Integrated temperature control, humidity control, and water recovery subsystem for a 90-day Space-Station Simulator test
Integrated temperature and humidity control and water recovery subsystem for manned test in space station simulator
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Integrated temperature and humidity control and water recovery subsystem for manned test in space station simulator
Apparatus is provided which controls humidity in a gas. The apparatus employs a porous interface that is preferably a manifolded array of stainless steel tubes through whose porous surface water vapor can pass. One side of the porous interface is in contact with water and the opposing side is in contact with gas whose humidity is being controlled. Water vapor is emitted from the porous surface of the tubing into the gas when the gas is being humidified, and water vapor is removed from the gas through the porous surfaces when the gas is being dehumidified. The temperature of the porous interface relative to the gas temperature determines whether humidification or dehumidification is being carried out. The humidity in the gas is sensed and compared to the set point humidity. The water temperature, and consequently the porous interface temperature, are automatically controlled in response to changes in the gas humidity level above or below the set point. Any deviation from the set point humidity is thus corrected.
Design and tests of water vapor electrolysis cell for generating and regulating spacecraft oxygen and for controlling humidity
This paper describes the development of a membrane-based process for dehumidifying the Extravehicular Mobility Unit (EMU). The membrane process promises to be smaller, lighter, and more energy efficient than the other technologies for dehumidification. The dehydration membranes were tested for 90 days at conditions expected to be present in the EMU. The results of these tests indicate that membrane-based technology can effectively control humidity in the EMU.
Scrubbing of the spacesuit air stream to control humidity and regulate carbon dioxide (CO 2 ) relies on amine-loaded resins, colloquially known as sorbents. The efficacy of Rapid Cycle Amine technology relies on the propensity of nitrogens toward adsorption of CO 2 while simultaneously offering regenerative properties under vacuum or positive pressure. The commonly utilized sorbent, SA9T, was recreated and evaluated further to increase stability and serve as a benchmark comparison for newly synthesized amine sorbent technologies. Ongoing storage studies with eight different environments will allow the development of applicable storage protocols and provide insight into possible ammonia generation pathways. Attempts to alleviate the known issues with SA9T included the alteration of the primary amine (tetraethylenepentamine), the choice of resin, and the particle size distribution. In-house CO 2 breakthrough experiments were conducted using a specialized apparatus that can simulate spacesuit conditions, offering high-quality triplicate capacity analysis affording direct comparison to known adsorbents in the literature. Thermo-Desorption Gas Chromatography Mass Spectrometry studies on the synthesized materials revealed any reagent or solvent offgassing while Nuclear Magnetic Resonance spectroscopy tracked the stability of the bound amine. Scanning Electron Microscope images of sieved materials provided a more accurate size interpretation facilitating synthetic design and pressure drop elimination. All efficient sorbents were synthesized to a commercial batch scale subsequent to evaluation including Xplo-SA9T.
During this project we develop and validate a cost-effective, integrated control solution to improve humidity control and comfort for energy-efficient homes in hot-humid climates. This study focuses on developing a strategy that is effective, field tested, and practical for builders to install with minimal disruption to standard practices. A successful solution would simplify the transition to high-performance humidity control and be the basis for design and installation guidance. By relying on the central system as a starting point, the strategy employed minimizes system complexity and cost for builders, while improving comfort and operating cost for homeowners. The solution strategy was to coordinate the cooling, dehumidification, and ventilation functions of central, ducted HVAC systems to better control indoor humidity, improve occupant thermal comfort, and capture energy savings. The primary strategic goals were to: (1) optimize dehumidification by the central air-conditioning system, particularly during part-load conditions, using conventional equipment with modified control settings and lower system airflows; (2) maximize ventilation during heating/cooling on-cycles, to “bank” and condition outdoor ventilation air, and minimize ventilation during off-cycles; (3) quantify the effectiveness and energy impact of the dehumidification and ventilation strategies, while identifying a metric that would be useful to evaluate latent effectiveness. For the test houses in our study, located in Richmond Hill, Georgia; Houston, Texas; and Monroe, Louisiana we observed: (1) the indoor humidity did not exceed 60% RH during the monitored cooling season for 99% of the time in Richmond Hill, 96% of the time in Houston, and 90% of the time in Monroe; (2) the dehumidification strategy improved the steady-state latent capacity of the HVAC system at design conditions by 16% to 49% at the Houston test house and by 28% to 71% at the Monroe test house, depending on which mode the system was operating in; and (3) the good results at the test houses were primarily due to the amount of time the air-conditioning system operated in ramping or dehumidification modes, or both, particularly during the early cooling season. This study demonstrates that air conditioners or heat pumps with a single-stage compressor can provide good humidity control without the need for a two-stage or variable-stage compressor system. The airflow and control settings for ramping and dehumidification modes are critical to control indoor humidity in hot-humid climates, particularly during part-load and shoulder season conditions. The dehumidification strategy used in this study did not jeopardize the mechanical reliability of the cooling equipment. The strategies used in this study are applicable across various equipment brands, models, and efficiency levels, and also applicable to a broad range of homes in hot-humid climates. Results will vary by specific equipment, location, and house configuration and construction.
In August 1997 NASA/ Marshall Space Flight Center (MSFC) began a test with the objective of monitoring the growth of microorganisms on material simulating the surface of the International Space Station (ISS) Temperature and Humidity Control (THC) Condensing Heat Exchanger (CHX). The test addressed the concerns of potential uncontrolled microbial growth on the surface of the THC CHX subsystem. For this study, humidity condensate from a closed manned environment was used as a direct challenge to the surfaces of six cascades in a test set-up. The condensate was collected using a Shuttle-type CHX within the MSFC End-Use Equipment Testing Facility. Panels in four of the six cascades tested were coated with the ISS CHX silver impregnated hydrophilic coating. The remainder two cascade panels were coated with the hydrophilic coating without the antimicrobial component, silver. Results of the fourteen-month study are discussed in this paper. The effects on the microbial population when drying vs. not-drying the simulated THC CHX surface are also discussed.
The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.
A regenerable CO2 and humidity control system is presently being developed for potential use on shuttle as an alternative to the baseline lithium hydroxide system. The system utilizes a sorbent material (designated HS-C) to adsorb CO2 and the latent heat load from the cabin atmosphere and desorb the CO2 and water vapor overboard when exposed to a space vacuum, thus reducing the overall vehicle heat rejection load. Continuous operation is achieved by utilizing two beds which are alternatively cycled between adsorption and desorption. The HS-C material process was verified. Design concepts for the auxiliary components for the HS-C prototype system were generated. Performance testing verified system effectiveness in controlling CO2 partial pressure and humidity.
Functional Requirements for the Carbon Dioxide and Humidity Control Unit (CDHCU): The CDHCU is a component of the Exploration Portable Life Support System (xPLSS) to provide carbon dioxide (CO2) and humidity control within the spacesuit for a crewmember to perform extravehicular activities (EVA) in vacuum (micro-g), lunar, and Mars environments for up to 8 hours continuous, and during EVA preparation in airlocks or support vehicles for an additional 2 hours (TBR) continuous.
A regenerable sorbent system was investigated for controlling the humidity and carbon dioxide concentration of the space shuttle cabin atmosphere. The sorbents considered for water and carbon dioxide removal were silica gel and molecular sieves. Bed optimization and preliminary system design are discussed along with system optimization studies and weight penalites.
A regenerable CO2 and humidity control system is being developed for potential use on shuttle as an alternate to the baseline lithium hydroxide (LiOH)/condensing heat exchanger system. The system utilizes a sorbent material, designated HS-C, to adsorb CO2 and water vapor from the cabin atmosphere. The material is regenerated by exposing it to space vacuum. A half-size breadboard system, utilizing a flight representative HS-C canister, was designed, built, and performance tested to shuttle requirements for total CO2 and total humidity removal. The use of a new chemical matrix material allowed significant optimization of the system design by packing the HS-C chemical into the core of a heat exchanger which is manifolded to form two separate and distinct beds. Breadboard system performance was proven by parametric testing and simulated mission testing over the full range of shuttle crew sizes and metabolic loadings. Vacuum desorption testing demonstrated considerable savings in previously projected shuttle vacuum duct sizing.
Development of two closely controlled humidity systems for microbiology
A regenerable CO2 and humidity control system is presently being developed for potential use on the space shuttle as an alternative to the baseline lithium hydroxide system. The system utilizes a sorbent material (designated HS-C) to adsorb CO2 and water vapor from the cabin atmosphere and desorb the CO2 and water vapor overboard when exposed to a space vacuum. Continuous operation is achieved by utilizing two beds which are alternately cycled between adsorption and desorption. A shuttle vehicle integration study showed that the HS-C system offers substantial weight advantages compared to the baseline shuttle orbiter expendable lithium hydroxide CO2 removal system for extended missions beyond the nominal design of four men for seven days. This study defined a system packaging envelope in the area presently occupied by the LiOH cartridges.
An advanced flight prototype regenerable CO2 and humidity control system was delivered to NASA-JSC in February 1980. It is pointed out that this system offers substantial weight savings compared with the Shuttle Orbiter expendable lithium hydroxide CO2 removal system for extended duration missions. The present paper provides a brief description of the 4- to 10-man regenerable CO2 and humidity control system. The potential advantages which can be realized for an extended duration Shuttle mission are considered along with the results of extensive testing conducted at JSC. The performance evaluation and endurance tests show that the system is capable of long-term operation (up to 60 days) without maintenance.
Manned evaluation of zero gravity humidity control system in potable water recovery unit for simulated spacecraft cabins
In this study, the control of a desiccant-wheel-based evaporative cooling system with a double-layer dew-point cooler system is emphasized. There are two dew-point evaporative coolers in the system and the air taken inside is subjected to pre- and post-cooling processes. The dehumidification process of the air taken in is carried out by the desiccant wheel after the pre-cooling process. A proportional-based control strategy has been developed to adjust the temperature and relative humidity of the room quickly and robustly with different operation modes for actuators to bring comfort with less energy consumption. In addition, an automatic Stop/Run mode has been added to the control strategy to save extra energy. With the developed control strategy, enabling the actuators to switch between the operation modes, more energy savings are achieved compared to both traditional ON/OFF and proportional controls. The accuracy and applicability of the developed control strategy were analyzed and it was observed that the room comfort reached the desired levels successfully under all disruptive effects. The control inputs and the energies consumed by all the actuators were investigated and it was determined that 21.19% more energy savings are provided by adding the automatic Stop/Run feature. With the multi-mode control strategy, a total of 40.90% less energy consumption is achieved compared to the classical ON/OFF control technique. Thus, it is seen that the controller developed for the desiccant-wheel-based evaporative cooler is a viable method to provide fast and robust comfort conditions with less energy.
The NASA X-Hab project aims to design, manufacture, test, and prove functionality of an air humidity control subsystem to dehumidify and re-humidify air from a space cabin. The method of regulating cabin air humidity utilizes vortex phase separation, which uses an ionic liquid (IL) desiccant for air-water phase separation. This subsystem is intended to be integrated with a CO 2 removal system requiring de-humidified air to operate efficiently. The air humidity control subsystem is composed of a cold-desiccant or cold-side Vortex Phase Separator (VPS) that dehumidifies the cabin air. The dehumidified air exits the cold-side (CS) VPS chamber to flow into the CO 2 removal module, and the cold, water-laden liquid desiccant flows to a regenerative heat exchanger. From the heat exchanger the liquid desiccant continues to the heater. After heating, the desiccant flows into a hot-desiccant or hot-side (HS) VPS as the dehumidified air from CO 2 removal module enters through the HS VPS air inlet. The rehumidified air exits the HS VPS into the space cabin. One pump installed at the liquid exit of the CS VPS and one pump installed at the liquid exit of the HS VPS transport the fluid through the system. To evaluate the system’s efficiency and effectiveness, the temperature, pressure, flow rate and relative humidity are read, recorded, and analyzed at critical points along the module.