Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “development design testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Status Update for the Bearing Test Article Design Development – FY2025

Argonne National Laboratory’s (ANL) Mechanism Engineering Test Loop (METL) team has completed the design of a new Bearing Test Article (BTA) to test mechanical bearings for sodium fast reactor (SFR) mechanism applications. Recognition of the need for further bearing testing arose due to failure of rolling element bearings during testing of components for in-vessel fuel handling machines (FHMs) conducted at ANL in the METL facility. While the initial concept of the BTA arose from a need for bearing testing for FHM applications, the BTA design is configurable to test bearings of various sizes, types, and materials submerged in liquid sodium. Requirements for loading, shaft speed, temperature, and bearing size range were chosen based on requirements for SFR fuel handling. Modular components in the test bearing housings and shaft sleeves allow the design to accommodate a wide range of bearing sizes without modification to the larger assembly. Loading will be applied with screw jacks on the air side of the test article that will be adjusted to apply radial, thrust, or combined loading conditions. Applied force will be measured by load cells in-line with the loading mechanisms. In FY25 we have completed the design of the test article that will be fabricated and undergo testing at the METL facility. Drawing packages for the fabrication of the test article have been drafted and are being reviewed to add part tolerances and we have started ordering off-the-shelf components. The report will summarize the development of the Bearing Test Article design starting with an overview of the entire test article, then a more detailed examination of the bearing test section, loading mechanisms, test article ports and seals, and support structures, including analysis that went into significant design choices.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Solid-State Fault Current Limiter Development: Design and Testing Update of a 15kV SSCL Power Stack

The Solid-State Fault Current Limiter (SSCL) is a promising technology that can be applied to utility power delivery systems to address the problem of increasing fault currents associated with load growth. As demand continues to grow, more power is added to utility system either by increasing generator capacity or by adding distributed generators, resulting in higher available fault currents, often beyond the capabilities of the present infrastructure. The SSCL is power-electronics based equipment designed to work with the present utility system to address this problem. The SSCL monitors the line current and dynamically inserts additional impedance into the line in the event of a fault being detected. The SSCL is based on a modular design and can be configured for 5kV through 69kV systems at nominal current ratings of 1000A to 4000A. Results and Findings This report provides the final test results on the development of 15kV class SSCL single phase power stack. The scope of work included the design of the modular standard building block sub-assemblies, the design and manufacture of the power stack and the testing of the power stack for the key functional tests of continuous current capability and fault current limiting action. Challenges and Objectives Solid-State Current Limiter technology impacts a wide spectrum of utility engineering and operating personnel. It addresses the problems associated with load growth both at Transmission and Distribution class networks. The design concept is pioneering in terms of developing the most efficient and compact power electronics equipment for utility use. The initial test results of the standard building blocks are promising. The independent laboratory tests of the power stack are promising. However the complete 3 phase system needs rigorous testing for performance and reliability. Applications, Values, and Use The SSCL is an intelligent power-electronics device which is modular in design and can provide current limiting or current interrupting capabilities. It can be applied to variety of applications from distribution class to transmission class power delivery grids and networks. It can also be applied to single major commercial and industrial loads and distributed generator supplies. The active switching of devices can be further utilized for protection of substation transformers. The stress on the system can be reduced substantially improving the life of the power system. It minimizes the voltage sag by speedy elimination of heavy fault currents and promises to be an important element of the utility power system. DOE Perspective This development effort is now focused on a 15kV system. This project will help mitigate the challenges of increasing available fault current. DOE has made a major contribution in providing a cost effective SSCL designed to integrate seamlessly into the Transmission and Distribution networks of today and the future. Approach SSCL development program for a 69kV SSCL was initiated which included the use of the Super GTO advanced semiconductor device which won the 2007 R&D100 Award. In the beginning, steps were identified to accomplish the economically viable design of a 69kV class Solid State Current Limiter that is extremely reliable, cost effective, and compact enough to be applied in urban transmission. The prime thrust in design and development was to encompass the 1000A and the 3000A ratings and provide a modular design to cover the wide range of applications. The focus of the project was then shifted to a 15kV class SSCL. The specifications for the 15kV power stack are reviewed. The design changes integrated into the 15kV power stack are discussed. In this Technical Update the complete project is summarized followed by a detailed test report. The power stack independent high voltage laboratory test requirements and results are presented. Keywords Solid State Current Limiter, SSCL, Fault Current Limiter, Fault Current Controller, Power electronics controller, Intelligent power-electronics Device, IED

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design, Development and Testing Plan for Energy Efficiency Algorithms Related to Building-Integrated Cooling, Heating, and Power Systems

Building-integrated cooling, heating and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. It is estimated that the total CHP technical potential in the commercial building sector is approximately 76 GW, but only a small fraction of it is actually deployed. Advanced control and monitoring systems that realize the full potential of these CHP systems can transform this capacity into an asset for both the owner and the grid and also accelerate the adoption of these systems in the building sector. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. It has been demonstrated by several studies that as much as 30% of building energy use is wasted. Much of the waste results from the inability to anticipate load variations (design day vs. non-design day operations; diurnal variation of loads), identify improper operation, and efficiently operate, control and maintain building systems. Moreover, many buildings, even those with adequate control infrastructure, lack knowledgeable staff to operate and maintain energy systems. Operators of buildings with CHP systems will constantly need to make tradeoffs (economic dispatch) between onsite power generation and purchasing power, between onsite heat production from distributed generation versus heating/cooling from conventional systems, and different passive and active load management measures. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of a clean, efficient, reliable and affordable next-generation integrated energy systems. This report lists the components for which PM, real-time CxV and AFDD algorithms will be developed, how the algorithms will be tested, and metrics that will be used to validate the algorithms and easy of deployment. Deployment of these algorithms in the field will result in savings reduction in energy consumption of between 10% and 20%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design, Development and Testing of Inconel Alloy IN718 Spherical Gas Bottle for Oxygen Storage

This paper describes the details of design, manufacture and testing of 200 mm diameter spherical gas bottle of Inconel 718 (IN718) with nominal wall thickness of 2.3 mm. Gas bottle was designed for the specified internal pressure loading with a thickness of 2.9 mm at the circumferential weld which was brought down to 2.3 mm at the membrane locations. Hemispherical forgings produced through closed-die hammer forging were machined and electron beam welded to produce a spherical gas bottle. Duly welded gas bottle was subjected to standard aging treatment to achieve the required tensile strength. Aged gas bottle was inspected for dimensions and other stringent quality requirements using various nondestructive testing techniques. After inspection, gas bottle was subjected to pressure test for maximum expected operating pressure and proof pressure of 25 and 37.5 MPa, respectively. Strain gauges were bonded at different locations on the gas bottle to monitor the strains during the pressure test and correlated with the predicted values. The predicted strain matched well with the experimental strain confirming the design and structural integrity.

36 MATERIALS SCIENCE↗

OCGen Module Mooring Project

Ocean Renewable Power Company's OCGen Module Mooring Project provided an extensive research, design, development, testing and data collection effort and analysis conducted with respect to a positively buoyant, submerged MHK device secured to the seabed using a tensioned mooring system. Different analytic tools were evaluated for their utility in the design of submerged systems and their moorings. Deployment and testing of a prototype OCGen® system provided significant data related to mooring line loads and system attitude and station keeping. Mooring line loads were measured in situ and reported against flow speeds. The Project made a significant step in the development of designs, methodologies and practices related to floating and mooring of marine hydrokinetic (MHK) devices. Importantly for Ocean Renewable Power Company, the Project provided a sound basis for advancing a technically and commercially viable OCGen® Power System. The OCGen® Power System is unique in the MHK industry and, in itself, offers distinct advantages of MHK devices that are secured to the seabed using fixed structural frames. Foremost among these advantages are capital and operating cost reductions and increased power extraction by allowing the device to be placed at the most energetic level of the water column.

16 TIDAL AND WAVE POWER↗

Secure Information Exchange Gateway for Electric Grid Operations

The major objectives of the SIEGate project were to improve the security posture and minimize the cyber-attack surface of electric utility control centers and to reduce the cost of maintaining control-room-to-control-room information exchange. Major project goals included the design, development, testing, and commercialization of a single security-hardened appliance that could meet industry needs for resisting cyber-attacks while protecting the confidentiality and integrity of a growing volume of real-time information needed to ensure the reliability of the bulk electric system and interoperating with existing data formats and networking technologies. The SIEGate project has achieved its goals and objectives. The SIEGate Design Document, issued in March 2012, presented SIEGate use cases, provided SIEGate requirements, established SIEGate design principles, and prescribed design functionality of SIEGate as well as the components that make up SIEGate. SIEGate Release Version 1.0 was posted in January 2014. Release Version 1.0.83, which was posted on March 28, 2014, fixed many issues discovered by early adopters and added several new features. Release Candidate 1.1, which added additional improvements and bug fixes, was posted in June 2014. SIEGate executables have been downloaded more than 300 times. SIEGate has been tested at PJM, Entergy, TVA, and Southern. Security testing and analysis of SIEGate has been conducted at PNNL and PJM. Alstom has provided a summary of recommended steps for commercialization of the SIEGate Appliance and identified two deployment models with immediate commercial application.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SolarSTARTS: Solar-Assisted State-Aware and ResilienT infrastructure System

This final technical report provides a description and results of the design, development, testing, and validation of the Automated Resilience Management System (ARMS) solution, which integrates different systems to collect, store and process relevant information from the power distribution system to automatically manage the operation of multiple energy assets to enhance the resilience of the power grid against high-impact physical incidents (e.g., hurricanes) and cyber threats. The developed solution comprises a suite of novel AI-based algorithms designed to first detect, locate, and classify anomalies by collecting and analyzing data from multiple monitoring and control devices

14 SOLAR ENERGY↗

Hardware Specification and Reference Design for the Low-Cost, Interoperable, User-Centric, Supervisory Controller Kit for Small and Medium Size Commercial Buildings

Commercial buildings are responsible for approximately 20 percent of the total United States energy consumption and greenhouse gas emissions. Over 85 percent of these buildings lack building automation systems to manage the various building systems they have. Many of these buildings are small (< 50,000 square feet), underserved, and use rooftop units (RTUs) for heating, ventilation, and air-conditioning needs. Because these buildings lack proper control systems, they have several operational deficiencies that lead to excess energy consumption. Studies have shown that managing the RTU’s heating and cooling setpoints, schedules, setbacks, and optimal start times can result in 20 to 25 percent reduction in electricity consumption in small and medium commercial buildings (SMBs). In addition, improving the demand flexibility of these buildings will result in additional cost savings for the building owner. To address the needs of the SMBs, the Department of Energy’s Building Technologies Office jointly funded Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to design, develop, test, and validate a low-cost, interoperable, user-centric, retrofit supervisory controller kit (SC-SMB) that can be used to continuously optimize energy consumption and deliver demand flexibility of SMBs, including all-electric buildings, and provide a means for maximizing decarbonization benefits. The team also includes industry partners Edo and Intellimation. Previously, the team drafted an SC-SMB system specification document (Goodman et al. 2023). This document describes a reference design of a low-cost supervisory control system for SMBs, including the various hardware components, software system, and an example implementation of the reference design. The final release of the reference design is planned for December 2025. Section 2.0 of the report documents the relevant building types that the SC-SMB system is suitable for. Section 3.0 documents the various hardware components, their function, cost, whether they are off-the-shelve, support standard communication, etc., and the software system. An example deployment in a 10,000-sf building with six rooftop units, a hot water heater, solar, and storage is described in Section 4.0. The planned next steps are described in Section 5.0, and references are listed in Section 6.0.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Global threat reduction initiative efforts to address transportation challenges associated with the recovery of disused radioactive sealed sources - 10460

Proper disposition of disused radioactive sources is essential for their safe and secure management and necessary to preclude their use in malicious activities. Without affordable, timely transportation options, disused sealed sources remain in storage at hundreds of sites throughout the country and around the world. While secure storage is a temporary measure, the longer sources remain disused or unwanted the chances increase that they will become unsecured or abandoned. The Global Threat Reduction Initiative's Off-Site Source Recovery Project (GTRIlOSRP), recovers thousands of disused and unwanted sealed sources annually as part of GTRl's larger mission to reduce and protect high risk nuclear and radiological materials located at civilian sites worldwide. Faced with decreasing availability of certified transportation containers to support movement of disused and unwanted neutron- and beta/gamma-emitting radioactive sealed sources, GTRIlOSRP has initiated actions to ensure the continued success of the project in timely recovery and management of sealed radioactive sources. Efforts described in this paper to enhance transportation capabilities include: {sm_bullet} Addition of authorized content to existing and planned Type B containers to support the movement of non-special form and other Type B-quantity sealed sources; {sm_bullet} Procurement of vendor services for the design, development, testing and certification of a new Type B container to support transportation of irradiators, teletherapy heads or sources removed from these devices using remote handling capabilities such as the IAEA portable hot cell facility; {sm_bullet} Expansion of shielded Type A container inventory for transportation of gamma-emitting sources in activity ranges requiring use of shielding for conformity with transportation requirements; {sm_bullet} Approval of the S300 Type A fissile container for transport of Pu-239 sealed sources internationally; {sm_bullet} Technology transfer of field-sealable (non-welded) special form capsules for commercial use.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot-Scale Removal of Fluoride from Legacy Plutonium Materials Using Vacuum Salt Distillation

Between September 2009 and January 2011, the Savannah River National Laboratory (SRNL) and HB-Line designed, developed, tested, and successfully deployed a system for the distillation of chloride salts. In 2011, SRNL adapted the technology for the removal of fluoride from fluoride-bearing salts. The method involved an in situ reaction between potassium hydroxide (KOH) and the fluoride salt to yield potassium fluoride (KF) and the corresponding oxide. The KF and excess KOH can be distilled below 1000°C using vacuum salt distillation (VSD). The apparatus for vacuum distillation contains a zone heated by a furnace and a zone actively cooled using either recirculated water or compressed air. During a vacuum distillation operation, a sample boat containing the feed material is placed into the apparatus while it is cool, and the system is sealed. The system is evacuated using a vacuum pump. Once a sufficient vacuum is attaned, heating begins. Volatile salts distill from the heated zone to the cooled zone where they condense, leaving behind the non-volatile material in the feed boat. Studies discussed in this report were performed involving the use of non-radioactive simulants in small-scale and pilot-scale systems as well as radioactive testing of a small-scale system with plutonium-bearing materials. Aspects of interest include removable liner design considerations, boat materials, in-line moisture absorption, and salt deposition.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Managing technical debt across large-scale control systems

This presentation provides a comprehensive overview of technical debt in the context of control systems for large-scale physics facilities. We will explore its various forms, common causes, and potential consequences on system reliability, maintainability, and upgradability. Drawing on experiences from multiple projects, we will present a range of strategies for proactively managing technical debt, including best practices in design, development, testing, and documentation, as well as reactive approaches for identifying and mitigating existing issues. The presentation will also emphasize the importance of a collaborative approach and the use of modern tools, like fault tracking systems, to ensure the long-term health and success of control systems in our field.

Watts, Adam [Fermilab]↗

APPLICATION OF VACUUM SALT DISTILLATION TECHNOLOGY FOR THE REMOVAL OF FLUORIDE

Vacuum distillation of chloride salts from plutonium oxide (PuO{sub 2}) and simulant PuO{sub 2} has been previously demonstrated at Department of Energy (DOE) sites using kilogram quantities of chloride salt. The apparatus for vacuum distillation contains a zone heated using a furnace and a zone actively cooled using either recirculated water or compressed air. During a vacuum distillation operation, a sample boat containing the feed material is placed into the apparatus while it is cool, and the system is sealed. The system is evacuated using a vacuum pump. Once a sufficient vacuum is attained, heating begins. Volatile salts distill from the heated zone to the cooled zone where they condense, leaving behind the non-volatile materials in the feed boat. The application of vacuum salt distillation (VSD) is of interest to the HB-Line Facility and the MOX Fuel Fabrication Facility (MFFF) at the Savannah River Site (SRS). Both facilities are involved in efforts to disposition excess fissile materials. Many of these materials contain chloride and fluoride salt concentrations which make them unsuitable for dissolution without prior removal of the chloride and fluoride salts. Between September 2009 and January 2011, the Savannah River National Laboratory (SRNL) and HB-Line designed, developed, tested, and successfully deployed a system for the distillation of chloride salts. Subsequent efforts are attempting to adapt the technology for the removal of fluoride. Fluoride salts of interest are less-volatile than the corresponding chloride salts. Consequently, an alternate approach is required for the removal of fluoride without significantly increasing the operating temperature. HB-Line Engineering requested SRNL to evaluate and demonstrate the feasibility of an alternate approach using both non-radioactive simulants and plutonium-bearing materials. Whereas the earlier developments targeted the removal of sodium chloride (NaCl) and potassium chloride (KCl), the current activities are concerned with the removal of the halide ions associated with plutonium trifluoride (PuF{sub 3}), plutonium tetrafluoride (PuF{sub 4}), calcium fluoride (CaF{sub 2}), and calcium chloride (CaCl{sub 2}). This report discusses non-radioactive testing of small-scale and pilot-scale systems and radioactive testing of a small-scale system. Experiments focused on demonstrating the chemistry for halide removal and addressing the primary engineering questions associated with a change in the process chemistry.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ICALEPCS 2025: Managing Technical Debt Across Large-Scale Control Systems

This presentation provides an overview of technical debt in the context of control systems for large-scale physics facilities. We explore various forms, common causes, and potential consequences on system reliability, maintainability, and extensibility. Drawing on experiences from multiple projects, including the ACORN control system modernization at Fermilab, we present a range of strategies for proactively managing technical debt, including best practices in design, development, testing, and documentation, as well as reactive approaches for identifying and mitigating existing issues.

Watts, Adam [Fermilab]↗