Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “blower door”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Blower-door techniques for measuring interzonal leakage

Abstract The standard blower door test methods, such as ASTM E779, describe how to use a single blower door to determine the total leakage of a single-zone structure such as a detached single-family home. There are no standard test methods for measuring interzonal leakage in a two-zone or multi-zone building envelope such as might be encountered in with an attached garage or in a multifamily building. Some practitioners have been using techniques that involve making multiple measurements with a single blower door as well as combined measurements using multiple blower doors. Even for just two zones there are dozens of combinations of one-door and two-door test protocols that could conceivably be used to determine the interzonal air tightness. We examined many of these two-zone configurations using both simulation and measured data to estimate the accuracy and precision of each technique for realistic measurement scenarios. We also considered the impact of taking measurements at a single pressure versus over multiple pressures. We compared the various techniques and evaluated them for specific uses. Some techniques work better in one leakage regime; some are more sensitive to wind and other noise; some are more suited to determining only a subset of the leakage values. This paper makes recommendations on which techniques to use or not use for various cases and provides data that could be used to develop future test methods.

99 GENERAL AND MISCELLANEOUS↗

Predicting Envelope Leakage in Attached Dwellings (Fact Sheet)

The most common method of measuring air leakage is to perform single (or solo) blower door pressurization and/or depressurization test. In detached housing, the single blower door test measures leakage to the outside. In attached housing, however, this "solo" test method measures both air leakage to the outside and air leakage between adjacent units through common surfaces. Although minimizing leakage to neighboring units is highly recommended to avoid indoor air quality issues between units, reduce pressure differentials between units, and control stack effect, the energy benefits of air sealing can be significantly overpredicted if the solo air leakage number is used in the energy analysis. Guarded blower door testing is more appropriate for isolating and measuring leakage to the outside in attached housing. This method uses multiple blower doors to depressurize adjacent spaces to the same level as the unit being tested. Maintaining a neutral pressure across common walls, ceilings, and floors acts as a "guard" against air leakage between units. The resulting measured air leakage in the test unit is only air leakage to the outside. Although preferred for assessing energy impacts, the challenges of performing guarded testing can be daunting.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Technology Solutions Case Study: Predicting Envelope Leakage in Attached Dwellings

The most common method of measuring air leakage is to perform single (or solo) blower door pressurization and/or depressurization test. In detached housing, the single blower door test measures leakage to the outside. In attached housing, however, this “solo” test method measures both air leakage to the outside and air leakage between adjacent units through common surfaces. In an attempt to create a simplified tool for predicting leakage to the outside, Building America team Consortium for Advanced Residential Buildings (CARB) performed a preliminary statistical analysis on blower door test results from 112 attached dwelling units in four apartment complexes. Although the subject data set is limited in size and variety, the preliminary analyses suggest significant predictors are present and support the development of a predictive model. Further data collection is underway to create a more robust prediction tool for use across different construction types, climate zones, and unit configurations.

algorithm↗

Multifamily Envelope Leakage Model

“The cost for blower testing is high, because it is labor intensive, and it may disrupt occupants in multiple units. This high cost and disruption deter program participants, and dissuade them from pursuing energy improvements that would trigger air leakage testing, such as improvements to the building envelope.” This statement found in a 2012 report by Heschong Mahone Group for several California interests emphasizes the importance of reducing the cost and complexity of blower testing in multifamily buildings. Energy efficiency opportunities are being bypassed. The cost of single blower testing is on the order of $300. The cost for guarded blower door testing—the more appropriate test for assessing energy savings opportunities—could easily be six times that, and that’s only if you have the equipment and simultaneous access to multiple apartments. Thus, the proper test is simply not performed. This research seeks to provide an algorithm for predicting the guarded blower door test result based upon a single, total blower door test.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Experimental Plan for the Vermiculite Study

Homes in which vermiculite, which can contain asbestos, is present are often deferred under the DOE Weatherization Assistance Program (WAP) because of uncertainty in how to safely weatherize such homes from a client and worker perspective and the potential costs associated with alternative approaches. Recognizing this situation, the Department of Energy (DOE) tasked the Oak Ridge National Laboratory (ORNL) to perform a research project that scientifically identifies the asbestos exposure risks in weatherizing homes with existing vermiculite insulation. Current approaches being used by Grantees and Subgrantees to weatherize homes with existing vermiculite insulation were identified as part of the development of this experimental plan based on a review of Grantee Health and Safety Plans and communications with weatherization program staff from seven states. Other than deferral, these approaches include the following:1.) Abating (i.e., removing) the existing vermiculite using funding sources other than WAP (e.g., state funds, utility funds, the Zonolite Attic Insulation Trust Fund, and possibly homeowner contributions) because abatement is not allowed using WAP funds per Weatherization Program Notice (WPN) 17-7. 2.) Weatherizing the house as normal after testing reveals that the vermiculite contains less than 1% asbestos. 3.) Avoiding areas of the house where vermiculite is installed and weatherizing the remaining areas of the house as normal. 4.) Encapsulating the existing vermiculite insulation in an attic by blowing cellulose or other insulation over it. 5.) Weatherizing the areas of the house where vermiculite is installed using unique/alternative approaches developed specifically for that house. Blower door testing is also impacted by the presence of vermiculite due to the concern of bringing asbestos fibers into the space. Some states address this by performing pressurized blower door tests, whereas other states prohibit blower door testing entirely when vermiculite is present. This research project will focus on gathering data on home occupant and weatherization worker exposures to asbestos before, during, and/or after the weatherization of the homes containing vermiculite insulation using five of the six approaches identified above. Abatement of the existing vermiculite insulation will not be studied because it is not allowed using WAP funding per WPN 17-7 and, thus, is not a sustainable approach for WAP.

36 MATERIALS SCIENCE↗

Predicting Envelope Leakage in Attached Dwellings

The most common method for measuring air leakage is to use a single blower door to pressurize and/or depressurize the test unit. In detached housing, the test unit is the entire home and the single blower door measures air leakage to the outside. In attached housing, this 'single unit', 'total', or 'solo' test method measures both the air leakage between adjacent units through common surfaces as well air leakage to the outside. Measuring and minimizing this total leakage is recommended to avoid indoor air quality issues between units, reduce energy losses to the outside, reduce pressure differentials between units, and control stack effect. However, two significant limitations of the total leakage measurement in attached housing are: for retrofit work, if total leakage is assumed to be all to the outside, the energy benefits of air sealing can be significantly over predicted; for new construction, the total leakage values may result in failing to meet an energy-based house tightness program criterion. The scope of this research is to investigate an approach for developing a viable simplified algorithm that can be used by contractors to assess energy efficiency program qualification and/or compliance based upon solo test results.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Predicting Envelope Leakage in Attached Dwellings

The most common method for measuring air leakage is to use a single blower door to pressurize and/or depressurize the test unit. In detached housing, the test unit is the entire home and the single blower door measures air leakage to the outside. In attached housing, this 'single unit', 'total', or 'solo' test method measures both the air leakage between adjacent units through common surfaces as well air leakage to the outside. Measuring and minimizing this total leakage is recommended to avoid indoor air quality issues between units, reduce energy losses to the outside, reduce pressure differentials between units, and control stack effect. However, two significant limitations of the total leakage measurement in attached housing are: for retrofit work, if total leakage is assumed to be all to the outside, the energy benefits of air sealing can be significantly over predicted; for new construction, the total leakage values may result in failing to meet an energy-based house tightness program criterion. The scope of this research is to investigate an approach for developing a viable simplified algorithm that can be used by contractors to assess energy efficiency program qualification and/or compliance based upon solo test results.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Challenges of Achieving 2012 IECC Air Sealing Requirements in Multifamily Dwellings

​While previous versions of the International Energy Conservation Code (IECC) have included provisions to improve the air tightness of dwellings, for the first time, the 2012 IECC mandates compliance verification through blower door testing. Simply completing the Air Barrier and Insulation Installation checklist through visual inspection is no longer sufficient by itself. In addition, the 2012 IECC mandates a significantly stricter air sealing requirement. In Climate Zones 3 through 8, air leakage may not exceed 3 ACH50, which is a significant reduction from the 2009 IECC requirement of 7 ACH50. This requirement is for all residential buildings, which includes low-rise multifamily dwellings. While this air leakage rate requirement is an important component to achieving an efficient building thermal envelope, currently, the code language doesn't explicitly address differences between single family and multifamily applications. In addition, the 2012 IECC does not provide an option to sample dwellings for larger multifamily buildings, so compliance would have to be verified on every unit. With compliance with the 2012 IECC air leakage requirements on the horizon, several of CARB's multifamily builder partners are evaluating how best to comply with this requirement. Builders are not sure whether it is more practical or beneficial to simply pay for guarded testing or to revise their air sealing strategies to improve compartmentalization to comply with code requirements based on unguarded blower door testing. This report summarizes CARB's research that was conducted to assess the feasibility of meeting the 2012 IECC air leakage requirements in 3 multifamily buildings.

&#8203↗

Challenges of Achieving 2012 IECC Air Sealing Requirements in Multifamily Dwellings

While previous versions of the International Energy Conservation Code (IECC) have included provisions to improve the air tightness of dwellings, for the first time, the 2012 IECC mandates compliance verification through blower door testing. Simply completing the Air Barrier and Insulation Installation checklist through visual inspection is no longer sufficient by itself. In addition, the 2012 IECC mandates a significantly stricter air sealing requirement. In Climate Zones 3 through 8, air leakage may not exceed 3 ACH50, which is a significant reduction from the 2009 IECC requirement of 7 ACH50. This requirement is for all residential buildings, which includes low-rise multifamily dwellings. While this air leakage rate requirement is an important component to achieving an efficient building thermal envelope, currently, the code language doesn't explicitly address differences between single family and multifamily applications. In addition, the 2012 IECC does not provide an option to sample dwellings for larger multifamily buildings, so compliance would have to be verified on every unit. With compliance with the 2012 IECC air leakage requirements on the horizon, several of Consortium for Advanced Residential Building's (CARB’s) multifamily builder partners are evaluating how best to comply with this requirement. Builders are not sure whether it is more practical or beneficial to simply pay for guarded testing or to revise their air sealing strategies to improve compartmentalization to comply with code requirements based on unguarded blower door testing. This report summarizes CARB's research that was conducted to assess the feasibility of meeting the 2012 IECC air leakage requirements in 3 multifamily buildings.

2012 IECC↗

Empirical Validation of Multi-Zone HVAC System Model: Evaluation of Existing Infiltration Models used in Building Energy Simulation

Infiltration can have a significant impact on building loads. Studies have shown that infiltration can account for 15-40% of annual space conditioning needs in commercial buildings (Emmerich et al. 2019; Younes et al. 2012). The driving force of infiltration is the pressure difference across the building envelope caused by wind, the stack effect (known as buoyancy effect), and the operation of ventilation equipment. Wind pressure is governed by wind direction, speed, building shape, and other structures around the building. The stack effect is a function of the building height and air density differences of ambient air (Han, 2015). The effect of wind is dominant in low-rise residential buildings, and the stack effect is dominant in highrise buildings (ASHRAE 2017). In building energy simulation programs (e.g., EnergyPlus), various empirical infiltration models (e.g., the effective leakage area model, the flow coefficient model) are available to simulate infiltration rates. To help users in selecting a proper infiltration model for modeling of the two-story Flexible Research Platform (FRP), the team evaluates the existing infiltration models in EnergyPlus based on field measurements from the FRP. The blower door and tracer gas decay tests were performed in the FRP. The blower door test result was used to estimate input parameters required in the infiltration models. The actual infiltration rates were estimated with the tracer gas decay test results.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building America Case Study: Predicting Envelope Leakage in Attached Dwellings (Fact Sheet)

'The cost for blower testing is high, because it is labor intensive, and it may disrupt occupants in multiple units. This high cost and disruption deters program participants, and dissuades them from pursuing energy improvements that would trigger air leakage testing, such as improvements to the building envelope.' This statement found in a 2012 report by Heschong Mahone Group emphasizes the importance of reducing the cost and complexity of blower testing in multifamily buildings. Energy efficiency opportunities are being bypassed. The cost of single blower testing is on the order of $300. The cost for guarded blower door testing, the more appropriate test for assessing energy savings opportunities, could easily be six times that and that's only if you have the equipment and simultaneous access to multiple apartments. Thus, the proper test is simply not performed. The objective of the 2013 research project was to develop the model for predicting fully guarded test results (FGT), using unguarded test data and specific building features of apartment units. The model developed has a coefficient of determination R2 value of 0.53 with a root mean square error (RMSE) of 0.13. Both statistical metrics indicate that the model is relatively strong. When tested against data that was not included in the development of the model, prediction accuracy was within 19%, which is reasonable given that seasonal differences in blower door measurements can vary by as much as 25%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Testing of Compartmentalization Methods for Multifamily Construction

The 2012 IECC has an airtightness requirement of 3 air changes per hour at 50 Pascals test pressure for both single-family and multifamily construction in Climate Zones 3-8. Other programs (LEED, ASHRAE 189, ASHRAE 62.2) have similar or tighter compartmentalization requirements, driving the need for easier and more effective methods of compartmentalization in multifamily buildings. Builders and practitioners have found that fire-resistance rated wall assemblies are a major source of difficulty in air sealing/compartmentalization, particularly in townhouse construction. This problem is exacerbated when garages are “tucked in” to the units and living space is located over the garages. In this project, Building Science Corporation examined the taping of exterior sheathing details to improve air sealing results in townhouse and multifamily construction, when coupled with a better understanding of air leakage pathways. Current approaches are cumbersome, expensive, time consuming, and ineffective; these details were proposed as a more effective and efficient method. The effectiveness of these air sealing methods was tested with blower door testing, including “nulled” or “guarded” testing (adjacent units run at equal test pressure to null out inter-unit air leakage, or “pressure neutralization”). Pressure diagnostics were used to evaluate unit-to-unit connections and series leakage pathways (i.e., air leakage from exterior, into the fire-resistance rated wall assembly, and to the interior).

42 ENGINEERING↗

Training in Building Audit Technologies

In 2011, the Tribe proposed and was awarded the Training in Building Audit Technologies grant from the DOE in the amount of $55,748 to contract for training programs for infrared cameras, blower door technology applications and building systems. The coursework consisted of; Infrared Camera Training: Level I - Thermal Imaging for Energy Audits; Blower Door Analysis and Building-As-A-System Training, Building Performance Institute (BPI) Building Analyst; Building Envelope Training, Building Performance Institute (BPI) Envelope Professional; and Audit/JobFLEX Tablet Software. Competitive procurement of the training contractor resulted in lower costs, allowing the Tribe to request and receive DOE approval to additionally purchase energy audit equipment and contract for residential energy audits of 25 low-income Tribal Housing units. Sault Tribe personnel received field training to supplement the classroom instruction on proper use of the energy audit equipment. Field experience was provided through the second DOE energy audits grant, allowing Sault Tribe personnel to join the contractor, Building Science Academy, in conducting 25 residential energy audits of low-income Tribal Housing units.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development and experimental evaluation of new building air leakage measurement methods: measurement of interior air leaks and comparison to conventional methods

Building air leaks (both through exterior and interior surfaces) can have a significant impact on energy consumption, indoor air quality, fire safety, and moisture accumulation affecting structural durability. Blower door testing has been used to measure leaks in buildings, but commonly used testing methods do not directly measure interior leaks. In this paper, new testing methods (guarded interior test and zonal multipoint pressure testing method) are presented that directly measure these interior leaks, utilizing common blower door equipment for both single and multi-point testing. Furthermore, these new methods are compared to conventional methods in terms of the information provided, limitations and time/effort needed. In addition, building leak measurement results are analyzed to reveal a) coupling between power law model values (exponent and coefficient) for an ensemble of buildings, b) the error in using single point testing when estimating low pressure leakage, and c) how building power law models vary from low to high pressure ranges.

99 GENERAL AND MISCELLANEOUS↗

Experimental and data-driven characterization of window-induced air leakage in residential buildings

Windows contributes up to 40% of envelope heat losses and around 9% of total building energy consumption due to air leakage. In the U.S., 48 million homes still use single-pane windows. Although the U.S. has an estimated 1.4 billion windows in its building stock and about 24 million windows are installed annually, only around 29 million individual window replacements (∼2%) occur each year. To address this gap, this study generates empirical evidence by (1) evaluating the contribution of windows to whole-building air leakage in 20 residential buildings using blower door tests before and after window replacement and (2) assessing whether building and window characteristics influence the measured change. Most simulation studies assume that replacing windows not only lowers the U-factor but also reduces air leakage by 10–20%. However, this assumption lacks empirical validation, highlighting the need for experimental analysis of air leakage specifically associated with windows. Using blower door tests in accordance with ASTM E779–19, the results indicated an average reduction in air infiltration of 6.1% within the range of 0.5–19.30% across all buildings and no significant correlations were found between air leakage improvements and any building/window characteristics. This research aims to help homeowners, and energy modelers to provide empirical data on importance of upgrading to more energy-efficient windows, supporting energy-efficient building standards.

Air leakage↗

Automated Air Sealing Demonstration: Denver Federal Center Building 40

This project aimed to demonstrate building airtightness achieved by automated air sealing in a commercial building setting. The automated air sealing demonstrated in this project uses a modified blower door to pressurize and distribute the sealing aerosol to achieve the required building airtightness. To demonstrate this technology, Building 40 at the Denver Federal Center, a federally owned campus under the jurisdiction, custody and control of the U.S. General Services Administration (GSA), was selected for testing (Figure 2). This building is currently undergoing several retrofit projects, including increasing insulation, installing high-performance windows, and adding advanced equipment, control systems, and automated air sealing. This demonstration project involved installing automated air sealing and measuring the improvements in the building's airtightness. The automated air sealing was installed over two days by AeroBarrier, the vendor. An external blower door test contractor measured the airtightness of the demonstration space before and after air sealing. The new airtightness value and the percentage increase in airtightness were used to evaluate the energy savings potential of automated air sealing. These airtightness values were used to compute the energy savings and CO 2 emissions reduction for different climate zones, building types, and initial airtightness conditions. In addition, the heating, ventilation and air conditioning (HVAC) load reduction attributable to the reduced building air leakage was studied. This study included research to determine the cost and time reduction of automated air sealing. Finally, the automated air sealing performance was evaluated qualitatively using a focus group discussion that included GSA and Bristol, the general contractor. The installation has shown the demonstration site, with a floor size of 4,462 ft 2 , air leakage has reduced by more than 50% in less than 7 hours, including preparation, site sealing, and cleanup. The performance objectives were classified as quantitative or qualitative based on the evaluation metrics used to assess the project’s success. The key performance objectives for this project were the level of airtightness achieved, the time and cost required to perform the sealing, and the HVAC load reduction attributable to air sealing. Table 1 shows the quantitative performance objectives.

42 ENGINEERING↗

Airtightness of Commercial Building Envelopes: Where are we and where could we go?

Air leakage in commercial buildings accounts for about one quad of energy annually; therefore, efforts have been put in place to decrease this energy penalty. Data from blower door tests indicate that the airtightness of new building envelopes has been improving in certain niches because of requirements set by local governments and the US Army Corps of Engineers (USACE), as well as the availability of air barrier consultants. Advances in air barrier technologies and construction practices have also contributed to these improvements. Even with these promising results, efforts have been slow to revise building codes so that they establish a maximum air leakage rate requirement for new buildings and envelope retrofits. This paper summarizes current techniques used to conduct whole building air leakage tests, where these tests are mandatory, how the air leakage rate of buildings appears to be decreasing, and what stakeholders think about blower door tests. The paper also includes the nationwide source energy and financial savings potential for standalone retail buildings that were calculated using a newly developed simulation tool that more accurately estimates the effect of air leakage on energy use.

Hun, Diana E.↗

Building America Case Study: Challenges of Achieving 2012 IECC Air Sealing Requirements in Multifamily Dwellings, Upstate New York (Fact Sheet)

While previous versions of the International Energy Conservation Code (IECC) have included provisions to improve the air tightness of dwellings, for the first time, the 2012 IECC mandates compliance verification through blower door testing. Simply completing the Air Barrier and Insulation Installation checklist through visual inspection is no longer sufficient by itself. In addition, the 2012 IECC mandates a significantly stricter air sealing requirement. In Climate Zones 3 through 8, air leakage may not exceed 3 ACH50, which is a significant reduction from the 2009 IECC requirement of 7 ACH50. This requirement is for all residential buildings, which includes low-rise multifamily dwellings. While this air leakage rate requirement is an important component to achieving an efficient building thermal envelope, currently, the code language doesn't explicitly address differences between single family and multifamily applications. In addition, the 2012 IECC does not provide an option to sample dwellings for larger multifamily buildings, so compliance would have to be verified on every unit. With compliance with the 2012 IECC air leakage requirements on the horizon, several of CARB's multifamily builder partners are evaluating how best to comply with this requirement. Builders are not sure whether it is more practical or beneficial to simply pay for guarded testing or to revise their air sealing strategies to improve compartmentalization to comply with code requirements based on unguarded blower door testing. This report summarizes CARB's research that was conducted to assess the feasibility of meeting the 2012 IECC air leakage requirements in 3 multifamily buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗