates proprietary grid-aware controls with battery energy storage systems (BESS) in a medium-voltage architecture that delivers three critical capabilities: Fast-responding demand flexibility that can service requests from the utility within 10 seconds, Uninterrupted transition to islanded operation during grid disturbances, Continuous uptime assurance while maintaining all customer service level commitments Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), we validated these capabilities on Vulcan, a 70 MW utility-scale test platform powered by NREL's ARIES Virtual Emulation Environment. This deployment-ready technology has successfully demonstrated that Verrus data centers can deliver meaningful grid services while maintaining mission-critical reliability. This technical report outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can play a pivotal role in enhancing grid flexibility and reliability, without sacrificing service level guarantees.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Overview of LWR Accident Tolerant Fuel Development in the United States

The U.S. Department of Energy (DOE) has conducted research and development (R and D) for enhanced, accident tolerant fuels (ATF) for light water reactors (LWRs) since 2012. The recently released Road-map to Congress for 'Development of Light Water Reactor Fuels with Enhanced Accident Tolerance' establishes the attributes that are desired for fuels that will exhibit enhanced accident tolerance and defines a path forward for the necessary R and D activities that will result in a lead fuel rod (LFR) or assembly (LFA) insertion in an operating, commercial LWR by 2022 to demonstrate the possibility of these advanced technologies. The aggressive development timeline is directed by Congressional language in the Senate Appropriations Committee Report (Senate Report 112-75), included in the Fiscal Year (FY) 2012 Energy and Water Development Appropriations Bill. ATF development is intended to be impactful to the current fleet of LWRs and future Generation III+ reactors. The development, future licensing and utility adoption of ATF technology will empower development of advanced technologies with safety significance. The work has progressed significantly since 2012, with multiple fuel and cladding concepts currently undergoing fundamental R and D including in-pile irradiation and out-of-pile testing to measure fundamental properties and to demonstrate performance under expected conditions. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The U.S. Fusion Materials Community Roadmap: Near-term research priorities for the development of plasma-facing and structural materials for fusion power plants

In response to the needs of a rapidly growing private fusion industry, the U.S. Fusion Materials Coordinating Committee (FMCC) and the broader U.S. fusion materials research community undertook an extensive effort to create a comprehensive roadmap for fusion materials development. The result of this effort was the U.S. Fusion Materials Community Roadmap (US-FMCR), which describes the steps needed to advance the technical maturity of leading candidates for plasma-facing materials and structural materials for fusion power plants from laboratory-scale experiments to a point of sufficient technological readiness for industrial adoption and implementation. However, researchers face significant resource constraints as well as very aggressive pilot plant development timelines. Thus, the research strategies detailed in the US-FMCR require further assessment to downselect the specific tasks that must be prioritized within the next two to three years, in order to make the most efficient use of funding, human resources, and experimental facilities. This paper presents an overview of the US-FMCR and its development process. We also present the subset of research objectives that the FMCC identified as the most urgent research priorities for the U.S. fusion materials research community. The state-of-the-art of materials research is also highlighted for each class of materials considered in the US-FMCR. The recommendations presented here integrate an extensive evaluation of the current status of fusion materials research with a broad cross-section of opinion from the wider U.S. fusion community.

Ferry, Sara [Massachusetts Institute of Technology↗

Screening and evaluation of biomass upgrading strategies for sustainable transportation fuel production with biomass-derived volatile fatty acids

Biomass conversion to fuels and chemicals is crucial to decarbonization, but choosing an advantageous upgrading pathway out of many options is challenging. Rigorously evaluating all candidate pathways (process simulation, product property testing) requires a prohibitive amount of research effort; even simple upgrading schemes have hundreds of possible permutations. We present a method enabling high-throughput screening by approximating upgrading unit operations and drop-in compatibility of products (e.g., fuel properties) and apply it to volatile fatty acid (VFA) conversion to liquid transportation fuels via a MATLAB script, VFA Upgrading to Liquid Transportation fUels Refinery Estimation (VULTURE). VULTURE selects upgrading configurations that maximize fuel blend bio-derived content. We validate VULTURE's approximations through surrogate fuel property testing and process simulation. Techno-economic and life cycle analyses suggest that VFA upgrading processes down-selected by VULTURE are profitable and have low carbon intensities, demonstrating the potential for the strategy to accelerate process development timelines at decreased costs.

09 BIOMASS FUELS↗

Transitioning Rationally Designed Catalytic Materials to Real 'Working' Catalysts Produced at Commercial Scale: Nanoparticle Materials

Catalyst design, from idea to commercialization, requires multi-disciplinary scientific and engineering research and development over 10-20 year time periods. Historically, the identification of new or improved catalyst materials has largely been an empirical trial-and-error process. However, advances in computational capabilities (new tools and increased processing power) coupled with new synthetic techniques have started to yield rationally-designed catalysts with controlled nano-structures and tailored properties. This technological advancement represents an opportunity to accelerate the catalyst development timeline and to deliver new materials that outperform existing industrial catalysts or enable new applications, once a number of unique challenges associated with the scale-up of nano-structured materials are overcome.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

High-energy x-ray scattering studies of battery materials

High-energy x-ray (HEX) scattering is a sensitive and powerful tool to nondestructively probe the atomic and mesoscale structures of battery materials under synthesis and operational conditions. The penetration power of HEXs enables the use of large, practical samples and realistic environments, allowing researchers to explore the inner workings of batteries in both laboratory and commercial formats. This article highlights the capability and versatility of HEX techniques, particularly from synchrotron sources, to elucidate materials synthesis processes and thermal instability mechanisms in situ, to understand (dis)charging mechanisms in operando under a variety of cycling conditions, and to spatially resolve electrode/electrolyte responses to highlight connections between inhomogeneity and performance. Such studies have increased our understanding of the fundamental mechanisms underlying battery performance. Here, by deepening our understanding of the linkages between microstructure and overall performance, HEXs represent a powerful tool for validating existing batteries and shortening battery-development timelines.

25 ENERGY STORAGE↗

Additive Manufacturing of Tooling for Refrigeration Cabinet Foaming Processes

The primary objective of this project was to leverage the Big Area Additive Manufacturing (BAAM) process and materials into a long term, quick change tooling concept to drastically reduce product lead and development timelines and costs. Current refrigeration foam molds are complicated to manufacture involving casting several aluminum parts in an approximate shape, machining components of the molds and post fitting and shimming of the parts in an articulated fixture. The total process timeline can take over 6 months. The foaming process is slower than required for production, therefore multiple fixtures, 10 to 27, are required per refrigerator model. Molds are particular to a specific product configuration making mixed model assembly challenging for sequencing, mold changes or auto changeover features. The initial goal was to create a tool leveraging the ORNL materials and additive process to build a tool in 4 to 6 weeks or less. A secondary goal was to create common fixture cores and provide lightweight fixture sections that could be revised in a very short time to increase equipment flexibility reduce lead times, lower the barriers to first production trials, and reduce tooling costs.

3d Printing↗