Engineering PapersSearch

SEARCH · Engineering Papers

Results for “charging infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION

CHARGE-MAP: An integrated framework to study the multicriteria EV charging infrastructure expansion problem

The widespread adoption of electric vehicles (EVs) in recent years has necessitated the development of effective charging infrastructures. However, charging infrastructure expansion is a multifaceted problem that requires careful consideration of the existing infrastructure, spatiotemporal distribution of charging demands, power-grid capacity, and budget constraints. Here, to approach this complex problem, we present CHARGE-MAP, a data-driven simulation-optimization framework, focused on ensuring meaningful charging experience for individual EV owners. CHARGE-MAP integrates three modules: an agent-based simulation module that estimates spatiotemporal distribution of charging demands by modeling EV adopter mobility and charging behavior; an optimization module that determines optimal new charging station/charger locations and capacities, while minimizing expected detour distances and wait-times with a limited number of new stations; and a power module that determines how to connect the stations to the power grid while maintaining its stability. Using the state of Virginia (consisting of 95 counties and 38 independent cities) as a case study, our results show that CHARGE-MAP can meet the demand of ~198,600 predicted EVs with 1,305 new public charging stations and 2,164 new chargers. It reduces average detour distances for charging by 66% and wait-times at stations by 72% compared to the existing infrastructure. Furthermore, transformer capacity requirement analysis reveals that only 1.8% of residential transformers require upgrades, while over 80% of commercial charging locations can be supported with modest transformer infrastructure (25 to 50 kVA). This indicates that targeted investments can facilitate cost-effective EV integration. Consequently, CHARGE-MAP provides policymakers and urban planners with crucial data-driven insights for effective EV charging infrastructure expansion. Sign up for PNAS alerts.

charging infrastructure

Recommendations for Minimum Required Diagnostics Information for Electric Vehicle Charging Infrastructure

The rapid growth of electrified transportation, including light- and medium-duty electric vehicles (EVs) as a mobility solution requires a reliable EV charging infrastructure. To advance charging reliability, the ChargeX Consortium reports “Recommendations for Minimum Required Error Codes for Electric Vehicle Charging Infrastructure” and “Implementation Guide for Minimum Required Error Codes in Electric Vehicle Charging Infrastructure” have provided recommendations for a set of minimum required error codes (MRECs), their functional and responsibility classifications, and a guide for their implementation using OCPP versions 1.6J and 2.0.1. These reports outline a recommended practice for consistent error reporting and interpretation, which is essential for communicating issues uniformly across the complex and diverse EV charging ecosystem. However, MRECs are just one part of diagnosing issues, another critical part is obtaining enough information about the current state and performance of the various charging components to identify root causes for each of the error codes. This additional diagnostics data can be used by technicians or automated systems to understand the context around an issue, allowing for timely resolution, decreased maintenance costs, and increased charging reliability. During everyday operations, data is regularly collected and analyzed across the ecosystem. Although sharing of all that available data would be great for diagnostics, concerns on data ownership, privacy, and OEM intellectual property pose a challenge. To overcome this obstacle, this report proposes a set of Minimum Required Diagnostic Information (MRDI) and recommends that the industry implement these uniformly across the North American EV charging ecosystem. MRDI provides a means to exchange only data deemed necessary for root cause determination.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS

Evaluating system responses to electric vehicle charging infrastructure expansion through data-driven simulation

Understanding the system responses to electric vehicle (EV) charging infrastructure expansion, including vehicle charging needs, station utilization, and energy consumption, is critical for effective planning to meet growing charging demand without unnecessary resource investment. This study evaluates the system responses to EV charging infrastructure expansion, focusing on charging needs, station utilization, and energy consumption. Using trip data from the National Household Travel Survey and origin–destination patterns, we simulated trip chains in downtown Atlanta with 10 % EV penetration. We assessed 32 scenarios involving different charging port power levels and siting strategies. Furthermore, we found that higher-power ports were more sensitive to placement, with concentrated expansion boosting station utilization more than uniform expansion. Adding high-power ports did not always increase peak energy consumption; in some cases, a few 400 kW ports reduced overall consumption compared to 150 kW ports by enabling faster charging and higher vehicle turnover.

Electric vehicle

Enhancing the EVI-X National Framework to Address Emerging Questions on Charging Infrastructure Deployment

As national investments in EV charging infrastructure accelerate, this project advances the state-of-the-art in infrastructure analysis to better inform deployment strategies. It enhances NLR's EVI-X Suite, a set of tools supporting national network planning, local site design, and financial evaluation. These capabilities will position VTO to provide timely analysis to the DOT/DOE Joint Office, and to guide the strategic buildout of the national charging network. EVI-X development is closely coordinated with other VTO-funded efforts to ensure consistent, integrated use of key inputs and outputs, including EV adoption scenarios from TEMPO and infrastructure designs developed through EVs@Scale.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

CyberMESA: Evaluation Procedures and Metrics for Charging Infrastructure Cybersecurity

A report detailing the cybersecurity evaluation and assessment procedures for EV charging infrastructure. This report is authored by three national lab contributors. INL, PNNL, NRL. The grid integration of Electric Vehicle Charging Infrastructure (EVCI) is a large and complex system of systems (SoS) made up of components from many manufacturers and integrated by various companies responsible for their operation and maintenance. This complexity makes it challenging to implement security standards like IEC 62443 across the entire infrastructure. This document aims to aid in the vulnerability assessments of individual devices, such as Electric Vehicle Supply Equipment (EVSE), to support vendors in adopting and implementing security standards such as UL 2900, NIST SP 800-53 and Common Criteria (CC) (ISO/IEC 15408). This document serves as a guide to help evaluate the cybersecurity posture of EVCI assets. It aims to provide a consistent method for evaluating EVCI, enabling cybersecurity research teams to systematically test a wide range of electric vehicle (EV) assets. The target audiences include cybersecurity research teams, vendor development teams, automotive OEMs, and third-party evaluators.

24 POWER TRANSMISSION AND DISTRIBUTION

Time Matters: A Survival Analysis of Public Electric Vehicle Charging Infrastructure Utilization

The rapid adoption of plug-in electric vehicles (PEVs) places significant demands on public charging infrastructure, making it critical to understand and optimize charger utilization. This study provides one of the most comprehensive analyses of charging behavior to date by applying a survival analysis to a dataset of nearly 16 million level 2 (L2) and direct current (DC) fast charger sessions across the United States from 2017 to 2022. Using Kaplan-Meier curves and log rank tests, our analysis reveals statistically significant and distinct duration patterns influenced by charger type, time of day, and day of the week. We find that L2 charging sessions exhibit high variability tied to venue type, whereas DC sessions are more uniform, typically lasting 30-45 min. This study introduces the operational efficiency score (OES), a metric for standardizing the performance evaluation of charging stations. Our findings offer actionable insights for optimizing charger deployment, developing dynamic pricing strategies to reduce vehicle dwell time, and improving load management for grid operators, ultimately enhancing the efficiency and availability of public charging infrastructure.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

What Shapes Transportation Charging Infrastructure Availability? Evidence from Tennessee

This study examines how community, travel, and freight characteristics relate to public charging infrastructure availability across Tennessee ZIP codes. We link Alternative Fuels Data Center station locations with traffic, socioeconomic, demographic, commuting, and freight employment data to build a ZIP code-level dataset. Ordinary least squares regression captures variation in chargers per 10,000 residents (R2=0.311). Quantile regressions at the 25th, 50th, and 75th percentiles, with pseudo R2 values up to 0.099, show that the determinants of infrastructure availability differ across low-, medium-, and high-availability areas. Percent female, percent car commuters, average household size, and median age are negatively associated with charging availability across much of the distribution. Truck traffic is positively associated only in lower-availability ZIP codes, while vehicle miles traveled shifts from a negative association at the lower end of the distribution to a positive association at the upper end. The results provide insight into how public charging deployment aligns with community characteristics, mobility demand, and freight activity across Tennessee. Future work can distinguish charger types and power levels, incorporate land-use and temporal rollout patterns, and examine how charging infrastructure needs differ across urban and rural contexts.

Calderón, Oriana [University of Tennessee, Knoxvil

Operations and Maintenance for Electric Vehicle Charging Infrastructure in Indian Country

This fact sheet provides an overview of operations and maintenance (O&M) costs, responsibilities, and contracts to help ensure EV charging infrastructure remains functional and reliable in Indian Country. O&M planning is important for Tribes to consider at the beginning of EV charging infrastructure projects to help ensure charger uptime and longevity.

33 ADVANCED PROPULSION SYSTEMS

Development and Experimental Validation of a High-Power DC Distribution Testbed for Advanced Charging Infrastructure and Energy Management

This paper presents the development of a hardware testbed for DC-distributed high-power charging (HPC) stations. As DC distributed solutions emerge as a viable solution to optimize HPC site operations, challenges such as interoperability, protection, and seamless integration of distributed energy resources (DER) persist. These issues underscore the need for a robust testing facility to investigate compliance of available commercial off-the-shelf (COTS) market devices. The developed testbed features a DC-distributed charging hub including a charger, emulated energy storage system (ESS), and site level communication and controller implementation. It facilitates the testing of COTS hardware, charger prototypes, standards validation and site energy management system (SEMS) controllers at rated power. This paper details the development of the charging infrastructure platform, implementation of communication system, validation of different SEMS algorithms, and understanding improvements required for future expansion. Using the developed testbed, interoperability gaps for SEMS implementation with multi-vehicle concurrent charging via a multi-port charger are experimentally observed. Aimed at supporting the transition to large-scale EV charging infrastructure deployment and DER integration, this testbed plays a crucial role in conformity testing of COTS device interoperability.

24 POWER TRANSMISSION AND DISTRIBUTION

Electric Vehicle and Charging Infrastructure Assessment in Cold-Weather Climates: A Case Study of Fairbanks, Alaska

The purpose of this report is to determine the effects that extreme cold temperatures have on electric vehicles (EVs) and electric vehicle supply equipment (EVSE). The adoption of EVs in extreme cold weather presents challenges that require careful analysis of efficiency and charging infrastructure. This report, "Electric Vehicle and Charging Infrastructure Assessment in Cold-Weather Climates: A Case Study of Fairbanks, Alaska," explores how EVs and EVSE perform in temperatures as low as -40 degrees C (-40 degrees F), focusing on real-world data from Teslas in Alaskan winter conditions. The findings indicate that EVs can successfully function in extreme cold, though efficiency is significantly affected. Vehicles stored in heated environments outperformed those stored outdoors, with efficiency dropping by up to 69% for outdoor storage. Despite these challenges, none of the vehicles experienced failures that prevented travel. Storing EVs indoors led to benefits such as faster preconditioning and improved efficiency, while charging in extreme cold, though slower, remained functional. Ultimately, the report concludes that with proper precautions and best practices, EVs are viable transportation solutions in cold climates. Investing in enclosed, heated storage is recommended to maximize efficiency and minimize battery strain. As advancements in battery chemistry and thermal management progress, EV adoption in extreme climates is expected to become even more feasible.

33 ADVANCED PROPULSION SYSTEMS

Data Files for "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure"

This dataset includes modeling results from The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure, including region-specific (i.e., national, state, and core-based statistical area [cities and towns]) electric vehicle supply equipment port count requirements in 2025 and 2030 for multiple scenarios described in the study.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Data Files for 'The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure'

This data set includes modeling results from The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure, including region-specific (i.e., national, state, and core-based statistical area cities and towns) electric vehicle supply equipment port count requirements in 2025 and 2030 for multiple scenarios described in the study.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Navigating Common Electric Vehicle and Charging Infrastructure Concerns

Increasing knowledge about electric vehicles (EVs) can increase Tribal member comfort level with the technology, leading to increased EV adoption. This fact sheet lists common EV and charging infrastructure concerns and provides information to help address these hurdles during engagement with Tribal communities.

33 ADVANCED PROPULSION SYSTEMS