Engineering PapersSearch

SEARCH · Engineering Papers

Results for “data center modeling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Electromagnetic Transient Modeling of Large Data Centers for Grid-Level Studies

The magnitude and complexity of electricity usage patterns from large data centers are having significant impacts on the operation and dynamics of the power grid; grid operators and planners require a range of specialized data center models to properly evaluate these impacts and specify technical solutions as needed. Towards addressing this need, Pacific Northwest National Laboratory (PNNL) has developed a library of electromagnetic transient (EMT) models for grid-level studies of data centers called the data center model library (DML). This report describes how the DML was created and how it may properly be used. The models present in the DML are generic models; subject matter expertise and additional technical data are needed to modify these models before they can represent any real data center. However, they will significantly reduce the level of effort required to develop site-specific models and can serve as a common starting point to guide industry towards a more refined consensus. Most of the models within DML are dedicated to representing the power electronics interfaces commonly used in modern data centers, such as double-conversion uninterruptible power supplies and single-phase power factor correction converters. These models are intended for use in grid-level studies and are a simplified aggregation of many small components. That said, background material on the physical and electrical design of large data centers is provided as companion material so that users can be aware of many of the details which have been omitted or streamlined as a matter of practical necessity. Additionally, guidance on the application of EMT analysis for data center interconnection studies is provided, which aids users in identifying when the DML is necessary and what sort of additional model development may be necessary for conducting real-world studies.

24 POWER TRANSMISSION AND DISTRIBUTION

Electromagnetic Transient Modeling of Large Data Centers for Grid-Level Studies: Beta Release

The magnitude and complexity of electricity usage patterns from large data centers are having significant impacts on the operation and dynamics of the power grid; grid operators and planners require a range of specialized data center models to properly evaluate these impacts and specify technical solutions as needed. Towards addressing this need, Pacific Northwest National Laboratory (PNNL) has developed a library of electromagnetic transient (EMT) models for grid-level studies of data centers called the data center model library (DML). This report describes how the DML was created and how it may properly be used. This report details the DML’s beta release, completed in July 2026. This is a revision and expansion of the alpha release, which was made available in January 2026 The models present in the DML are generic models; subject matter expertise and additional technical data are needed to modify these models before they can represent any real data center. However, they will significantly reduce the level of effort required to develop site-specific models and can serve as a common starting point to guide industry towards a more refined consensus. Most of the models within DML are dedicated to representing the power electronics interfaces commonly used in modern data centers, such as double-conversion uninterruptible power supplies and single-phase power factor correction converters. These models are intended for use in grid-level studies and are a simplified aggregation of many small components. That said, background material on the physical and electrical design of large data centers is provided as companion material so that users can be aware of many of the details which have been omitted or streamlined as a matter of practical necessity. Additionally, guidance on the application of EMT analysis for data center interconnection studies is provided, which aids users in identifying when the DML is necessary and what sort of additional model development may be necessary for conducting real-world studies.

electromagnetic transients

Electromagnetic Transient Modeling of Data Centers

This report serves as a user manual for the accompanying EMT model library developed by the National Laboratory of the Rockies (NLR) for various equipment in large data centers. The EMT model library enables detailed modeling of large data center loads for conducting grid stability studies. The EMT model library for data centers include detailed models of a 5.5 kW power supply unit (PSU), a 2.5 uninterruptible power supply (UPS), a 260 MW gas turbine-generator, a 500 kW motor load, and a 33 kW IT rack. These components represent all major equipment in data centers that need to be modeled for performing grid stability studies for data centers.

24 POWER TRANSMISSION AND DISTRIBUTION

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)

Modeling Framework for Data Center

This chapter highlights the critical need for advanced modeling of data centers due to their rapidly increasing energy consumption and impact on grid reliability. Driven by the demand for AI applications, data centers are projected to consume a significant portion of US energy by 2028, putting stress on an already challenged power grid. The chapter emphasizes the importance of "fast" time-scale models to understand the dynamic interactions between data centers and the grid, especially given the rapid power fluctuations of AI workloads. It outlines a modeling framework that includes both offline and real-time EMT domain simulations, detailing the necessary representations for various components like utility interfaces, transformers, IT loads, UPS, cooling loads, Battery Energy Storage Systems (BESS), generators, protection systems, and higher-level control systems. While standard simulation tools like PSCAD offer basic models, custom development is often required to accurately capture the unique and fast-changing behaviors of modern data centers. The chapter also discusses key metrics and test cases for validating these models, focusing on transient load responses, protection relay coordination, and demand flexibility. Finally, it addresses the challenges of modeling large-scale data centers, such as computational complexity and the trade-off between model fidelity and practicality, suggesting hybrid modeling approaches as a solution. The overarching goal is to create a robust framework that helps assess data center impacts on grid stability, identify vulnerabilities, and inform the development of standards for reliable integration of these large loads into the bulk power system.

25 ENERGY STORAGE

Data management for community research projects: A JGOFS case study

Since the mid 1980s, much of the marine science research effort in the United Kingdom has been focused into large scale collaborative projects involving public sector laboratories and university departments, termed Community Research Projects. Two of these, the Biogeochemical Ocean Flux Study (BOFS) and the North Sea Project incorporated large scale data collection to underpin multidisciplinary modeling efforts. The challenge of providing project data sets to support the science was met by a small team within the British Oceanographic Data Centre (BODC) operating as a topical data center. The role of the data center was to both work up the data from the ship's sensors and to combine these data with sample measurements into online databases. The working up of the data was achieved by a unique symbiosis between data center staff and project scientists. The project management, programming and data processing skills of the data center were combined with the oceanographic experience of the project communities to develop a system which has produced quality controlled, calibrated data sets from 49 research cruises in 3.5 years of operation. The data center resources required to achieve this were modest and far outweighed by the time liberated in the scientific community by the removal of the data processing burden. Two online project databases have been assembled containing a very high proportion of the data collected. As these are under the control of BODC their long term availability as part of the UK national data archive is assured. The success of the topical data center model for UK Community Research Project data management has been founded upon the strong working relationships forged between the data center and project scientists. These can only be established by frequent personal contact and hence the relatively small size of the UK has been a critical factor. However, projects covering a larger, even international scale could be successfully supported by a network of topical data centers managing online databases which are interconnected by object oriented distributed data management systems over wide area networks.

Lowry, Roy K.

Potential of Data Center Controls in Grid Services

The rapid proliferation of large data centers brings both challenges and opportunities for grid reliability. The data center resources and their potential flexibility have the potential to contribute resources to grid operations. Through capabilities like energy shifting and resource coordination, data centers can help reduce their net demand on the transmission network, as well as provide additional grid services to support reliable operation on the grid. While transient and long-term grid planning and operations are the scenarios that draw most attention, the quasi-steady state timeseries (QSTS) operation of data centers and grid bring interesting scenarios that can help evaluate the data center controls to aid grid services. This work is focused on modeling data centers for QSTS applications – incorporating the AI data center load profiles and building on the PNNL digital twin model for the thermal management loads to enable simulation studies to reveal the impact of data center controls on grid performance. This includes the integration of a QSTS battery and natural gas generator model to incorporate local resource impacts to the system. The simulation study is performed with a modified IEEE 24-Bus transmission system. Scenarios are focused on evaluating the data center load impacts on the transmission system and leveraging both data center and local generation controls to mitigate those impacts and provide additional grid services. The data center controls revealed the ability to contribute to two main kinds of grid services: preventing congestion on a weak grid by coordinating the data center resources with the collocated BESS and onsite generation; and the ability to help the grid operations during stressed times of operation like during a contingency. Leveraging these and other capabilities has the potential to help data centers become grid responsive assets, aiding in both their integration into the power system and grid reliability.

power grid simulation

Reliable Integration of AI Data Centers at Scale – Analysis, Modeling and Synthetic Data Generation

This report analyzes the power consumption of large dynamic digital loads using the open-source MIT supercloud and SURF datasets. With an emphasis on the MIT data, we calculate important power consumption characteristics to help system operators improve generation planning and resource allocation. We also introduce a rudimentary model for generating synthetic load profiles.

97 MATHEMATICS AND COMPUTING

Modeling of Microgrid for Critical Data Center Applications

As part of continuing efforts to develop support, understanding, and infrastructure of data center integration onto the electric grid, our work aims to model and analyze the behavior of data center loads in a microgrid power system. Our model consists of renewable energy sources, batteries, and a nuclear reactor-steam Rankine cycle to power data center loads. The simulation studies investigate the electrical behavior of the microgrid system to assess its ability in supporting large data center electrical demands.

14 - SOLAR ENERGY

TSDC: Transportation Secure Data Center: Real-World Data for Planning, Modeling, and Analysis

The Transportation Secure Data Center is a centralized repository for high-resolution transportation data from hundreds of travel and transit surveys and studies. It makes vital transportation data broadly available to users while preserving the privacy of survey participants. It houses surveys and studies conducted by state departments of transportation, metropolitan planning organizations, transit agencies, cities, and other public agencies. Meanwhile, the Livewire Data Platform empowers research, industry, and academic partners to easily and securely preserve, maintain, share, discover, and gain access to transportation and mobility data. Livewire accommodates a range of datasets, including behavioral, experimental, model, analytical, and raw data at the vehicle, traveler, and system levels. Datasets support mobility research and planning spanning urban science, connected and automated vehicles, fueling and charging infrastructure, mobility decision science, multimodal transportation, vehicle efficiency, and more.

33 ADVANCED PROPULSION SYSTEMS

Horizontal mixing coefficients for two-dimensional chemical models calculated from National Meteorological Center Data

Calculations of the two-dimensional, species-independent mixing coefficients for two-dimensional chemical models for the troposphere and stratosphere are performed using quasi-geostrophic potential vorticity fluxes and gradients from 4 years of National Meteorological Center data for the four seasons in both hemispheres. Results show that the horizontal mixing coefficient values for the winter lower stratosphere are broadly consistent with those currently employed in two-dimensional models, but the horizontal mixing coefficient values in the northern winter upper stratosphere are much larger than those usually used.

Newman, P. A.

The NASA/National Space Science Data Center trapped radiation environment model program, 1964 - 1991

The major effort that NASA, initially with the help of the United States Air Force (USAF), carried out for 27 years to synthesize the experimental and theoretical results of space research related to energetic charged particles into a quantitative description of the terrestrial trapped radiation environment in the form of model environments is detailed. The effort is called the Trapped Radiation Environment Modeling Program (TREMP). In chapter 2 the historical background leading to the establishment of this program is given. Also, the purpose of this modeling program as established by the founders of the program is discussed. This is followed in chapter 3 by the philosophy and approach that was applied in this program throughout its lifetime. As will be seen, this philosophy led to the continuation of the program long after it would have expired. The highlights of the accomplishments are presented in chapter 4. A view to future possible efforts in this arena is given in chapter 5, mainly to pass on to future workers the differences that are perceived from these many years of experience. Chapter 6 is an appendix that details the chronology of the development of TREMP. Finally, the references, which document the work accomplished over these years, are presented in chapter 7.

Vette, James I.

Dataset of Generative AI Workload Power Profiles

This dataset provides a collection of high-resolution (5/10 Hz or every 0.2/0.1 seconds) power consumption profiles for generative artificial intelligence (GenAI) workloads executed on NLR's High Performance Computing (HPC) platform Kestrel. The dataset also includes examples of representative whole-facility power profiles generated using a bottom-up, event-driven, data center energy model . This dataset is designed to support research in energy modeling, infrastructure planning, energy system integration, and sustainability analysis for AI-driven computing systems. The dataset captures time-resolved electrical power measurements across a diverse set of configurations, including variations in job type (inference vs. training), workload (LLM vs. image generation), datasets, and number of compute nodes. Power traces are provided in a standardized format and include both raw/instantaneous and aggregated files. Each profile is accompanied by metadata describing workload parameters, enabling reproducibility and cross-study comparison. The dataset is intended for use in applications such as data center infrastructure planning, energy modeling, demand response and grid impact studies, and development and validation of system-level simulation tools. By making these workload-specific power profiles publicly available, this dataset aims to address the current lack of open, empirical energy data for generative AI systems and to facilitate transparent, reproducible research on the energy and environmental impacts of large-scale AI deployment. If you use this dataset, please cite the associated publication: Vercellino et al., “Measurement of Generative AI Workload Power Profiles for Whole-Facility Data Center Infrastructure Planning,” arXiv:2604.07345 (2026).

97 MATHEMATICS AND COMPUTING

A Methodology to Evaluate the Grid Reliability Impact of Oscillations Induced by Large Loads

The rapid growth of hyperscale AI data centers is bringing renewed attention to the reliability risk that sustained forced oscillations pose to bulk power systems, with cyclic computational workloads emerging as a new forcing source. Unlike the broadband, stochastic disturbances from traditional industrial loads such as arc furnaces, AI training and inference facilities can inject large active power swings concentrated at specific frequencies over extended durations - characteristics that existing grid planning practices do not account for. While the North American Electric Reliability Corporation (NERC) has recognized this gap and called for system-level studies of large load interconnections, no standardized methodology exists to screen, simulate, and quantify these risks at the planning stage. This report presents the Risk Assessment Tool for Large Load-induced Events (RATLLE), a Python-based, publicly available script suite developed at the Pacific Northwest National Laboratory to evaluate bulk power system reliability risks from data center-induced oscillations. RATLLE implements a three-module workflow: a screening module that identifies vulnerable interconnection locations and excitable system modes; a simulation module that models cyclic data center load behavior using a commercial positive sequence simulation platform; and an analysis module that computes risk metrics and generates interactive visualization dashboards. The risk metrics, formulated around simulation observables, map oscillation impacts to a three-stage severity scale spanning latent equipment fatigue through imminent cascading failure. The methodology is demonstrated on two Western Electricity Coordinating Council (WECC) system models: a publicly available 240-bus reduced representation and a detailed 2031 Heavy Winter planning case. Case studies illustrate that even modest 50 MW forced oscillations at resonant frequencies can produce wide-area power swings, N-1 security constraint violations, and cascading generator trips through protection actions - outcomes that would not occur under normal operating conditions without oscillations present. The results underscore the need for standardized oscillation impact assessment in large load interconnection studies and provide a reproducible, extensible framework for utilities to adopt or customize within their existing planning workflows.

Biswas, Shuchismita

Responsible Adoption of Artificial Intelligence (AI) in Electric Grid Operations

The future of the grid will be powered by AI—or undermined by it. Artificial intelligence is rapidly reshaping grid operations, improving fault detection, forecasting accuracy, and real-time optimization. As AI systems move closer to operational decision loops, however, they introduce new consequence pathways: expanded attack surfaces, model integrity risks, regulatory exposure, and human-automation challenges. This talk presents a consequence-driven framework for deploying AI responsibly in the electric grid. Attendees will gain practical strategies to strengthen resilience, boost reliability, and deploy AI securely — ensuring the grid of the future is not only smarter but safer.