Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “contact-handled”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Process Knowledge Summary Report for Advanced Test Reactor Complex Contact-Handled Transuranic Waste Drum TRA010029

This Process Knowledge Summary Report summarizes information collected to satisfy the transportation and waste acceptance requirements for the transfer of one drum containing contact-handled transuranic (TRU) actinide standards generated by the Idaho National Laboratory at the Advanced Test Reactor (ATR) Complex to the Advanced Mixed Waste Treatment Project (AMWTP) for storage and subsequent shipment to the Waste Isolation Pilot Plant for final disposal. The drum (i.e., Integrated Waste Tracking System Bar Code Number TRA010029) is currently stored at the Materials and Fuels Complex. The information collected includes documentation that addresses the requirements for AMWTP and applicable sections of their Resource Conservation and Recovery Act permits for receipt and disposal of this TRU waste generated from ATR. This Process Knowledge Summary Report includes information regarding, but not limited to, the generation process, the physical form, radiological characteristics, and chemical contaminants of the TRU waste, prohibited items, and packaging configuration. This report, along with the referenced supporting documents, will create a defensible and auditable record for this TRU waste originating from ATR.

99 GENERAL AND MISCELLANEOUS↗

Advanced Fuel Cycle Cost Basis Report: Module D1-7 Contact-Handled Pelletized Pressurized Heavy Water (PHWR) UOX Fuel Fabrication (Rev.1)

In addition to literature-based pressurized heavy-water reactor (PHWR) fuel price information in the 2017 AFC-CBR, the what-it-takes (WIT) unit cost data in this update is informed by new analysis and escalation of the 1978 PHWR-UOX fuel life cycle cost (LCC) data from ORNL reports prepared for the 1977–1980 Nonproliferation Alternative Systems Assessment Program (NASAP). (These reports are referenced and summarized in detail in Module D1-PR.) The PHWR fuel fabrication LCC data in these reports is scaled from a bottom-up cost estimate for a reference technology pressurized-water reactor (PWR)—uranium oxide (UOX) fuel fabrication plant by using algorithms that consider the manufacturing process complexity, fuel design complexity, plant floor space requirements, and the radiation and health, safety, and environmental (HS&E) regulatory environment of PHWR-UOX fuel production vis-à-vis light-water reactor (LWR)-UOX production (PWR fuel in this case). The module name has been changed from “Canadian Deuterium Uranium (CANDU)” to the more generic PHWR fuel fabrication in recognition that not all power reactors that might use this fuel type are considered. Unfortunately, the detailed algorithms and their design bases were not archived at the end of the NASAP effort of the commercial CANDU concept specifically developed in the middle of the last century by Atomic Energy of Canada Limited (AECL).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Project Execution Plan for the Remote Handled Low-Level Waste Disposal Project

As part of ongoing cleanup activities at the Idaho National Laboratory (INL), closure of the Radioactive Waste Management Complex (RWMC) is proceeding under the Comprehensive Environmental Response, Compensation, and Liability Act (42 USC 9601 et seq. 1980). INL-generated radioactive waste has been disposed of at RWMC since 1952. The Subsurface Disposal Area (SDA) at RWMC accepted the bulk of INL’s contact and remote-handled low-level waste (LLW) for disposal. Disposal of contact-handled LLW and remote-handled LLW ion-exchange resins from the Advanced Test Reactor in the open pit of the SDA ceased September 30, 2008. Disposal of remote-handled LLW in concrete disposal vaults at RWMC will continue until the facility is full or until it must be closed in preparation for final remediation of the SDA (approximately at the end of fiscal year FY 2017). The continuing nuclear mission of INL, associated ongoing and planned operations, and Naval spent fuel activities at the Naval Reactors Facility (NRF) require continued capability to appropriately dispose of contact and remote handled LLW. A programmatic analysis of disposal alternatives for contact and remote-handled LLW generated at INL was conducted by the INL contractor in Fiscal Year 2006; subsequent evaluations were completed in Fiscal Year 2007. The result of these analyses was a recommendation to the Department of Energy (DOE) that all contact-handled LLW generated after September 30, 2008, be disposed offsite, and that DOE proceed with a capital project to establish replacement remote-handled LLW disposal capability. An analysis of the alternatives for providing replacement remote-handled LLW disposal capability has been performed to support Critical Decision-1. The highest ranked alternative to provide this required capability has been determined to be the development of a new onsite remote-handled LLW disposal facility to replace the existing remote-handled LLW disposal vaults at the SDA. Several offsite DOE and commercial disposal options exist for contact-handled LLW; however, offsite disposal options are either not currently available (i.e., commercial disposal facilities), practical, or cost-effective for all remote-handled LLW streams generated at INL. Offsite disposal of all INL and tenant-generated remote-handled waste is further complicated by issues associated with transporting highly radioactive waste in commerce; and infrastructure and processing changes at the generating facilities, specifically NRF, that would be required to support offsite disposal. The INL Remote-Handled LLW Disposal Project will develop a new remote handled LLW disposal facility to meet mission-critical, remote-handled LLW disposal needs. A formal DOE decision to proceed with the project has been made in accordance with the requirements of National Environmental Policy Act (42 USC§ 4321 et seq.). Remote-handled LLW is generated from nuclear programs conducted at INL, including spent nuclear fuel handling and operations at NRF and operations at the Advanced Test Reactor. Remote-handled LLW also will be generated by new INL programs and from segregation and treatment (as necessary) of remote handled scrap and waste currently stored in the Radioactive Scrap and Waste Facility at the Materials and Fuels Complex.

99 GENERAL AND MISCELLANEOUS↗

CH-TRU Wasate Content Codes (CH-TRUCON) (Rev. 44)

The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) contact-handled transuranic (CH-TRU) waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Cleanup of the East Tennessee Technology Park Year One - Execution with Certainty SM - 13120

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation in Tennessee. UCOR will close out cleanup operations that began in 1998 under a previous contract. When the Contract Base scope of work [1] is completed in 2016, the K-25 gaseous diffusion building will have been demolished and all waste dispositioned, demolition will have started on the K-27 gaseous diffusion building, all contact-handled and remote-handled transuranic waste in inventory (approximately 500 cubic meters) will have been transferred to the Transuranic Waste Processing Center, previously designated 'No-Path-To-Disposition Waste' will have been dispositioned to the extent possible, and UCOR will have managed DOE Office of Environmental Management (EM)- owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and the Y-12 National Security Complex in a safe and cost-effective manner. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; advanced the deactivation and demolition (D and D) of the K-25 gaseous diffusion building; recovered and completed the Tank W-1A and K-1070-B Burial Ground remediation projects; characterized, packaged, and shipped contact-handled transuranic waste to the Transuranic Waste Processing Center; disposed of more than 90,000 cubic yards of cleanup waste while managing the Environmental Management Waste Management Facility (EMWMF); and provided operations, surveillance, and maintenance activities at DOE EM facilities at ETTP, ORNL, and the Y-12 National Security Complex. Project performance as of December 31, 2012 has been excellent: - Cost Performance Index - 1.06; - Schedule Performance Index - 1.02. At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand in hand with its excellent project performance. Through calendar year 2012, UCOR's recordable injury rate was 0.33, and the company has worked close to 4 million hours without a lost work day injury. UCOR's safety record is one of the best in the DOE EM Complex. This performance was due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key approaches included: - Selected and deployed experienced staff in key leadership positions throughout the organization; - Approached 'Transition' as the 'true' beginning of the cleanup project - kicking off a number of project initiatives such as Partnering, PMB development, D and D Plan execution, etc. - Established a project baseline for performance measurement and obtained EVMS certification in record time; - Determined material differences and changed conditions that warranted contract change - then quickly addressed these changes with the DOE client; - Aligned the project and the contract within one year - also done in record time; - Implemented Safety Trained Supervisor and Safety Conscious Work Environment Programs, and kicked off the pursuit of certification under DOE's Voluntary Protection Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Generator Instructions: Key to Successful Implementation of the US DOE's 435.1 for Transuranic Waste Packaging Instructions (LA-UR-12-24155) - 13218

In times of continuing fiscal constraints, a management and operation tool that is straightforward to implement, works as advertised, and virtually ensures compliant waste packaging should be carefully considered and employed wherever practicable. In the near future, the Department of Energy (DOE) will issue the first major update to DOE Order 435.1, Radioactive Waste Management. This update will contain a requirement for sites that do not have a Waste Isolation Pilot Plant (WIPP) waste certification program to use two newly developed technical standards: Contact-Handled Defense Transuranic Waste Packaging Instructions and Remote-Handled Defense Transuranic Waste Packaging Instructions. The technical standards are being developed from the DOE O 435.1 Notice, Contact-Handled and Remote-Handled Transuranic Waste Packaging, approved August 2011. The packaging instructions will provide detailed information and instruction for packaging almost every conceivable type of transuranic (TRU) waste for disposal at WIPP. While providing specificity, the packaging instructions leave to each site's own discretion the actual mechanics of how those Instructions will be functionally implemented at the floor level. While the Technical Standards are designed to provide precise information for compliant packaging, the density of the information in the packaging instructions necessitates a type of Rosetta Stone that translates the requirements into concise, clear, easy to use and operationally practical recipes that are waste stream and facility specific for use by both first line management and hands-on operations personnel. The Waste Generator Instructions provide the operator with step-by-step instructions that will integrate the sites' various operational requirements (e.g., health and safety limits, radiological limits or dose limits) and result in a WIPP certifiable waste and package that can be transported to and emplaced at WIPP. These little known but widely productive Waste Generator Instructions (WGIs) have been used occasionally in the past at large sites for treatment and packaging of TRU waste. The WGIs have resulted in highly efficient waste treatment, packaging and certification for disposal of TRU waste at WIPP. For example, a single WGI at LANL, combined with an increase in gram loading, resulted in a mind boggling 6,400% increase in waste loading for {sup 238}Pu heat source waste. In fact, the WGI combined with a new Contact Handled (CH) TRU Waste Content (TRUCON) Code provided a massive increase in shippable wattage per Transuranic Package Transporter-II (TRUPACT-II) over the previously used and more restrictive TRUCON Code that have been used previously for the heat source waste. In fact, the use of the WGI process at LANL's TA-55 facility reduced non-compliant drums for WIPP certification and disposal from a 13% failure rate down to a 0.5% failure rate and is expected to further reduce the failure rate to zero drums per year. The inherent value of the WGI is that it can be implemented in a site's current procedure issuance process and it provides documented proof of what actions were taken for each waste stream packaged. The WGI protocol provides a key floor-level operational component to achieve goal alignment between actual site operations, the WIPP TRU waste packaging instructions, and DOE O 435.1. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Transuranic Waste Inventory Report - 2011(Rev. 0)

The U.S. Department of Energy’s (DOE’s) Waste Isolation Pilot Plant (WIPP) began accepting defense-related transuranic (TRU) waste on March 26, 1999, becoming the nation’s first deep geologic repository for the permanent disposal of defense-generated TRU waste. TRU waste generation has occurred at both large quantity and small quantity sites (LQSs and SQSs) across the country. Many of these sites have emplaced their waste at WIPP, found other disposition pathways for the waste, or transferred the waste to other sites for further disposition. As of December 31, 2010 (the cutoff date for inventory data for this report), there have been 9,207 shipments (8,761 contact-handled [CH] and 446remote-handled [RH]) of TRU waste to WIPP for emplacement since WIPP’s opening(DOE 2011).This Annual Transuranic Waste Inventory Report – 2011 (ATWIR-2011) (hereafter referred to as “this report” or “ATWIR-2011”) reflects the changes that have occurred and provides an update to the defense-related TRU waste inventory data since the last published report, the Annual Transuranic Waste Inventory Report – 2010 (ATWIR-2010)(DOE 2010a).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Small Modular Reactor Economics Status Report

This report describes the data collection work performed for an advanced small modular reactor (AdvSMR) economics analysis activity at the Oak Ridge National Laboratory. The methodology development and analytical results are described in separate, stand-alone documents as listed in the references. The economics analysis effort for the AdvSMR program combines the technical and fuel cycle aspects of advanced (non-light water reactor [LWR]) reactors with the market and production aspects of SMRs. This requires the collection, analysis, and synthesis of multiple unrelated and potentially high-uncertainty data sets from a wide range of data sources. Further, the nature of both economic and nuclear technology analysis requires at least a minor attempt at prediction and prognostication, and the far-term horizon for deployment of advanced nuclear systems introduces more uncertainty. Energy market uncertainty, especially the electricity market, is the result of the integration of commodity prices, demand fluctuation, and generation competition, as easily seen in deregulated markets. Depending on current or projected values for any of these factors, the economic attractiveness of any power plant construction project can change yearly or quarterly. For long-lead construction projects such as nuclear power plants, this uncertainty generates an implied and inherent risk for potential nuclear power plant owners and operators. The uncertainty in nuclear reactor and fuel cycle costs is in some respects better understood and quantified than the energy market uncertainty. The LWR-based fuel cycle has a long commercial history to use as its basis for cost estimation, and the current activities in LWR construction provide a reliable baseline for estimates for similar efforts. However, for advanced systems, the estimates and their associated uncertainties are based on forward-looking assumptions for performance after the system has been built and has achieved commercial operation. Advanced fuel materials and fabrication costs have large uncertainties based on complexities of operation, such as contact-handled fuel fabrication versus remote handling, or commodity availability. Thus, this analytical work makes a good faith effort to quantify uncertainties and provide qualifiers, caveats, and explanations for the sources of these uncertainties. The overall result is that this work assembles the necessary information and establishes the foundation for future analyses using more precise data as nuclear technology advances.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Small to Full Height Scale Comparisons of Cesium Ion Exchange Performance with Crystalline Silicotitanate

The U.S. Department of Energy’s (DOE) Hanford Site houses 56 million gallons of high-level radioactive waste generated from plutonium production from 1944 to 1988. The supernatant waste, currently stored in underground tanks, is intended to be vitrified following filtration and 137 Cs removal at the Hanford Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Vitrification Facility. The WTP Pretreatment Facility will not be operational for several years. The Tank Side Cesium Removal (TSCR) system is a technology demonstration that will remove cesium from tank waste supernate to support directly feeding LAW to the vitrification facility. The 137 Cs removal is important to meet the WTP LAW contract specification and ultimately for creating a contact-handled waste form. The waste acceptance criteria (WAC) limit for the WTP LAW Facility is <3.18E-5 Ci 137 Cs per mole Na. The TSCR system is skid mounted and employs two key technologies: dead end filtration for solids removal and ion exchange (IX) for cesium removal. Filtration is necessary to protect the functionality of the IX columns. The IX process utilizes sodium form crystalline silicotitanate (CST) IX media produced by UOP Honeywell, LLC (Des Plaines, IL) under the product name IONSIV R9140-B, 18 x 50 mesh, in a lead-lag-polish column configuration. Each column contains a CST bed height of 92 inches and a volume of approximately 157 gallons of CST IX media. The full-scale TSCR operation will run at a residence time of 1.9 bed volumes (BV)/h, which results in a superficial velocity of 7.3 cm/min and a flowrate of ~5 gal/min. Column testing at small (2.5% of the full bed height), medium (12% of the full bed height), and full-height scales has been previously conducted to evaluate process variables and scale up performance of Cs exchange onto the CST. Cesium load performances from various sieve cuts at the small scale indicated that a 30-mesh sieve cut be tested to determine if it better reflects the 12% and full-height column performances at the small scale. Two process flowrates were tested in the small-column configuration with <30-mesh CST and simulant solutions. These tests were compared to full-height column tests at the same residence times to assess CST particle size effect on column scaling. Table S.1 summarizes the observed column performance determined for the two flowrates juxtaposed to the previous work with 5.6 M Na simulant at higher scales (used as benchmarks). The WAC breakthroughs between the small and full-height tests at 1.3 BV/h differed by ~59 BVs. The WAC breakthroughs for small, medium, and full-height tests at 1.8 BV/h were consistent at 240 BVs. The 50% Cs breakthroughs were nominally equivalent for all column tests. The common transition zones and onsets of Cs breakthrough at the 1.8 BV/h tests indicated that the Cs mass transfers were equivalent and thus the <30-mesh CST Cs load performance at the small scale successfully modeled that of the full-height system. It is recommended that the <30-mesh CST be used in subsequent 10-mL CST bed tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of CST Post-Processing AP-105 Hanford Tank Waste

The primary goal of the Tank Side Cesium Removal (TSCR) system, under development by Washington River Protection Solutions, LLC (WRPS), is to remove entrained solids and 137 Cs from the Hanford tank waste supernate to expedite production of low-activity waste. Ion exchange (IX) testing of 10.9 L of waste from Hanford tank 241-AP-105 (AP-105), performed by Pacific Northwest National Laboratory, used a lead-lag-polish column format, with a bed volume of 10 mL per column, to decontaminate tank waste supernate using crystalline silicotitanate (CST) as the IX media. The AP-105 Cs IX processing test, discussed elsewhere, resulted in a shorter transition zone (i.e., steeper load curve) than those defined by wastes from tanks 241-AP-107 and 241-AW-102.1 The shorter transition zone was indicative of a matrix effect retarding Cs capacity. Therefore, aliquots of spent CST from the lead, lag, and polish columns were subjected to a digestion protocol to quantify analytes retained by the CST and extrapolate the impact on Cs capacity. The spent CST was digested using a combination of 5 M HNO 3 and H 2 O 2 with vigorous heating and stirring. Due to the radiation dose accompanying the 137 Cs on the CST columns, a secondary Cs separation by ammonium molybdophosphate embedded in polyacrylonitrile (AMP-PAN) was performed to separate the 137 Cs from the CST so the samples could be contact-handled for analysis outside of a shielded facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improbability of Post-Closure Criticality in Array of Transuranic Waste Containers after Compaction by Salt Creep at Waste Isolation Pilot Plant

Based on the rationale presented, post-closure nuclear criticality is improbable when room closure compacts containers disposing transuranic (TRU) waste emplaced at the Waste Isolation Pilot Plant (WIPP), an operating repository in bedded salt in southeastern New Mexico. As described in the original WIPP certification, a qualitative estimate of the probability of post-closure criticality in TRU waste produced from atomic energy defense activities has been low either because remote-handled TRU waste canisters are neutronically isolated by the bedded salt or because the low fissile mass in an array of contact-handled TRU waste drums cannot be compacted sufficiently by room closure from salt creep. These situations are still valid for the majority of TRU waste that is disposed at WIPP without any disposal constraints, as updated herein. This report also qualitatively evaluates the probability of criticality after disposal of TRU waste in pipe overpack containers (POC) where every POC in a shipment may have the maximum 200 fissile gram equivalent of 239Pu content. The probability of criticality for a disposal room filled with POCs is estimated during four representative phases of repository evolution: (1) a large salt block falls onto POCs in the first 20 years, (2) salt creep closes a disposal room in the first 1000 years without brine seepage and subsequent gas generation, which permits maximum compaction, (3) some brine seepage occurs into the closed room, which initiates consumption of the fiberboard (cellulose) impact absorber in the POC in the second 1000 years, and (4) full brine inundation of a room and consumption of all fiberboard thereafter. Salt-block fall in the first phase does not greatly disrupt three tiers of POCs. The compacted spacing of POCs in the later three repository conditions is calculated through high-fidelity, geomechanical modeling. Criticality evaluation of compacted 200-g 239 Pu spheres at the compacted spacing shows that neither 12-inch nor 6-inch POCs are critical after the first 1000 years, the second 1000 years, or thereafter as the sea of reflector material changes to represent the three repository conditions. Specifically, fiberboard and iron isolates 239 Pu while dry, and brine reduces the reactivity when a room is partially and fully inundated. Because POC behavior bounds behavior of other standard TRU waste containers, post-closure criticality caused by room closure compacting containers is omitted in the performance assessments for the 2019 and 2026 WIPP compliance re-certification applications to the US Environmental Protection Agency.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford and Savannah River Site Programmatic and Technical Integration

Abstract only. The Hanford Site and the Savannah River Site (SRS) were the primary plutonium production facilities within the U.S. nuclear weapons complex. Radioactive wastes were generated as part of these missions and are stored in similar fashion. The majority of radioactivity maintained by the two sites is located in underground carbon steel tanks in the physical form of supernatant, saltcake, or sludge. Disposition of SRS tank waste is ongoing by converting it into glass (pathway for sludge and radionuclides separated from supernatant or dissolved saltcake) or cement (pathway for the decontaminated supernatant and dissolved saltcake). Tank closure activity has also begun at SRS and will continue for the duration of mission. The Hanford tank waste inventory is roughly 2/3rds larger than SRS's by volume- but nominally half the radioactivity. The baseline disposition path includes high-level and low-activity waste vitrification with separate disposition of contact-handled transuranic tank waste. Retrieval of tank waste from aging single­ shell tanks (SSTs) into double-shell tanks (DSTs) is currently ongoing. As vitrification commences later this decade, Hanford will be in a similar operations mode as SRS. Site integration is increasing as the missions align. The ongoing integration is centered on key issues that impact both sites- regardless of mission timeframe. Three recent workshop exchanges have been held to improve communication with the primary intent of improving operations and technical work organization. The topics of these workshops are as follows: DST space utilization, optimization, and closure; Waste Feed Qualification; and, Cementitious Waste Forms. Key goals for these and future exchanges include aligning research and technology, preparing for joint initiatives (to maximize budgetary value for the customer), and reviewing lessons learned. Each site has played a leading role in the development of technology and operational practices that can be used to meet current challenges and to minimize the impact of future challenges. This paper provides an overview of the exchanges held, but predominately focuses on the team development and actions leading from the workshops.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safer Transportation and Disposal of Remote Handled Transuranic Waste - 12033

Since disposal of remote handled (RH) transuranic (TRU) waste at the Waste Isolation Pilot Plant (WIPP) began in 2007, the Department of Energy (DOE) has had difficulty meeting the plans and schedule for disposing this waste. PECOS Management Services, Inc. (PECOS) assessed the feasibility of proposed alternate RH-TRU mixed waste containerisation concepts that would enhance the transportation rate of RH-TRU waste to WIPP and increase the utilization of available WIPP space capacity for RH-TRU waste disposal by either replacing or augmenting current and proposed disposal methods. In addition engineering and operational analyses were conducted that addressed concerns regarding criticality, heat release, and worker exposure to radiation. The results of the analyses showed that the concept, development, and use of a concrete pipe based design for an RH-TRU waste shipping and disposal container could be potentially advantageous for disposing a substantial quantity of RHTRU waste at WIPP in the same manner as contact-handled RH waste. Additionally, this new disposal method would eliminate the hazard associated with repackaging this waste in other containers without the requirement for NRC approval for a new shipping container. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Direct Path To WIPP - 12471

Sandia National Laboratories/New Mexico (SNL/NM), designated as a small quantity site (SQS) by the National TRU Program (NTP), generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) waste primarily from the decontamination and clean-out of glove boxes at the Hot Cell Facility (HCF) at Technical Area (TA) V. All of the waste required repackaging, with the CH TRU waste being repackaged from late 2007 through 2011. Three shipments of CH were completed in October 2011, which de-inventoried SNL/NM's legacy TRU waste. In FY11, RH TRU waste was repackaged at the Auxiliary Hot Cell Facility (AHCF) located in TAV with the support of the Central Characterization Project (CCP). The waste was originally packaged in SNL/NM fabricated casks, cement or lead-lined 55-gallon drums, or 30-gallon drums. The AHCF is a small hot cell, with access only through a roof port which presented challenges for inserting and removing waste from the hot cell. The CCP provided visual examination operators (VEOs) to observe and document each waste item repackaged, removal of prohibited items, and radiological sampling. Dose-to-Curie measurements were calculated by CCP after a radiological report was prepared using scaling factors determined by the analysis of swipe samples. Finally, headspace gas samples were taken and sent to the Advanced Mixed Waste Treatment Project (AMWTP) for analysis. Despite the challenges, the RH waste is on track to be shipped to WIPP in early FY12. The processes used and procedures developed to conduct the repackaging operations, the issues identified and mitigated were challenging but the cooperation between SNL/NM and the Central Characterization Program (CCP) enabled SNL/NM to complete the repackaging and support the characterization and shipment. An inventory list, identification of the campaigns, discussion of the challenges and mitigations, and the final loading of the RH 72-B casks at TA-V for direct shipment to the Waste Isolation Pilot Plant (WIPP) will be discussed. Lessons learned from the RH campaigns are: - Some containers that were originally identified as HC-3 have been re-evaluated and became < HC-3 due to the conservative estimates made by the original generators - Operators at the AHCF were not accustomed to the detail required by the VE operators. However, they worked well together and the repackaging was completed ahead of schedule. - The AK was not always accurate as was demonstrated by the solid waste found in the drum during the first visit by EPA. That waste has since been determined to be low-level. - Two drums originally thought to be RH turned out to be CH and arrangement for RTR had to be made quickly. - Six of the original RH repacked drums became low level. - Lessons learned from the CH campaigns were helpful in avoiding many issues. The RH repackaging effort has been a success due to the expertise of the AHCF operators, supervisor, and manager, the conscientious attention to detail of the CCP VE operators, the experience of the CCP DTC and headspace gas sampling staff, and the guidance and support from CCP and CBFO. Sometimes schedules had to be adjusted, processes updated, and issues discussed, but the communication between CCP and SNL/NM was good. SNL/NM hopes to have the legacy RH TRU waste shipped off-site by early 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Advanced Mixed Waste Treatment Project: Optimizing use of This National Asset to Treat Challenging Radioactive Waste From Other Department of Energy Sites - 16064

The U.S. Department of Energy's (DOE) Advanced Mixed Waste Treatment Project (AMWTP) is a world-class radioactive waste treatment facility with a highly experienced and innovative workforce located at the Idaho National Laboratory (INL). The AMWTP's state-of-the-art capabilities include a 62-ton super-compactor, remote cutting and sorting, macro-encapsulation systems, assay units, drum repackaging, waste characterization, and payload assembly and loading. Since operations began in 2003, the facility has been the largest shipper for contact-handled (CH) transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP). It has successfully processed over 56,000 cubic meters (m{sup 3}) of CH TRU waste and mixed low-level waste (MLLW) from the Idaho Site and approximately 700 m{sup 3} of CH TRU waste from 15 other DOE sites. While the AMWTP is nearing successful completion of its Idaho mission, other DOE environmental cleanup sites will require safe and proven capabilities to treat, package, characterize, and certify legacy radioactive waste inventories well into the next decade. In addition, DOE's national security, nuclear energy, and science programs need sustainable treatment capabilities to support ongoing and new missions. The AMWTP could continue to serve a vital role beyond its current Idaho mission to help address these larger DOE needs. To this end and in recognition that AMWTP's current priority is to complete the processing and removal of Idaho waste, DOE's Office of Environmental Management has initiated strategic planning to assess the feasibility of continued AMWTP operations to treat challenging radioactive waste from other generator sites consistent with existing regulatory agreements. This paper describes AMWTP's unique capabilities and identifies potential benefits, opportunities, and possible solutions to packaging and transportation challenges to fully use AMWTP as a national asset. A panel discussion of subject matter experts with audience participation would help to inform DOE's strategic planning on how best to use this national asset into the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unique Facilities, Innovative Treatment Processes, and a Talented Workforce Allow Fluor Idaho to Successfully Disposition Transuranic Waste - 18388

Fluor Idaho is utilizing state-of-the-art equipment, treatment technologies, and employee expertise at the Department of Energy's (DOE) Idaho Site to treat contact-handled transuranic (CH-TRU) waste, as well as extremely challenging remote-handled transuranic (RH-TRU) waste forms, to prepare the material for shipment and permanent disposal at the Department's Waste Isolation Pilot Plant (WIPP). Nowhere else in the DOE Complex - perhaps the world - will one find the compilation of tools and an experienced workforce with an unparalleled history of safely retrieving, characterizing, treating, repackaging, certifying, and shipping TRU waste. Since 2003, the Advanced Mixed Waste Treatment Project (AMWTP) has used both conventional and unique retrieval concepts, high-tech characterization equipment - including real-time radiography and radioassay - robotics, and automated treatment processes to retrieve and treat 65,000 cubic meters of above-ground CH-TRU waste. Additionally, engineered controls and specialized personal protective equipment have allowed employees to make thousands of entries into high-radiation areas without a skin or clothing contamination incident - evidence of the employees' commitment to safety. AMWTP has encountered and found solutions for many challenging waste forms, including polychlorinated biphenyl-contaminated wastes, TRU waste containers with up to 1,000 fissile gram equivalent plutonium-239, oversized TRU boxes, and partially absorbed organic sludge waste. By utilizing additional facilities and equipment at the Accelerated Retrieval Project V and VII, Fluor Idaho has developed new processing lines and capabilities to ensure worker safety and milestone completion. These two soft-sided buildings, located at a facility adjacent to AMWTP, were originally constructed to exhume Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) TRU wastes from a section of a 97-acre landfill. After a total of 1,150 cubic meters of targeted waste were removed, personnel, working in collaboration with state regulators, successfully implemented a unique regulatory strategy that allowed these CERCLA facilities to be modified and permitted to treat Resource Conservation and Recovery Act (RCRA) wastes from the AMWTP - a savings of tens of millions of dollars over the cost of constructing new buildings. Adding to the AMWTP's technological uniqueness is its ability to treat wastes from other facilities in the DOE Complex. Two prior decision documents and an agreement with the state of Idaho have allowed AMWTP to treat wastes from 15 other DOE sites. It is the only project in the complex to have done so. At another project located next to AMWTP, targeted waste exhumation within the Subsurface Disposal Area is approximately two years ahead of schedule. Crews have removed more than 8,600 cubic meters of CH-TRU and hazardous wastes from eight exhumation areas that equal a combined footprint of 4.75 acres. Less than one acre remains to be exhumed to satisfy the 2008 Record of Decision waste exhumation end state between the DOE, Environmental Protection Agency, and state of Idaho. Construction of the final building where targeted waste exhumation will continue was completed during the summer of 2017. Exhumation will be completed within the next few years. Following exhumation completion, an evapotranspiration barrier (or cap) will be constructed over the entire landfill. Fluor Idaho continues to make progress on a more challenging project involving an inventory of RH-TRU waste that also contains the reactive metal sodium. Crews are utilizing hot cells, once used for spent nuclear fuel reprocessing and high-level waste treatment at the Idaho Nuclear Technology and Engineering Center, to render this challenging waste form safe for disposal in a national geologic waste repository. The treatment methods being employed on this RH-TRU waste are unique in the DOE Complex. Minute concentrations of water are sprayed onto the sodium-contaminated material in a process called 'spritzing' to chemically change the sodium from a reactive metal to a non-reactive salt. In other cases, sodium-contaminated waste is dipped in water to initiate a reaction in a process called 'immersion.' Lastly, for more challenging waste shapes that could not be successfully treated with the two prior methods, crews lower the sodium-contaminated RH-TRU waste into a one-of-a-kind distillation unit that uses high temperature and vacuum to volatilize the sodium and recapture it in a condenser unit for disposal. The RH-TRU waste treated with this technology is then safe for permanent disposal. Fluor Idaho is proud to operate DOE's CH- and RH-TRU waste treatment facilities, as well as use innovative processes and its talented workforce to complete this important work-scope. Such capabilities allow the contractor to meet the commitments made by the DOE to the state of Idaho. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

National Plan for the Disposal of Existing and Future TRU Wastes - 18616

Now that the Waste Isolation Pilot Plant (WIPP) has re-opened, after being down for three years due to an accident the DOE National TRU Program has re-developed a plan for the disposal of existing and future TRU wastes. The National TRU Waste Management Plan (NTWMP) is an integrated plan to address the needs of DOE sites across the DOE Weapons Complex that create and store TRU waste, and is centered on the capability of WIPP to receive and dispose of TRU waste. The WIPP capability is planned as a weekly shipping rate and is defined by emplacement and receipt rate capabilities since WIPP is not permitted for long-term storage. And, shipping rates may be constrained by new WIPP Waste Acceptance Criteria (WAC) and future plans for repository configurations and disposal package capabilities over the next 30 years. Since WIPP is the only disposal system available to the DOE for TRU waste disposal, DOE has a newly projected life-cycle need for WIPP to remain open and available up to 2050. It is projected that the need for WIPP will continue up to the year 2050 for the disposition of the remaining legacy TRU inventories and for the disposal of TRU waste continuing to be generated at DOE's National Laboratories. In addition, there are several other potential new waste streams in which WIPP is being considered an alternative solution for their disposition. The NTWMP has been updated to reflect the short-term and long-term plans for TRU waste disposal at WIPP. The short-term plan is used by DOE for budget projection and integration purposes to facilitate and inform budget planning, both in DOE's Environmental Management (EM) and National Nuclear Security Administration (NNSA) organizations. Most legacy TRU waste (generated in the past and stored at DOE sites today) is owned and managed by EM. And, EM submits integrated budget requests for DOE sites, including the integration of resources for TRU waste management. NNSA and DOE's Office of Science (OS) funds TRU waste management as part of their mission funding and NNSA should eventually be the primary user of the WIPP resources as EM's legacy TRU waste is cleaned-up. Prior to the unexpected shutdown of WIPP in 2014, there was a small back-log of waste certified for WIPP disposal and shipments of TRU waste to WIPP were 'just-in-time' as waste was certified. After three years of WIPP being down, DOE sites have built significant back-logs of TRU waste to be certified for WIPP. That back-log built up to over 25,000 containers of TRU waste during that three-year period (Table 1). The backlog included both Contact-Handled (CH) TRU waste and Remote-Handled (RH) TRU waste, and even though WIPP re-opened in April of 2017, it is only open for TRU waste containers that can be stacked on disposal room floors. Plans for changing RH waste disposal packages and methods are in-the-works, but are not yet mature enough for significant planning. In addition, the WIPP underground facilities are now partially contaminated with radioactive particulate, which significantly reduces the WIPP operational efficiencies as compared to 2014. With a large back-log of waste ready for WIPP disposal and limited throughput for WIPP disposal rates, the focus of the NTWMP is to prioritize the selection of TRU wastes from the various sites based on WIPP waste emplacement rates and shipping rates to WIPP. Some TRU waste sites have a significant need to be top priority for shipments to WIPP, and that must be balanced with the need for all TRU waste sites to have some shipments to deplete their back-log of TRU wastes. Storage and management of TRU waste is very costly for DOE and many of those resources could be used to optimize the overall disposition of TRU waste and save DOE significant funding. In addition, the plan will show the possible transition of TRU Waste Management from primarily being an EM function to being an NNSA function in the coming years. As legacy TRU waste inventories are removed, and as NNSA mission-related TRU waste inventories are produced, DOE will be faced with deciding where the primary responsibility for TRU waste management should reside. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗