Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “builders”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

CHARMM-GUI Bicelle Builder : An Extension of Membrane Builder for Modeling and Simulation of Bicelle Systems

Membrane mimetics, such as detergent micelles, nanodiscs, and amphipol complexes, which can provide membrane-like environments while retaining small and soluble features, have been utilized to study membrane proteins. A bicelle, composed of varying lipids and detergents, is a useful membrane mimetic because the lipid-to-detergent ratio, the q-value, can be adjusted to alter the properties of the aggregate, including the thickness and size of the bicelle. However, building a bicelle model for modeling and simulation studies requires nontrivial efforts, even for experts. We introduce CHARMM-GUI Bicelle Builder, a web-based platform that can generate various all-atom bicelle systems via a graphical user interface with all available lipids and detergents in Membrane Builder. To illustrate and validate Bicelle Builder with practical systems, we have modeled and simulated pure bicelles consisting of 1,2-dimyristoyl-sn-glycero-3-phosphocholine (DMPC) lipids with 1,2-dihexanoyl-sn-glycero-3-phosphocholine (C6DHPC) detergents and protein–bicelle complexes, composed of DMPC with C6DHPC, foscholine-10 (FOS10), and lysophosphatidylcholine-12 (LPC12) detergents. Our simulation results indicate that Bicelle Builder can generate reliable and robust bicelle models with and without proteins that retain DMPC bilayer characteristics. Bicelle Builder is expected to help researchers better understand not only bicelles themselves but also atomistic-level structures of protein–bicelle complexes that are often difficult to access through experimental approaches.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Evaluation of the U.S. Department of Energy Challenge Home Program Certification of Production Builders

The purpose of this project was to evaluate integrated packages of advanced measures in individual test homes to assess their performance with respect to Building America Program goals, specifically compliance with the DOE Challenge Home Program. BSC consulted on the construction of five test houses by three Cold Climate production builders in three separate US cities. BSC worked with the builders to develop a design package tailored to the cost-related impacts for each builder. Therefore, the resulting design packages do vary from builder to builder. BSC provided support through this research project on the design, construction and performance testing of the five test homes. Overall, the builders have concluded that the energy related upgrades (either through the prescriptive or performance path) represent reasonable upgrades. The builders commented that while not every improvement in specification was cost effective (as in a reasonable payback period), many were improvements that could improve the marketability of the homes and serve to attract more energy efficiency discerning prospective homeowners. However, the builders did express reservations on the associated checklists and added certifications. An increase in administrative time was observed with all builders. The checklists and certifications also inherently increase cost due to: 1. Adding services to the scope of work for various trades, such as HERS Rater, HVAC contractor; 2. Increased material costs related to the checklists, especially the EPA Indoor airPLUS and EPA WaterSense(R) Efficient Hot Water Distribution requirement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Practices and Processes of Leading High Performance Home Builders in the Upper Midwest

The NorthernSTAR Building America Partnership team proposed this study to gain insight into the business, sales, and construction processes of successful high performance builders. The knowledge gained by understanding the high performance strategies used by individual builders, as well as the process each followed to move from traditional builder to high performance builder, will be beneficiant proposing more in-depth research to yield specific action items to assist the industry at large transform to high performance new home construction. This investigation identified the best practices of three successful high performance builders in the upper Midwest. In-depth field analysis of the performance levels of their homes, their business models, and their strategies for market acceptance were explored. All three builders commonly seek ENERGY STAR certification on their homes and implement strategies that would allow them to meet the requirements for the Building America Builders Challenge program. Their desire for continuous improvement, willingness to seek outside assistance, and ambition to be leaders in their field are common themes. Problem solving to overcome challenges was accepted as part of doing business. It was concluded that crossing the gap from code-based building to high performance based building was a natural evolution for these leading builders.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building America Best Practices Series - Volume 8: Builders Challenge Quality Criteria Support Document

The U.S. Department of Energy (DOE) has posed a challenge to the homebuilding industry—to build 220,000 high-performance homes by 2012. Through the Builders Challenge, participating homebuilders will have an easy way to differentiate their best energy-performing homes from other products in the marketplace, and to make the benefits clear to buyers. This document was prepared by Pacific Northwest National Laboratory for DOE to provide guidance to U.S. home builders who want to accept the challenge. To qualify for the Builders Challenge, a home must score 70 or less on the EnergySmart Home Scale (E-Scale). The E-scale is based on the well-established Home Energy Rating System (HERS) index, developed by the Residential Energy Services Network (RESNET). The E-scale allows homebuyers to understand – at a glance – how the energy performance of a particular home compares with the performance of others. To learn more about the index and HERS Raters, visit www.natresnet.org. Homes also must meet the Builders Challenge criteria described in this document. To help builders meet the Challenge, guidance is provided in this report for each of the 29 criteria. Included with guidance for each criteria are resources for more information and references for relevant codes and standards. The Builders Challenge Quality Criteria were originally published in Dec. 2008. They were revised and published as PNNL-18009 Rev 1.2 in Nov. 2009. This is version 1.3, published Nov 2010. Changes from the Nov 2009 version include adding a title page and updating the Energy Star windows criteria to the Version 5.0 criteria approved April 2009 and effective January 4, 2010. This document and other information about the Builders Challenge is available on line at www.buildingamerica.gov/challenge.

Builders Challenge↗

Evaluation of the U.S. Department of Energy Challenge Home Program Certification of Production Builders

The purpose of this project was to evaluate integrated packages of advanced measures in individual test homes to assess their performance with respect to Building America program goals, specifically compliance with the DOE Challenge Home Program. BSC consulted on the construction of five test houses by three cold climate production builders in three U.S. cities and worked with the builders to develop a design package tailored to the cost-related impacts for each builder. Also, BSC provided support through performance testing of the five test homes. Overall, the builders have concluded that the energy related upgrades (either through the prescriptive or performance path) represent reasonable upgrades. The builders commented that while not every improvement in specification was cost effective (as in a reasonable payback period), many were improvements that could improve the marketability of the homes and serve to attract more energy efficiency discerning prospective homeowners. However, the builders did express reservations on the associated checklists and added certifications. An increase in administrative time was observed with all builders. The checklists and certifications also inherently increase cost due to: adding services to the scope of work for various trades, such as HERS Rater, HVAC contractor; and increased material costs related to the checklists, especially the EPA Indoor airPLUS and EPA WaterSense® Efficient Hot Water Distribution requirement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Double or Triple? Factors Influencing the Window Purchasing Decisions of High-Performance Home Builders

To better understand why triple-pane windows are so slow to catch on and to inform the development and adoption of a new approach to insulated windows, thin triple-pane windows (or thin triples), Pacific Northwest National Laboratory (PNNL) conducted a market assessment of the window purchasing practices of new home builders in 2018-19. While there are several players who can impact the adoption of new residential window technologies, this report focuses strictly on home builders and the key part they play in new window technology adoption. A better understanding of the motivations, experiences, and concerns expressed by new home builders regarding window purchases could inform efforts to develop and deliver thin triple-pane windows and lead to their widespread acceptance in the marketplace. For the past several years, the DOE has supported the development of a thin triple-pane window that uses a center pane of thin glass and krypton gas fill to produce an insulated glass unit (IGU) with nearly the same weight and the same thickness as a double-pane IGU but with the performance of the heavier, thicker, standard triple-pane windows available today. To conduct this study, PNNL interviewed 29 home builders who have participated in the DOE Zero Energy Ready Home (ZERH) program. These builders include many of the most active builders in the DOE ZERH program. Together, they have constructed 2,534 of the 3,417 homes certified through the DOE program as of April 1, 2019. In 2018, they constructed an estimated 1,040 homes and purchased an estimated 17,800 windows. This report summarizes the key findings from these interviews.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗