Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “airport reconfiguration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

A Markov Decision Process Framework for Optimal Airport Reconfiguration

The airport runway configuration is defined as a combination set of runways for arrivals and departures used at a point during operation of the airport. An optimal configuration of these runways depends on a number of factors, including traffic demand, wind magnitude and direction, other adverse weather conditions, and noise restrictions, among others. Based on the current state of these factors and predictions of traffic demand and weather conditions, runway configuration changes are made and coordinated between tower controller, other air traffic control facilities, pilots, and ground personnel. Reconfigurations can be quite disruptive to airport operations; minimizing their frequency and scheduling them well in advance is essential for mitigating some of the added workload for controllers and pilots. Unfortunately, deciding on an appropriate time to change is challenging for human decision makers. Not only do multiple factors need to be evaluated, but the uncertainty in their forecasts must also be considered. Previous optimization methods, such as mixed linear integer programming, have been proposed. Although these methods can reason over a large set of variables, they do not systematically handle the uncertainty associated with weather movement, traffic demands, and other variables. In this work, we introduce a Markov Decision Process (MDP)-based decision making framework which can reason effectively over the inherent uncertainties and make optimal decisions on if/when to change the airport configuration. In a prototype implementation, we present a single runway with three aircraft and utilize knowledge of the forecasted wind speed and direction to determine whether to keep or change the current runway configuration. Our aim through this work is to present a framework for airport reconfiguration which can be scalable to additional aircraft, multiple runways, and various input parameters. This technique will optimize the airport reconfiguration procedure by providing a proactive approach, optimizing not just at the next optimal opportunity for a reconfiguration based on varying atmospheric and traffic conditions in the terminal airspace, but also anticipating future necessary reconfigurations. This will eliminate the inefficiencies of frequent changes currently associated with runway reconfiguration procedures.

runway reconfiguration↗

Improved Throughput with Cooperating Futuristic Airspace Management Components

An experiment was conducted to integrate airspace management tools that would typically be confined to either the en route or the terminal airspace to explore the potential benefits of their communication to improve arrival capacity. A NAS-wide simulation was configured with a new concept component that used the information to reconfigure the terminal airspace to the capacity benefit of the airport. Reconfiguration included a dynamically expanding and contracting TRACON area and a varying number of active arrival runways, both automatically selected to accommodate predicted volume of traffic. ATL and DFW were selected for the study. Results showed significant throughput increase for scenarios that are considered to be over-capacity for current day airport configurations. During periods of sustained demand for ATL 2018, throughput increased by 26 operations per hour (30%) and average delay was reduced from 18 minutes to 8 minutes per flight when using the dynamic TRACON. Similar results were obtained for DFW with 2018 traffic levels and for ATL with 2006 traffic levels, but with lower benefits due to lower demand.

Glaab, Patricia C.↗

Precision Arrival Scheduling for Tactical Reconfiguration

This research adapts the concept of precision arrival scheduling to accommodate reconfiguration operations between two sets of fixed arrival routes modeled for Chicago O'Hare International Airport (ORD). Integrated fixed path routing from en-route to runways was modeled for ORD's top two peak traffic configurations, as well as transition routing between the two configurations. A first-come-first-served multi-point scheduler was adapted to the reconfiguration problem by prioritizing the rescheduling of aircraft within the terminal airspace at the time of reconfiguration notification. Arrival rescheduling was then tested for a range of arrival rates and reconfiguration notification lead-times in fasttime simulation. Reconfigurations with lead-times as short as 10 minutes at a nominal static configuration arrival rate (~25 arrivals per quarter hour) could be accommodated with little impact to throughput. However, as lead-time shortened below 25 minutes, individual aircraft efficiency quickly degraded due to extra flight time at lower altitude and speed. In general, first-come-first-served arrival scheduling on fixed routing for this sample reconfiguration problem is promising if at least 10-15 minutes lead-time is given before the reconfiguration is in effect.

airport reconfiguration↗

Surface Development and Test Facility (SDTF) New R&D Simulator for Airport Operations

A new simulator, the Surface Development and Test Facility (SDTF) is under construction at the NASA Ames Research Center in Mountain View, California. Jointly funded by the FAA (Federal Aviation Administration) and NASA, the SDTF will be a testbed for airport surface automation technologies of the future. The SDTF will be operational in the third quarter of 1998. The SDTF will combine a virtual tower with simulated ground operations to allow evaluation of new technologies for safety, effectiveness, reliability, and cost benefit. The full-scale level V tower will provide a seamless 360 degree high resolution out-the-window view, and a full complement of ATC (air traffic control) controller positions. The imaging system will be generated by two fully-configured Silicon Graphics Onyx Infinite Reality computers, and will support surface movement of up to 200 aircraft and ground vehicles. The controller positions, displays and consoles can be completely reconfigured to match the unique layout of any individual airport tower. Dedicated areas will accommodate pseudo-airport ramp controllers, pseudo-airport operators, and pseudo-pilots. Up to 33 total personnel positions will be able to participate in simultaneous operational scenarios. A realistic voice communication infrastructure will emulate the intercom and telephone communications of a real airport tower. Multi-channel audio and video recording and a sophisticated data acquisition system will support a wide variety of research and development areas, such as evaluation of automation tools for surface operations, human factors studies, integration of terminal area and airport technologies, and studies of potential airport physical and procedural modifications.

Dorighi, Nancy S.↗

The design of a long-range megatransport aircraft

Aircraft manufacturers are examining the market and feasibility of long-range passenger aircraft carrying more than 600 passengers. These aircraft would carry travelers at reduced cost and, at the same time, reduce congestion around major airports. The design of a large, long-range transport involves broad issues such as: the integration of airport terminal facilities; passenger loading and unloading; trade-offs between aircraft size and the cost to reconfigure these existing facilities; and, defeating the 'square-cube' law. Thirteen Purdue design teams generated RFP's that defined passenger capability and range, based upon team perception of market needs and infrastructure constraints. Turbofan engines were designed by each group to power these aircraft. The design problem and the variety of solutions developed are reviewed.

Weisshaar, Terrence A.↗

The Temporal Configuration of Airline Networks

The deregulation of US aviation in 1978 resulted in the reconfiguration of airline networks into hub-and-spoke systems, spatially concentrated around a small number of central airports or 'hubs' through which an airline operates a number of daily waves of flights. A hub-and-spoke network requires a concentration of traffic in both space and time. In contrast to the U.S. airlines, European airlines had entered the phase of spatial network concentration long before deregulation. Bilateral negotiation of traffic fights between governments forced European airlines to focus their networks spatially on small number of 'national' airports. In general, these star-shaped networks were not coordinated in time. Transfer opportunities at central airports were mostly created 'by accident'. With the deregulation of the EU air transport market from 1988 on, a second phase of airline network concentration started. European airlines concentrated their networks in time by adopting or intensifying wave-system structures in their flight schedules. Temporal concentration may increase the competitive position of the network in a deregulated market because of certain cost and demand advantages.

Burghouwt, Guillaume↗

Distributed Scheduling Architecture for Multi-Center Time-Based Metering

The Traffic Management Advisor (TMA) is an air traffic control automation system currently in use in seven Air Route Traffic Control Centers (ARTCCs) to enable time based metering to busy airports within their airspace. However, this system is limited to operation within a single ARTCC, within about a 200 nautical mile radius of the airport, and on relatively simple streams of traffic. The need for coordinated metering within a greater (300+ nautical mile) radius of an airport, on streams of traffic with significant branching, and across ARTCC boundaries, has been identified. Early tests revealed that TMA could not simply be scaled up to handle such a problem. Instead, a loosely coupled hierarchy of schedules, in which constraints from downstream schedules are passed upstream, is required. Such an architecture reduces the reliance on distant projections of arrival times, making schedules robust to changes in sequence and to additions of aircraft (such as aircraft departing inside the system s scheduling horizon). This architecture is also scaleable, easily reconfigurable, and can be networked together. As such, it can be adapted for use in any size or configuration of airspace and with any number of airports delivering restrictions. An implementation of this distributed scheduling architecture is currently undergoing testing in the TMA-Multi Center system. This paper describes the architecture and its motivation.

Landry, Steven↗

Information Presentation and Control in a Modern Air Traffic Control Tower Simulator

The proper presentation and management of information in America's largest and busiest (Level V) air traffic control towers calls for an in-depth understanding of many different human-computer considerations: user interface design for graphical, radar, and text; manual and automated data input hardware; information/display output technology; reconfigurable workstations; workload assessment; and many other related subjects. This paper discusses these subjects in the context of the Surface Development and Test Facility (SDTF) currently under construction at NASA's Ames Research Center, a full scale, multi-manned, air traffic control simulator which will provide the "look and feel" of an actual airport tower cab. Special emphasis will be given to the human-computer interfaces required for the different kinds of information displayed at the various controller and supervisory positions and to the computer-aided design (CAD) and other analytic, computer-based tools used to develop the facility.

Haines, Richard F.↗

Operational wind shear detection and warning - The 'CLAWS' experience at Denver and future objectives

An operational wind shear detection and warning experiment was conducted at Denver's Stapleton International Airport in summer 1984. Based on meteorological interpretation of scope displays from a Doppler weather radar, warnings were transmitted to the air traffic control tower via voice radio. Analyses of results indicated real skill in daily microburst forecasts and very short-term (less than 5-min) warnings. Wind shift advisories with 15-30 min forecasts, permitted more efficient runway reconfigurations. Potential fuel savings were estimated at $875,000/yr at Stapleton. The philosophy of future development toward an automated, operational system is discussed.

Mccarthy, John↗