KSC Construction Cost Index

Kennedy Space Center cost Index aids in conceptual design cost estimates. Report discusses development of KSC Cost Index since January 1974. Index since January 1974. Index provides management, design engineers, and estimators an up-to-data reference for local labor and material process. Also provides mount and rate of change in these costs used to predict future construction costs.

Brown, J. A.↗

Processor Units Reduce Satellite Construction Costs

As part of the effort to build the Fast Affordable Science and Technology Satellite (FASTSAT), Marshall Space Flight Center developed a low-cost telemetry unit which is used to facilitate communication between a satellite and its receiving station. Huntsville, Alabama-based Orbital Telemetry Inc. has licensed the NASA technology and is offering to install the cost-cutting units on commercial satellites.

Source record↗

Evaluation of selected chemical processes for production of low-cost silicon

Plant construction costs and manufacturing costs were estimated for the production of solar-grade silicon by the reduction of silicon tetrachloride in a fluidized bed of seed particles, and several modifications of the iodide process using either thermal decomposition on heated filaments (rods) or hydrogen reduction in a fluidized bed of seed particles. Energy consumption data for the zinc reduction process and each of the iodide process options are given and all appear to be acceptable from the standpoint of energy pay back. Information is presented on the experimental zinc reduction of SiCl4 and electrolytic recovery of zinc from ZnCl2. All of the experimental work performed thus far has supported the initial assumption as to technical feasibility of producing semiconductor silicon by the zinc reduction or iodide processes proposed. The results of a more thorough thermodynamic evaluation of the iodination of silicon oxide/carbon mixtures are presented which explain apparent inconsistencies in an earlier cursory examination of the system.

Blocher, J. M., Jr.↗

Construction bidding cost of KSC's space shuttle facilities

The bidding cost of the major Space Transportation System facilities constructed under the responsibility of the John F. Kennedy Space Center (KSC) is described and listed. These facilities and Ground Support Equipment (GSE) are necessary for the receiving, assembly, testing, and checkout of the Space Shuttle for launch and landing missions at KSC. The Shuttle launch configuration consists of the Orbiter, the External Tank, and the Solid Rocket Boosters (SRB). The reusable Orbiter and SRB's is the major factor in the program that will result in lowering space travel costs. The new facilities are the Landing Facility; Orbiter Processing Facility; Orbiter Approach and Landing Test Facility (Dryden Test Center, California); Orbiter Mating Devices; Sound Suppression Water System; and Emergency Power System for LC-39. Also, a major factor was to use as much Apollo facilities and hardware as possible to reduce the facilities cost. The alterations to existing Apollo facilities are the VAB modifications; Mobile Launcher Platforms; Launch Complex 39 Pads A and B (which includes a new concept - the Rotary Service Structure), which was featured in ENR, 3 Feb. 1977, 'Hinged Space Truss will Support Shuttle Cargo Room'; Launch Control Center mods; External Tank and SRB Processing and Storage; Fluid Test Complex mods; O&C Spacelab mods; Shuttle mods for Parachute Facility; SRB Recovery and Disassembly Facility at Hangar 'AF'; and an interesting GSE item - the SRB Dewatering Nozzle Plug Sets (Remote Controlled Submarine System) used to inspect and acquire for reuse of SRB's.

Brown, Joseph Andrew↗

Benefits of hydrogen production research

An economic analysis of total monetary benefits arising from increased volume and efficiency of hydrogen production from various primary energy sources is carried out. The analysis is based on NASA's projections of future hydrogen demand in terms of both established industrial-chemical uses and new energy system applications, along with the mix of primary energy sources needed to meet this demand. A cost methodology model is worked out with the basic cost elements being plant construction costs, feedstock and energy costs, and operating and labor-related costs. A computer simulation technique was developed and a set of model calculations was performed. Some representative outputs of the computer analysis are displayed and conclusions are drawn on major factors determining the overall savings possible in hydrogen production and on its technological and economic impact.

Manvi, R.↗

Conceptual Cost Estimating

Kennedy Space Center data aid in efficient construction-cost managment. Report discusses development and use of NASA TR-1508, Kennedy Space Center Aerospace Construction price book for preparing conceptual budget, funding cost estimating, and preliminary cost engineering reports. Report based on actual bid prices and Government estimates.

Brown, J. A.↗

Strawman Optical Reception Development Antenna (SORDA)

A strawman design of a ground-based station for receiving optical communications from deep space is presented. This strawman will serve as a basis for further study and design refinement. The recommendation to build rather than to use an existing facility is explained. Parameters of the design were selected to postulate a workable system, starting with a 10 m diameter, hexagonally segmented, f/0.5 primary mirror. The effects of variations of design parameters on performance and cost are discussed. Some design formulas are included. An electro-optical functional block diagram is presented and discussed. Cost calculations are based on a previous cost model for the hardware or on typical construction costs per unit area for several types of facilities. Other cost factors are included in the usual way for Construction of Facilities. The ratio of high and low reasonable values was less than a factor of 2, with a best estimate of under $16,000,000.

Kerr, E. L.↗

A fixed collector employing reversible vee-trough concentrator and a vacuum tube receiver for high temperature solar energy systems

A solar heat collection system employing non-tracking reflectors integrated with a fixed vacuum tube receiver which achieves modest year-round concentration (about 2) of the sunlight at low capital costs is discussed. The axis of the vee-trough reflector lies in a east-west direction and requires reversal of the reflector surfaces only twice a year without disturbing the receiver tubes and associated plumbing. It collects most of the diffuse flux. The vacuum tube receiver with selective absorber has no convection losses while radiation and conduction losses are minimal. Significant cost reductions are offered since the vee-trough can be fabricated from inexpensive polished or plastic reflector laminated sheet metal covering 2/3 of the collection area, and only about 1/3 of the area is covered with the more expensive vacuum tube receivers. Thermal and economic performance of the vee-trough vacuum tube system, year-round variation of the concentration factor, incident flux, useful heat per unit area at various operation temperatures and energy cost estimates are presented. The electrical energy cost is estimated to be 77 mills/kWh, and the system construction cost is estimated to be $1140/kWe.

Selcuk, M. K.↗

Cost and Throughput Analysis for the NASA Ames Arc Jet Modernization Program

NASA Ames Center is currently evaluating alternatives to modernize the Arc Jet Complex, a critical part of testing for NASA’s planetary missions. NASA’s Arc Jet Complex facilities “are used to simulate the aerothermodynamic heating that a spacecraft endures throughout hypersonic atmospheric entry, and to test candidate thermal protection system (TPS) materials and systems. “Because planetary mission schedules often have tight windows due to planetary alignment constraints, a small increase in schedule could result in a two-year delay. Such a delay could increase the cost of a $1billionmissionbyhundreds of millions of dollars due to project personnel pay and clean room storage. To avoid these costs, the authors support NASA Ames in evaluating return on investment (ROI) and effectiveness of alternatives for modernizing the complex. The first input into the ROI is the deconstruction and construction cost estimates, which are developed using independent research on highly specialized subsystems, vendor quotes, and Unified Facilities Criteria (UFC), depending on the facility and work package. One of the measures of effectiveness is throughput analysis of the test bays, as a main goal of the modernization is to increase the number of possible test runs per year. This analysis is conducted via a probabilistic simulation and accounts for a variety of stochastic factors that influence the sequence of test runs, such as the facility availability; test complexity; the need to pause to assess test results; test failure; and the possibility of a system failure. The methodologies for both these analyses are discussed, along with the challenges presented due to the unique nature of the highly specialized test equipment.

Jennifer Scheel↗

Vacuum Pump-Down of the Annular Insulation Space for Large Field-Erected Liquid Hydrogen Storage Tanks

Insulation systems are critical to liquid hydrogen storage tank performance. Tanks in the capacity range of 100 to 1,000 m 3 are typically shop built and designed with high-vacuum (HV) multi-layer insulation (MLI), whereas storage vessels larger than 1,000 m 3 are typically field-erected and supplied with bulk fill insulation working at moderate vacuum (MV) levels (1-100 millitorr). For large, field-erected vessels, two types of bulk fill insulation typically used: perlite and hollow glass microspheres (glass bubbles). Selection of either material is driven by a tradeoff between CAPEX and OPEX, such as the material and construction cost versus operating thermal performance and maintenance. In either case, the vacuum level needed to achieve optimum performance is likely to drive the field testing and commissioning portion of the construction schedule. A primary goal of this paper is to present practical experience and data for warm vacuum pressure (WVP) and cold vacuum pressure (CVP) levels. Recommended WVP levels needed prior to cooldown consider both perlite powder and glass bubbles. Pumping time expected to achieve target vacuum levels, considering a variety of factors, is also discussed. Recommendations for a standard practice in vacuum-insulated tank commissioning are based on historical NASA data, and those collected during recent projects.

A M Swanger↗

Cost comparisons of solar power satellites versus lunar based power systems

A comparison is made between projected electricity costs of an optimized space solar power station (SPS) in GEO and a moon-based SPS (LPS). A single SPS would receive sunlight on an almost uninterruptible basis. The LPS would be illumined 50 percent of the time, thus requiring two stations on opposite sides of the moon as well as three terrestrial rectennas spaced 120 deg apart. The 5 percent efficient LPS cells would be manufactured from lunar materials and built into arrays mounted on tall mounds. The steerable GEO SPS would have 15 percent efficient cells. Construction costs would be significantly lower on the moon, but the total antenna area would need to be two orders of magnitude larger to produce the same output as the SPS. It is estimated that the LPS would therefore deliver 5 GW electricity to earth stations at a cost of 511.3 mills/kW, compared to 46.8 mills/kW from the SPS. It is concluded that lunar materials are suitable for building an SPS, not a LPS.

Kerwin, E. M.↗

Hermes CX-7: Air transport system design simulation

The Hermes CX-7 has been designed to service the overnight parcel package delivery needs of the cities of Aeroworld as determined in the G-Dome Enterprises market survey. The design optimization centers on the prime goal of servicing the needs of these cities as efficiently and profitably as possible. The greatest factors which affect the design of an aircraft for the mission outlined in the Request for Proposal are cost, construction feasibility and effectiveness of the design. Other influencing factors are given by the constraints of the market, including a maximum takeoff and landing distance of 60 feet, storage capability in a container of size 5 ft. x 3 ft. x 2 ft., cargo packages of 2 inch and 4 inch cubes, and ability to turn with a radius no larger than 60 feet. Safety considerations such as flying at or below Mach one (30 ft/s) and controllability and maintainability of the aircraft must also be designed into the aircraft. Another influential factor is the efficiency of the aircraft which involves optimizations and tradeoffs of such factors as weight, lifting surface sizing, structural redundancy, and material costs.

Amer, Brian↗

Solar power satellite. System definition study. Part 1, volume 3: Construction, transportation and cost analyses

Concepts developed for both LEO and GEO construction of photovoltaic and thermal engine satellites are analyzed. Topics discussed include: satellite construction; crew scheduling; crew jobs and organizations; operator productivity rating; constructability rating; transportation systems for cargo launch, refueling operations, personnel transport, and orbit transfer; collision analysis, cost analysis, and radiation evironment and effects.

Source record↗

Measuring watershed runoff capability with ERTS data

Parameters of most equations used to predict runoff from an ungaged area are based on characteristics of the watershed and subject to the biases of a hydrologist. Digital multispectral scanner, MSS, data from ERTS was reduced with the aid of computer programs and a Dicomed display. Multivariate analyses of the MSS data indicate that discrimination between watersheds with different runoff capabilities is possible using ERTS data. Differences between two visible bands of MSS data can be used to more accurately evaluate the parameters than present subjective methods, thus reducing construction cost due to overdesign of flood detention structures.

Blanchard, B. J.↗

Prospects for obtaining metallic hydrogen with spherical presses

Description of a split-sphere apparatus modified for use at low temperature and affording a possible method for compressing molecular hydrogen to a pressure in excess of 1 Mbar and for converting it to the metallic state. The construction costs of the apparatus are relatively low and the amount of liquid helium required for low-temperature operation is readily obtainable with modern liquefiers.

Spain, I. L.↗

Improved bonding of honeycomb panels

Technique, using angular metal braces bonded onto panels, lowers construction costs. Technique improves overall structural strength, decreases assembly time, and avoids wear points created by bolts and rivets.

Sobkiewicz, S. A.↗

Solar heating and hot water system installed at office building, One Solar Place, Dallas, Texas

A solar heating on cooling system is described which is designed to provide 87 percent of the space heating needs, 100 percent of the potable hot water needs and is sized for future absorption cooling. The collection subsystem consists of 28 solargenics, series 76, flat plate collectors with a total area of 1,596 square feet. The solar loop circulates an ethylene glyco water solution through the collectors into a hot water system exchanger. The water storage subsystem consists of a heat exchanger, two 2,300 gallon concrete hot water storage tanks with built in heat exchangers and a back-up electric boiler. The domestic hot water subsystem sends hot water to the 10,200 square feet floor area office building hot water water fixtures. The building cold water system provides make up to the solar loop, the heating loop, and the hot water concrete storage tanks. The design, construction, cost analysis, operation and maintenance of the solar system are described.

Source record↗