Automated qualification data tool for high temperature metallic materials

This report describes a framework for storing, processing, and displaying qualification data for high temperature mechanical properties. The framework automates the process of generating design data from mechanical test results, for example for a data qualification report for the ASME Boiler \& Pressure Vessel Code. The framework has three parts: a data storage model with common formats for several types of typical mechanical property tests, a backend based on the \pycreep Python library for correlating and extrapolating the data to generate design material properties and allowable stresses, and a demonstration user interface for displaying, sorting, and filtering the data and exploring different options for modeling the design mechanical properties. The report discusses the options available for data processing, with illustrations from real test data on Alloy 617, Alloy 709, Alloy 740H, and Laser-Powder Bed Fusion 316H. The framework is complete for ASME type data analysis and will be used to store test data generated by the Department of Energy, Office of Nuclear Energy, Advanced Materials and Manufacturing Technologies sponsored qualification programs. Future work could extend the tool to other types of material properties and/or expand the demo user interface to make it accessible across the AMMT program.

36 MATERIALS SCIENCE

Data Qualification Report: SRNL Glass Composition-Properties (ComPro) Database

The Savannah River National Laboratory Glass Composition-Properties (ComPro) database is an extensive database containing pertinent composition and durability data to support the accelerated clean-up mission at the Defense Waste Processing Facility. The activities described in this data qualification report were performed to support the information contained in the database. There were two objectives of the original data qualification process. The first objective was to review supporting documentation to determine if DOE/RW-0333P Quality Assurance Requirements and Description had been implemented during the original work. If the DOE/RW-0333P Quality Assurance Requirements and Description had not been directly implemented during the original work, the second objective was to determine if the controls that were used were adequate to meet the intent of the DOE/RW-0333P Quality Assurance Requirements and Description. The results of these two objectives and the activities performed to support these decisions are described in this document. An assessment of each dataset was made to determine if the data were RW-0333P Compliant, RW-0333P Equivalent or Non-RW-0333P Compliant. The original data qualification was performed in accordance with E7, Conduct of Engineering Manual, Procedure 3.70, Revision 4, Qualification of Data. The specific method that was used was Equivalent Controls as described in E7, 3.70. Revision 2 of this document adds supporting information for the RW-0333P Compliant datasets added to Revision 3 of the database.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W

Sensor Data Qualification for Autonomous Operation of Space Systems

NASA's new Exploration initiative for both robotic and manned missions will require higher levels of reliability, autonomy and reconfiguration capability to make the missions safe, successful and affordable. Future systems will require diagnostic reasoning to assess the health of the system in order to maintain the system s functionality. The diagnostic reasoning and assessment will involve data qualification, fault detection, fault isolation and remediation control. A team of researchers at the NASA Glenn Research Center is currently working on a Sensor Data Qualification (SDQ) system that will support these critical evaluation processes, for both automated and human-in-the-loop applications. Data qualification is required as a first step so that critical safety and operational decisions are based on good data. The SDQ system would monitor a network of related sensors to determine the health of individual sensors within that network. Various diagnostic systems such as the Caution and Warning System would then use the sensor health information with confidence. The proposed SDQ technology will be demonstrated on a variety of subsystems that are relevant to NASA s Exploration systems, which currently include an electrical power system and a cryogenic fluid management system. The focus of this paper is the development and demonstration of a SDQ application for a prototype power distribution unit that is representative of a Crew Exploration Vehicle electrical power system; this provides a unique and relevant environment in which to demonstrate the feasibility of the SDQ technology.

Maul, William A.

HDG-1 Experiment Irradiation Monitoring Data Qualification Final Report

SUMMARY The U.S. Department of Energy (DOE) Advanced Reactor Technologies (ART) Graphite Research and Development (GRD) Program is conducting a series of six experiments to quantify the effects of irradiation on nuclear-grade graphite. This report documents the qualification of irradiation monitoring data for the fifth experiment, High Dose Graphite-1 (HDG-1). Qualified monitoring data are required by the ART program to support the design and licensing of the first high-temperature reactor (HTR) nuclear plant. Data are classified as Qualified if they meet the usage requirements described in the experiment planning and quality assurance (QA) documents, Failed if they do not meet those requirements and provide no usable information, or Trend if they do not fully meet all requirements but still provide useful information subject to an assessment of how any deficiencies may affect a particular use of the data. HDG-1 irradiation began with Advanced Test Reactor (ATR) Cycle 168B on August 24, 2020, and concluded after Cycle 173C on January 27, 2025. The HDG-1 capsule was removed from the reactor core twice—during core internal change (CIC) Cycle 170A and powered axial locator mechanism (PALM) Cycle 172A—to prevent overheating of the graphite specimens during high-power PALM cycles. The capsule was therefore irradiated during a total of seven normal ATR cycles: 168B, 169A, 171A, 171B, 173A, 173B, and 173C. Irradiation monitoring data evaluated in this report include thermocouple (TC) temperature, gas flow rate, gas moisture, gas pressure, specimen load, and graphite stack displacement. Temperature. A total of 14,508,065 TC temperature records were captured. Of these, 13,901,785 (95.8%) are Qualified and 606,280 (4.2%) are Failed. The principal source of failed temperature data was the instrument failure of TC-9 (Zone 2) on June 24, 2024, and TC-10 (Zone 1) on July 5, 2024, near the end of Cycle 173A, which resulted in 595,554 Failed readings. An additional 379 missing values and 10,347 slightly negative values from TC-13 during ATR outages are also Failed. Neither TC-9 nor TC-10 was used as a temperature-control TC, and their failures did not compromise capsule condition monitoring. Correlation analysis of all 13 TCs found no evidence of virtual junction formation. Control chart analysis revealed clear downward drift of approximately 80°C for TC-6 (Zone 3) relative to other stable TCs, and possible downward drift of approximately 60°C for TC-13 relative to the Zone 5 control TC (TC-1), though TC-13 remained consistent with the Zone 2 control TC (TC-12). Gas flow. A total of 20,088,090 gas flow rate records were captured. Of these, 19,941,463 (99.3%) are Qualified and 146,627 (0.7%) are Failed due to missing values. All argon, helium, and total gas flow data were within expected ranges throughout the irradiation. Gas moisture. A total of 1,116,005 outlet gas moisture values were captured. Of these, 1,101,421 (98.7%) are Qualified and 14,584 (1.3%) are Failed, comprising 14,556 out-of-range values and 28 missing values. The out-of-range moisture values exceeded 22,000 ppmv for approximately 1 week at the beginning of Cycle 173A, when accumulated moisture evaporated after the capsule was retrieved from water storage during PALM Cycle 172A and reinserted into the east flux trap. Moisture levels returned to below 25 ppmv for the remaining three cycles, and the transient high-moisture event did not affect the integrity of specimen irradiation. Gas pressure. A total of 7,812,035 gas pressure values were captured. Of these, 6,642,048 (85.0%) are Qualified and 1,169,987 (15.0%) outlet pressure values are Failed, comprising 718,537 zero outlet pressure values due to sensor failure from Cycle 168B through Cycle 171B, 54,550 missing values, and 396,900 too-low outlet pressure values, ranging from 1.1 to 1.6 psia after sensor replacement during Cycle 173A. Load. A total of 6,696,030 load values were captured. Of these, 6,694,580 (99.98%) are Qualified and 1,450 (0.02%) are Failed due to missing values. Applied loads to the six specimen stacks were stable throughout the irradiation. Stack displacement. A total of 6,696,030 displacement values were captured. Of these, 5,713,297 (85.32%) are Qualified and 3,781 (0.06%) are Failed due to missing values. Stack displacement increased consistently throughout the irradiation, reaching approximately 3.08 in. for Channels 5 and 6 by the end of irradiation. 978,952 (14.62%) substantially elevated displacements observed for Channel 6 beginning in Cycle 171A and for Channel 5 beginning in Cycle 173A are assigned Trend status. Raising pressure. A total of 1,115,999 raising pressure values were captured. Of these, 1,115,430 (99.95%) are Qualified and 569 (0.05%) are Failed due to missing values. Ram pressure. A total of 6,696,030 ram pressure values were captured. Of these, 6,692,249 (99.95%) are Qualified and 3,484 (0.05%) are Failed due to missing values. Stack raising was perf

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Summary of Savannah River Site FY24 Salt Waste Qualification Data

Savannah River Mission Completion (SRMC), the Liquid Waste Operations subcontractor at SRS, and Savannah River National Laboratory (SRNL) analyzed samples from Savannah River Site (SRS) Waste Tanks 21H, 41H, and 42H to support qualification of Salt Waste Processing Facility (SWPF) Waste Batches 10, 11, 12, and 13 for processing (the FY24 Salt Batch Qualification samples). These Tanks (i.e. 21H, 41H and 42H) are blend tanks for feed to SWPF. This report focuses on the characterization of the Salt Batch Qualification sub-samples (i.e., any adjustments after qualification or as a part of processing are documented elsewhere). None of the samples displayed any unusual or unexpected characteristics such as large amounts of solids, floating solids, or unusual color. Characterization of these samples confirmed similar chemical composition and characteristics to previous salt waste batches. The analytical results (both rapid, typically 4 weeks, and long-term, typically 8 weeks) for Salt Batches 10, 11, 12, and 13 are now summarized and discussed in this technical report. SRMC-Analytical Laboratory (SRMC-AL), for the first time, provided all the short-term analyses data used in the qualification evaluations of SWPF Salt Batches 10, 11, 12, and 13. These SRMC short-term results are presented along with the results for the long-term analyses provided by SRNL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W

Legacy Metallic Fuel U(Pu)Zr Data Qualification

The Metallic Fuels Irradiation and Physics Database (FIPD) is an organized collection of legacy metallic fuel U(Pu)Zr data, measurements, and reactor conditions from the Experimental Breeder Reactor II (EBR-II) and the Fast Flux Test Facility (FFTF). The database provides a wealth of information and is easily accessed and utilized by the U.S. nuclear industry and the Nuclear Regulatory Commission (NRC). The database contains three categories of data. The first category covers fuel pin fabrication specifications, including fuel slug diameter and length, cladding diameter, smeared density, etc. The second consists of operational conditions, which include axial distributions of power, temperature, fluence, burnup, isotopic density, etc. The third category contains post-irradiation examination (PIE) results, largely collected at facilities now part of the Idaho National Laboratory (INL), formerly part of Argonne National Laboratory -West (ANL-W) and at the Alpha-Gamma Hot Cell Facility (AGHCF) at Argonne National Laboratory, comprising fission gas release and chemistry analysis, profilometry measurements, neutron radiography data, etc. All these data have been organized and preserved in FIPD.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Summary of Savannah River Site FY23 Salt Waste Qualification Data

The Savannah River National Laboratory (SRNL) analyzed samples from Savannah River Site (SRS) Waste Tanks 41H and 21H to support qualification of Salt Waste Processing Facility (SWPF) Waste Batches 8 and 9 for processing (the FY23 Salt Batch Qualification samples). These Tanks (i.e. 41H and 21H) are blend tanks for feed to SWPF. None of the samples displayed any unusual or unexpected characteristics such as large amounts of solids, floating solids, or unusual color. Characterization of these samples confirmed similar chemical composition and characteristics to previous salt waste batches. The results for Batches 8 and 9 were provided by SRNL to Savannah River Mission Completion (SRMC), the Liquid Waste Operations subcontractor at SRS, as External Sample Results (Laboratory Information Management System (LIMS)) Reports. Additionally, a separate technical memo was issued by SRNL to report re-test data for Batch 8 for Cs-137 for filtered samples only which were run at the request of SWPF. For Batch 9, a set of samples was also analyzed in parallel by the SWPF-Analytical Laboratory (SWPF-AL). The SWPF-AL data is included herein for comparison with the SRNL data where applicable. The analytical results (both rapid, typically 4 weeks, and long term, typically 8 weeks) for Batches 8 and 9 are now summarized and discussed in this technical report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W

Progress Report on SFR Metallic Fuel Data Qualification

This report summarizes the progress of SFR metallic fuel qualification related activities, which are focused on providing quality assurance relevant information applicable to experiments irradiated during the Integral Fast Reactor (IFR) program. An overview of the metallic fuel performance data and the associated databases, including the EBR-II Fuels Irradiation & Physics Database (FIPD), Out-of-Pile Transient Database (OPTD), and TREAT Experimental Relational Database (TREXR) is included. The legacy data in the databases, including as-built, post-irradiation examination (PIE), operating parameters, and out-of-pile experiment post-test data are introduced. The SFR metallic fuel Quality Assurance Program Plan (QAPP) and its implementation to qualify these legacy data is described in detail. Important PIE data QA documents and the specifications of seven types of PIE measurements (contact profilometry, laser profilometry, neutron radiography, gamma scan, fission gas release fission gas chemistry, and metallography) are provided. Examples of the implementation of the QAPP to qualify each of those types of PIE data are provided.

Mo, Kun [Argonne National Laboratory (ANL), Argonn

Quality Assurance Program Plan for SFR Metallic Fuel Data Qualification

This document contains an evaluation of the applicability of the current Quality Assurance Standards from the American Society of Mechanical Engineers Standard NQA-1 (NQA-1) criteria and identifies and describes the quality assurance process(es) by which attributes of historical, analytical, and other data associated with sodium-cooled fast reactor [SFR] metallic fuel will be evaluated. This process is being instituted to facilitate validation of data to the extent that such data may be used to support future licensing efforts associated with advanced reactor designs. The initial data to be evaluated under this program were generated during the US Integral Fast Reactor program between 1984-1994, where the data include, but are not limited to, research and development data and associated documents, test plans and associated protocols, operations and test data, technical reports, and information associated with past United States Nuclear Regulatory Commission reviews of SFR designs. It is recognized that managing the data generated by large research and development projects presents a significant challenge for retaining data integrity and availability. American Society of Mechanical Engineers Standard NQA-1 (NQA-1) 2008/2009a provides appropriate requirements for this plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Space shuttle redesigned solid rocket motor Certificate of Qualification (COQ) data report

The Space Shuttle Redesigned Solid Rocket Motor (RSRM) Certification Program provides confidence that the RSRM and its components/subsystems meet or exceed Mission Oriented Requirements when manufactured per design requirements and specified/approved processes. Certification is based on documented results of tests, analyses, inspections, similarity, and demonstrations. Evidencing information is provided to certify that each RSRM component/subsystem satisfies design, mission related requirements and objectives.

Duersch, Fred, Jr.

Meeting the Challenges of Exploration Systems: Health Management Technologies for Aerospace Systems With Emphasis on Propulsion

The constraints of future Exploration Missions will require unique Integrated System Health Management (ISHM) capabilities throughout the mission. An ambitious launch schedule, human-rating requirements, long quiescent periods, limited human access for repair or replacement, and long communication delays all require an ISHM system that can span distinct yet interdependent vehicle subsystems, anticipate failure states, provide autonomous remediation, and support the Exploration Mission from beginning to end. NASA Glenn Research Center has developed and applied health management system technologies to aerospace propulsion systems for almost two decades. Lessons learned from past activities help define the approach to proper ISHM development: sensor selection- identifies sensor sets required for accurate health assessment; data qualification and validation-ensures the integrity of measurement data from sensor to data system; fault detection and isolation-uses measurements in a component/subsystem context to detect faults and identify their point of origin; information fusion and diagnostic decision criteria-aligns data from similar and disparate sources in time and use that data to perform higher-level system diagnosis; and verification and validation-uses data, real or simulated, to provide variable exposure to the diagnostic system for faults that may only manifest themselves in actual implementation, as well as faults that are detectable via hardware testing. This presentation describes a framework for developing health management systems and highlights the health management research activities performed by the Controls and Dynamics Branch at the NASA Glenn Research Center. It illustrates how those activities contribute to the development of solutions for Integrated System Health Management.

Melcher, Kevin J.

Testing in Support of Space Fission System Development and Qualification

Extensive data would be required for the qualification of a fission surface power (FSP) system. The strategy for qualifying a FSP system could have a significant programmatic impact. This paper explores potential options that could be used for qualifying FSP systems, including cost-effective means for obtaining required data. three methods for obtaining qualification data are analysis, non-nuclear testing, and nuclear testing. It has been over 40 years since the US qualified a space reactor for launch. During that time, advances have been made related to all three methods. Perhaps the greatest advancement has occurred in the area of computational tools for design and analysis. Tools that have been developed, coupled with modem computers, would have a significant impact on a FSP qualification. This would be especially true for systems with materials and fuels operating well within temperature, irradiation damage, and burnup limits. The ability to perform highly realistic non-nuclear testing has also advanced throughout the past four decades. Instrumented thermal simulators were developed during the 1970s and 1980s to assist in the development, operation, and assessment of terrestrial fission systems. Instrumented thermal simulators optimized for assisting in the development, operation, and assessment of modem FSP systems have been under development (and utilized) since 1998. These thermal simulators enable heat from fission to be closely mimicked (axial power profile, radial power profile, temperature, heat flux, etc.} and extensive data to be taken from the core region. Both steady-state and transient operation can be tested. For transient testing, reactivity feedback is calculated (or measured in cold/warm criticals) based on reactor temperature and/or dimensional changes. Pin power during a transient is then calculated based on the reactivity feedback that would occur given measured values of temperature and/or dimensional change. In this way nonnuclear testing can be used to provide very realistic information related to nuclear operation. Non-nuclear testing can be used at all levels, including component, subsystem, and integrated system testing. Realistic non-nuclear testing is most useful for systems operating within known temperature, irradiation damage, and burnup capabilities.

Houts, Mike

Environmental Data Recorder (EDR) qualification

Qualification testing of the environmental data recorder (EDR) was successfully completed. The purpose of this test was to qualify the EDR so that it could monitor segments shipped via railcar from Utah to Kennedy Space Center (KSC). The tests consisted of a transportation and a functional test. The transportation test verified EDR operation in its intended environment. The functional test verified EDR accuracy. Data from the functional test showed that the EDR accuracies complied with requirements. Since the EDR meets or exceeds all of its test objectives, it was successfully qualified. It is recommended that the EDR replace the transportation monitoring unit (TMU). A description of the qualification procedure is presented.

Danforth, Richard A.

Performance Evaluation of a Data Validation System

Online data validation is a performance-enhancing component of modern control and health management systems. It is essential that performance of the data validation system be verified prior to its use in a control and health management system. A new Data Qualification and Validation (DQV) Test-bed application was developed to provide a systematic test environment for this performance verification. The DQV Test-bed was used to evaluate a model-based data validation package known as the Data Quality Validation Studio (DQVS). DQVS was employed as the primary data validation component of a rocket engine health management (EHM) system developed under NASA's NGLT (Next Generation Launch Technology) program. In this paper, the DQVS and DQV Test-bed software applications are described, and the DQV Test-bed verification procedure for this EHM system application is presented. Test-bed results are summarized and implications for EHM system performance improvements are discussed.

Wong, Edmond

AGR-5/6/7 Ceramography Report

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program was established in 2002 to conduct research and development on tri-structural isotropic (TRISO)-coated particle fuel for High Temperature Gas-cooled Reactors (HTGRs). All AGR irradiations have been completed: AGR-1 (Collin 2015), AGR-2 (Collin 2014), AGR-3/4 (Collin 2016) and AGR-5/6/7 (Pham 2021). The objectives of each program are presented in Figure 1.1. The purpose of the AGR-5/6/7 program was to provide a baseline fuel qualification data set to support licensing, deployment, and operation of HTGRs in the United States. To achieve these goals, the program includes fuel fabrication, irradiations of TRISO fuels and high-temperature materials, safety testing and post-irradiation examination (PIE), fuel performance modeling, and fission product (FP) transport (Sharp 2020). The AGR-5/6/7 work continues as a final irradiation program of the Advanced Reactor Technologies (ART) program, that began in February 2018 and ended in July 2020. The AGR-5/6/7 fuel compacts were irradiated for a total of approximately 360.9 effective full power days (EFPDs) (Stempien 2023), resulting in final burn-up values, on a per-compact basis, ranging from 5.66% to 15.26% fissions per initial heavy metal atom (FIMA), and fast fluence values ranging from 1.62×1025 n/m2 to 5.55×1025 n/m2 (E >0.18 MeV) (Stempien 2022)

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS