End-Use Savings Shapes Measure Documentation: Boiler Replacement with Air-Source Heat Pump Boiler and Natural Gas Boiler Backup

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy's ResStock (™) and ComStock (™) models over the past three years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility end-use load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) measures. "Measures" refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility measure applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each timestep. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual subhourly energy consumption of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology and results of the baseline model are discussed in the final technical report of the End-Use Load Profiles project. This documentation focuses on a single end-use savings shape measure - boiler replacement with air-source heat pump boiler with natural gas boiler backup. This measure replaces natural gas boilers for HVAC application by air-source heat pump boilers when applicable and use natural gas boiler backup when the heat pump boiler could not operate due to outdoor air conditions which are below its cutoff temperature. This measure helps to quantify the decarbonization as well as the energy savings potential from the replacement. The measure resulted higher savings in natural gas consumption compared to the increase in electricity consumption, with a ratio of 3. The total natural gas energy consumption was reduced by 41%, whereas the total electricity consumption was increased by 5.3%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

End-Use Savings Shapes Measure Documentation: Boiler Replacement with Air-Source Heat Pump Boiler and Electric Boiler Backup

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy's ResStock TM and ComStock TM models over the past three years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility end-use load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) measures. "Measures" refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility measure applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each timestep. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual sub hourly energy consumption of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology and results of the baseline model are discussed in the final technical report of the End-Use Load Profiles project. This documentation focuses on a single end-use savings shape measure—boiler replacement by air-source heat pump boiler. This measure replaces space heating natural gas boilers by air-source heat pump boilers when applicable and helps quantify the decarbonization as well as the energy savings potential from the replacement. The measure resulted higher savings in natural gas consumption compared to the increase in electricity consumption, with a ratio of 2.9. The total natural gas energy consumption was reduced by 20%, whereas the total electricity consumption was increased by 2.5%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modelica-based system modeling for studying control-related faults in chiller plants and boiler plants serving large office buildings

System modeling is critical when studying operation faults in chiller plants and boiler plants. However, current fault models have difficulties faithfully representing the operation of chiller plants and boiler plants under the effects of those faults, especially the control-related ones. In this study, we present a systematic method to develop high-fidelity models for approximating the behaviors of chiller plants and boiler plants under faulty conditions. Compared to existing ones, the resulting fault models have two advantages: first, they better characterize the dynamic patterns in the system operation. In those models, control architecture and control logic are faithfully implemented. Thus, they can be used to study control-related faults, such as incorrect staging control due to sensor bias and mistuned feedback control. Second, they are readily extensible and can support large-scale investigations to explore different faulty conditions/scenarios. Those models are established in a hierarchical structure while modules in each layer can be redeclared and parameterized at upper layers. In such a case, modifications to the models can be realized through model modifiers and the process can be easily streamlined with scripts. We applied the proposed models in a comprehensive fault impact evaluation of the 13 control-related faults of chiller and boiler plants. In this evaluation, the proposed plant model is coupled with the EnergyPlus thermal load model to study the impact of various faulty scenarios. Based on the evaluation results, we identified the faults that have the most significant impacts on the operation of the chiller and boiler plants, respectively. We also found that the relationship between the impacts of the studied faults and the severity level of the faults are highly non-linear

Huang, Sen↗

A Pilot-Scale Evaluation of a New Technology to Control NO(x) Emissions from Boilers at KSC: Hydrogen Peroxide Injection into Boiler Flue Gases Followed by Wet Scrubbing of Acid Gases

Emissions of nitrogen oxides NO(x) are a significant problem in the United States. NO(x) are formed in any combustion process, therefore it is not surprising that NO(x) are emitted from the boilers at KSC. Research at UCF has shown (in the laboratory) that injecting H2O2 into hot simulated flue gases can oxidize the NO and NO2 to their acid gas forms, HNO2 and HNO3, respectively. These acid gases are much more water soluble than their counterparts, and theoretically can be removed easily by wet scrubbing. This technology was of interest to NASA, both for their boilers at KSC, and for their combustion sources elsewhere. However, it was necessary to field test the technology and to provide pilot-scale data to aid in design of full-scale facilities. Hence this project was initiated in May of 1996.

Cooper, C. David↗

Emission factors of industrial boilers burning biomass-derived fuels

Boilers are combustion devices that provide process heat and are integral to many industrial facilities. Historically, outside of the pulp and paper industry, most boilers burned fossil fuels, although interest in decarbonization has been leading to an increased use of renewable fuels in boilers. These boilers, including those in the biorefineries, are often large sources of air pollutant emissions, and the characterization of these emissions is critical to obtaining air permits and ensuring protection of the surrounding air quality. Several industrial boilers and new biorefineries allow utilization of biomass-derived fuels (e.g. wastewater sludge, lignin, etc.) produced during their operation as a fuel for the boiler to meet process energy needs. However, there is limited empirical data on emission factors for the burning of unconventional fuels, such as solid-gas mixtures containing biomass residues. To fill this gap, we carry out a comprehensive data survey, collecting information on emission factors for boilers burning either a single or a mixture of solid and gaseous biomass-derived fuels. We review multiple hard-to-obtain and unconventional data sources, such as air permit applications, stack test data, and industry-sponsored data collection efforts, to compile emission factors for biomass-derived fuels. We then compare this data with wood residue emission factors from the U.S. Environmental Protection Agency’s AP-42 emission factor database. Our results indicate that the emission factors for boilers burning unconventional fuels vary widely depending on the fuel composition, boiler type, and fuel characteristics. Overall, we find that median emission factors of selected biomass-derived fuels are typically lower than those of wood residue boilers in AP-42. The information collected herein could be useful to permitting agencies and industries utilizing boilers who may want to reduce the carbon impact of their facilities by combusting biomass-derived wastes for process energy needs, for more accurate emission estimation for permitting.

09 BIOMASS FUELS↗

Extended Low Load Boiler Operation to Improve Performance and Economics of an Existing Coal Fired Power Plant (Final Report)

The overall goal is to improve the performance and economics of existing coal fired power plants by extending low load boiler operation to lower loads than is currently achievable. The objective of this program is to develop and validate sensor hardware and analytical algorithms to lower plant operating expenses (OPEX) for the currently operating pulverized coal utility boiler fleet. Coal fired utility boilers are increasingly under grid dispatch pressure. In some cases, the coal fired cost of generation is noncompetitive with respect to natural gas generation and subsidized renewable sources. To remain profitable and remain fully compliant with existing environmental regulations, the installed coal fired fleet must find technologies which allow it to move into a more flexible cyclic load dispatch model. Today the installed coal fired utility fleet must be cost of generation competitive, fully emissions compliant, and responsive to the variability inherent in renewable energy generation sources. In the Phase I of the project, GE Steam Power, Inc. (GE) performed modeling of different operating scenarios for low load operation using an existing full plant dynamic model developed for a 660MW steam power plant. Sensors and analytic algorithms to enable a stable and steady coal supply for low load pulverizer operation were identified and tested at the Pulverizer Development Facility (PDF) at GE’s Clean Energy Center in Bloomfield, Connecticut. Sensors and analytic algorithms to enable stable combustion for low load operation were identified and tested at the 15 MWth Industrial Scale Burner facility (ISBF) at GE’s Clean Energy Center. A concept was developed to test the sensors and control algorithms, down selected after testing, at a full-scale coal fired power plant. A budget estimate was then developed, and the concept was implemented at an existing utility power plant. The specific objectives of the experimental work were to: • Identify and select sensors and analytic algorithms for monitoring coal pulverizer operation at lower loads to provide stable operation and appropriate coal fineness at lower coal throughput; Identify and select sensors and analytic algorithms for a Boiler Flame Stability Monitor to better balance air and fuel at each burner. This enables a reduction in a coal boiler’s safe low load power level while maintaining stable flame characteristics; Develop a concept in Phase I for low load operation of a full-scale power plant and develop a budget estimate for testing and execute the test plan at an existing plant in Phase II; Validate the capability of the extended low load boiler system to extend the minimum load operating point in a safe and reliable manner on an existing full-scale utility boiler. At the completion of this experimental study, GE has developed a set of sensors and analytic algorithms, down selected after testing, that have the potential to enable safe low load operation of a utility boiler. GE has also identified a host site for testing these identified sensors and analytic algorithms. GE has generated a full set of deliverables that provide sufficient information to proceed with the next step of testing at a host site. This includes a potential host site and budget estimate for concept testing at host site. In the Phase II of the project, a series of field tests were completed to validate the extended low load boiler operation, which consisted of detailed engineering, installation, commissioning, and testing the additional sensors and analytics for the coal-fired combustion system on an existing full-scale utility boiler. The optimization work has been supported by the host plant and endorsed by their engineering and operation staff.

01 COAL, LIGNITE, AND PEAT↗

Full Scale 3D Computational Model of the Industrial -Scale Coal Fired Boiler Performance for Temperature Sensor Installation Guidance

Abstract Nearly 30% of the electricity is generated by using coal as the primary fuel in the US. One of the major concerns in coal-fired power plants is the failure of boiler tubes that leads to unscheduled maintenance and has a huge economical and societal impact. High temperature flue gas along with ash pass over the boiler tubes, which over time leads to tube failure. Therefore, developing temperature sensors for harsh environments and install them for temperature sensing and boiler tube lifetime prediction is an urgent need. On the side of sensor development, the location of the sensor installation is important for stable sensing performance and easy calibration. In this study, computational fluid dynamics and heat transfer modeling are adopted to establish a full-scale 3-dimensional model of a coal-fired boiler to investigate the flue gas temperature distribution within the boiler and identify the proper locations for sensor installation. We proposed three criteria to select the temperature sensor installation location: (1) select the boiler tube panel away from the sidewalls, (2) select the boiler tube section closer to the top wall of the boiler; and (3) select the boiler tube on the back of the boiler panel (not directly facing the flue gas flow). In these regions, the flue gas temperature is stable, providing an ideal environment for stable temperature sensing and calibration.

Gupta, Tanuj↗

Real-time sensor measurements to evaluate impacts of load cycling on high-temperature fire-side corrosion in a PC boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Full-scale Demonstration of Multi-process Sensor at a Cycling PC-fired Boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Test and Validate Distributed Coaxial Cable Sensors for in situ Condition Monitoring of Coal-Fired Boiler Tubes

This project aims to test, validate, and advance the technology readiness level (from TRL5 to TRL7) of a novel low-cost distributed stainless-steel/ceramic coaxial cable sensing (SSC-CCS) technology for in situ monitoring of the boiler tube temperature in existing coal-fired power plants. The novel SSC-CCS sensing technology and associated condition-based monitoring (CBM) software to be demonstrated in this project will lead to an improved understanding of the boiler tube failure mechanisms and a prognostic system to improve the overall performance, reliability, and flexibility of the nation’s coal-fired power plant fleet. A boiler tube monitoring system with distributed coaxial cable temperature sensors and a sensor acquisition system was constructed. The high-temperature coaxial cable sensor with a length of 1.3m was made by using a quartz tube (1mm inner diameter (ID) and 6mm outer diameter (OD)) to concentrically separate a 304 stainless-steel (SS) rod (1mm OD) and SS tube (7.94mm OD and 6.16mm ID). The sensor acquisition system includes a vector network analyzer (VNA), a radio frequency (RF) power amplifier, multiple switches and a USB hub. The distributed stainless-steel quartz coaxial cable sensor (SSQ-CCS) had a linear response to temperature with a resolution uncertainty of σ = 0.77℃. To withstand the harsh conditions of 3,300 steam pressures and 800℃ high temperatures, the sensor was shielded by a protective tube made of the same material as the boiler tube. The protection tube had an OD of 1.5 inches and a thickness of 0.25 inches. In the laboratory tests, the sensor showed good sensitivity and fast response. The drift was bounded between +0.33% and -0.67% during a test at 600℃ for 350 hours, indicating good stability of the sensor. A field test was conducted where four sensors were welded on four superheat tubes (SH-Ts) at a coal-fired power station over 400 days. Conventional thermocouples were welded to the superheater tubes alongside the coaxial cable sensors for the purpose of comparison. Two sensors were capable of distributed sensing, with three multiplexed sensing sections. The other two sensors were single section. During the 400-day test period, the power plant experienced startups and shutdowns. At the steady state operations, the temperature of the boiler tube is about 600℃ (1112°F). The sensors recorded the entire coal-firing processes (start-up, steady state, and shut-down) and the glitch event. A GSM modem and a Watchdog were added to the system to ensure reliable data recording. The GSM modem sent daily messages to plant managers and Clemson team to inform the status of the sensor system. If the system was not normally working, the Watchdog would reboot the system automatically. The new coaxial cable based distributed sensing technology has been proven to be successful in both laboratory and field tests. A comprehensive four-stage multi-physics computational framework has been developed to assist the design, optimization, installation, and operation of SSQ-CCS. With the consideration of various operation conditions, we predict the distributions of flue gas temperatures within coal-fired boilers, the temperature correlation between the boiler tube and SSQ-CCS, and the safety of SSQ-CCS. A conditional-based monitoring system is implemented as well. The computational framework developed in this work can guide the future operation of coal-fired plants and other power plants for the safety prediction of boiler operations.

01 COAL, LIGNITE, AND PEAT↗

Modular Staged Pressurized Oxy-Combustion (SPOC) Power Plant for Coal and Biomass – Integration of Combustor Boiler and DCC

Utilities and grid operators worldwide are under significant pressure to incorporate intermittent renewable sources while strategizing on how to maintain the necessary stability and reliability of the grid. The development of a power plant which will be capable of flexible operation to meet the needs of the grid as more intermittent sources like wind and solar energy are incorporated is key to maintain the reliability of the grid. Through the use of innovative and cutting-edge technologies that improve efficiency and reduce carbon emissions, and being small compared to today's conventional utility-scale power plants, the modular Staged, Pressurized Oxy-Combustion (SPOC) process envisioned by and under development at Washington University in St. Louis (WUSTL) has the potential to achieve these goals. Specifically, the process offers: 1) a modular plant design that allows for better operational flexibility; 2) the utilization of fuel-staging and pressurized oxy-combustion, resulting in smaller plant size, improved plant efficiency, and reduced costs for pollutant and CO2 removal compared to traditional power plants with post-combustion capture technology; and 3) the use of small modular boilers and pollutant removal units that can be constructed off-site leading to reduced capital costs for the plant. WUSTL is advancing the development of the critical components for the SPOC power plant, including the integrated combustor-boiler system and the direct contact cooler. To demonstrate the boiler convective section and to obtain critical data for commercial-scale pressurized boiler design, a simulated convective heat transfer boiler test section was designed and integrated with the combustor (radiant section). A direct contact cooler (DCC) was integrated with the combustor-boiler to demonstrate the dynamic operation of the integrated system and the performance of the DCC, including the efficiency for simultaneous removal of NOx and SOx. This talk will present an update on the evaluation of the critical components for system integration, including heat transfer data from the simulated boiler, scrubbing efficiency for the DCC under different operating conditions, and CFD modeling and validation for burner and boiler development.

Magalhaes, Duarte↗

Oxy-combustion process with modular boiler design

A modular boiler system for implementing fuel combustion is provided. The system includes a first boiler and a second boiler of a plurality of boilers, an oxygen input unit, a fuel input unit, a recycled flue gas input unit, and a flue gas separator. The first boiler receives oxygen from the oxygen input unit, fuel from the fuel input unit, and recycled flue gas from the recycled flue gas input unit. The first boiler outputs intra-system flue gas. The flue gas separator separates the intra-system flue gas into a first and second flue gas stream, transfers the first flue gas stream to the second boiler, and transfers the second flue gas stream to a gas cleaning system. The second boiler receives oxygen from the oxygen input unit, fuel from the fuel input unit, and the first flue gas stream from the flue gas separator.

Axelbaum, Richard L.↗

Creating an Advanced Sensor Network to calculate real-time, mass-weighted flue gas composition and air heater leakage of a coal-fired utility boiler under dynamic operating conditions

Utilization of renewable energy sources to minimize the environmental impact of energy production has changed the way utility boilers operate, requiring frequent load cycling between full load and partial loads as low as 30%. Dynamic operation of coal-fired utility boilers significantly reduces boiler efficiency when compared to steady state at full load. Data-driven plant optimization has shown success with coal-fired utility boilers under dynamic operating conditions. The purpose of this work was to create an Advanced Sensor Network (ASN) to provide more extensive real-time data to inform dynamic plant optimization of Net Unit Heat Rate (NUHR). The ASN consists of gas sampling grids in the convective pass of the boiler and downstream of the air heater. These sampling grids allow for quantification of spatial variation of flue gas within the boiler and calculation of mass-weighted composition of flue gas through the combination of composition, velocity, and temperature measurements. The comparison of O 2 between the inlet and outlet of the air heater is used to calculate air leakage in real time. Flue gas composition and air heater leakage are both important factors in boiler efficiency and NUHR. Further, the results of this work support the value of mass-weighted averages for determining flue gas composition accurately. The measurements from the ASN show increased composition stratification during dynamic operation, with an average standard deviation 38% higher than observed during steady-state operation. Air heater leakage was also observed to increase from 2.8% to 5.1% following a load change. Prior to the installation of the ASN, these data would not have been available for dynamic control. These real-time data will be leveraged to calculate and optimize for NUHR during dynamic operation in future work.