Best Practices Guide for Energy-Efficient Data Center Design

This guide provides an overview of best practices for energy-efficient data center design which spans the categories of information technology (IT) systems and their environmental conditions, data center air management, cooling and electrical systems, and heat recovery. IT system energy efficiency and environmental conditions are presented first because measures taken in these areas have a cascading effect of secondary energy savings for the mechanical and electrical systems. This guide concludes with a section on metrics and benchmarking values by which a data center and its systems energy efficiency can be evaluated. No design guide can offer “the most energy-efficient” data center design but the guidelines that follow offer suggestions that provide efficiency benefits for a wide variety of data center scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Advanced Data Center Energy Opportunities: Cloud and Infrastructure CoP - Data Center Energy and Efficiency with AI Adoption

The NLR portion of the "Cloud & Infrastructure CoP - Data Center Energy and Efficiency with AI Adoption" web meeting will cover data center locations, energy use and load growth, best practices, performance metrics, transition to direct liquid cooled data center equipment, and NLR's approach to optimizing data center.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Electromagnetic Transient Modeling of Large Data Centers for Grid-Level Studies

The magnitude and complexity of electricity usage patterns from large data centers are having significant impacts on the operation and dynamics of the power grid; grid operators and planners require a range of specialized data center models to properly evaluate these impacts and specify technical solutions as needed. Towards addressing this need, Pacific Northwest National Laboratory (PNNL) has developed a library of electromagnetic transient (EMT) models for grid-level studies of data centers called the data center model library (DML). This report describes how the DML was created and how it may properly be used. The models present in the DML are generic models; subject matter expertise and additional technical data are needed to modify these models before they can represent any real data center. However, they will significantly reduce the level of effort required to develop site-specific models and can serve as a common starting point to guide industry towards a more refined consensus. Most of the models within DML are dedicated to representing the power electronics interfaces commonly used in modern data centers, such as double-conversion uninterruptible power supplies and single-phase power factor correction converters. These models are intended for use in grid-level studies and are a simplified aggregation of many small components. That said, background material on the physical and electrical design of large data centers is provided as companion material so that users can be aware of many of the details which have been omitted or streamlined as a matter of practical necessity. Additionally, guidance on the application of EMT analysis for data center interconnection studies is provided, which aids users in identifying when the DML is necessary and what sort of additional model development may be necessary for conducting real-world studies.

24 POWER TRANSMISSION AND DISTRIBUTION

Electromagnetic Transient Modeling of Large Data Centers for Grid-Level Studies: Beta Release

The magnitude and complexity of electricity usage patterns from large data centers are having significant impacts on the operation and dynamics of the power grid; grid operators and planners require a range of specialized data center models to properly evaluate these impacts and specify technical solutions as needed. Towards addressing this need, Pacific Northwest National Laboratory (PNNL) has developed a library of electromagnetic transient (EMT) models for grid-level studies of data centers called the data center model library (DML). This report describes how the DML was created and how it may properly be used. This report details the DML’s beta release, completed in July 2026. This is a revision and expansion of the alpha release, which was made available in January 2026 The models present in the DML are generic models; subject matter expertise and additional technical data are needed to modify these models before they can represent any real data center. However, they will significantly reduce the level of effort required to develop site-specific models and can serve as a common starting point to guide industry towards a more refined consensus. Most of the models within DML are dedicated to representing the power electronics interfaces commonly used in modern data centers, such as double-conversion uninterruptible power supplies and single-phase power factor correction converters. These models are intended for use in grid-level studies and are a simplified aggregation of many small components. That said, background material on the physical and electrical design of large data centers is provided as companion material so that users can be aware of many of the details which have been omitted or streamlined as a matter of practical necessity. Additionally, guidance on the application of EMT analysis for data center interconnection studies is provided, which aids users in identifying when the DML is necessary and what sort of additional model development may be necessary for conducting real-world studies.

electromagnetic transients

Demonstrating the data center as a flexible grid asset using a C-HIL setup

Increasing data center demand is outpacing grid infrastructure development. Artificial intelligence workloads and hyperscale cloud growth are creating unprecedented demand for power, while traditional grid expansion faces multiyear development timelines. Verrus is developing an innovative datacenter solution for this challenge, data centers that act as active grid-supportive assets rather than passive loads. Our approach integrates a novel grid-aware power flow management system with battery energy storage systems(BESS) into a microgrid-controlled, medium-voltage power distribution architecture that delivers critical capabilities, such as: * Fast response to grid disturbances such over/ under voltage or over/ under frequency * Demand flexibility that can service requests from the utility within 10 s * Uninterrupted transition to islanded operation during grid outages * Continuous uptime assurance for compute loads while maintaining all customer service level agreements. Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), these capabilities were validated using NREL's Advanced Research on Integrated Energy Systems (ARIES) virtual emulation environment to model a 70-MW grid-interactive data center. This paper outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can provide both critical load resilience and ancillary grid support without compromising uptime requirements. Specifically, we present a digital real time simulation of a 70 MW data center integrated with a physical microgrid controller, and demonstrate the data center response in the event of a grid voltage and frequency event, utility demand response request and utility outage.

24 POWER TRANSMISSION AND DISTRIBUTION

Performance analysis and data reduction for exascale scientific workflows

Chimbuko is the first in situ, scalable, workflow-level performance analysis tool for trace-level analysis and visualization of application performance. This tool was developed by the Co-design Center for Online Data Analysis and Reduction and funded by the U.S. Department of Energy’s Exascale Computing Project. We provide a detailed description of Chimbuko’s architecture and illustrate our online and offline visualization with multiple use cases. We also present results for the deployment and scalability of the tool as applied to a high-energy physics workflow running at large scale on the Frontier supercomputer.

97 MATHEMATICS AND COMPUTING

Next Generation Heat Transfer Fluids for Two-Phase Immersion Cooling of Data Centers

The purpose of this study is to evaluate the performance of next generation dielectric fluids in a Two-Phase Immersion Cooling (2PIC) system, which was designed for use in data centers. Hence, this report contains the performance evaluations of a new developmental dielectric fluid, Opteon™ 2P50, in a commercially available small-scale 2PIC system under typical and off-design range of operating conditions. Accordingly, ambient temperature and thermal loads were varied to simulate different ambient conditions. Additionally, this research report describes the development of a semi-empirical lumped model to predict the energy efficiency of the 2PIC system using Opteon™ 2P50 across a wide range of conditions. The model aims to offer a comprehensive understanding of the system’s efficiency and potential improvements. The outcomes of this study are expected to contribute to the adoption of sustainable 2PIC cooling technologies in data centers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Performance Study of CXL Memory Topology

This paper presents a comprehensive evaluation of the performance impact of various Compute Express Link (CXL) memory topologies, with a particular emphasis on CXL switches, in the context of High- Performance Computing (HPC) and Large Language Model (LLM) inference workloads. Our study unveils significant performance variations across different topologies, demonstrating that certain configurations yield superior performance for specific workloads. These findings underscore the critical importance of tailored topol- ogy selection in optimizing system performance. Additionally, we address the inherent challenges associated with integrating CXL switches, including overhead considerations and routing complex- ities. Our research highlights the necessity for thorough evalua- tion methodologies to fully leverage CXL technology’s potential in contemporary computing environments. These insights provide valuable guidance for system architects and data center operators in designing and optimizing CXL-based infrastructures for diverse workload requirements.

CXL, memory, Artificial Intelligence (AI), HPC

IM3 Data Center Driven Grid Stress Dataset for the U.S. Western Interconnection

This dataset provides projected grid stress and reliability results (including all model inputs and outputs from an open-source grid operations modeling framework - GO), for the Integrated Multisector, Multiscale Modeling (IM3) project, under varying levels of data center demand growth between 2025 and 2035 in the U.S. Western Interconnection. The scenarios and sensitivity experiments are combinations of different data center demand growth rates and energy, weather, population and economic pathways. Data center demand growth projections were sourced from the Electric Power Research Institute (EPRI). The data center demand growth projection names are: Low (3.71% annual data center demand growth) Moderate (5% annual data center demand growth) High (10% annual data center demand growth) Higher (15% annual data center demand growth) Energy, weather, population and economic pathways are informed by two Shared Socioeconomic Pathways (SSP3 and SSP5) and two Representative Concentration Pathways (RCP4.5 and RCP8.5) following the hotter general circulation model (GCM) forcing group from a set of perturbed thermodynamics simulations. The resulting pathway names are: rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 The main scenarios and sensitivity experiments are detailed below. Reference scenario: The projected grid stress and reliability results for the U.S. Western Interconnection from a previous study. This scenario does not consider data center demand growth explicitly. Data center scenario: Building on the reference scenario, this scenario considers various data center growth rates and how they impact the U.S. Western Interconnection. Data center loads are modeled as flat 8760-hr profiles. This scenario does not consider new generation and transmission capacities specifically designed to meet the new data center demands. The related folder is named "flat". Delayed generator retirements sensitivity experiment: Building on the data center scenario, this experiment explores the impact of different levels of natural gas and nuclear generator retirement delays. The resulting scenario names are: (1) postponing 100% nuclear retirements; (2) postponing 100% nuclear and 25% natural gas retirements; (3) postponing only 50% natural gas retirements; (4) postponing 100% nuclear and 50% natural gas retirements; (5) postponing 100% nuclear and 75% natural gas retirements; and (6) postponing 100% nuclear and 100% natural gas retirements. The related folder names are: no_gen_retire_0_gas, no_gen_retire_25_gas, no_gen_retire_50_gas, no_gen_retire_50_gas_only, no_gen_retire_75_gas, and no_gen_retire_100_gas. Demand response through curtailment sensitivity experiment: Building on the data center scenario, this experiment explores the impact of different participation and compensation levels of data center demand response. The resulting scenario names are: (1) 5% demand available for curtailment with 750 $/MWh compensation; (2) 5% demand available for curtailment with 500 $/MWh compensation; (3) 5% demand available for curtailment with 250 $/MWh compensation; (4) 15% demand available for curtailment with 750 $/MWh compensation; (5) 15% demand available for curtailment with 500 $/MWh compensation; and (6) 15% demand available for curtailment with 250 $/MWh compensation. The related folder names are: dr_cost_250_drup_0_drdown_5, dr_cost_250_drup_0_drdown_15, dr_cost_500_drup_0_drdown_5, dr_cost_500_drup_0_drdown_15, dr_cost_750_drup_0_drdown_5, and dr_cost_750_drup_0_drdown_15. Combination of delayed generator retirements and demand response through curtailment sensitivity experiment: The impact of combining postponing 100% nuclear and 25% natural gas retirements with 5% demand available for curtailment with 750 $/MWh compensation is simulated. The related folder is named "dr_cost_750_drup_0_drdown_5_nuc_100_gas_25". Please refer to the README file for a detailed description of the dataset including individual files and references.

Artificial Intelligence

2025 Large Load Literature Review

This literature review catalogs more than 90 publications focused on large loads, and groups the documents and resources thematically into 12 categories, (listed below). The 2026 Large Load Literature Review and Data Sources summary reports are available here: https://emp.lbl.gov/publications/2026-large-load-literature-review -Load forecasting -Data sources -Reliability and resource adequacy -Large load interconnection -Demand flexibility -Generation -Co-location -Data center location/infrastructure -Large load tariffs -Policy options -Maps and tools -Design and operations

97 MATHEMATICS AND COMPUTING

Futureproofing through 2035 for the AI and HPC Power Density Trend

HPC and AI are businesses necessitating growth for providing performance improvement with increased power and cooling. As HPC and AI computers and their supporting facilities approach utility scale with a frequency of technology innovation outpacing utility and construction timelines, understanding and designing for this trend has become critical. This paper will provide historical trend data for facilities and compute racks, relate power trend data to cooling technology capabilities, and reason through constraints impacting anticipated future power densities to aid the reader in futureproofing a facility’s power and cooling systems through the mid-2030’s.

97 MATHEMATICS AND COMPUTING

Vulcan Test Platform: Demonstrating the Data Center as a Flexible Grid Asset

Explosive data center demand is outpacing grid infrastructure development. AI workloads and hyperscale cloud growth are creating unprecedented power requirements, while traditional grid expansion faces multi-year development timelines, regulatory hurdles, and decarbonization challenges. Sidewalk Infrastructure Partners recognized this impending crisis years ago and founded Verrus to develop an innovative solution: data centers that function as grid assets rather than passive loads. The Verrus approach integrates proprietary grid-aware controls with battery energy storage systems (BESS) in a medium-voltage architecture that delivers three critical capabilities: Fast-responding demand flexibility that can service requests from the utility within 10 seconds, Uninterrupted transition to islanded operation during grid disturbances, Continuous uptime assurance while maintaining all customer service level commitments Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), we validated these capabilities on Vulcan, a 70 MW utility-scale test platform powered by NREL's ARIES Virtual Emulation Environment. This deployment-ready technology has successfully demonstrated that Verrus data centers can deliver meaningful grid services while maintaining mission-critical reliability. This technical report outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can play a pivotal role in enhancing grid flexibility and reliability, without sacrificing service level guarantees.

24 POWER TRANSMISSION AND DISTRIBUTION

Dataset of Generative AI Workload Power Profiles

This dataset provides a collection of high-resolution (5/10 Hz or every 0.2/0.1 seconds) power consumption profiles for generative artificial intelligence (GenAI) workloads executed on NLR's High Performance Computing (HPC) platform Kestrel. The dataset also includes examples of representative whole-facility power profiles generated using a bottom-up, event-driven, data center energy model . This dataset is designed to support research in energy modeling, infrastructure planning, energy system integration, and sustainability analysis for AI-driven computing systems. The dataset captures time-resolved electrical power measurements across a diverse set of configurations, including variations in job type (inference vs. training), workload (LLM vs. image generation), datasets, and number of compute nodes. Power traces are provided in a standardized format and include both raw/instantaneous and aggregated files. Each profile is accompanied by metadata describing workload parameters, enabling reproducibility and cross-study comparison. The dataset is intended for use in applications such as data center infrastructure planning, energy modeling, demand response and grid impact studies, and development and validation of system-level simulation tools. By making these workload-specific power profiles publicly available, this dataset aims to address the current lack of open, empirical energy data for generative AI systems and to facilitate transparent, reproducible research on the energy and environmental impacts of large-scale AI deployment. If you use this dataset, please cite the associated publication: Vercellino et al., “Measurement of Generative AI Workload Power Profiles for Whole-Facility Data Center Infrastructure Planning,” arXiv:2604.07345 (2026).

97 MATHEMATICS AND COMPUTING

New H erwig7 underlying event tune: From RHIC to LHC energies

We present parameter sets corresponding to new underlying event tunes for the H erwig7.3 Monte Carlo event generator. The existing H erwig tunes are in good agreement with LHC data, however, they are not typically designed for center-of-mass energies below $\sqrt{𝑠}$ = 300 GeV. The tunes presented in this study can describe midrapidity data collected at the nominal RHIC energy of $\sqrt{𝑠}$ = 200 GeV as well as higher center-of-mass energies utilized by experiments at the LHC and Tevatron. The base “New Haven” tune is developed by fitting minimum-bias simulations of proton-proton ($𝑝⁢𝑝$) collisions to midrapidity identified hadron and jet data from the STAR experiment. The “Nashville” tune includes a separate set of parameters developed by tuning to Tevatron proton-antiproton ($𝑝\bar{⁢𝑝}$) data at $\sqrt{𝑠}$ = 300, 900 and 1960 GeV from CDF, and LHC $𝑝⁢𝑝$ measurements from CMS at $\sqrt{𝑠}$ =7 TeV, in addition to the STAR measurements. Both new tunes demonstrate significant improvements over the recommended default tune currently included in the latest version of H erwig for minimum bias production. As such, we advocate using these tunes for future simulation studies at midrapidity by experimental collaborations at RHIC (STAR and sPHENIX) and the LHC (ALICE, ATLAS, and CMS).

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS

Exploring DAOS as a Burst Buffer for a 100 Gbps DAQ Real-Time Streaming System

We present an experimental evaluation of a burst buffer for a real-time DAQ streaming system designed to transmit instrument data to remote data centers. The system is based on EJ-FAT, a load balancing system capable of Nx 100Gbps streams, distributing data from event sources to processing nodes. We explore applying the DAOS system as a burst buffer to serve a number of purposes: improve resiliency, elasticity and add new functions into the processing pipeline. In the evaluation a sender transmits events over a 100Gbps network to a receiver integrated with DAOS to store the reassembled events using DAOS APIs. We evaluate the system for possible bottlenecks and provide end-to-end evaluation with a burst buffer using DAOS storage abstractions. We show that a receiver node can support 38.1 Gbps. This proves the viability of our approach and allows us to extend this work to investigate scale-out properties and new streaming optimizations.

Mei, Xinxin

Ultra-low thermal resistance and pressure drop copper and copper-tungsten diamond-shaped pin fin cold plates for liquid cooling of electronics

Modern and future data centers face increasing cooling challenges due to increasing chip thermal design power and die size, along with the need to reduce energy consumption used for cooling. High performance cooling solutions that maintain a low chip junction temperature are needed to ensure electronics reliability. This work develops an ultra-low thermal resistance and low pressure drop 75 mm × 75 mm cold plate, intended for next-generation electronics cooling. The cold plate features an array of diamond-shaped pin fins and integrated copper tungsten heat spreader, selected for its low coefficient of thermal expansion which reduces thermomechanical deformation and allows for closer integration of the cold plate with silicon dies. Starting with 300 candidate designs, three-dimensional computational fluid dynamics simulations predict the thermal-hydraulic performance of cold plate subsections. The highest performing geometries are evaluated with high fidelity simulations. Four cold plates are manufactured for experiments: three with diamond-shaped pin fins and one with straights fins for comparison purposes. The cold plates are fabricated from copper-tungsten (CuW), copper (Cu), or aluminum-silicon-magnesium alloy (AlSi10Mg). The diamond-shaped pin fins achieve a roughly 15 % lower thermal resistance compared to the conventional straight fin microchannel. The highest performing design achieves a chip-to-coolant (including thermal interface material) thermal resistance of 9.0 K/kW in CuW and 6.9 K/kW in Cu under a 1 kW heat load with an inlet-to-outlet pressure drop of 9.0 kPa and water as the working fluid. This work demonstrates ultra-low thermal resistance and pressure drop cold plates for large die, high heat load applications, and shows that CuW is an attractive cold plate material for improved reliability in next generation data center cooling.

Coefficient of thermal expansion

Challenges and strategies for probing the composite interface of PEM electrolyzers and fuel cells using operando AP-XPS

Left: cross-section schematic of a membrane electrode assembly, the working electrode changing state with applied potential. Center: the operando cell design that enables snapshot data acquisition during trajectory movement. Right: resulting spectra. Understanding the surface chemistry of electrocatalyst systems under operando conditions is central to revealing the electrocatalytic cell's working mechanisms. Determination of these catalytic processes on a molecular scale and the involved components is fundamental to streamlining material design for energy conversion and storage applications. X-ray photoelectron spectroscopy (XPS) is an established technique used to study the chemical and electronic states of materials. While the surface sensitivity of XPS is typically high, use of tender X-ray energies and technical advancements have allowed for the direct probing of solid–vapor and solid–liquid interfaces. However, protocols and documentation of experimental considerations for operando XPS probing of working electrolyzers and fuel cells remain scarce. Herein, we report an approach for the study of working polymer electrolyte membrane (PEM) electrolysis cells using ambient pressure X-ray photoelectron spectroscopy (AP-XPS). This approach directly probes the composite electrode surface on the membrane electrode assembly (MEA) in 100% relative humidity to establish a meaningful liquid layer for electrocatalysis. We carry out a systematic investigation from the cell constituent components to a fully assembled working operando electrolytic system and establish a method for AP-XPS study of the complex composite MEA, providing recommendations for data acquisition and component analysis.

Hamlyn, Rebecca

The PARADIGM Project: Case Study in Balancing Experiment Uncertainty with Design simplicity

Accurate nuclear data are required for simulations of many applications including nuclear criticality safety. Actinide nuclear data at intermediate energies (from 1 to 100s of keV) are imprecise and inaccurate, because of scarce differential data, and an insufficient theory approach to capture the structures expected in the data to yield evaluated nuclear data, and lack of integral data for proper validation. This is a known deficiency but has proved challenging to address. More specifically, only 5% of integral experiments in the International Criticality Safety Benchmark Evaluation Project (ICSBEP) benchmark suite address intermediate energies (Fig. 1). Associated calculated effective multiplication factor, k eff , values for these experiments are far outside the experimental uncertainties and are 25× further from experiment than for fast energies. These differences could either stem from systematic biases in nuclear data, experiments or both. The goal of the PARADIGM (PARallel Approach of Differential and InteGral Measurements) project is to significantly reduce (by more than tens of percent) the uncertainties of intermediate energy actinide nuclear data. The PARADIGM project designed and intends to execute LANSCE (Los Alamos Neutron Science CEnter) and NCERC (National Criticality Experiments Research Center) intermediate experiments in parallel. They will specifically address a high priority nuclear data need—reducing bias and uncertainty in intermediate plutonium nuclear data. The two experiment will achieve that by informing each other and nuclear theory. By doing all these steps in parallel, the timeline to deliver improved nuclear data to users will significantly be reduced. This work will focus on the integral experiment final design and the balance of design and modeling simplicity while minimizing experiment uncertainty.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS