At least 19 records

Impacts of Spatial Resolution in a High-Fidelity Capacity Expansion Model: An ERCOT Case Study

Capacity expansion models are important tools in examining the evolution of the electric power sector. Embedded in these tools are many modeling choices with consequential impacts on computational burden and associated analysis. In this study, we adjust the spatial resolution of the Regional Energy Deployment System (ReEDS) to understand the implications of higher-fidelity modeling on energy system projections and model solve times. The native ReEDS regions capture the contiguous United States in 134 balancing areas whereas the regions in the higher-resolution version are defined by over 3,000 U.S. counties. Using both resolutions, we conduct a case study of the Texas Interconnection (The Electric Reliability Council of Texas [ERCOT]) to explore differences in model projections and to inform appropriate applications of high spatial resolution in a large-scale, applied capacity expansion model.

county

Discrete versus continuous: Enhancing battery optimization in capacity expansion models

This study compares two battery modeling approaches for capacity expansion models: discrete-duration and continuous-duration formulations. In the discrete approach, battery duration is fixed, and power capacity is optimized. In the continuous approach, both power and energy capacities are decision variables, allowing storage duration to be optimized endogenously. Although both discrete-duration and continuous-duration battery formulations are used in long-term power system planning models, the literature has provided limited direct, systematic comparisons of their implications within a common modeling framework. To address this gap, this study implements both approaches in the Regional Energy Deployment System (ReEDS TM ) capacity expansion model using two resource adequacy methods, across a range of future system conditions, and with varying battery cost projections. Results show continuous-duration and high-resolution discrete approaches produce similar capacity expansion outcomes. The continuous formulation achieves faster runtimes compared to discrete-duration runs with many discrete-duration options. However, the discrete-duration approach allows users to choose to have limited fidelity for storage duration options, which in some cases can outperform the continuous formulation. The continuous formulation has the lowest overall system costs, indicating its ability to fine-tune storage duration to better meet specific system needs. This study's findings provide a side-by-side evaluation of discrete and continuous battery modeling approaches and offer guidance for improving the representation of real-world systems, flexibility, and computational efficiency for representing energy storage in long-term power system planning models.

25 ENERGY STORAGE

GRIDCERF - Geospatial Raster Input Data for Capacity Expansion Regional Feasibility

The Geospatial Raster Input Data for Capacity Expansion Regional Feasibility (GRIDCERF) data package is a high-resolution product to evaluate siting suitability for renewable and non-renewable power plants in the conterminous United States. GRIDCERF offers hundreds of individual suitability layers for use with both renewable and non-renewable power plant technology configurations in a harmonized format that can be easily ingested by geospatially-enabled modeling software. It also provides pre-compiled technology-specific suitability layers and allows for user customization to robustly address science objectives when evaluating varying future conditions. GRIDCERF data can be directly used with the CERF (Capacity Expansion Regional Feasibility) model to site power plants at a 1km resolution. GRIDCERF includes composite technology siting suitability raster layers for the following utility scale technology configurations. Note that, in addition to technology sub-types shown below, various cooling types are also included (recirculating, pond, once-through, recirculating-seawater, dry-hybrid, or dry) for various technologies. Biomass Conventional (with or without CCS) IGCC (with or without CCS) Coal Conventional (with or without CCS) IGCC (with or without CCS) Natural Gas Combined-cycle (CC) (with or without CCS) Turbine Geothermal Enhanced Geothermal Systems (EGS) - Class 1 through Class 5 resource potential Nuclear Gen 2 Light Water Reactor (LWR) Gen 3 Small Modular Reactor (SMR) Gen 3 AP1000 Refined Liquids Combined-cycle (CC) (with or without CCS) Turbine Solar Photovoltaic (PV) - for capacity factors in the range of 6-18% Utility-scale Concentrating Solar Power (CSP) - for capacity factors in the range of 24-46% Tower Wind (Onshore) - for capacity factors in the range of 5-50% 80m hub height 100m hub height 120m hub height 140m hub height Wind (Offshore) - for capacity factors in the range of 25-60% 100m hub height 140m hub height 160m hub height

capacity expansion

Sparse chronology strategy for integrating seasonal energy storage in capacity expansion models

Here, this study develops the sparse chronology method to enhance the representative period framework in capacity expansion models, enabling the effective integration of long-duration energy storage modeling. Traditional representative period methods cannot capture the state of charge of seasonal energy storage systems because they do not establish effective inter-day linkages to connect the state of charge between periods. The sparse chronology approach addresses this limitation by establishing inter-day linkages that allow state of charge to shift inter-seasonally. At the same time, it groups identical representative days into partitions, applying constraints sparsely and implicitly to reduce computational load further. Validation results demonstrate that this method successfully simulates long-duration energy storage patterns, achieving close alignment with a continuous yearly benchmark model, with seasonal trends and state of charge cycles clearly represented. The computational load analysis reveals that the sparse chronology method efficiently applies constraints on maximum and minimum state of charge limits within the representative day framework, eliminating the need for detailed constraints on each individual day. By partitioning representative days and constraining only the start and end of each partition, the method significantly decreases computational requirements. Simulation results show that sparse chronology closely approximates the continuous yearly method's accuracy, even with as few as 20 representative days, achieving correlation values with the benchmark of nearly 0.9 in state of charge plots. Furthermore, it maintains computational efficiency, requiring only 4 % of the solver time compared to the continuous yearly method with 20 representative days. This approach allows capacity expansion models to incorporate long-duration energy storage with high temporal, spatial, and technological resolution, enabling more detailed modeling for large-scale power systems.

24 POWER TRANSMISSION AND DISTRIBUTION

From zonal to nodal capacity expansion planning: Spatial aggregation impacts on a realistic test-case

Solving power system capacity expansion planning (CEP) problems at realistic spatial resolutions is computationally challenging. Thus, a common practice is to solve CEP over zonal models with low spatial resolution rather than over full-scale nodal power networks. Due to improvements in solving large-scale stochastic mixed integer programs, these computational limitations are becoming less relevant, and the assumption that zonal models are realistic and useful approximations of nodal CEP is worth revisiting. Here, this work is the first to conduct a systematic computational study on the assumption that spatial aggregation can reasonably be used for ISO-scale CEP. By considering a realistic, large-scale test network based on the state of California with over 8000 buses, we find that well-designed small spatial aggregations can yield good approximations but that coarser zonal models may result in large distortions of investment decisions, e.g., capacity under-investment of up to 41% for the lowest resolution model considered.

24 POWER TRANSMISSION AND DISTRIBUTION

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION

The Capacity Expansion Regional Feasibility (CERF) Model: High-Resolution Power Plant Siting

Abstract This presentation gives an overview of the geospatial power plant siting model CERF. CERF (Capacity Expansion Regional Feasibility) is an open source Python package developed under the Integrated Multisector Multiscale Modeling (IM3) Project at PNNL. This presentation covers an overview of how the CERF model works, walks through various power plant siting analyses, and discusses future research opportunities for the model. The CERF model can be accessed at https://github.com/IMMM-SFA/cerf. PNNL Information Release Number: PNNL-SA-207336 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

Mongird, Kendall [Pacific Northwest National Labor

STREAM: A technology planning and capacity expansion model for the industrial sector

The Strategic Technology Roadmapping and Energy, Environmental, and Economic Analysis Model—STREAM—is an optimization-based modeling tool and analysis framework to assist with strategic planning and technology investments of the industrial sector. This open-source framework is written in Julia using the JuMP package, which enables users to model future “pathways” for incumbent and future production technologies, costs, fuels and energy carriers, and energy and non-energy environmental impacts from industries as they transform in pursuit of a robust and competitive manufacturing sector. The model starts with an initial stock of industrial production technologies and assets at a facility level and then determines pathways that minimize cost, subject to an array of possible constraints on demand, market shares, environmental flows, and other exogenously specified operational considerations such as capacity utilization rates or regional energy costs. Key features of the framework include flexibility to model a wide range of industries and industrial technologies/processes at varying levels of granularity, ability to perform parametric sensitivity analyses, and ability to visualize model results using visualization objects.

capacity expansion

SERA: A Hydrogen Infrastructure Capacity Expansion Model

The Scenario Evaluation and Regionalization Analysis (SERA) model is an infrastructure planning optimization model that can guide hydrogen production, delivery, and end-use investment decisions and accelerate the adoption of low-cost hydrogen at scale, whether for fuel cell electric vehicles or non-transportation applications. In this talk, we will review the SERA model objective function as well as the data inputs and outputs. We will also look at a SERA case study identifying potential dispensed costs of hydrogen along major refueling corridors throughout the United States. In addition to the SERA model, Justin will also discuss his recent work for the Office of Manufacturing and Energy Supply Chains on electrolyzer supply chain readiness, and his work for the Hydrogen Fuel Cell Technologies Office and Environmental Protection Agency on the levelized cost of dispensed hydrogen for heavy-duty trucking.

30 DIRECT ENERGY CONVERSION