At least 19 records

Overall chilled water system energy consumption modeling and optimization

The emergence of increasingly affordable variable-speed drive technology has changed the approach used to control chilled water systems equipped with these drives. The purpose of this research was to develop an integrated chilled water modeling technique that can determine the optimal system setpoints and estimate the energy saving potential of chiller system. The chiller system equipped with Variable Frequency Drives (VFDs) on cooling tower fans and condenser water pumps. To accomplish the objective, physical component models of the centrifugal chiller, cooling tower and condenser water pump were established with the goal of incorporating the system’s condenser water flow rate and cooling tower fan speeds as optimization variables. Furthermore, a cooling load prediction algorithm was developed using a multiple non-linear regression model to approximate the building’s cooling load subject to a range of environmental conditions. The inputs and outputs of the individual component models were linked to estimate how adjusting the cooling tower fan and condenser water pump speed would influence the system’s comprehensive performance. Here, the overall system model was then optimized using a generalized reduced gradient optimization algorithm to determine the potential energy savings through speed control with VFDs and to ascertain a control logic strategy for the building automation system to operate the heating and cooling system. A case-study was performed on a single chiller system at a museum and the model was calibrated according to logged data collected over four months. Results showed that for the system analyzed, the energy saving of optimizing the cooling tower fan system was found to be 12–15%, while the energy saving potential of optimizing the condenser water pump with the cooling tower fan was negligible. Additionally, comparing different cooling tower fan control strategies showed that a wet-bulb approach-based cooling tower control strategy was shown to have the highest correlation to the optimized fan speed with an R 2 of 0.924.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lower and upper threshold limit for artificial neural network based chilled and condenser water temperatures set-point control in a chilled water system

In this study, an ANN (artificial neural network) based real-time optimized control algorithm for a chilled water cooling system was developed and applied in an actual building to analyze its cooling energy saving effects through in-situ application and actual measurements. For this purpose, the cooling tower’s CndWT (condenser water temperature) and the chiller’s ChWT (chilled water temperature) were set as system control variables. To evaluate algorithm performance, the electric consumption and the COP (coefficient of performance) were compared and analyzed when ChWT and CndWTs were controlled conventionally and controlled based on the ANN. During the analysis, unexpected abnormal data was observed due to insufficient training data and limited consideration of OWBT (outdoor air wet-bulb temperature) when determining the CndWT set-point. Therefore, it is necessary to further build training data from a wider range of conditions and to set the lower limit of CndWT set-point to at least +3.6 °C above OWBT when the OWBT is higher than 23 °C, so that further energy savings can be achieved.

42 ENGINEERING↗

Application of Artificial Neural Network Model for Optimized Control of Condenser Water Temperature Set-Point in a Chilled Water System

Here, in this study, real-time predictive control and optimization model based on an ANN (artificial neural network) was developed to evaluate the cooling energy saving performance of the optimized control of CndWT (condenser water temperature). For this purpose, the difference in TCEC (total cooling energy consumption) between the conventional control strategy when the CndWT produced by the cooling tower is fixed and the optimized control strategy when real-time control of the CndWT through the optimal ANN model is applied was compared and analyzed. For the modeling of the building to be simulated, the co-simulation of EnergyPlus and MATLAB was built through the middleware Building Controls Virtual Test Bed. For the prediction of TCEC, an ANN model was developed through MATLAB's neural network toolbox. The model accuracy of the ANN was examined through Cv(RMSE) index and as a result, Cv(RMSE) of the optimized ANN model turned out to be approximately 25 %. More importantly, the predictive control technique was able to save TCEC by 5.6 % compared to the conventional control method constantly fixing CndWT set-point to 30 °C. These results showed that the CndWT needs to be dynamically controlled using artificial intelligence technique such as ANN model and that significant energy savings were achievable compared to the conventional fixed control.

42 ENGINEERING↗

High throughput screening of ultra-thin electrocaloric materials enabled by additive manufacturing

Current HVAC systems can constitute as much as half of a building’s total energy consumption, depending on its use. More specifically cooling, particularly in hotter climates or for energy intensive applications, like data centers, can comprise between 10-30% of the total energy use. These cooling systems are largely comprised of compressor-based direct expansion systems and chilled water systems that use refrigerants or water, respectively, to reject heat. . Electrocaloric (EC) cycles present an eco-friendly alternative to these conventional processes.

36 MATERIALS SCIENCE↗

Monitoring Based Commissioning: Step-by-Step Approach to Implementation in Chiller Plants

Chilled water systems consume a significant portion of the energy in manufacturing, and inefficient operation could significantly influence utility bills and the environmental footprint of a facility. One way to ensure long-term energy-efficient plant operation is to ensure that chilled water system equipment, such as chillers, cooling towers, and pumps, are running at their best. Periodic operational assessments help to meet efficiency objectives for cooling plants. However, occasional set point and operational changes resulting from short-term fluctuations cause the plant operation to deviate from optimal. These changes accumulate over time, and operational efficiency deteriorates. Significant energy efficiency improvement potential in chilled water systems can be achieved by operational changes alone. Recent developments in information technology and the industrial internet of things data processing ability have overcome traditional problems and given rise to a new paradigm: monitoring-based commissioning (MBCx). Commissioning platforms and fault detection and diagnostics capabilities have evolved over time and presented more sophisticated abilities to efficiently control process cooling plants. The typical architectures of the MBCx process and a detailed approach to implement the process for chilled water systems are presented. A case study highlighting the energy-and cost-savings potential of MBCx systems is also presented.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Installation of Direct Water-Cooling Systems to Reduce Cooling Energy Requirements for High-Performance Computing Centers

A large cluster of High-Performance Computing (HPC) equipment at the Lawrence Livermore National Laboratory in California was retrofitted with an Asetek cooling system. The Asetek system is a hybrid scheme with water-cooled cold plates on high-heat-producing components in the information technology (IT) equipment, and with the remainder of the heat being removed by conventional air-cooling systems. In order to determine energy savings of the Asetek system, data were gathered and analyzed two ways: using top-down statistical models, and bottom-up engineering models. The cluster, “Cabernet”, rejected its heat into a facilities cooling water loop which in turn rejected the heat into the same chilled water system serving the computer-room air handlers (CRAHs) that provided the air-based cooling for the room. Because the “before” and “after” cases both reject their heat into the chilled water system, the only savings is due to reduction in CRAH fan power. The top-down analysis showed a 4% overall energy savings for the data center (power usage effectiveness (PUE) —the ratio of total data center energy to IT energy— dropped from 1.60 to 1.53, lower is better); the bottom-up analysis showed a 3% overall energy savings (PUE from 1.70 to 1.66) and an 11% savings for the Cabernet system by itself (partial PUE of 1.51). Greater savings, on the order of 15-20%, would be possible if the chilled water system was not used for rejecting the heat from the Asetek system. About 37% of the heat from the Cab system was rejected to the cooling water, lower than at other installations.

Earni, Shankar↗

Field Validation of Electrochemical Water Filtration System on Open Loop Cooling Towers at Automotive Plants

Open loop cooling towers play a pivotal role in rejecting heat for chilled water systems serving industrial processes, heating, ventilation, and air conditioning loads. Exposure to outside conditions can present certain operating challenges to system performance including scaling, corrosion, and biological growth. These issues are mitigated through the use of effective cooling tower water filtration and treatment systems to reduce contaminants—along with other total suspended solids (TSS) and total dissolved solids (TDS)—in the system. The U.S. Department of Energy’s Industrial Efficiency and Decarbonization Office is interested in an electrochemical-based filtration system with the ability to remove TSS particulate down to 1 micron. The removal of finer particulates reduces the need for blowdown and, in turn, makeup water use and chemical treatment in the cooling tower. Additionally, the removal process can reduce fouling at the condensers, resulting in better heat exchange and energy savings. Two Industrial Technology Validation program projects validated the electrochemical water filtration system at the Toyota Motor Manufacturing, Mississippi plant in Blue Springs, Mississippi, and the Nissan Canton Vehicle Assembly Plant in Canton, Mississippi. Researchers found that installation of both systems resulted in water and chemical treatment savings with minimal impact on energy use.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Performance study of a novel dew point evaporative cooler in the climate of central Europe using building simulation tools

This paper presents the performance research of a hybrid air conditioning system (System II) equipped with novel dew point evaporative cooler (DPIEC) for a retail building located in temperate climatic conditions. The new cooler has a dedicated, adaptable structure that maximizes its performance in the climate conditions of central Europe. The unit can operate as a typical regenerative air cooler when outdoor air is drier than indoor air, it can operate as a counter-flow heat recovery unit when indoor conditions are more dry than outdoor and it can operate as a combination of both arrangements. The year-round, hourly-stepped building energy simulations were carried-out using a prognostic tool of energy consumption. The novel dew point evaporative cooler application potential was established using the black-box model based on regression equations was established based on experimental tests on a prototype of novel DPIEC. The hybrid system operation was compared to the typical air handling unit equipped with a standard energy wheel for heat recovery (System I). Presented research shows that DPIEC can cover about 95% of total cooling loads while the energy wheel covers only 9% of total cooling load. System II allows us to save 65% of seasonal electricity consumption comparing to System I. It comes from the fact that during most of the cooling season DPIEC is in operation and it covers most of the cooling loads without the need to switch the chilled water system.

Air conditioning↗

Department of Energy/IDEA: More best-practices research

This article continues the overview of the U.S. Department of Energy and IDEA collaboration by highlighting additional case studies that demonstrate innovative engineering approaches in district energy systems. It focuses on how campuses are improving efficiency, integrating advanced technologies, and reducing energy use and emissions through data-driven strategies. The University of Cincinnati is featured for its highly efficient chilled water system, using advanced algorithms and upgraded “smart chillers” to optimize performance, reduce energy consumption, and lower costs. Wake Forest University emphasizes a data-informed modernization process, using system optimization and targeted building improvements to significantly boost efficiency and reduce overall energy use. Arizona Western College showcases creative solutions to extreme cooling demands, including system redesign, smart controls, and thermal storage to improve reliability and cut peak energy costs. Overall, the article demonstrates that combining innovative engineering, real-time data analysis, and system optimization can significantly enhance performance, reduce emissions, and deliver cost savings in district energy systems.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Development of a Test-Bed for Testing and Refining EarthEn’s Supercritical CO 2 Based Energy Storage System

EarthEn’s energy storage concept leverages supercritical carbon dioxide (sCO 2 ) as a working fluid and relies on compact, high-performance components operating at elevated pressures and temperatures. To accelerate component development and reduce technical risk prior to larger-scale demonstrations, Oak Ridge National Laboratory (ORNL) developed a 100 kW-scale sCO 2 test-bed under a Cooperative Research and Development Agreement with EarthEn (CRADA NO. NFE-24-10050). The objective of the work was to design and construct a flexible experimental facility capable of reproducing key thermodynamic state points and heat-transfer conditions relevant to EarthEn’s thermal energy storage (TES) cycle, with particular emphasis on enabling development and evaluation of next-generation heat exchangers and TES concepts. The test-bed consists of a closed-loop sCO 2 circulation system housed within an open-topped enclosure. In its as-installed configuration, dense-phase sCO 2 is recirculated through a printed circuit recuperator, an electrically heated section, a throttling device used to simulate turbine expansion, and a water-cooled printed circuit heat exchanger that rejects heat to the building chilled-water system before returning to the pump. The pump is driven by a variable frequency drive, enabling controlled adjustment of flow and operating point. A comprehensive instrumentation suite was integrated to support both safe operation and high-quality data collection. Installed sensors include Coriolis flow meters for sCO 2 flow rate and density, resistance temperature detectors and thermocouples distributed throughout the loop (including the heated section and key heat exchanger ports), and pressure transducers for absolute and differential pressure measurements. The facility was designed to support high-pressure (19 MPa nominal) and high-temperature (575°C nominal) operation with credited overpressure protection provided by a rupture disk. Nominal operating conditions were selected to support 100 kW-class testing while maintaining flexibility for non-heated and heated shakedown, control development, and future integration of advanced TES test sections. In parallel with facility development, a system-level thermal-hydraulic model was created using Modelica-based tools to support component sizing, anticipate performance over targeted test conditions, and establish a framework for future model calibration against experimental data. At the conclusion of the project performance period, the facility was in final assembly, and the pressure boundary was nearly completed. However, several practical challenges associated with high-pressure/high-temperature systems and specialized component procurement impacted schedule and prevented initial pump-driven operation and full commissioning within the available resources. This report documents the as-built design, operating capabilities, and instrumentation, and it summarizes key lessons learned related to heater fabrication and testing, first-of-a-kind assembly factors, specialty flange supply constraints, and fill pump corrective actions. Finally, it outlines a phased plan for future commissioning and experimental campaigns, including control and instrumentation shakedown, heater characterization, model calibration, and testing at state points representative of EarthEn’s TES cycle.

25 ENERGY STORAGE↗

Fundamental Science of Doping and Defects in Ga 2 O 3 for Next Generation Power Semiconductors

The aim and scope of this project was the development of a capability to prepare high-quality, epitaxial beta gallium oxide films by oxide reactive molecular-beam epitaxy. The purpose was to demonstrate that beta gallium oxide could be grown by such a method using Sandia’s existing oxide molecular-beam epitaxy instrument. The key activity in this project was the installation of a gallium oxide capability on the Sandia instrument. This required the acquisition of several custom items for the instrument, including: a gallium effusion cell, appropriate cell power supplies and temperature controllers, a shutter to block beam flux, installation of an existing ozone generator with a directed gas nozzle and controlled leak valve, and re-routing the chilled water system to accommodate the cell. In addition, beta gallium oxide single crystals were acquired and their surfaces characterized by reflection high energy electron diffraction.

36 MATERIALS SCIENCE↗

Continuous Monitoring and Partial Water Softening for Cooling Tower Water Treatment

Cooling towers are an integral component of many refrigeration systems, providing comfort or process cooling across a broad range of applications. They are the point in the system where heat is dissipated to the atmosphere through the evaporative cooling process. Cooling towers are commonly found in industrial applications and are also often used in water-cooled chilled water plants in medium to large commercial buildings. Continuous monitoring and partial water softening for cooling towers used in medium to large commercial buildings are the focus of this paper. Cooling towers consume large amounts of water. Cooling tower-related water consumption is one of largest potable water loads within buildings in the United States, with substantial building water use associated with heating and cooling. Regional water shortages have highlighted a need to reduce water consumption; the U.S. General Services Administration (GSA) and Executive Order 13834 place priority on reducing water consumption. This priority has fueled interest in the identification, investigation, and potential broad deployment of cost-effective opportunities to reduce water use, such as alternative water treatment (AWT) technologies for cooling towers. Traditional water treatment approaches use chemicals to extend the ability of the water to hold scaling minerals in suspension, minimize corrosion, and prevent biological growth. This treatment protects the chillers and cooling tower equipment; however, even when chemicals are used regularly, a certain percentage of condenser water must be drained and made up with fresh water to maintain system water quality parameters. In addition, the use of chemicals sometimes creates a waste disposal issue and can cause building owners to incur additional fees, such as disposal or wastewater charges. To manage cooling tower water treatment, GSA typically contracts with a company specializing in conventional chemical maintenance for a fixed fee. While there are many types and vendors of AWT systems, this project assesses the effectiveness of one technology provided by Aqualogix. This system is a chilled water plant monitoring and control system aimed at optimizing system performance by reducing the blowdown occurrences used to remove mineral build-up. The technology consists of two components – continuous programmable logic control (PLC) monitoring and side-stream filtration with partial water softening. PLC monitoring calculates cycles of concentration (CoC) and determines the optimum amount of blowdown water required to satisfy all water chemistry requirements. Side-stream filtration removes suspended matter and improves biocide efficacy while precisely dispensing softened water to achieve optimal makeup water hardness. Unlike other AWT systems evaluated by GSA to date, this system does not replace the legacy treatment system but is used in addition to chemical water treatment. The vendor claims their technology will reduce water consumption, water discharge, and maintenance costs. The AWT system evaluated in this demonstration is a commercialized technology. Given its commercialized state, the system evaluated in this report is at a Technology Readiness Level 9 according to National Aeronautics and Space Administration (NASA) definitions.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Laboratory Testing and Performance Characterization of the High Efficiency Dehumidification System (HEDS) Technology

The high efficiency dehumidification system (HEDS) is a unique air handling unit (AHU) design with two water coils. Connected in series, these water coils can sensibly reheat the airstream after it is cooled and dehumidified, thereby mitigating (or sometimes eliminating) the need for conventional sensible reheat with additional energy from hot water, electric resistance or steam coils. Another unique design feature is the size of the HEDS primary cooling coil. While typical AHU cooling coils have a 6-row geometry, the HED's cooling coil has a deeper 10-row geometry enabling discharge air dew point temperatures at or below 55 degrees F despite warmer chilled water supply temperatures approaching (sometimes exceeding) 50 degrees F. The ability to meet acceptable discharge air dew points with warmer chilled water supply temperatures improves both operational efficiency and system resilience against chilled water plant operational or control issues. This report summarizes the 59 steady-state test results that form a comprehensive performance map of the HEDS technology including its reheat capability. The breadth of outdoor air conditions and flow rates over which the HEDS technology was tested and characterized encompasses the unit 1) operating as a dedicated outdoor air system or mixed air system and 2) controlled with constant air volume or variable air volume fan control.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Techno-Economic Analysis for the Addition of a Thermal Energy Storage System to a Central Plant

Increasing energy demand and rising peak loads present significant challenges for energy management in commercial and institutional settings. As climate change drives greater cooling needs, central plants must navigate the complex tradeoffs between operational efficiency, cost control, and grid stability. Thermal energy storage (TES) systems offer a viable solution by shifting energy consumption from peak to off-peak periods, thereby reducing peak demand, lowering utility expenses, and improving grid resilience. However, the success of TES implementation hinges on appropriate system sizing, effective control strategies, and alignment with local utility rate structures. This article presents a techno-economic analysis of integrating a chilled water TES system into the central plant at California State University, Dominguez Hills. Drawing on historical load profiles and utility tariffs, we assess three TES sizing approaches and their corresponding control strategies from both energy and economic perspectives. This article utilizes a model-based approach to assess the impact of TES sizing and control strategies on the techno-economic feasibility of integrating TES into an existing central plant. The models employed for this analysis were calibrated using 4 years of historical data. Here, the results demonstrated that utility tariffs and the campus's operational profiles dictate the most feasible sizing and control methods. The findings offer valuable insights for institutions and commercial building managers exploring sustainable energy solutions. By demonstrating how optimized TES strategies can improve operational efficiency while achieving financial savings, this study highlights the potential for TES to align performance with cost effectiveness in real-world applications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Investigation of Energy Efficient Retrofit HVAC Systems for a University: Case Study

We did energy efficient retrofits for the Indiana University Purdue University—Indianapolis Health Science Building using the eQuest energy software. The current dual-fan dual-duct (DFDD) system is 41 years old and has a higher energy utilization index (EUI) than the national average for similar building types. The baseline model with the DFDD system was compared with the actual electrical consumption. Then, two energy efficiency measures (EEMs) were applied to the model. The first EEM was ‘DFDD system with chilled water and steam heating,’ and the second EEM was ‘single-duct variable air volume (VAV) with chilled water and electric reheat.’ After comparative simulations and analyses, it was determined that the ‘single duct VAV with chilled water and electric reheat’ was the most energy efficient and saved 28% in utility costs. The recommendation given to the facility services was to change the current DFDD system to the single-duct VAV system. The single-duct VAV system will save energy and create additional space above the ceiling after the heating duct is removed.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Techno-Economic Analysis for the Addition of Thermal Energy Storage to a Campus With Existing Battery Storage

Rising global temperatures and increasing energy demands pose significant challenges for energy management, particularly in institutional and commercial settings. As cooling needs grow, campuses must balance operational efficiency, cost control, and grid stability. Energy storage solutions, such as thermal energy storage (TES) systems, offer a promising approach to shifting energy consumption from peak to off-peak periods, alleviating peak demand, reducing utility costs, and enhancing grid resilience. When integrated with existing battery energy storage systems (BESS), TES can further optimize load management and improve energy savings, especially in buildings with diverse energy needs. This article presents a techno-economic analysis of integrating a chilled water TES system into the central plant at California State University, Dominguez Hills, which already operates a BESS. We assess three TES sizing strategies—full storage, load leveling, and peak demand limiting—by modeling and simulations based on historical energy loads. Our findings show that we can control TES systems to complement BESS operation, with campus-level load leveling providing the greatest cost savings by reducing peak demands. Furthermore, the study also evaluates the long-term economic viability of TES, considering installation costs, energy savings, and payback periods under varying tariffs. This research offers practical guidance for institutions seeking to enhance energy resilience and reduce operational costs through energy storage solutions.

25 ENERGY STORAGE↗

Site Ambient Temperatures and Operating Schedules for EIC - Utility CW Considerations

The heat dissipated by the EIC accelerator system and components is ultimately removed by the conventional water-cooling systems that will be ultimately dissipated the waste heat to the atmosphere. An estimated 45 MW of heat will be dissipated to water during full beam operation and that will need to be effectively rejected to the atmosphere. Approximately 50% of the heat is required to be rejected to a low temperature heat sink that cannot be achieved by an evaporative cooling tower during summer. To operate during these summer months, a secondary chilled water refrigeration system will be required that would increase the cost of the cooling water system. Further, operating chiller compressor in the summer months will increase the energy consumption of the machine. This analysis is being prepared to evaluate the impact on operating and capital costs on the cooling system for various summer operating schedules while utilizing the most cost-effective scenario of an evaporative cooling system. The technology selection for the various heat sinks is addressed in a separate write-up and are not expected to change the conclusions of this write-up.

43 PARTICLE ACCELERATORS↗

ComStock Measure Scenario Documentation: Chiller Replacement

Building on a 3-year effort to calibrate and validate the U.S. Department of Energy's ResStock (TM) and ComStock (TM) models, this work produces national datasets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of questions regarding their commercial building stock. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual energy consumption (at a subhourly resolution) of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology and results of the baseline model are discussed in the final technical report of the End-Use Load Profiles project. The goal of this work is to develop energy efficiency and demand flexibility end-use load shapes that cover high-impact, market-ready (or nearly market-ready) measures. "Measures" refers to various "what-if" scenarios that can be applied to buildings. An end-use savings shape is the difference in energy consumption between a baseline building (or collection of buildings) and a building with an energy efficiency or demand flexibility measure applied. It results in a time-series profile broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each time step, as well as annual aggregations. This report describes the modeling methodology for a single end-use savings shape measure - chiller replacement - and briefly introduces key results. The full public dataset can be accessed on the ComStock (TM) data lake or via the Data Viewer at comstock.nrel.gov. The public data set enables users to create custom aggregations of results for their use case (e.g., filter to a specific county).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗