Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa Nevada National Security Site, Nevada (Rev. 1)

This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for the Central and Western Pahute Mesa (PM) Corrective Action Units (CAUs) 101 and 102. Corrective action is needed because underground radioactive contamination exists in these areas resulting from historic underground nuclear testing. The PM CAUs are located in the northwestern portion of the Nevada National Security Site and comprise 82 corrective action sites. A total of 85 underground nuclear detonations took place within the area covered by the PM CAUs between 1965 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa Nevada National Security Site, Nevada, Revision 2

This revision was prepared to document changes to the data-collection activities. Specifically, the drilling and completion of the wells have been revised, and enhancements to the surface geophysics measurements have been included. Corrective action is needed because underground radioactive contamination exists in these areas resulting from historic underground nuclear testing. The PM CAUs are located in the northwestern portion of the Nevada National Security Site and comprise 82 corrective action sites. A total of 85 underground nuclear detonations took place within the area covered by the PM CAUs between 1965 and 1992 and resulted in the release of radionuclides in the subsurface in the vicinity of the test cavities.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 542: Disposal Holes, Nevada Test Site, Nevada, Revision 0, with ROTC 1-2

The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation for closure of CAU 542 with no further corrective action. To achieve this, corrective action investigation (CAI) activities were performed from July 19 through August 25, 2006, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 542: Disposal Holes. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: Determine whether contaminants of concern (COCs) are present. If COCs are present, determine the nature and extent. Provide sufficient information and data to complete appropriate corrective actions.

54 ENVIRONMENTAL SCIENCES↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada National Security Site, Nevada

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 114 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site: • 25-41-03, EMAD Facility (Building 3900) • 25-99-23, Manned Control Car (MCC) and Engine Installation Vehicle (EIV) • 25-33-05, Building 3901, Engine Transport System Maintenance Building (Train Shed) This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 114. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective actions for CAU 114. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If specific conditions or findings fall outside the bounds of the conceptual site model, such as an unanticipated release, the Nevada Division of Environmental Protection (NDEP) will be consulted to determine the path forward before proceeding. Upon completion of SAFER activities, a closure report (CR) will be prepared and submitted to NDEP for review and approval. The schedule for completion of the CR will be established in consultation with NDEP.

54 ENVIRONMENTAL SCIENCES↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 578: Miscellaneous Inactive Sites Nevada National Security Site, Nevada, (Rev. 0)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 578, Miscellaneous Inactive Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 578 comprises the following 11 corrective action sites (CASs) located in Areas 2, 3, 4, 6, 7, 12, and 23 of the Nevada National Security Site: • 02-26-01, Lead (Concrete Box w/Lining) • 02-26-07, Gun Turret w/Lead in Barrel • 03-16-01, U-3auS Disposal Site • 04-26-02, Lead on Instrument Bunker • 06-99-07, Sump • 07-99-01, Miscellaneous Debris • 12-02-11, UST-P-2 • 12-06-01, Muckpile • 12-06-04, Muckpile • 23-12-01, Boiler (2) • 23-99-04, Salvage Yard This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 578 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary. This will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

54 ENVIRONMENTAL SCIENCES↗

Apollo experience report: Problem reporting and corrective action system

The Apollo spacecraft Problem Reporting and Corrective Action System is presented. The evolution from the early system to the present day system is described. The deficiencies and the actions taken to correct them are noted, as are management controls for both the contractor and NASA. Significant experience gained from the Apollo Problem Reporting and Corrective Action System that may be applicable to future manned spacecraft is presented.

Adams, T. J.↗

Closure Report for Corrective Action Unit 572: Test Cell C Ancillary Building and Structures, Nevada National Security Site, Nevada, Revision 0

The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for CAU 572 were met. To achieve this, the following actions were performed: • Corrective action investigation (CAI) activities were performed from August 2020 through May 2023, as set forth in the SAFER Plan for CAU 572; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. • Corrective actions were completed during decontamination and demolition (D&D) and disposal activities, and were performed from August 2022 through September 2025.

54 ENVIRONMENTAL SCIENCES↗

Closure Report for Corrective Action Unit 366: Area 11 Plutonium Valley Dispersion Sites, Nevada National Security Site, Nevada with ROTC 1

This Closure Report presents information supporting closure of Corrective Action Unit (CAU) 366, Area 11 Plutonium Valley Dispersion Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 366 were met. CAU 366 consists of the following six Corrective Action Sites (CASs), located in Area 11 of the Nevada National Security Site: • CAS 11-08-01, Contaminated Waste Dump #1 • CAS 11-08-02, Contaminated Waste Dump #2 • CAS 11-23-01, Radioactively Contaminated Area A • CAS 11-23-02, Radioactively Contaminated Area B • CAS 11-23-03, Radioactively Contaminated Area C • CAS 11-23-04, Radioactively Contaminated Area D

54 ENVIRONMENTAL SCIENCES↗

Closure Report for Corrective Action Unit 578: Miscellaneous Inactive Sites, Nevada National Security Site, Nevada

This closure report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 578: Miscellaneous Inactive Sites, Nevada National Security Site, Nevada. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 578 based on the implementation of the corrective actions listed in Table ES-1.

54 ENVIRONMENTAL SCIENCES↗

Mars Observer Propulsion and Pyrotechnics Corrective Actions Test Program Blanket Release

The Mars Observer Propulsion and Pyrotechnic Corrective Actions Test Program has been in progress at the NASA White Sands Test Facility since 1995. This program has developed capabilities to accurately characterize pyrovalve hazards and has established corrective actions that arc helping to preclude loss of spacecraft due to pyrovalve and propellant interaction. Rather than wait for conclusion of the test program, significant rest results, findings, and safety recommendations have been and will continue to be released soon after they became available to meet needs of near-term NASA and commercial space programs. This release will cover approximately three to five papers per year until program end.

Saulsberry, Regor L.↗

TERRA Battery Thermal Control Anomaly - Simulation and Corrective Actions

The TERRA spacecraft was launched in December 1999 from Vandenberg Air Force Base, becoming the flagship of NASA's Earth Observing System program to gather data on how the planet's processes create climate. Originally planned as a 5 year mission, it still provides valuable science data after nearly 10 years on orbit. On October 13th, 2009 at 16:23z following a routine inclination maneuver, TERRA experienced a battery cell failure and a simultaneous failure of several battery heater control circuits used to maintain cell temperatures and gradients within the battery. With several cells nearing the minimum survival temperature, preventing the electrolyte from freezing was the first priority. After several reset attempts and power cycling of the control electronics failed to reestablish control authority on the primary side of the controller, it was switched to the redundant side, but anomalous performance again prevented full heater control of the battery cells. As the investigation into the cause of the anomaly and corrective action continued, a battery thermal model was developed to be used in determining the control ability remaining and to simulate and assess corrective actions. Although no thermal model or detailed reference data of the battery was available, sufficient information was found to allow a simplified model to be constructed, correlated against pre-anomaly telemetry, and used to simulate the thermal behavior at several points after the anomaly. It was then used to simulate subsequent corrective actions to assess their impact on cell temperatures. This paper describes the rapid development of this thermal model, including correlation to flight data before and after the anomaly., along with a comparative assessment of the analysis results used to interpret the telemetry to determine the extent of damage to the thermal control hardware, with near-term corrective actions and long-term operations plan to overcome the anomaly.

Grob, Eric W.↗

Closure Report for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada National Security Site, Nevada with ROTC-1

CR loaded to this OSTI record. Just adding new file which includes CR plus new ROTC 1 and update the metadata to the following: This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 116, Area 25 Test Cell C Facility. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 [as amended March 2010]). CAU 116 consists of the following two Corrective Action Sites (CASs), located in Area 25 of the Nevada National Security Site: (1) CAS 25-23-20, Nuclear Furnace Piping and (2) CAS 25-41-05, Test Cell C Facility. CAS 25-41-05 consisted of Building 3210 and the attached concrete shield wall. CAS 25-23-20 consisted of the nuclear furnace piping and tanks. Closure activities began in January 2007 and were completed in August 2011. Activities were conducted according to Revision 1 of the Streamlined Approach for Environmental Restoration Plan for CAU 116 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2008). This CR provides documentation supporting the completed corrective actions and provides data confirming that closure objectives for CAU 116 were met. Site characterization data and process knowledge indicated that surface areas were radiologically contaminated above release limits and that regulated and/or hazardous wastes were present in the facility. The Record of Technical Change 1 updated the use restriction information.

54 ENVIRONMENTAL SCIENCES↗

Underground Test Area (UGTA) Sampling Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada National Security Site, Nevada, Revision 2

The purpose of this groundwater sampling plan (referred to herein as “the Plan”) is to describe the approach for collecting and analyzing groundwater samples to meet the objectives of the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity. The Plan is focused on the Central and Western Pahute Mesa corrective action units (CAUs 101 and 102), which are currently in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) stage of the Federal Facility Agreement and Consent Order (FFACO) UGTA Strategy. The remaining UGTA CAUs are in the final stage of the UGTA strategy (Closure Report [CR] stage), and monitoring requirements for these CAUs are described in the Federal Facility Agreement and Consent Order Nevada National Security Site Use Restriction Management Plan (DOE/EMNV, 2024a). The Plan supersedes the Nevada National Security Site Integrated Groundwater Sampling Plan and its ensuing Record of Technical Change (ROTC) (DOE/EMNV, 2019b).

54 ENVIRONMENTAL SCIENCES↗

Non-Resource Conservation and Recovery Act Corrective Action Unit (CAU) Post-Closure Inspection Report, Nevada National Security Site, Nevada For Calendar Year 2025

This report includes visual inspection results, descriptions of maintenance and repair activities, and recommendations for CY 2025 for use restrictions (URs) at corrective action sites (CASs) located on the Nevada National Security Site and on the Nevada Test and Training Range (NTTR) that are accessed through the NNSS Main Gate. This document is arranged by project activity (i.e., Industrial Sites, Soils, and Defense Threat Reduction Agency [DTRA]); then by corrective action unit (CAU); and then by CAS. Post-closure UR inspections are performed on an annual basis, unless as noted in text. Post-closure UR inspections verify the condition of physical controls required by each UR, which may include the following activities: • Visual verification of the legibility of signs • Visual inspection of fencing, signs, monuments, and/or markers for indications of wear • Visual inspection of soil covers for indications of subsidence, erosion, or unauthorized use Deficiencies in UR requirements that were identified during CY 2024 inspections and not addressed in the CY 2024 report are addressed in this CY 2025 report.

54 ENVIRONMENTAL SCIENCES↗

A Comprehensive Reliability Methodology for Assessing Risk of Reusing Failed Hardware Without Corrective Actions with and Without Redundancy

This paper deals with the development of a reliability methodology to assess the consequences of using hardware, without failure analysis or corrective action, that has previously demonstrated that it did not perform per specification. The subject of this paper arose from the need to provide a detailed probabilistic analysis to calculate the change in probability of failures with respect to the base or non-failed hardware. The methodology used for the analysis is primarily based on principles of Monte Carlo simulation. The random variables in the analysis are: Maximum Time of Operation (MTO) and operation Time of each Unit (OTU) The failure of a unit is considered to happen if (OTU) is less than MTO for the Normal Operational Period (NOP) in which this unit is used. NOP as a whole uses a total of 4 units. Two cases are considered. in the first specialized scenario, the failure of any operation or system failure is considered to happen if any of the units used during the NOP fail. in the second specialized scenario, the failure of any operation or system failure is considered to happen only if any two of the units used during the MOP fail together. The probability of failure of the units and the system as a whole is determined for 3 kinds of systems - Perfect System, Imperfect System 1 and Imperfect System 2. in a Perfect System, the operation time of the failed unit is the same as that of the MTO. In an Imperfect System 1, the operation time of the failed unit is assumed as 1 percent of the MTO. In an Imperfect System 2, the operation time of the failed unit is assumed as zero. in addition, simulated operation time of failed units is assumed as 10 percent of the corresponding units before zero value. Monte Carlo simulation analysis is used for this study. Necessary software has been developed as part of this study to perform the reliability calculations. The results of the analysis showed that the predicted change in failure probability (P(sub F)) for the previously failed units is as high as 49 percent above the baseline (perfect system) for the worst case. The predicted change in system P(sub F) for the previously failed units is as high as 36% for single unit failure without any redundancy. For redundant systems, with dual unit failure, the predicted change in P(sub F) for the previously failed units is as high as 16%. These results will help management to make decisions regarding the consequences of using previously failed units without adequate failure analysis or corrective action.

Putcha, Chandra S.↗

2020 Postclosure Groundwater Monitoring and Inspection Report, Central Nevada Test Area, Subsurface Corrective Action Unit 443

This report presents the groundwater monitoring data collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) from the Central Nevada Test Area (CNTA), Nevada, Site, Subsurface Corrective Action Unit (CAU) 443 in Nye County, Nevada (Figure 1). The CNTA is the site of an underground nuclear test in 1968 that resulted in residual contamination near the detonation depth of 3200 feet (ft); the contamination requires long-term monitoring. Responsibility for the environmental restoration and long-term monitoring was transferred from DOE’s National Nuclear Security Administration, Nevada Field Office, to LM on October 1, 2006. The environmental restoration and site closure process were completed in 2015 in accordance with the amended 1996 Nevada Federal Facility Agreement and Consent Order (FFACO) (State of Nevada et al. 1996, as amended) and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. The Closure Report, Central Nevada Test Area, Subsurface Corrective Action, Unit 443 (DOE 2018), also called the Closure Report, originally was completed in January 2016 and revised in October 2018; it describes LM’s plan for long-term postclosure monitoring. This includes monitoring of the radioisotopes of interest and water elevations, inspecting the site and maintaining the institutional controls (ICs), evaluating and reporting data, and documenting the site’s records and data management processes (DOE 2018).

54 ENVIRONMENTAL SCIENCES↗

Non-Resource Conservation and Recovery Act Corrective Action Unit (CAU) Post-Closure Inspection Report, Nevada National Security Site, Nevada For Calendar Year 2022

This report includes visual inspection results, descriptions of maintenance and repair activities, and recommendations for calendar year (CY) 2022 for use restrictions (URs) at corrective action sites (CASs) located on the Nevada National Security Site (NNSS) and on the Nevada Test and Training Range (NTTR) that are accessed through the NNSS Main Gate. This document is formatted by project activity (i.e., Industrial Sites, Soils, and Defense Threat Reduction Agency [DTRA]); then by corrective action unit (CAU); and then by CAS.