Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “corrective action management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

Measures↗

Agent-Based Simulations for Project Management

Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

White, J. Chris↗

Integrated Issues and Risk Management: A Theoretical Framework Overview

The contractor requirements document for DOE O 226.1B, Implementation of Department of Energy Oversight Policy, requires DOE/NNSA contractors to establish an assurance system that includes, among other things, “Rigorous, risk-informed, and credible self-assessment and feedback and improvement activities. Assessment programs must be risk-informed, formally described and documented, and appropriately cover potentially high consequence activities” and “Contains an issues management process that is capable of categorizing the significance of findings based on risk and priority and other appropriate factors….” However, the term “risk-informed” is not defined in this or any other DOE order, and no formal guidance on how to integrate the two concepts currently exists. The Risk Management Guide for Defense Programs released by NA-18, Office of Systems Engineering and Integration (SE&I), states it is “a framework and general guidance to program office personnel on the effective management of program risks and issues”, however it then defines issues as “events with 100% likelihood of affecting program objectives” and states “unless specified otherwise, the term “risk” will also serve to represent issues for the remainder of this plan,” severally limiting its ability to provide adequate guidance on this topic. Outside of DOE scope, the U.S. Nuclear Regulatory Commission (U.S. NRC) imposes similar requirements. ASME NQA-1-2015 Requirement 16 states “Conditions adverse to quality shall be identified promptly and corrected as soon as practicable. In the case of a significant condition adverse to quality, the cause of the condition shall be determined, and corrective action taken to preclude recurrence. The identification, cause, and corrective action for significant conditions adverse to quality shall be documented and reported to appropriate levels of management. Completion of corrective actions shall be verified”. The purpose of this document is to provide a best-in-class framework for an integrated risk and issues management process. This process would provide a robust feedback loop between risk management and issues management to: Enhance risk identification and characterization, use risk handling principles to improve corrective action planning, and ensure regulatory compliance.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

SQL-RAMS

SQL-RAMS (where "SQL" signifies Structured Query Language and "RAMS" signifies Rocketdyne Automated Management System) is a successor to the legacy version of RAMS -- a computer program used to manage all work, nonconformance, corrective action, and configuration management on rocket engines and ground support equipment at Stennis Space Center. The legacy version resided in the File-Maker Pro software system and was constructed in modules that could act as standalone programs. There was little or no integration among modules. Because of limitations on file-management capabilities in FileMaker Pro, and because of difficulty of integration of FileMaker Pro with other software systems for exchange of data using such industry standards as SQL, the legacy version of RAMS proved to be limited, and working to circumvent its limitations too time-consuming. In contrast, SQL-RAMS is an integrated SQL-server-based program that supports all data-exchange software industry standards. Whereas in the legacy version, it was necessary to access individual modules to gain insight into a particular workstatus document, SQL-RAMS provides access through a single-screen presentation of core modules. In addition, SQL-RAMS enables rapid and efficient filtering of displayed statuses by predefined categories and test numbers. SQL-RAMS is rich in functionality and encompasses significant improvements over the legacy system. It provides users the ability to perform many tasks, which in the past required administrator intervention. Additionally, many of the design limitations have been corrected, allowing for a robust application that is user centric.

Alfaro, Victor O.↗

SQL-RAMS

SQL-RAMS (where "SQL" signifies Structured Query Language and "RAMS" signifies Rocketdyne Automated Management System) is a successor to the legacy version of RAMS a computer program used to manage all work, nonconformance, corrective action, and configuration management on rocket engines and ground support equipment at Stennis Space Center. The legacy version resided in the FileMaker Pro software system and was constructed in modules that could act as stand-alone programs. There was little or no integration among modules. Because of limitations on file-management capabilities in FileMaker Pro, and because of difficulty of integration of FileMaker Pro with other software systems for exchange of data using such industry standards as SQL, the legacy version of RAMS proved to be limited, and working to circumvent its limitations too time-consuming. In contrast, SQL-RAMS is an integrated SQL-server-based program that supports all data-exchange software industry standards. Whereas in the legacy version, it was necessary to access individual modules to gain insight to a particular work-status documents, SQL-RAMS provides access through a single-screen presentation of core modules. In addition, SQL-RAMS enable rapid and efficient filtering of displayed statuses by predefined categories and test numbers. SQL-RAMS is rich in functionality and encompasses significant improvements over the legacy system. It provides users the ability to perform many tasks which in the past required administrator intervention. Additionally many of the design limitations have been corrected allowing for a robust application that is user centric.

Alfaro, Victor O.↗

LaSalle Leaking Pin PIE Proposal

Determine the most probable root cause of the LaSalle fuel rod failure, distinguish primary failure mechanisms from post-failure degradation, and assess whether the condition is isolated or indicative of a broader issue affecting similar rods or assemblies. Results will support decisions related to core operation, fuel management, and corrective actions.

LaSalle↗

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)↗

Wilson Corners SWMU 001 2019-2020 Annual Long-Term Monitoring Report Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2019 and 2020 at Wilson Corners, Solid Waste Management Unit 001, at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. Sampling of these wells in 2020 was replaced with the direct push technology investigations in October 2020 and April 2021. The activities presented in this report include three field events: (1) December 2019 -groundwater gauging of 38 monitoring wells and sampling of 36 monitoring wells; (2) May 2020 - groundwater sampling of 7 monitoring wells; and (3) December 2020 - groundwater gauging of 49 monitoring wells and sampling of 43 monitoring wells. During the December 2019 and May 2020 events, monitoring wells were sampled using passive diffusion bags and were analyzed for a “full list” of volatile organic compounds (VOCs), including Freon 113. During the December 2020 event, the low flow sampling method was used, and samples were analyzed for a “select list” of VOCs, including Freon 113. The following conclusions can be made based on the 2019 and 2020 LTM results: •In December 2019 and December 2020, groundwater flow for the site was generally to the west with the individual zones only varying by occasional northerly and southerly components. This is generally consistent with historical observations at the site. •The GCTL plume continues to extend both horizontally and vertically beyond our current monitoring well network. •The vertical extent of VOCs was historically generally delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells WILC-MW0078 and WILC-MW0130 that were sampled during the 2019 and 2020 LTM indicate that groundwater VOC concentrations in both wells were greater than the GCTL. •Freon 113 was not detected above GCTLs during the 2019 and 2020 LTM events. Based on groundwater sampling activities performed during this reporting period, including recent DPT groundwater sampling conducted for the implementation of an air sparge system, the following recommendations are provided: •Install 10 new monitoring wells, which will be sampled along with 49 existing monitoring wells, to assist with delineation of the low concentration plume. The wells are listed inTable 4-1, and the proposed locations are presented on Figures4 -1 through 4-5. (Figures 4-1, 4-2, 4-3, and 4-5 also show updated plumes and proposed performance monitoring well locations. This information will be discussed and presented under a separate cover.) •Modify the annual LTM sampling plan as presented inTable 4-1. •Sampling for future events at the site will be conducted using low flow pumping methods. The next annual LTM sampling event is currently planned for December 2021. Please note the 10 new monitoring wells will not be installed before this event but will be installed as part of the upcoming IM construction and will be sampled during baseline sampling, along with the 49 existing monitoring wells. Following this sampling event, it is recommended that the Annual LTM be combined with the performance monitoring under the IM implementation, and LTM be temporarily discontinued. Objectives of the 2021 LTM are to: (i) evaluate groundwater gradient and flow direction by collecting depth to water measurements from LTM wells; (ii) continue monitoring the peripheral VOC trends in the northern, southern, and western portions of the site by monitoring existing wells and installing and monitoring new wells as recommended; and (iii) monitor select internal plume wells.

Jennifer Lynn Joyal↗

Argonne National Laboratory Site Environmental Report for Calendar Year 2022

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2022. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with environmental management, sustainability efforts, environmental corrective actions, and habitat restoration. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and wastewater were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off site population groups was estimated. Results are interpreted with respect to the origin of the radioactive and chemical substances (i.e., natural, Argonne, and other) and are compared with applicable standards intended to protect human health and the environment. A U.S. Department of Energy (DOE) dose calculation methodology, based on International Commission on Radiological Protection (ICRP) recommendations and the U.S. Environmental Protection Agency’s (EPA) CAP 88 Version 4.1 computer code, was used in preparing this report.

54 ENVIRONMENTAL SCIENCES↗

Argonne National Laboratory Site Environmental Report for Calendar Year 2023

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2023. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with environmental management, sustainability efforts, environmental corrective actions, and habitat restoration. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and wastewater were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off site population groups was estimated. Results are interpreted with respect to the origin of the radioactive and chemical substances (i.e., natural, Argonne, and other) and are compared with applicable standards intended to protect human health and the environment. A U.S. Department of Energy (DOE) dose calculation methodology, based on International Commission on Radiological Protection (ICRP) recommendations and the U.S. Environmental Protection Agency’s (EPA) CAP 88 computer code, was used in preparing this report.

54 ENVIRONMENTAL SCIENCES↗

Argonne National Laboratory Site Environmental Report for Calendar Year 2024

This report discusses the status and accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2024. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with environmental management, efficiency efforts, environmental corrective actions, and habitat restoration. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and wastewater were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups and on-site members of the public was estimated. Results are interpreted with respect to the origin of radioactive and chemical substances (i.e., natural, Argonne, and other) and are compared with applicable standards intended to protect human health and the environment. A U.S. Department of Energy (DOE) dose calculation methodology, based on International Commission on Radiological Protection (ICRP) recommendations and the U.S. Environmental Protection Agency’s (EPA) CAP 88 computer code, was used in preparing this report.

54 ENVIRONMENTAL SCIENCES↗

Fire Station #3 Area, Solid Waste Management Unit (SWMU) 106 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report Kennedy Space Center, Florida

This Per-and Polyfluoroalkyl Substances (PFAS) Site Assessment (SA) Progress Report (SAPR) presents the activities and results associated with PFAS investigation in the Fire Station #3 (FS3) Area located at Kennedy Space Center (KSC), Florida. FS3 (formerly known as Fire Station #6) was previously designated as Solid Waste Management Unit (SWMU) 106 for legacy contaminants that were investigated and still being managed under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This PFAS SA is being managed under SWMU 106 as the fire station was also identified as the potential source of PFAS to the environment in this area.

Sarah Damphouse↗

Fire Station #1 Area, SWMU 116 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report Kennedy Space Center, Florida

This Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment (SA) Progress Report (SAPR) discusses the investigation activities and findings for the Fire Station #1 (FS1) Area (formerly known as Fire Station #4) located at Kennedy Space Center (KSC), Florida (Figure 1-1). This site has been designated Solid Waste Management Unit (SWMU) 116 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This PFAS SA is being managed under SWMU 116 as the fire station was identified as a potential source of PFAS to the environment. This PFAS SAPR was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0070. This is the first progress report to document on-going SA activities; supplemental progress reports will be provided as additional data is collected. During the SA, a total of six soil, 48 groundwater direct push technology (DPT), eight groundwater monitoring well, and one surface water sample were collected between October 2021 and March 2022. The samples were analyzed for 28 PFAS compounds using the Department of Defense Quality Systems Manual-compliant Method. SA sample results were used along with historical results to evaluate the extent of PFAS impacts to the environment in the FS1 Area. Data generated to date and prior results were screened against the United States Environmental Protection Agency (USEPA) May 2022 Tap Water Regional Screening Levels (RSLs) for groundwater and residential RSLs for soil (hazard quotient of 0.1). Surface water results were screened against the State of Florida Human Health Surface Water Screening Levels (SWSLs). Overall, results from the SA showed exceedances of the applicable screening criteria for soil, groundwater and surface water. Considering the current and historical dataset, perfluorooctanesulfonic acid (PFOS) is the prevalent PFAS compound, which is indicative of AFFF releases. Based on results of the SA, additional groundwater DPT and surface water sampling should be considered, focused on evaluating surface water bodies in the southeast portion of the Industrial Area, which discharge into the Banana River. Additionally, installation of monitoring wells should be considered to evaluate the interaction between groundwater and surface water in the FS1 Area.

PFAS↗

2020 Postclosure Groundwater Monitoring and Inspection Report, Central Nevada Test Area, Subsurface Corrective Action Unit 443

This report presents the groundwater monitoring data collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) from the Central Nevada Test Area (CNTA), Nevada, Site, Subsurface Corrective Action Unit (CAU) 443 in Nye County, Nevada (Figure 1). The CNTA is the site of an underground nuclear test in 1968 that resulted in residual contamination near the detonation depth of 3200 feet (ft); the contamination requires long-term monitoring. Responsibility for the environmental restoration and long-term monitoring was transferred from DOE’s National Nuclear Security Administration, Nevada Field Office, to LM on October 1, 2006. The environmental restoration and site closure process were completed in 2015 in accordance with the amended 1996 Nevada Federal Facility Agreement and Consent Order (FFACO) (State of Nevada et al. 1996, as amended) and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. The Closure Report, Central Nevada Test Area, Subsurface Corrective Action, Unit 443 (DOE 2018), also called the Closure Report, originally was completed in January 2016 and revised in October 2018; it describes LM’s plan for long-term postclosure monitoring. This includes monitoring of the radioisotopes of interest and water elevations, inspecting the site and maintaining the institutional controls (ICs), evaluating and reporting data, and documenting the site’s records and data management processes (DOE 2018).

54 ENVIRONMENTAL SCIENCES↗

NASA Audit Follow-up Handbook

This NASA Audit Follow-up Handbook is issued pursuant to the requirements of the Office of Management and Budget (OMB) Circular A-50, Audit Follow-up, dated September 29, 1982. It sets forth policy, uniform performance standards, and procedural guidance to NASA personnel for use when considering reports issued by the Office of Inspector General (OIG), other executive branch audit organizations, the Defense Contract Audit Agency (DCAA), and the General Accounting Office (GAO). It is intended to: specify principal roles; strengthen the procedures for management decisions (resolution) on audit findings and corrective action on audit report recommendations; emphasize the importance of monitoring agreed upon corrective actions to assure actual accomplishment; and foster the use of audit reports as effective tools of management. A flow chart depicting the NASA audit and management decision process is in Appendix A. This handbook is a controlled handbook issued in loose-leaf form and will be revised by page changes. Additional copies for internal use may be obtained through normal distribution channels.

Source record↗

Apollo experience report: Problem reporting and corrective action system

The Apollo spacecraft Problem Reporting and Corrective Action System is presented. The evolution from the early system to the present day system is described. The deficiencies and the actions taken to correct them are noted, as are management controls for both the contractor and NASA. Significant experience gained from the Apollo Problem Reporting and Corrective Action System that may be applicable to future manned spacecraft is presented.

Adams, T. J.↗