Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “counterweights”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Counterweight for Long Reach Robotic Arm

Maintenance for vital systems proves challenging due to their location: tucked up and behind components. Pinpointing the precise location of errors presents difficulty when relying solely on the human eye. The solution to this issue arises in the form of a Long Reach Robotic Arm. An adequately balanced robot with several individually controlled links contains the capability to maneuver around obstructing components to locate the points of failure with accuracy. The design process for such a robot begins with the writing of a program. The program intends to visualize how the Long Reach Robotic Arm will move in 2D space by printing a select number of lines representing each arm link to the screen and controlling each link through the keyboard. This code substantially simplifies the design process for the multi-linked arm. The next step in the Long Reach Robotic Arm design process is the development of the arm and its counterweight system. The clear division of this work allows two interns to work on this project: one assumes responsibility for the arm, and the other for the counterweight. I undertook the design for the counterbalance. My half of the project is essential for maintaining safety as an extended multi-linked robot arm presents the challenge of preserving stability. The best method to supply a balance to the robot, even in extension, is a mobile counterweight with a compact design.

43 PARTICLE ACCELERATORS↗

DC 12m telescope. Preliminary calculations. Investigation of elevation axis position.

This paper examines some simple calculations of a 2D model of a telescope in order to understand how different design parameters affect the design. For the design of a telescope it is assumed that they need a design that minimizes deflections of the dish and also minimizes the size of the motors and torques needed to rotate in elevation. A common belief is that a lighter dish and minimum counterweight is desirable. However, these calculations show this is not necessarily true. The torque needed for rotation depends on the moment of inertia and if the telescope is balanced about the elevation axis. A light dish with no CW requires that the elevation axis be several meters in front of the dish (8-9m) in order to be balanced. This is not practical from a structural point of view. If the elevation axis is only 2m in front of the dish and there is no counterweight then the telescope will be unbalanced and the toruqes required will be very high - much higher than the torques needed only to overcome inertia. A heavy dish though can act as its own counterweight and the elevation axis only has to be 2-3m in front of the dish in order to achieve a balanced telescope. Also the struts that support the camera from the dish place a load on the dish which will put a bending moment on the dish. This bending moment will deform the dish and require it to be stiffer. A counterweight structure performs two functions. First, it allows the telescope to be balanced about the elevation axis. Second, it applies a force on the dish that opposes the forces from the camera struts, thereby reducing the bending moment and deformations of the dish.

47 OTHER INSTRUMENTATION↗

System and method of making a crankshaft with alternate materials

A crankshaft for an internal combustion engine is provided. The crankshaft comprises at least four main journals aligned on a crankshaft axis of rotation defining a centerline. The crankshaft further comprises at least three pin journals. Each pin journal is disposed about a respective pin journal axis and positioned between the main journals. Each of the pin journals is joined to a pair of crank arms. Each pair of crank arms is joined to a respective main journal. Each of the main journals, pin journals, and crank arms is made of a first metallic material. Each crank arm has an over-molded counterweight metallurgically bonded thereto. Each counterweight is disposed opposite a respective pin journal relative to the centerline for balance and stability. Each counterweight is made of a second metallic material. The crankshaft has a weight ratio of the second metallic material to the first metallic material of between 0.20 to 0.50.

Klemstine, David C.↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 561: Waste Disposal Areas, Nevada National Security Site, Nevada, Revision 0 with ROTC 1

CAU 561 comprises 10 CASs: (1) 01-19-01, Waste Dump; (2) 02-08-02, Waste Dump and Burn Area; (3) 03-19-02, Debris Pile; (4) 05-62-01, Radioactive Gravel Pile; (5) 12-23-09, Radioactive Waste Dump; (6) 22-19-06, Buried Waste Disposal Site; (7) 23-21-04, Waste Disposal Trenches ; (8) 25-08-02, Waste Dump; (9) 25-23-21, Radioactive Waste Dump; and (10) 25-25-19, Hydrocarbon Stains and Trench. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 561 with no further corrective action. The purpose of the CAI was to fulfill the following data needs as defined during the DQO process: (1) Determine whether COCs are present; (2) If COCs are present, determine their nature and extent; and (3) Provide sufficient information and data to complete appropriate corrective actions. The following contaminants were determined to be present at concentrations exceeding their corresponding FALs: (1) No contamination exceeding FALs was identified at CASs 01-19-01, 03-19-02, 05-62-01, 12-23-09, and 22-19-06. (2) The surface and subsurface soil within the burn area at CAS 02-08-02 contains arsenic and lead above the FALs of 23 milligrams per kilogram (mg/kg) and 800 mg/kg, respectively. The surface and subsurface soil within the burn area also contains melted lead slag (potential source material [PSM]). The soil within the waste piles contains polyaromatic hydrocarbons (PAHs) above the FALs. The contamination within the burn area is spread throughout the area, as it was not feasible to remove all the PSM (melted lead), while at the waste piles, the contamination is confined to the piles. (3) The surface and subsurface soils within Trenches 3 and 5 at CAS 23-21-04 contain arsenic and polychlorinated biphenyls (PCBs) above the FALs of 23 mg/kg and 0.74 mg/kg, respectively. The soil was removed from both trenches, and the soil that remains at this CAS does not contain contamination exceeding the FALs. Lead bricks and counterweights were also removed, and the soil below these items does not contain contamination that exceeds the FAL for lead. (4) The concrete-like material at CAS 25-08-02 contains arsenic above the FAL of 23 mg/kg. This concrete-like material was removed, and the soil that remains at this CAS does not contain contamination exceeding the FALs. Lead-acid batteries were also removed, and the soil below the batteries does not contain contamination that exceeds the FAL for lead. (5) The surface soils within the main waste dump at the posted southern radioactive material area (RMA) at CAS 25-23-21 contain cesium (Cs)-137 and PCBs above the FALs of 72.9 picocuries per gram (pCi/g) and 0.74 mg/kg, respectively. The soil was removed from the RMA, and the soil that remains at this CAS does not contain contamination exceeding the FALs. (6) The surface and subsurface soils at CAS 25-25-19 do not contain contamination exceeding the FALs. In addition, lead bricks were removed, and the soil below these items does not contain contamination that exceeds the FAL for lead. The following best management practices were implemented: (1) Housekeeping debris at CASs 02-08-02, 23-21-04, 25-08-02, 25-23-21, and 25-25-19 was removed and disposed of; (2) The open trenches at CAS 23-21-04 were backfilled; (3) The waste piles at CAS 25-08-02 were removed and the area leveled to ground surface; and (4) The remaining waste piles at the main waste dump at CAS 25-23-21 were leveled to ground surface. Therefore, NNSA/NSO provides the following recommendations: (1) No further action for CASs 01-19-01, 03-19-02, 05-62-01, 12-23-09, and 22-19-06; (2) Closure in place with an FFACO use restriction (UR) at CAS 02-08-02 for the remaining PAH-, arsenic-, and lead-contaminated soil, and the melted lead PSM. The UR form and map have been filed in the NNSA/NSO Facility Information Management System, the FFACO database, and the NNSA/NSO CAU/CAS files; (3) No further corrective action at CAS 23-21-04, as the lead bricks and counterweights (PSM) have been removed, and the COCs of arsenic and PCBs in soil have been removed; (4) No further corrective action at CAS 25-08-02, as the COC of arsenic in soil has been removed, and the lead-acid batteries have been removed; (5) No further corrective action at CAS 25-23-21, as the COCs of Cs-137 and PCBs in soil have been removed, and the cast-iron pipes have been removed and disposed of; (6) No further corrective action at CAS 25-25-19, as the lead bricks (PSM) been removed; (7) A Notice of Completion to the NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 561; and (8) Corrective Action Unit 561 should be moved from Appendix III to Appendix IV of the FFACO.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Antarctic Cloud Macrophysical, Thermodynamic Phase, and Atmospheric Inversion Coupling Properties at McMurdo Station—Part II: Radiative Impact During Different Synoptic Regimes

Different cloud types are generated over Antarctica as a result of various synoptic conditions. The cloud characteristics affect their impact on the surface energy budget. In this study, the dominating synoptic regimes over Antarctica (centered on the Ross Ice Shelf) are classified using self-organizing map (SOM) analysis, applied over long-term ERA-Interim 700 hPa geopotential height data. The corresponding cloud properties over McMurdo Station (measured as part of the AWARE campaign) are described and discussed with respect to the synoptic settings and sea-ice extent conditions. Cloud radiative forcing calculations are performed as well, and a particular focus is given to the net longwave “radiatively cloudy/opaque” (RO) regime. These results are compared with measurements performed at the West Antarctic Ice Sheet (WAIS) Divide to examine their variability and applicability to other Antarctic locations. It is found that the McMurdo cloud properties are strongly affected by the regional mesoscale cyclonic activity, which counterweights the larger-scale synoptic regime influence, while the WAIS clouds are more susceptible to the varying synoptic settings. In addition, it is suggested that the positive trend in the (frequent) cyclonic activity near the Antarctic coastal regions makes ice-clouds an increasing prominent contributor for the RO cases, especially during freeze-up and maximum sea-ice conditions.

antarctic clouds↗

Thrust stand for vertically oriented electric propulsion performance evaluation

A variation of a hanging pendulum thrust stand capable of measuring the performance of an electric thruster operating in the vertical orientation is presented. The vertical orientation of the thruster dictates that the thruster must be horizontally offset from the pendulum pivot arm, necessitating the use of a counterweight system to provide a neutrally stable system. Motion of the pendulum arm is transferred through a balance mechanism to a secondary arm on which deflection is measured. A noncontact light-based transducer is used to measure displacement of the secondary beam. The members experience very little friction, rotating on twisting torsional pivots with oscillatory motion attenuated by a passive, eddy-current damper. Displacement is calibrated using an in situ thrust calibration system. Thermal management and self-leveling systems are incorporated to mitigate thermal and mechanical drifts. Gravitational force and torsional spring constants associated with flexure pivots provide restoring moments. An analysis of the design indicates that the thrust measurement range spans roughly four decades, with the stand capable of measuring thrust up to 12 N for a 200 kg thruster and up to approximately 800 mN for a 10 kg thruster. Data obtained from calibration tests performed using a 26.8 lbm simulated thruster indicated a resolution of 1 mN on 100 mN level thrusts, while those tests conducted on a 200 lbm thruster yielded a resolution of roughly 2.5 mN at thrust levels of 0.5 N and greater.

42 ENGINEERING↗

The coupled nonlinear dynamics of a lift system

Coupled lateral and longitudinal vibrations of suspension and compensating ropes in a high-rise lift system are often induced by the building motions due to wind or seismic excitations. When the frequencies of the building become near the natural frequencies of the ropes, large resonance motions of the system may result. This leads to adverse coupled dynamic phenomena involving nonplanar motions of the ropes, impact loads between the ropes and the shaft walls, as well as vertical vibrations of the car, counterweight and compensating sheave. Such an adverse dynamic behaviour of the system endangers the safety of the installation. This paper presents two mathematical models describing the nonlinear responses of a suspension/ compensating rope system coupled with the elevator car / compensating sheave motions. The models accommodate the nonlinear couplings between the lateral and longitudinal modes, with and without longitudinal inertia of the ropes. The partial differential nonlinear equations of motion are derived using Hamilton Principle. Then, the Galerkin method is used to discretise the equations of motion and to develop a nonlinear ordinary differential equation model. Approximate numerical solutions are determined and the behaviour of the system is analysed.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Narrow-line self-assembled GaAs quantum dots for plasmonics

We demonstrate efficient coupling of excitons in near-surface GaAs quantum dots (QDs) to surface-plasmon polaritons. We observe distinct changes in the photoluminescence of the emitters as the distance between the QDs and the gold interface decreases. Based on an electric point-dipole model, we identify the surface plasmon launching rates for different QD-surface distances. While in conventional far-field experiments only a few percent of the emitted photons can be collected due to the high refractive index semiconductor substrate, already for distances around 30 nm the plasmon launching-rate becomes comparable to the emission rate into bulk photon modes, thus much larger than the photon collection rate. For even smaller distances, the degrading optical properties of the emitter counterweight the increasing coupling efficiency to plasmonic modes.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

SU-F-T-217: A Comprehensive Monte-Carlo Study of Out-Of-Field Secondary Neutron Spectra in a Scanned-Beam Proton Therapy Treatment Room

Purpose: To simulate secondary neutron radiation-fields produced at different positions during phantom irradiation inside a scanning proton therapy gantry treatment room. Further, to identify origin, energy distribution and angular emission as function of proton beam energy. Methods: GEANT4 and FLUKA Monte-Carlo codes were used to model the relevant parts of the treatment room in a gantry-equipped pencil beam scanning proton therapy facility including walls, floor, metallic gantry-components, patient table and the homogeneous PMMA target. The proton beams were modeled based on experimental beam ranges in water and spot shapes in air. Neutron energy spectra were simulated at 0°, 45°, 90° and 135° relative to the beam axis at 2m distance from isocenter, as well as 11×11 cm2 fields for 75MeV, 140MeV, 200MeV and for 118MeV with 5cm PMMA range-shifter. The total neutron energy distribution was recorded for these four positions and proton energies. Additionally, the room-components generating secondary neutrons in the room and their contributions to the total spectrum were identified and quantified. Results: FLUKA and GEANT4 simulated neutron spectra showed good general agreement in the whole energy range of 10{sup −}9 to 10{sup 2} MeV. Comparison of measured spectra with the simulated contributions of the various room components helped to limit the complexity of the room model, by identifying the dominant contributions to the secondary neutron spectrum. The iron of the bending magnet and counterweight were identified as sources of secondary evaporation-neutrons, which were lacking in simplified room models. Conclusion: Thorough Monte-Carlo simulations have been performed to complement Bonner-sphere spectrometry measurements of secondary neutrons in a clinical proton therapy treatment room. Such calculations helped disentangling the origin of secondary neutrons and their dominant contributions to measured spectra, besides providing a useful validation of widely used Monte-Carlo packages in comparison to experimental data. Cluster of Excellence of the German Research Foundation (DFG) “Munich-Centre for Advanced Photonics (MAP)”.

60 APPLIED LIFE SCIENCES↗

India and China: Assessing the Need to Strengthen Bilateral CBMs

India and China display a peculiar case of “constrained cooperation” 50 years after their border war, with convergence of economic interests tending to overlook strategic differences. While China acknowledges sharing an interest in a peaceful and stable South Asia, it perceives strengthened Indo-US ties as an attempt to enlist New Delhi as a counterweight to China or as part of a containment strategy against it. The Chinese realists are subdivided into “offensive”/“defensive” and “hard”/“soft” camps; each believes that the state has to build its own strength. The hard-power realists argue for strengthening national power–particularly the military and economic dimensions, while soft-power realism emphasizes diplomacy and cultural power. The “offensive realists” argue that China should use its newly built military, economic, and diplomatic influence to coerce others toward the ends China desires. A range of CBMs between India and China that could reduce frictions and establish common ground are discussed.

99 GENERAL AND MISCELLANEOUS↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence P - Raw Data

Sequence P: Wake Flow Visualization, Upwind (P) This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speed ranged from 5 m/s to 15 m/s. Yaw angles of 0° to –60° were achieved. The blade tip pitch was 3°. The rotor rotated at 72 RPM. Blade and probe pressure measurements were collected. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to –99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. The aluminum blade tip designed to contain a smoke generator was installed, and counterweights were installed in the non-instrumented blade tip to compensate. The turbine was positioned at the appropriate yaw angle, and the smoke generator was ignited remotely. The campaign duration was 3 minutes for all tests except P1000000, which was 2 minutes. The file name convention was the standard format except for P10000A0, which indicated a 3° pitch angle. File P1000000 used a 12° pitch angle. After these two campaigns were collected, it was determined that all subsequent data should be collected with a 3° pitch angle. Pressure data were not acquired during this sequence, so all associated data values were flagged as not applicable by setting the measured values in the data file to 0.000 Pa. Corresponding pressure data are available from Sequence H for the 3° pitch angle test points. Flow visualization data obtained from wall- and ceiling-mounted video cameras were recorded to videotape. The camera locations and calibration procedures are described in Appendix J.

17 WIND ENERGY↗

Using piezo-electric material to simulate a vibration environment

A target object can be vibrated using actuation that exploits the piezo-electric ("PE") property. Under combined conditions of vibration and centrifugal acceleration, a centrifugal load of the target object on PE vibration actuators can be reduced by using a counterweight that offsets the centrifugal loading. Target objects are also subjected to combinations of: spin, vibration, and acceleration; spin and vibration; and spin and acceleration.

Jepsen, Richard A↗

Long Reach Robotic Arm

The Accelerator Division at Fermilab began a robotics program, known as the AD Robotics Initiative. A multi-axis robotic arm was proposed to be included in the program. This summer internship, our team began the planning and design for this project, called the Long Reach Robotic Arm. The problem is that critical systems around the magnets require analysis when water leaks cause them to fail. However, the tightly compacted parts and the quadrupole magnet, weighing approximately 1,000 pounds, cause access viewing problems. The process of having to dismantle and remove the magnet is time-consuming; it is not an efficient solution. The goal for the Long Reach Robotic Arm was to extend and reach behind the component of the Main Injector while "snaking" around and avoiding obstructions. At the start of the project, my teammate, Amanda Hoeksema, and I coded a program in the C language that will determine the number of links and their respective lengths for the robot arm. After, we began the 3D CAD model of the robot arm, base, and counterweight system. The design of the Long Reach Robotic Arm provided a learning experience in learning how to code in the C programming language, using SDL libraries and understanding mechanical engineering.

43 PARTICLE ACCELERATORS↗

Scroll-type machine

A scroll-type displacement machine, e.g. scroll compressor, has fixed and orbiting scrolls and an Oldham ring to prevent relative rotation between scrolls. A drive module positioned between the orbiting scroll and drive shaft incorporates an eccentric drive system and first and second counterweights for dynamic balancing. The motor, motor bearings, and motor shaft (i.e., drive shaft) are packaged as a separate, modular unit (e.g. “off-the-shelf” motor) that attaches to the compressor frame. The machine is configured as a high-side machine with a low-pressure port at a radial outer portion of the fixed scroll and a high-pressure port or discharge port located in the floor of the orbiting scroll at its axis, with high pressure flow passing over and around the eccentric drive bearing and drive mechanism. The Oldham ring is distributed on a lateral or radial plane of the scroll pair with a portion surrounding a portion of the fixed scroll and another portion surrounding a portion of the orbiting scroll. The ring may be formed as four arcuate members arranged on two levels, to occupy otherwise unused space in the scroll-type machine.

42 ENGINEERING↗

Self-balancing, long reach robotic arm

Vital accelerator components are difficult to inspect and troubleshoot when they fail. Theuse of a self-balancing, long articulating robot simplifies the identification and troubleshootingof broken components in the narrow places of the beamline by pinpointing the location of theseerrors due to its ability to maneuver through these limited spaces. The design of the long reachrobot is the second iteration of a previous model accomplished by interns Amanda Hoeksemaand Brenda Sanchez. This new robot was redesigned with a greater focus on safety and structural integrity by removing 3D-printed parts in load-bearing positions and switching to off-the-shelf components with manufacturer-specified capabilities. These changes ensure that the new robotic arm and counterbalance designs conform closer to safety regulations by not depending on the vague durability of 3D-printed parts. This design change necessitated new calculations for the arm and counterweight to ensure the robot will function as intended.

Hoeksema, Amanda↗

Small Waste in a Large Package - Meeting Requirements for Packaging, Transport and Disposal - 18092

A small amount of Class C Mixed Low Level Waste (MLLW) required packaging and disposition to an off-site facility. The AREVA TN RAM cask, designed and licensed for shipping Type B waste packages, was chosen as the most appropriate shipping solution. Due to packaging, shipping and disposal requirements, the standard TN RAM cask could not be utilized without making some modifications. Unique solutions and approaches had to be developed by the AREVA design team to complete the project within the anticipated budget and schedule. The general work scope was to characterize, remove from a pool, profile, package, certify and transport four irradiated components to an approved off-site facility. The material makeup of the components (three stainless steel plates and a lead counterweight) resulted in a MLLW classification which required special packaging and disposal methods. The AREVA design team worked with the disposal facility to identify all requirements associated with disposal of Class B/C MLLW. After defining the packaging and disposal requirements, it was determined that unique spacers and void fillers would be required. The design solution consisted of a liner insert as well as axial and radial spacers filled with inert material. Remaining voids in the liner insert were filled with recycled glass beads to fulfill the requirement for maximum 10% void space in the waste package. The axial spacers also served to center the waste load in the shipping cask to comply with the AREVA TN RAM Cask NRC license. Concentration averaging and waste consolidation were used to reach the Class C MLLW determination for shipping and disposal. This disposal method for Class C waste met the requirements of macro-encapsulation. Therefore, no additional treatment action was required when disposing of Class C MLLW. AREVA's solution provides a model for meeting macro-encapsulation requirements while also meeting void space requirements. This solution provides a model for how to adapt large shipping casks and liners to smaller waste packages that would not normally be a good fit for traditional casks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗