Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cruise operations phase”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Mars Reconnaissance Orbiter Ka-band (32 GHz) Demonstration: Cruise Phase Operations

The X-band (8.41 GHz) frequency currently used for deep space telecommunications is too narrow (50 MHz) to support future high rate missions. Because of this NASA has decided to transition to Ka-band (32 GHz) frequencies. As weather effects cause much larger fluctuations on Ka-band than on X-band, the traditional method of using a few dBs of margin to cover these fluctuations is wasteful of power for Ka-band; therefore, a different operations concept is needed for Ka-band links. As part of the development of the operations concept for Ka-band, NASA has implemented a fully functioning Ka-band communications suite on its Mars Reconnaissance Orbiter (MRO). This suite will be used during the primary science phase to develop and refine the Ka-band operations concept for deep space missions. In order to test the functional readiness of the spacecraft and the Deep Space Network's (DSN) readiness to support the demonstration activities a series of passes over DSN 34-m Beam Waveguide (BWG) antennas were scheduled during the cruise phase of the mission. MRO was launched on August 12, 2005 from Kennedy Space Center, Cape Canaveral, Florida, USA and went into Mars Orbit on March 10, 2006. A total of ten telemetry demonstration and one high gain antenna (HGA) calibration passes were allocated to the Ka-band demonstration. Furthermore, a number of "shadow" passes were also scheduled where, during a regular MRO track over a Ka-band capable antenna, Ka-band was identically configured as the X-band and tracked by the station. In addition, nine Ka-band delta differential one way ranging ((delta)DOR) passes were scheduled. During these passes, the spacecraft and the ground system were put through their respective paces. Among the highlights of these was setting a single day record for data return from a deep space spacecraft (133 Gbits) achieved during one 10-hour pass; achieving the highest data rate ever from a planetary mission (6 Mbps) and successfully demonstrating Ka-band DDOR. In addition, DSN performed well. However, there are concerns with the active pointing of the Ka-band antennas as well as delivery of the monitor data from the stations. The spacecraft also presented challenges not normally associated with planetary missions mostly because of its very high equivalent isotropic radiated power (EIRP). This caused problems in accurately evaluating the in-flight EIRP of the spacecraft which led to difficulties evaluating the quality of the HGA calibration data. These led to the development of additional measurement techniques that could be used for future high-power deep space missions.

Mars Reconnaissance Orbiter (MRO)↗

Curiosity: the Mars Science Laboratory Project

The Curiosity rover landed successfully in Gale Crater, Mars on August 5, 2012. This event was a dramatic high point in the decade long effort to design, build, test and fly the most sophisticated scientific vehicle ever sent to Mars. The real achievements of the mission have only just begun, however, as Curiosity is now searching for signs that Mars once possessed habitable environments. The Mars Science Laboratory Project has been one of the most ambitious and challenging planetary projects that NASA has undertaken. It started in the successful aftermath of the 2003 Mars Exploration Rover project and was designed to take significant steps forward in both engineering and scientific capabilities. This included a new landing system capable of emplacing a large mobile vehicle over a wide range of potential landing sites, advanced sample acquisition and handling capabilities that can retrieve samples from both rocks and soil, and a high reliability avionics suite that is designed to permit long duration surface operations. It also includes a set of ten sophisticated scientific instruments that will investigate both the geological context of the landing site plus analyze samples to understand the chemical & organic composition of rocks & soil found there. The Gale Crater site has been specifically selected as a promising location where ancient habitable environments may have existed and for which evidence may be preserved. Curiosity will spend a minimum of one Mars year (about two Earth years) looking for this evidence. This paper will report on the progress of the mission over the first few months of surface operations, plus look retrospectively at lessons learned during both the development and cruise operations phase of the mission..

project formulation↗

Cassini Information Management System in Distributed Operations Collaboration and Cassini Science Planning

Launched on October 15, 1997, the Cassini-Huygens spacecraft began its ambitious journey to the Saturnian system with a complex suite of 12 scientific instruments, and another 6 instruments aboard the European Space Agencies Huygens Probe. Over the next 6 1/2 years, Cassini would continue its relatively simplistic cruise phase operations, flying past Venus, Earth, and Jupiter. However, following Saturn Orbit Insertion (SOI), Cassini would become involved in a complex series of tasks that required detailed resource management, distributed operations collaboration, and a data base for capturing science objectives. Collectively, these needs were met through a web-based software tool designed to help with the Cassini uplink process and ultimately used to generate more robust sequences for spacecraft operations. In 2001, in conjunction with the Southwest Research Institute (SwRI) and later Venustar Software and Engineering Inc., the Cassini Information Management System (CIMS) was released which enabled the Cassini spacecraft and science planning teams to perform complex information management and team collaboration between scientists and engineers in 17 countries. Originally tailored to help manage the science planning uplink process, CIMS has been actively evolving since its inception to meet the changing and growing needs of the Cassini uplink team and effectively reduce mission risk through a series of resource management validation algorithms. These algorithms have been implemented in the web-based software tool to identify potential sequence conflicts early in the science planning process. CIMS mitigates these sequence conflicts through identification of timing incongruities, pointing inconsistencies, flight rule violations, data volume issues, and by assisting in Deep Space Network (DSN) coverage analysis. In preparation for extended mission operations, CIMS has also evolved further to assist in the planning and coordination of the dual playback redundancy of highvalue data from targets such as Titan and Enceladus. This paper will outline the critical role that CIMS has played for Cassini in the distributed ops paradigm throughout operations. This paper will also examine the evolution that CIMS has undergone in the face of new science discoveries and fluctuating operational needs. And finally, this paper will conclude with theoretical adaptation of CIMS for other projects and the potential savings in cost and risk reduction that could potentially be tapped into by future missions.

Equils, Douglas J.↗

Mars Observer mission status and orbit insertion phase planning

The Mars Observer spacecraft will reach Mars on August 24, 1993. Launch and cruise phase operations have gone smoothly, with few spacecraft anomalies. The orbit insertion phase, which spans a three month period and involves a series of seven maneuvers, has been redesigned postlaunch making use of excess spacecraft velocity change (Delta V) capability to advance the mapping phase, now planned to begin November 24, 1993. This is highly desirable since it moves the start of the mapping phase away from solar conjunction and the expected dust storm disturbances. The redesign process involved making tradeoffs between science, operations, and maneuver requirements. At Mars, the spacecraft will continuously record data with a single daily playback through the Deep Space Network's 34-meter high-efficiency antennas for one Martian year.

Dodd, Suzanne R.↗

Preparations for the Launch, Cruise, and Orbital Operations Phases of the Psyche Mission

“Psyche: Journey to a Metal World” was selected in 2017 as the 14th mission in NASA’s Discovery program. The mission uses an electric propulsion (EP) system to rendezvous with and orbit the large metal asteroid (16) Psyche. Spacecraft development is a hybrid approach with deep-space avionics provided by the Jet Propulsion Laboratory (JPL) and a solar electric propulsion chassis based on Maxar’s 1300-series GEO communications satellites. The payload suite is comprised of a magnetometer, multispectral imager, and gamma ray & neutron spectrometer science instruments and the Deep Space Optical Communications advanced technology demonstration.The spacecraft is currently in the final integration and test phase to support a planned launch period open in August 2022. With under a year until liftoff, final pre-liftoff preparations are underway for the mission’s major in-flight Phases. The Launch Phase is the mission’s only critical event as the vehicle autonomously deploys the solar arrays and delivers the spacecraft to a safe state. Following a planned 70-day Initial Checkout Phase, the spacecraft thrusts with the EP system through the majority of a 3.5-year Cruise Phase, which includes a Mars gravity assist, to rendezvous with (16) Psyche. The Approach Phase uses optical navigation while continuing to thrust with the EP engines to deliver the spacecraft into orbit. Orbital Operations are baselined for 20 months as the spacecraft steps through four progressively lower orbital altitudes to study the largest M-type asteroid in the solar system.

Hart, William↗

Voyager mission support

Tracking and data acquisition for Project Voyager are discussed for the period of April through June 1981. Voyager 1 was in the extended mission phase of operations. Voyager 2 completed the cruise phase of its operations and on 5 June entered the observatory phase of the Saturn encounter operations.

Fanelli, N.↗

Roll-Out and Turn-Off Display Software for Integrated Display System

This report describes the software products, system architectures and operational procedures developed by Lockheed-Martin in support of the Roll-Out and Turn-Off (ROTO) sub-element of the Low Visibility Landing and Surface Operations (LVLASO) program at the NASA Langley Research Center. The ROTO portion of this program focuses on developing technologies that aid pilots in the task of managing the deceleration of an aircraft to a pre-selected exit taxiway. This report focuses on software that produces a system of redundant deceleration cues for a pilot during the landing roll-out, and presents these cues on a head up display (HUD). The software also produces symbology for aircraft operational phases involving cruise flight, approach, takeoff, and go-around. The algorithms and data sources used to compute the deceleration guidance and generate the displays are discussed. Examples of the display formats and symbology options are presented. Logic diagrams describing the design of the ROTO software module are also given.

Johnson, Edward J., Jr.↗

Pioneers 6 through 12 mission support

The continuing efforts of the Deep Space Network in support of Pioneer Mission Operations during the cruise phases of the Pioneers 6 through 11 spacecraft and Pioneer Venus orbital operations are discussed.

Nevarez, R. E.↗

Pioneers 6 through 12 mission support

The Deep Space Network support of Pioneer Mission Operations during the cruise phases of Pioneers 6 through 9, Pioneer 10, Pioneer 11, and the orbital operations of Pioneer 12 spacecrafts is described. All Pioneer spacecraft appear in good health and are operating nominally. Tracking coverage from June 1980 through March 1981 is shown.

Nevarez, R.↗

Tracking and data system support for the Viking 1975 mission to Mars. Volume 2: Launch through landing of Viking 1

Problems inherent in the deployment and management of a worldwide tracking and data acquisition network to support the two Viking Orbiters and two Viking Landers simultaneously over 320 million kilometers (200 million miles) of deep space are discussed. Activities described include tracking coverage of the launch phase, the deep space operations during the long cruise phase that occupied approximately 11 months, and the implementation of the a vast worldwide network of tracking sttions and global communications systems. The performance of the personnel, hardware, and software involved in this vast undertaking are evaluated.

Mudgway, D. J.↗

Examining the Trends in Financial Support Given to Science Teams for Data Analysis in Mission Proposals

Introduction: The goal of this summer internship research project was to analyze trends in financial support proposed for the science teams of planetary missions. The analysis focuses on the funding for Co-Investigators (Co-Is) to conduct research and/or data analysis needed to achieve the science objectives of the mission. The operational portion of the missions after launch (i.e., Phase E, including cruise and prime operations at the final destination) were examined since that is when the bulk of research is funded and conducted. The objectives of the project were to determine the average level of support for Co-Investigators, identify variation between mission competitions and over time, and determine the relationship between mission type and the amount of support requested. Methodology: This project was conducted using data from 90 proposals submitted to six mission competitions in the Discovery and New Frontiers programs. The level of support for Co-Is was determined by examining Work Breakdown Structure (WBS) 4 (Science Analysis) for Phase E, which was further subdivided into cruise and prime operations. This data represents a proxy rather than the actual funding Co-Is receive to perform research and data analysis because not every dollar in WBS 4 is spent on this activity. Therefore, the proxy obtained in this research represents an overestimate of the funds allocated to Co-Is for research and data analysis. Findings: Analysis shows that on average a Co-I receives approximately four full years of support spread across the entirety of Phase E for science analysis. The variation among proposed missions is less than expected given the variety of factors that are expected to drive this metric (length of mission, mission type, etc.). Additionally, the level of requested support for Co-Is has been remarkably consistent across every variable considered (by competition, over time, by mission type) over the six competitions and nearly 20 years spanned by this project. This remains true for cruise, primary operations, and all of Phase E. Conclusions: A remarkable amount of science is accomplished by the science teams of planetary missions. However, a surprisingly small amount of funding is requested to support the science analysis driving this productivity, both in terms of absolute magnitude of funding and as a portion of total mission cost. This suggests improvements are needed to refine the estimates of Co-I support and/or that Co-Is rely on other funding sources to conduct their research. Better estimates can be determined by engaging directly with Co-Is and NASA centers to obtain data as well as finding other data sources. Additionally, NASA could consider mandating improved reporting of requested funding levels in mission competitions.

E Murray↗

An investigation of the landing characteristics of the NASA-MSC August 1969 baseline orbiter configuration in ground effect

A 0.05 scale model of the NASA-MSC August 1969 baseline shuttle craft was tested in Texas A&M University's 7- x 10-foot low speed wind tunnel facility. The purpose of the test was to determine the landing aerodynamic characteristics of the shuttle craft vehicle in ground effect and to evaluate control surface hinge moments experienced in the cruise and landing operational phases of flight. Analysis of the final data will allow evaluation of vehicle flight stability in ground effect and estimation of vehicle control surface power system requirements.

Chambliss, E. B.↗

NASA's Space Lidar Measurements of Earth and Planetary Surfaces

A lidar instrument on a spacecraft was first used to measure planetary surface height and topography on the Apollo 15 mission to the Moon in 1971, The lidar was based around a flashlamp-pumped ruby laser, and the Apollo 15-17 missions used them to make a few thousand measurements of lunar surface height from orbit. With the advent of diode pumped lasers in the late 1980s, the lifetime, efficiency, resolution and mass of lasers and space lidar all improved dramatically. These advances were utilized in NASA space missions to map the shape and surface topography of Mars with > 600 million measurements, demonstrate initial space measurements of the Earth's topography, and measured the detailed shape of asteroid. NASA's ICESat mission in Earth orbit just completed its polar ice measurement mission with almost 2 billion measurements of the Earth's surface and atmosphere, and demonstrated measurements to Antarctica and Greenland with a height resolution of a few em. Space missions presently in cruise phase and in operation include those to Mercury and a topographic mapping mission of the Moon. Orbital lidar also have been used in experiments to demonstrate laser ranging over planetary distances, including laser pulse transmission from Earth to Mars orbit. Based on the demonstrated value of the measurements, lidar is now the preferred measurement approach for many new scientific space missions. Some missions planned by NASA include a planetary mission to measure the shape and dynamics of Europa, and several Earth orbiting missions to continue monitoring ice sheet heights, measure vegetation heights, assess atmospheric CO2 concentrations, and to map the Earth surface topographic heights with 5 m spatial resolution. This presentation will give an overview of history, ongoing work, and plans for using space lidar for measurements of the surfaces of the Earth and planets.

Abshire, James B.↗

BepiColombo Science Investigations During Cruise and Flybys at the Earth, Venus and Mercury

The dual spacecraft mission BepiColombo is the first joint mission between the European Space Agency (ESA) and the Japanese Aerospace Exploration Agency (JAXA) to explore the planet Mercury. BepiColombo was launched from Kourou (French Guiana) on October 20th, 2018, in its packed configuration including two spacecraft, a transfer module, and a sunshield. BepiColombo cruise trajectory is a long journey into the inner heliosphere, and it includes one flyby of the Earth (in April 2020), two of Venus (in October 2020 and August 2021), and six of Mercury (starting from 2021), before orbit insertion in December 2025. A big part of the mission instruments will be fully operational during the mission cruise phase, allowing unprecedented investigation of the different environments that will encounter during the 7-years long cruise. The present paper reviews all the planetary flybys and some interesting cruise configurations. Additional scientific research that will emerge in the coming years is also discussed, including the instruments that can contribute.

79 ASTRONOMY AND ASTROPHYSICS↗

In-Flight Operation of the Dawn Ion Propulsion System Through Start of the Vesta Cruise Phase

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. IPS will be operated for over two years at throttled power levels leading to arrival at Vesta in September of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through the start of deterministic thrusting to Vesta.

Garner, Charles E.↗

Maneuver Design for the Juno Mission: Inner Cruise

The Juno spacecraft launched in August 2011 and, following a successful Earth flyby in October 2013, is on course for a nominal orbit insertion at Jupiter in July 2016. This paper examines the design and execution of deterministic and statistical trajectory correction maneuvers during the first approximately 27 months of post-launch operations that defined the "Inner Cruise" phase of the Juno mission. Topics of emphasis include the two deep space maneuvers, Earth flyby altitude biasing strategy, and the sequence of trajectory correction maneuvers executed in the weeks prior to the successful Earth gravity assist.

Pavlak, Thomas A.↗

Parachute Swivel Mechanism for planetary entry

A parachute swivel mechanism (PSM) for planetary entry missions such as a Mars probe (MARSNET) or return of cometary material samples (ROSETTA mission) has been developed. The purpose of the PSM is to decouple the spin of the probe from the parachute, with low friction torque, during both the deployment and descent phases. Critical requirements are high shock loads, low friction, low temperatures, and several years of storage in the deep space environment (during the cruise phase of the probe, prior to operation). The design uses a main thrust ball bearing to cope with the load requirement and a smaller thrust ball bearing for guiding of the shaft. Except for use on the Viking and Galileo swivels, it appears that this type of bearing has very rarely been employed in space mechanisms, so that little is known of its friction behavior with dry lubrication. A slip ring assembly allows the transfer of electrical power for post-reefing of the parachute. A test program has been conducted covering the environmental conditions of Mars entry and Earth reentry. This paper describes requirement constraints, model missions of planetary entries, a bearing trade-off, analyses performed, design details, the lubrication system, and test results (friction torque versus load/spin rate). In addition, the design of the test rig is addressed.

Birner, R.↗

Flight Software Dictionary Development for the Mars2020 Rover

The Mars2020 project, developed and operated by the Jet Propulsion Laboratory (JPL), successfully landed the Perseverance rover and its flying companion Ingenuity on the surface of Mars on February 18th 2021. Perseverance combines heritage and cutting-edge flight software and hardware to accomplish crucial mission requirements related to Martian surface sampling. The design, development, and operation of NASA’s large strategic science missions require the ability to communicate spacecraft capabilities to hundreds of engineers across multiple disciplines. The interaction between flight and ground software development, Verification and Validation (V&V), Assembly, Test, and Launch Operations (ATLO), and management each demand quick understanding of unique slices of information for each discipline. This information includes the current capabilities of the flight system as well as future capabilities and their status as they are developed and tested. Despite the fundamental and critical nature of this information, the flight software dictionaries used to track it are a stumbling block for many projects. These dictionaries provide the cornerstone for the interpretation of data sent from the spacecraft, allowing for quick comprehension by engineers on the ground. During both spacecraft development and operations, flight software dictionary management includes significant challenges due to the large number of interfacing systems and the subtle yet distinct needs of each.The engineering of flight software dictionaries for Mars2020 had numerous challenges, most-notably: parallel dictionary development to support simultaneous separate flight software build campaigns for each mission phase (cruise and surface), managing requests for operations-enabling information without perturbing the heritage interface with the rover, and the introduction of new tools by the dictionary stakeholders that forced the dictionary team to innovate and redesign the heritage tool chain. These challenges generated guiding principles for the dictionary development effort: emphasize coding best practices and unit testing in the dictionary code development tool chain, use institutionally provided COTS (commercial-off-the-shelf) tools whenever possible, and maintain the heritage flight-ground interface all while advancing operations-enabling information via a loosely coupled interface.Throughout development and operations, the Mars2020 dictionary toolchain included IBM DOORS Next Generation, GitHub, Microsoft Excel, Docker, Jenkins, and a significant custom-built Python codebase. Significant interfaces included JPL’s command and control software, heritage flight software team tools and processes, and the many cloud-based ground tools developed for the mission.This paper will discuss the requirements for the Mars2020 dictionary development, the development team’s response to those requirements, lessons learned throughout the process, steps taken towards automated deliveries and continuous integration of stakeholder inputs, potential toolchain improvements for Mars2020, and key takeaways that could be applied to future missions.

Pyrzak, Guy↗