Engineering PapersSearch

SEARCH · Engineering Papers

Results for “customer satisfaction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Improving Customer Satisfaction in an R and D Environment

Satisfying customer needs is critical to the sustained competitive advantage of service suppliers. It is therefore important to understand the types of customer needs which, if fulfilled or exceeded, add value and contribute to overall customer satisfaction. This study identifies the needs of various research and development (R&D) customers who contract for engineering and design support services. The Quality Function Deployment (QFD) process was used to organize and translate each customer need into performance measures that, if implemented, can improve customer satisfaction. This study also provides specific performance measures that will more accurately guide the efforts of the engineering supplier. These organizations can either implement the QFD methodology presented herein or extract a few performance measures that are specific to the quality dimensions in need of improvement. Listening to 'what' customers talk about is a good first start.

Alexander, Anita

The power of cross-functional teams in driving total quality

Garrett Canada, a Division of Allied-Signal Aerospace Canada, has been a member of the Canadian aerospace industry for 40 years. Although Garrett Canada has always been a profitable division with a solid market share, the changing and turbulent business environment and globalization of the aerospace industry has created new demands and challenges. The marketplace is demanding faster introduction of new products, as well as shorter leadtimes for repairs and spares. It was recognized that reducing cycle times for new products and for ongoing production would not only satisfy our customers, it would also enhance our business performance through reduced inventories, lower past due, and more responsiveness to change. It was evident that drastic function changes were required if we were to maintain our position as a premier aerospace supplier. The challenge was to convert a stable, somewhat slow-paced work environment with strong functional boundaries into a boundaryless world class team functioning in a total quality environment and focused on customer satisfaction. Complete and uncompromised customer satisfaction has become our driving force, with Total Quality being our engine to continuously improve our processes and increase our speed. The way in which this transition has been brought about is the subject of this presentation.

Mcclung, Tim M.

Application of Probabilistic Methods for the Determination of an Economically Robust HSCT Configuration

This paper outlines an approach for the determination of economically viable robust design solutions using the High Speed Civil Transport (HSCT) as a case study. Furthermore, the paper states the advantages of a probability based aircraft design over the traditional point design approach. It also proposes a new methodology called Robust Design Simulation (RDS) which treats customer satisfaction as the ultimate design objective. RDS is based on a probabilistic approach to aerospace systems design, which views the chosen objective as a distribution function introduced by so called noise or uncertainty variables. Since the designer has no control over these variables, a variability distribution is defined for each one of them. The cumulative effect of all these distributions causes the overall variability of the objective function. For cases where the selected objective function depends heavily on these noise variables, it may be desirable to obtain a design solution that minimizes this dependence. The paper outlines a step by step approach on how to achieve such a solution for the HSCT case study and introduces an evaluation criterion which guarantees the highest customer satisfaction. This customer satisfaction is expressed by the probability of achieving objective function values less than a desired target value.

Mavris, Dimitri N.

Method for optimizing resource allocation in a government organization

The managers in Federal agencies are challenged to control the extensive activities in government and still provide high-quality products and services to the American taxpayers. Considering today's complex social and economic environment and the $3.8 billion daily cost of operating the Federal Government, it is evident that there is a need to develop decision-making tools for accurate resource allocation and total quality management. The goal of this thesis is to provide a methodical process that will aid managers in Federal Government to make budgetary decisions based on the cost of services, the agency's objectives, and the customers' perception of the agency's product. A general resource allocation procedure was developed in this study that can be applied to any government organization. A government organization, hereafter the 'organization,' is assumed to be a multidivision enterprise. This procedure was applied to a small organization for the proof of the concept. This organization is the Technical Services Directorate (TSD) at the NASA Lewis Research Center in Cleveland, Ohio. As part of the procedure, a nonlinear programming model was developed to account for the resources of the organization, the outputs produced by the organization, the decision-maker's views, and the customers' satisfaction with the organization. The information on the resources of the organization was acquired from current budget levels of the organization and the human resources assigned to the divisions. The outputs of the organization were defined and measured by identifying metrics that assess the outputs, the most challenging task in this study. The decision-maker's views are represented in the model as weights assigned to the various outputs and were quantified by using the analytic hierarchy process. The customer's opinions regarding the outputs of the organization were collected through questionnaires that were designed for each division individually. Following the philosophy of total quality management, information on customers' satisfaction is presented in the model as the quality of output. The model is a nonlinear one whose objective is to maximize customers' satisfaction such that the total cost of operation does not exceed the organization's budget. This model represents a structured approach or policy mechanism, at the agency level, to make capital investment decisions based on the priorities of the agency and the quality of outputs. This procedure applied to TSD resulted in a resources allocation scheme that was reasonable and acceptable to the decision-makers and, as expected, dependent on the assumptions and accuracy of the data used in the model.

Afarin, James

Office of Equal Opportunity Programs

The NASA Glenn Office of Equal Opportunity Programs works to provide quality service for all programs and/or to assist the Center in becoming a model workplace. During the summer of 2004, I worked with Deborah Cotleur along with other staff members to create and modify customer satisfaction surveys. This office aims to assist in developing a model workplace by providing functions as a change agent to the center by serving as an advisor to management to ensure equity throughout the Center. In addition, the office serves as a mediator for the Center in addressing issues and concerns. Lastly, the office provides assistance to employees to enable attainment of personal and organizational goals. The Office of Equal Opportunities is a staff office which reports and provides advice to the Center Director and Executive Leadership, implements laws, regulations, and presidential executive orders, and provides center wide leadership and assistance to NASA GRC employees. Some of the major responsibilities of the office include working with the discrimination complaints program, special emphasis programs (advisory groups), management support, monitoring and evaluation, contract compliance, and community outreach. During my internship in this office, my main objective was to create four customer satisfaction surveys based on EO retreats, EO observances, EO advisory boards, and EO mediation/counseling. I created these surveys after conducting research on past events and surveys as well as similar survey research created and conducted by other NASA centers, program for EO Advisory group members, leadership training sessions for supervisors, preventing sexual harassment training sessions, and observance events. I also conducted research on the style and format from feedback surveys from the Marshall Equal Opportunity website, the Goddard website, and the main NASA website. Using the material from the Office of Equal Opportunity Programs at Glenn Research Center along with my previous research, I created four customer satisfaction surveys. Additional information is included in the original extended abstract.

Chin, Jennifer L.

Product Defect Detection System: SYSM- 5620 Final Project

Retail sales is a growing market estimated to up to seven percent year over year. With this growing market there is also a trend in growing rate of retail returns, estimated just last year at $\$$850 billion. Retail stores must ensure that products available for purchase remain safe, undamaged, and acceptable to customers throughout their time in the store. This job exists regardless of the specific solution used because stores are always responsible for preventing damaged or defective products from reaching customers and when they fail to this is categorized under operation inefficiencies which accounts for an estimated $\$$12 billion in returns. When defective items remain on the sales floor, stores may experience increased returns, reduced customer satisfaction, loss of customer trust, and potential safety concerns depending on the product type. As a result, the core job to be done is to identify defective products quickly, remove them from the sales floor before they are purchased, and preserve useful information about the defect so that the store can improve its handling, stocking, and supplier coordination over time. The need for a more reliable process is especially important in high volume retail environments where employees manage large numbers of products across many aisles, shelves, and storage areas. In these settings, manual inspection alone can be inconsistent and difficult to sustain at the individual item level. At the same time, broader retail trends continue to emphasize operational efficiency, product visibility, and improved customer experience, creating an opportunity for more automated and data driven defect detection methods.

42 ENGINEERING

Customer-Focused Key Performance Indicators for Electric Vehicle Charging

To systematically improve the public charging experience, EV charging industry stakeholders need to define and measure it precisely. Many stakeholders currently measure aspects of the charging experience, but they typically employ metrics that are either operational in nature, such as charger uptime and mean time between failures, or composite customer satisfaction indices. To improve the customer experience most effectively, the industry needs metrics that define the charging experience from the perspective of the customer, not business operations. Furthermore, industry practitioners need granular metrics to know what specific aspects of the charging experience need improvement. This report defines such customer-focused metrics, called key performance indicators (KPIs).

33 - ADVANCED PROPULSION SYSTEMS

ChargeX KPIs Transition to SAE

To systematically improve the public charging experience, EV charging industry stakeholders need to define and measure it precisely. Many stakeholders currently measure aspects of the charging experience, but they typically employ metrics that are either operational in nature, such as charger uptime and mean time between failures, or composite customer satisfaction indices. To improve the customer experience most effectively, the industry needs metrics that define the charging experience from the perspective of the customer, not business operations. Furthermore, industry practitioners need granular metrics to know what specific aspects of the charging experience need improvement. This presentation gives an overview of the key performance indicators (KPIs) defined by the ChargeX Consortium.

33 ADVANCED PROPULSION SYSTEMS

Cross-Cultural Perspectives of Service Quality and Risk in Air Transportation

This study compares US and Korean customers in terms of their perceptions of airline service quality based on SERVPERF and industry-based measures, as well as their perceptions of risks involved in the airline choice. SERVPERF is a set of multi-dimensional measures of customer evaluations of service quality. The results indicate that: (1) US passengers are generally more satisfied with their airline service than Korean customers on most of the SERVPERF dimensions; (2) Koreans are generally more satisfied with the bumping procedures whereas US participants feel more satisfied with the airline's baggage handling, operations/safety, and connections; and (3) US participants perceive higher levels of performance and financial risks whereas Koreans feel greater social risk in choosing an airline. This study also examines the SERVPERF, industry-based measure, and perceived risk in predicting customer satisfaction with, and intention to repatronize the airline. The results suggest that US customers consider service reliability, in-flight comfort, and connections as the key factors determining satisfaction with airline service whereas Korean passengers generally regard reliability, assurance, and risk factors as predictors of satisfaction. The determining factors of customer intention to repatronize the airline are reliability and empathy for US, and reliability and overall risk for Korean customers. The study demonstrates the applicability of SERVPERF as a cross-cultural tool and indicates the importance of perceived risk in cross-cultural studies.

Cunningham, Lawrence F.

Ideas for Future GPS Timing Improvements

Having recently met stringent criteria for full operational capability (FOC) certification, the Global Positioning System (GPS) now has higher customer expectations than ever before. In order to maintain customer satisfaction, and the meet the even high customer demands of the future, the GPS Master Control Station (MCS) must play a critical role in the process of carefully refining the performance and integrity of the GPS constellation, particularly in the area of timing. This paper will present an operational perspective on several ideas for improving timing in GPS. These ideas include the desire for improving MCS - US Naval Observatory (USNO) data connectivity, an improved GPS-Coordinated Universal Time (UTC) prediction algorithm, a more robust Kalman Filter, and more features in the GPS reference time algorithm (the GPS composite clock), including frequency step resolution, a more explicit use of the basic time scale equation, and dynamic clock weighting. Current MCS software meets the exceptional challenge of managing an extremely complex constellation of 24 navigation satellites. The GPS community will, however, always seek to improve upon this performance and integrity.

Hutsell, Steven T.

NASA's EOSDIS, Trust and Certification

NASA's Earth Observing System Data and Information System (EOSDIS) has been in operation since August 1994, managing most of NASA's Earth science data from satellites, airborne sensors, filed campaigns and other activities. Having been designated by the Federal Government as a project responsible for production, archiving and distribution of these data through its Distributed Active Archive Centers (DAACs), the Earth Science Data and Information System Project (ESDIS) is responsible for EOSDIS, and is legally bound by the Office of Management and Budgets circular A-130, the Federal Records Act. It must follow the regulations of the National Institute of Standards and Technologies (NIST) and National Archive and Records Administration (NARA). It must also follow the NASA Procedural Requirement 7120.5 (NASA Space Flight Program and Project Management). All these ensure that the data centers managed by ESDIS are trustworthy from the point of view of efficient and effective operations as well as preservation of valuable data from NASA's missions. Additional factors contributing to this trust are an extensive set of internal and external reviews throughout the history of EOSDIS starting in the early 1990s. Many of these reviews have involved external groups of scientific and technological experts. Also, independent annual surveys of user satisfaction that measure and publish the American Customer Satisfaction Index (ACSI), where EOSDIS has scored consistently high marks since 2004, provide an additional measure of trustworthiness. In addition, through an effort initiated in 2012 at the request of NASA HQ, the ESDIS Project and 10 of 12 DAACs have been certified by the International Council for Science (ICSU) World Data System (WDS) and are members of the ICSUWDS. This presentation addresses questions such as pros and cons of the certification process, key outcomes and next steps regarding certification. Recently, the ICSUWDS and Data Seal of Approval (DSA) organizations merged their Core Trustworthy Data Repositories Requirements and require that members be recertified every three years. Given the rigor with which NASA manages the ESDIS Project and the DAACs, the recertification through WDSDSA, while involving some additional work, is a relatively simple process.

Certification

Proposal Improvements That Work

Rocketdyne Propulsion and Power, an operating location of Boeing in Canoga Park, California is under contract with NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama for design, development, production, and mission support of Space Shuttle Main Engines (SSMEs). The contract was restructured in 1996 to emphasize a mission contracting environment under which Rocketdyne supports the Space Transportation System launch manifest of seven flights a year without the need for a detailed list of contract deliverables such as nozzles, turbopumps, and combustion devices. This contract structure is in line with the overall Space Shuttle program goals established by the NASA to fly safely, meet the flight manifest, and reduce cost. Rocketdyne's Contracts, Pricing, and Estimating team has worked for the past several years with representatives from MSFC, the local Defense Contract Management Command, and the DCAA to improve the quality of cost proposals to MSFC for contract changes on the SSME. The contract changes on the program result primarily from engineering change proposals for product enhancements to improve safety, maintainability, or operability in the space environment. This continuous improvement team effort has been successful in improving proposal quality, reducing cycle time, and reducing cost. Some of the principal lessons learned are highlighted here to show how proposal improvements can be implemented to enhance customer satisfaction and ensure cost proposals can be evaluated easily by external customers.

Dunn, F.

Human factors involvement in bringing the power of AI to a heterogeneous user population

The Human Factors involvement in developing COMPAQ QuickSolve, an electronic problem-solving and information system for Compaq's line of networked printers, is described. Empowering customers with expert system technology so they could solve advanced networked printer problems on their own was a major goal in designing this system. This process would minimize customer down-time, reduce the number of phone calls to the Compaq Customer Support Center, improve customer satisfaction, and, most importantly, differentiate Compaq printers in the marketplace by providing the best, and most technologically advanced, customer support. This represents a re-engineering of Compaq's customer support strategy and implementation. In its first generation system, SMART, the objective was to provide expert knowledge to Compaq's help desk operation to more quickly and correctly answer customer questions and problems. QuickSolve is a second generation system in that customer support is put directly in the hands of the consumers. As a result, the design of QuickSolve presented a number of challenging issues. Because the produce would be used by a diverse and heterogeneous set of users, a significant amount of human factors research and analysis was required while designing and implementing the system. Research that shaped the organization and design of the expert system component as well.

Czerwinski, Mary

Techno-Economic Analysis of Data-Driven and Transactive Approaches for Resilience Enhancement

As extreme weather events lead to more frequent power outages, understanding and enhancing grid resilience is critical to mitigating economic losses and non-energy impacts from service disruptions. Here, this study introduces a novel techno-economic analysis framework for evaluating resilience enhancement mechanisms. The framework combines grid response modeling with a co-simulation approach and valuation methodology to provide a comprehensive assessment. We apply this framework to a realistic case study of the Texas grid during Winter Storm Uri in February 2021. Two advanced resilience strategies are analyzed: a data-driven rolling outage mechanism and a transactive energy (TE) based allocation scheme. The rolling outage scheme selectively serves customers based on real-time curtailment needs, while the TE scheme allows customers to trade energy allocations according to their preferences. Our findings show that both the rolling outage and TE schemes significantly outperform conventional methods (i.e. controlled outages) by reducing the amount of energy not supplied to customers by 41% and 64%, respectively. These approaches also enhance flexibility and customer satisfaction, while improving energy utilization for greater resilience. Additionally, they maintain thermal comfort about 3.5 times better and substantially lower customer risk exposure. A key contribution of this study is addressing both utility and customer perspectives while considering both energy and non-energy impacts. The techno-economic analysis indicates that implementing these resilience enhancement strategies would incur an additional 1.1Bto1.6B in utility costs but has the potential to avoid 17.3Bto18B of customer losses as compared to existing solutions, thereby underscoring the value of investing in advanced resilience, as it provides significant societal benefits to customers.

42 ENGINEERING

Agile manufacturing: The factory of the future

The factory of the future will require an operating methodology which effectively utilizes all of the elements of product design, manufacturing and delivery. The process must respond rapidly to changes in product demand, product mix, design changes or changes in the raw materials. To achieve agility in a manufacturing operation, the design and development of the manufacturing processes must focus on customer satisfaction. Achieving greatest results requires that the manufacturing process be considered from product concept through sales. This provides the best opportunity to build a quality product for the customer at a reasonable rate. The primary elements of a manufacturing system include people, equipment, materials, methods and the environment. The most significant and most agile element in any process is the human resource. Only with a highly trained, knowledgeable work force can the proper methods be applied to efficiently process materials with machinery which is predictable, reliable and flexible. This paper discusses the affect of each element on the development of agile manufacturing systems.

Loibl, Joseph M.

Manufacturing Bms/Iso System Review

The Quality Management System (QMS) is one that recognizes the need to continuously change and improve an organization s products and services as determined by system feedback, and corresponding management decisions. The purpose of a Quality Management System is to minimize quality variability of an organization's products and services. The optimal Quality Management System balances the need for an organization to maintain flexibility in the products and services it provides with the need for providing the appropriate level of discipline and control over the processes used to provide them. The goal of a Quality Management System is to ensure the quality of the products and services while consistently (through minimizing quality variability) meeting or exceeding customer expectations. The GRC Business Management System (BMS) is the foundation of the Center's ISO 9001:2000 registered quality system. ISO 9001 is a quality system model developed by the International Organization for Standardization. BMS supports and promote the Glenn Research Center Quality Policy and wants to ensure the customer satisfaction while also meeting quality standards. My assignment during this summer is to examine the manufacturing processes used to develop research hardware, which in most cases are one of a kind hardware, made with non conventional equipment and materials. During this process of observation I will make a determination, based on my observations of the hardware development processes the best way to meet customer requirements and at the same time achieve the GRC quality standards. The purpose of my task is to review the manufacturing processes identifying opportunities in which to optimize the efficiency of the processes and establish a plan for implementation and continuous improvement.

Gomez, Yazmin

Total quality management: It works for aerospace information services

Today we are in the midst of information and 'total quality' revolutions. At the NASA STI Program's Center for AeroSpace Information (CASI), we are focused on using continuous improvements techniques to enrich today's services and products and to ensure that tomorrow's technology supports the TQM-based improvement of future STI program products and services. The Continuous Improvements Program at CASI is the foundation for Total Quality Management in products and services. The focus is customer-driven; its goal, to identify processes and procedures that can be improved and new technologies that can be integrated with the processes to gain efficiencies, provide effectiveness, and promote customer satisfaction. This Program seeks to establish quality through an iterative defect prevention approach that is based on the incorporation of standards and measurements into the processing cycle. Four projects are described that utilize cross-functional, problem-solving teams for identifying requirements and defining tasks and task standards, management participation, attention to critical processes, and measurable long-term goals. The implementation of these projects provides the customer with measurably improved access to information that is provided through several channels: the NASA STI Database, document requests for microfiche and hardcopy, and the Centralized Help Desk.

Erwin, James