Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “controller-in-the-loop”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

An agent-based hardware-in-the-loop simulation framework for building controls

In general, a hardware-in-the-loop (HIL) building simulation has lower cost and fewer practical limitations (e.g., scheduling issues) than field tests in occupied buildings, while also overcoming limitations of simulations alone by capturing the full behavior of some physical systems, equipment, and components. However, the implementation of an HIL can be difficult due to the scarcity of appropriate tools. Here, this paper presents an agent-based framework for HIL simulation. It can be used for investigation of controller performance via controller-in-the-loop simulations and also HIL for system synthesis. In the latter case, both controllers and major equipment participate in tests to ensure that dynamics of equipment operation are correctly captured in addition to controller performance. The HIL simulation framework presented allows such actual physical parts to be included in the framework while representing others for which behaviors are better known and modeled in simulation models. The mechanism implemented in the framework to synchronize simulations in software with real-time operation of physical equipment is described. Lastly, as an example, use of the HIL simulation framework is illustrated through a brief study of speed control of the supply fan in the air handling unit of a variable-air-volume building heating, ventilating and air-conditioning system.

42 ENGINEERING↗

Cooperative fault management for resilient integration of renewable energy

Cooperative fault management (CFM) is designed herein to control different types of renewable energy resources cooperatively during electrical faults. This paper studies systems with a high penetration of photovoltaic (PV) energy and wind energy. First, CFM leverages power converters of PV farms to boost the ride-through capability of nearby doubly-fed induction generators (DFIGs). By controlling PV farms’ output voltages to change smoothly during both fault initiation and fault clearance, the widely used crowbar in DFIGs is less likely to be activated. Crowbar activation adversely makes DFIGs lose controllability and absorb reactive power. The second contribution is the development of a software-defined CFM controller and a controller in-the-loop demonstration of the real-time performance of this optimization-based CFM. CFM capitalizes on distributed optimization formulation to enable flexibility, plug-and-play, and privacy-preserving. Computation time, however, is a major concern for optimization-based dynamics control. Here, real-time controller-in-the-loop simulation results show optimization-based CFM can output reference values around 60 ms and is quick enough for dynamic control.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluation of Centralized Model Based FLISR in a Lab Setup

Utilities are installing advanced distribution management systems (ADMS) around the globe to improve the sensing and control of distribution systems. ADMS is becoming a critical component to improve the resiliency and reliability of distribution systems. These management systems host a multitude of applications that can be used to sense, control, and operate distribution systems. Fault location, isolation, and service restoration (FLISR) is one of the ADMS applications that is critical to improving resilience during fault conditions. FLISR applications use smart, controllable devices that are installed in the distribution system for FLISR operation. These controllable devices include distributed energy resources (DER) and reclosers. Evaluating such ADMS applications before installation in the field can help de-risk the field implementation and avoid costly failures in the field. This paper presents a background on experimental setup that are typically used to evaluate ADMS applications. This is followed by briefly presenting the setup used to evaluate the FLISR application in an off-the-shelf ADMS tool. Finally, results from the evaluation experiments are presented.

94 GMLC - Grid Modernization Laboratory Consortium↗

Hardware-in-the-Loop Using Electromagnetic Transient Simulation

Digital real time simulators have the capability to run electromagnetic transient simulations in real time. This capability allows users to leverage the hardware-software combination to evaluate controller performance, protection device performance, and power device performance. This has helped many field deployment projects to be successful and be cost-effective. In this talk, we will present current state-of-art, and future of real time electromagnetic transient simulation and its impacts on field deployment.

08 HYDROGEN↗

Evaluation of Centralized Model-Based FLISR in a Lab Setup: Preprint

Utilities are installing advanced distribution management systems (ADMS) around the globe to improve the sensing and control of distribution systems. ADMS is becoming a critical component to improve the resiliency and reliability of distribution systems. These management systems host a multitude of applications that can be used to sense, control, and operate distribution systems. Fault location, isolation, and service restoration (FLISR) is one of the ADMS applications that is critical to improving resilience during fault conditions. FLISR applications use smart, controllable devices that are installed in the distribution system for FLISR operation. These controllable devices include distributed energy resources (DER) and reclosers. Evaluating such ADMS applications before installation in the field can help de-risk the field implementation and avoid costly failures in the field. This paper presents a background on experimental setup that are typically used to evaluate ADMS applications. This is followed by briefly presenting the setup used to evaluate the FLISR application in an off-the-shelf ADMS tool. Finally, results from the evaluation experiments are presented.

94 GMLC - Grid Modernization Laboratory Consortium↗