Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “battery energy storage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Regional Power System Black Start with Run-of-river Hydropower Plant and Battery Energy Storage

Battery energy storage systems (BESSs) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various critical services to the power grid. This paper presents the real-world experience of using a megawatt-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to restore a regional power system. To demonstrate this, we carry out power-hardware-in-the-loop experiments integrating an actual GFL- or GFM-controlled BESS and a load bank. Both the simulation and experimental results presented in this paper show the different roles of GFL- or GFM-controlled BESS in power system black starts. The results provide further insight for system operators on how GFL- or GFM-controlled BESS can enhance grid stability and how an ROR hydropower plant can be converted into a black-start-capable unit with the support of a small-capacity BESS. The results show that an ROR hydropower plant combined with a BESS has the potential of becoming one of enabling elements to perform bottom-up black-start schemes as opposed to conventional bottom-down method, thus enhancing the system resiliency and robustness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Simulation of the Interaction Between Flywheel Energy Storage and Battery Energy Storage on the International Space Station

Replacement of one module of the battery charge discharge unit (BCDU) of the International Space Station (ISS) by a flywheel energy storage unit (FESU) is under consideration. Integration of these two dissimilar systems is likely to surface difficulties in areas of system stability and fault protection. Other issues that need to be addressed include flywheel charge and discharge profiles and their effect on the ISS power system as well as filter sizing for power Ability purposes. This paper describes a SABER based simulation to study these issues.

Trouong, Long V.↗

Demonstration of Power System Black Start with Hydropower Generator and Battery Energy Storage: Preprint

Battery energy storage systems (BESS) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various services to the grid. This paper presents the hardware demonstration and characterization of using a utility-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to perform a bottom-up power system black start that enhances power systems' resiliency. ROR hydropower plants are generally not used for power system restoration due to their frequency instability during islanded operation; however, BESS with droop control can provide critical damping to convert a ROR hydropower generator into a blackstart- capable unit. To demonstrate this, we carry out hardware experiments at the megawatt-scale integrating a synchronous generator driven by a dynamometer, an actual GFL/GFM BESS, a medium-voltage impedance network, and a load bank. The demonstration shows the different roles of BESS with GFL and GFM control in power system restoration. GFL BESS can suffer from high-frequency oscillations, even instability, depending on the droop control gain and loading condition. The results provide further insights for system operators on how GFL- or GFMcontrolled BESS can enhance grid stability and how hydro-BESS hybrids can operate as a black-start-capable unit. The presented experimental results are also a valuable resource to understand the different stability characteristics of real-world BESS with different control modes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Examination of entrainment, combustibility, and heat transfer due to cell venting inside simplified battery energy storage enclosures

Battery energy storage systems (ESS) assembled of modules containing lithium-ion batteries can pose fire and explosion hazards during thermal runaway because vented gases may accumulate, combust, or escape enclosures. Here, we propose a prototypical configuration composed of the main components of an ESS rack, where modules are represented as rectangles within an enclosure and vent gas is injected steadily through the top of a module. This idealized geometry allows for exploration of how rack-level characteristics can influence smaller single-cell or module-level scales. Through this geometry, we conduct numerical simulations to understand how variations in the vent velocity, temperature, and vertical location affect entrainment rates, fraction of uncombusted fuel, rich-gas coverage, and heat flux to other modules. At lower vent velocities and vertical positions, buoyancy drives enough entrainment and mixing to react with most of the vent gases on the converging plenum. As jet momentum increases and/or buoyancy decreases via higher vent position in the rack, vent gases can propagate into and burn in the divergence plenum. Heat flux to the impinged module scales strongly with vent momentum and temperature, while heat transfer to upper modules peaks when flames in the diverging plenum reach the surface and declines when combustion is suppressed.

Computational fluid dynamics↗

A Statistical Analysis of the Economic Drivers of Battery Energy Storage in Commercial Buildings: Preprint

There is significant interest in using battery energy storage systems (BESS) to reduce peak demand charges, and therefore the life cycle cost of electricity, in commercial buildings. This paper explores the drivers of economic viability of BESS in commercial buildings through statistical analysis. A sample population of buildings was generated, a techno-economic optimization model was used to size and dispatch the BESS, and the resulting optimal BESS sizes were analyzed for relevant predictor variables. Explanatory regression analyses were used to demonstrate that peak demand charges are the most significant predictor of an economically viable battery, and that the shape of the load profile is the most significant predictor of the size of the battery.

25 ENERGY STORAGE↗

Converter-Based Emulation of Battery Energy Storage Systems (BESS) for Grid Applications

Battery energy storage systems (BESSs) tend to be too costly, restrictive, and require high maintenance for experimental use, but power system tests often need their representation. As a solution, we propose an all-in-one, reconfigurable BESS emulation tool for grid applications that only requires one three-phase voltage-source converter. This emulator provides chemistry-specific battery behavior like previous work, but it also includes the BESS's power electronics interface and control as well as automatic frequency and voltage support functions for the attached power system. Thus, it allows simple, plug-and-play BESS emulation for grid applications. Here, this paper details the construction, verification, and use of the BESS emulator in an existing grid testbed and concludes that it provides an inexpensive, easy-to-use alternative to using real BESSs in power system experiments.

25 ENERGY STORAGE↗

Photovoltaic Plant and Battery Energy Storage System Integration at NREL's Flatirons Campus

Although utility-scale solar photovoltaic (PV) power plants are becoming a cost-effective energy resource, there is belief within the energy industry that the increasing penetrations of PV technologies could potentially impact grid reliability. This is due to the variability across timescales, the forecast uncertainty of the solar energy resource, and the impacts on both distribution and transmission systems. This can cause utilities to severely limit PV installations or to assign PV integration costs when considering a least-cost portfolio of resources. As California and other regions in the United States are marching toward fulfilling - and probably exceeding - their renewables portfolio standards goals, grid operators are beginning to face operational challenges that could have implications for existing renewable and nonrenewable generators and that will shape opportunities for future projects. In this work, we focused on developing controls and conducting demonstrations for AC-coupled PV-battery energy storage systems (BESS) in which PV and BESS are collocated and share a point of common coupling (PCC).

14 SOLAR ENERGY↗

Battery Energy Storage Systems Report

Battery energy storage systems (BESS) are a critical component of grid reliability and resilience today, providing rapid response capabilities while enabling grid modernization and capacity expansion across the United States. As utilities, communities, and customers prepare to deploy significant BESS capacity over the next several years, the United States has an opportunity to build security into battery system design and deployments. This report provides a framework for assessing the current dominance of foreign-manufactured components in the supply chains for BESS, inverter-based resources, and transformers. It offers high-impact, actionable solutions to service partners, industry, and government to address supply chain risks for currently installed, in design, and future deployments.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Provision of Grid Services by PV Plants with Integrated Battery Energy Storage System: Preprint

Battery energy storage systems (BESS), due to their tremendous range of uses and configurations, may assist PV integration in any number of ways by increasing power system flexibility. In this paper we describe results of a research project conducted by NREL and First Solar for developing controls and demonstrating many use cases for PV-BESS systems including (1) matching generation to loads through time shifting, reducing PV curtailment,; (2) promoting higher levels of PV penetrations by balancing the grid through ancillary services; (3) use of PV-BESS systems to provide wide-area stability services in the form of oscillations damping controls; and (r) use of gird forming BESS for enabling black start and islanded applications for PV-BESS systems. In the paper we will also describe the unique multi-MW test and validation platform developed at NREL for conducting research on fielded utility-scale PV-BESS systems. The platform consists of First Solar 0.43 MW PV power plant, NREL’s 1MW/1MW BESS, 2MW PV power supplies and 7MVA power electronic grid simulator interfaced with industrial plant controllers and power-hardware-in-the-loop (PHIL) capability.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Life Prediction Model for Grid-Connected Li-ion Battery Energy Storage System

Lithium-ion (Li-ion) batteries are being deployed on the electrical grid for a variety of purposes, such as to smooth fluctuations in solar renewable power generation. The lifetime of these batteries will vary depending on their thermal environment and how they are charged and discharged. To optimal utilization of a battery over its lifetime requires characterization of its performance degradation under different storage and cycling conditions. Aging tests were conducted on commercial graphite/nickel-manganese-cobalt (NMC) Li-ion cells. A general lifetime prognostic model framework is applied to model changes in capacity and resistance as the battery degrades. Across 9 aging test conditions from 0oC to 55oC, the model predicts capacity fade with 1.4% RMS error and resistance growth with 15% RMS error. The model, recast in state variable form with 8 states representing separate fade mechanisms, is used to extrapolate lifetime for example applications of the energy storage system integrated with renewable photovoltaic (PV) power generation.

25 ENERGY STORAGE↗

Principles and Options for Designing Battery Energy Storage Zoning Ordinances

Deployment of battery energy storage (BESS) systems, both standalone and as part of hybrid systems paired with generation, has rapidly increased in the United States in recent years as utilities and communities have deployed storage to improve electric grid reliability and act as a cost-effective alternative to larger grid infrastructure. The modular nature of BESS technologies means systems may be built near other existing land uses, creating the potential for conflicts with neighboring landowners that can be managed and mitigated through zoning and permitting requirements established by local jurisdictions. While many cities and counties have adopted ordinances specific to BESS into their local zoning codes, these ordinances vary significantly in their requirements and level of detail. Meanwhile, many other jurisdictions, including those home to proposed or existing BESS projects, lack any specific language related to BESS in their zoning codes. Local planning and zoning officials have limited capacity and may lack the familiarity with BESS technologies needed to develop ordinances or otherwise make reasonable zoning decisions that balance safety, community impacts, and other goals. The resulting uncertainty at the local zoning level has led developers to withdraw projects in some areas and has spurred moratoria or bans on energy storage projects in others. This report intends to provide practical resources for practitioners interested in reasonable and effective local regulation of battery energy storage. It does not present a model zoning ordinance, but rather is intended to complement model ordinances developed by others by providing additional context and analysis regarding the structure of energy storage zoning ordinances and the decision points for local officials. Zoning ordinances at the city, town, and county level across the U.S. were surveyed alongside two template model ordinances to identify common elements and options for regulating the zoning and siting of BESS. Common elements identified and analyzed include definitions and general requirements, including cutoffs or tiers used to apply regulations to different system sizes and the permitted zones where jurisdictions allow BESS to be sited; visual, noise, and aesthetic requirements, including property line setbacks, fencing and visual screening, noise, and lighting requirements; and safety and planning requirements, such as site plans, decommissioning plans or funds, and requirements for access by emergency services. The report also summarizes some of the more unique regulations, including those that place additional restrictions on BESS at the local level.

25 ENERGY STORAGE↗

Sizing battery energy storage and PV system in an extreme fast charging station considering uncertainties and battery degradation

In this paper, we present mixed integer linear programming (MILP) formulations to obtain optimal sizing for a battery energy storage system (BESS) and solar generation system in an extreme fast charging station (XFCS) to reduce the annualized total cost. The proposed model characterizes a typical year with eight representative scenarios and obtains the optimal energy management for the station and BESS operation to exploit the energy arbitrage for each scenario. Contrasting extant literature, this paper proposes a constant power constant voltage (CPCV) based improved probabilistic approach to model the XFCS charging demand for weekdays and weekends. This paper also accounts for the monthly and annual demand charges based on realistic utility tariffs. Furthermore, BESS life degradation is considered in the model to ensure no replacement is needed during the considered planning horizon. Different from the literature, this paper offers pragmatic MILP formulations to tally BESS charge/discharge cycles using the cumulative charge/discharge energy concept. McCormick relaxations and the Big-M method are utilized to relax the bi-linear terms in the BESS operational constraints. Finally, a robust optimization-based MILP model is proposed and leveraged to account for uncertainties in electricity price, solar generation, and XFCS demand. Case studies were performed to signify the efficacy of the proposed formulations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-service battery energy storage system optimization and control

Battery energy storage systems (BESS) have become fundamental part of modern power systems due to their capability to provide multiple grid services. As the renewable penetration increases, BESS procurement is also expected to increase where it is envisioned to play a systematic and strategical role in power systems planning and operation. Hence, in this paper we present a multiple grid service procurement and operation for BESS - ranging from energy arbitrage, reserve/regulation services, power factor correction, and demand management. The proposed framework considers an optimal multi-temporal dimension, designed to be operable for both planning and real-time operation. Moreover, non-linearity inherent to BESS services and uncertainty associated to market forecasts variables are addressed using techniques such as polyhedral norms and robust optimization approaches. Here, the developed model is tested using a utility-scaled BESS and the obtained results show the effectiveness of the systematic BESS multi-service planning and operation approach.

25 ENERGY STORAGE↗