Engineering PapersSearch

SEARCH · Engineering Papers

Results for “activity planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

ORNL Infrastructure: Status Update on BEA Research Reactor Cask Planning Activities Completed During FY 2025

This report documents Oak Ridge National Laboratory’s (ORNL’s) FY 2025 progress toward establishing readiness to use the Battelle Energy Alliance (BEA) Research Reactor (BRR) shipping cask in support of the Nuclear Science User Facilities (NSUF). The BRR cask will provide a new shared infrastructure capability for transporting irradiated fuels and materials between ORNL and Idaho National Laboratory (INL), thereby supporting NSUF’s mission of enabling user access to advanced nuclear research facilities. In FY 2025, ORNL advanced the regulatory, contractual, safety review, and planning activities necessary to qualify its facilities and staff for BRR cask handling. Although loaded shipments were delayed due to fabrication lead times for Orano Federal Services LLC’s internal basket hardware, the program progressed to the point where an empty cask dry run is scheduled for October 2025. This dry run represents a critical step in demonstrating ORNL’s ability to receive, handle, and return the BRR cask.

99 GENERAL AND MISCELLANEOUS

Three-Dimensional Grid Visualization for Planning Activities: A Dubai Case Study

National Laboratory of the Rockies (NLR), in collaboration with the Dubai Electricity and Water Authority (DEWA) and Infra-X, has undertaken the Energy Visualization Analysis Project. The aim of this project is to enhance analytical and 3D visualization capabilities for distribution network planning and renewable energy integration. As modern grid continues to evolve with large-scale solar PV deployment and emerging distributed energy resources (DERs), the ability to effectively analyze, visualize, and communicate complex grid behaviors has become increasingly critical. The project focuses on developing empirical use cases based on real distribution feeder data and engineering workflows, ensuring the outcomes are directly aligned with operational environment. Through time-series power flow simulations and nodal hosting capacity analysis, the study quantifies the impacts of high PV penetration on voltage and thermal limits within representative 11 kV feeders. These analyses identify specific nodes and conditions where DER integration challenges arise. Furthermore, a Battery Energy Storage System (BESS) optimization algorithm was applied to determine the optimal size and placement of storage systems that can mitigate network constraints and enhance hosting capacity. The comparative results between base-case and BESS-augmented scenarios clearly demonstrate improvements in network stability and load management efficiency. In parallel, the NLR team developed an immersive 3D visualization framework, enabling interactive exploration of grid simulations using commodity head-mounted display (HMD) systems. This framework transforms conventional 2D simulation data into spatially intuitive visual environments - allowing engineers to analyze feeder conditions, PV hosting potential, and BESS effects in real time. This report represents the first foundational phase in establishing a visualization-driven analytical ecosystem. It provides a methodological foundation for data integration, visualization architecture, and simulation-based decision support, paving the way for large-scale adoption of immersive visualization across DEWA's Smart Grid Initiative, R&D activities, and future network resilience studies.

24 POWER TRANSMISSION AND DISTRIBUTION

Underground Test Area Activity Waste Management Plan; and Attachment 1 Fluid Management Plan for the Underground Test Area Activity

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office initiated the Underground Test Area Activity to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the Nevada National Security Site. The UGTA Activity is now administered by the DOE Environmental Management Nevada Program. This document is a revision to NNSA/NSO (2009). The new document and revision number reflect EM Nevada Program as the current UGTA Activity administrator.

54 ENVIRONMENTAL SCIENCES

Best Practices for Grid Communications

As the grid evolves, the communications architecture will need to evolve with it. That architecture affords a structured means by which the evolving complexities of the modern electric grid can be managed. This document provides best practices that can be implemented in the grid of today and evolve towards the grid and grid architecture of the future. The evolving grid and its control communications increasingly rely on commercial communications providers and a variety of technologies, from wireless (e.g., 5G, microwave, Wi-Fi) to wireline (fiber, copper) to radio communications (P25, other repeater-based systems), and all these communications systems rely on electric power. A reliable and resilient grid must account for this complex set of interdependencies in its planning activities, especially those involving restoration and recovery. The participation of all relevant parties in both planning and exercising of plans can prevent unexpected conditions that impede the reliable operation and recovery of the grid. Best practices for grid communications include using a Network Management System to document the operational state, define and monitor baselines, detect changes, and accelerate response to abnormalities. If transitioning from SONET to IP/packet-based systems, translating grid requirements into communications requirements for latency, bandwidth and throughput, IP packet delay variation, packet loss, and availability should inform and drive technology planning and selection as well as that communication system’s Quality of Service (QoS) policies and Service Level Agreements (SLAs). Secure and reliable timing is another key component of a reliable and resilient grid that can operate through adverse events. A trusted internal NTP configuration, an integrated and diverse timing delivery system, optimizing the timing architecture based on the transport technologies of the communications system, and using established standards can deliver the level of timing accuracy required by a range of time-sensitive power system applications.

24 POWER TRANSMISSION AND DISTRIBUTION

Critical Minerals and Materials Matchmaker-CM3

This is the Critical Minerals and Materials Matchmaker (CM3) survey form. CM3 is an online information resource created to help connect users across the critical minerals and materials supply chain. The survey is designed to allow organizations to self-identify their critical minerals and materials-aligned activities and interests, and an interactive map that displays those on-going activities in a dynamic way. To include your critical minerals management activity or activities in CM3, please open and fill out the Critical Minerals and Materials Survey. If your organization has many ongoing or planned activities that would be onerous to enter in the form, or if your activities are difficult to geolocate (such as a transport network), please email the team at edxspatial@netl.doe.gov. This initiative is aligned with the approach of DOE’s H2 Matchmaker and Carbon Matchmaker. Read more information on H2 Matchmaker and Carbon Matchmaker. Below are some questions to help understand if you should fill out the CM3 survey: Does your company work with elements such as lithium, cobalt, copper, graphite, nickel, rare earth minerals, or platinum group metals? Does your organization have research and development activities related to critical materials or their supply chains? Does your company currently work in the critical minerals or materials supply chain? Do you have prospective work in critical minerals or materials in the next 5 years? Does your company mine, process, refine or distribute critical minerals or materials? Do you want to network with other facilities or organizations working in the same areas? Are you curious about the critical mineral and material activity in your surrounding area? Are you interested in aligning your potential needs across the supply chain to different geographic areas within the U.S? For more information, please see the CM3 website (https://www.energy.gov/fecm/articles/critical-minerals-materials-matchmaker-cm3) or email our team at edxspatial@netl.doe.gov.

CM3

EV Load Forecasting Guide: A Report by the Energy Systems Integration Group’s EV Load Forecasting Task Force

Forecasting electricity usage is a foundational planning activity for utilities, underpinning billions of dollars in grid investments that ensure system reliability. Historically, forecasting relied on trends in economic and population growth; however, transportation electrification presents a new and complex planning challenge. Unlike conventional loads, electric vehicle (EV) charging has relatively limited usage history. In addition, charging is driven by complex human behaviors, is mobile, and at the same time can concentrate geographically in ways that, without proper planning, can quickly overwhelm local distribution systems.

Giraldez, Julieta [Electric Power Engineers, Austi

Municipal Fleet Action Plan Guide

This action plan template and guide have been designed to support light-duty or medium-duty municipal fleet managers as they plan to adopt electric vehicles. The resource is an adaptation of content created by the National Laboratory of the Rockies (NLR), with support from World Resources Institute (WRI), for participants in the U.S. Department of Energy's Energy to Communities peer-learning cohort, Charting a Path to Municipal Fleet Electrification. Fifteen participating municipalities joined monthly cohort workshops from July through December 2024 to learn and plan for their own fleet electrification. Clean Cities and Communities coalitions supported participating municipalities throughout the cohort series by conducting fleet analysis and planning activities on their behalf. This template is an adapted version of cohort activities.

29 ENERGY PLANNING, POLICY, AND ECONOMY

DEVELOPMENT OF AN INTEGRATED SECURITY AND SAFETY MONITORING SYSTEM FOR SPENT NUCLEAR FUEL AND HIGH-LEVEL WASTE TRANSPORTATION

This paper provides an overview of the progress to date, and discussion of the path forward, related to designing, fabricating, and testing an integrated security and safety monitoring system (ISSMS) for railcars used to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) in the United States. The system will comply with the US Department of Energy’s (DOE) Order 460.2B “Departmental Materials Transportation Management” and the Association of American Railroads’ (AAR) standard S-2043 “Performance Specification for Trains Used to Carry High-level Radioactive Material” [1] developed specifically for railcars used to transport high-level radioactive material (HLRM). DOE is in the process of developing and testing an ISSMS that will satisfy both DOE requirements and AAR standards. DOE has already developed railcar designs for transportation of HLRM. In 2024, DOE’s Atlas railcar project completed the design, fabrication and testing of three railcar types: transportation cask-carrying, buffer, and security escort, resulting in AAR conditional approval to operate on freight rail networks in North America. DOE decided to combine the required security and safety systems into one system, and this combined system is the subject of the current effort. DOE is developing and proposes to implement the ISSMS for these railcars as part of the build out of the railcar fleet. DOE began planning for development of the ISSMS in February 2020. The project is divided into seven phases starting with conceptual design and continuing through production design, as shown in Figure 1. An earlier version of the system was tested as part of the Atlas railcar consist demonstration test run in 2023. This paper describes the design features and system testing using the Atlas project railcars, and laboratory testing completed to date. The paper will also describe the activities planned to support the DOE project to ship the High Burn-Up Research Cask (HBRC) in 2027.

Schultze, Michael [ORNL] (ORCID:0000000283205671)

Lessons Learned: Summary of Insights From the HERO WEC and Waves to Water Deployments Between 2022 and 2024

In 2020, a team from the National Renewable Energy Laboratory (NREL) partnered with the East Carolina University Coastal Studies Institute to develop a small, modular, wave-powered point absorber desalination prototype. That prototype, known as the hydraulic and electric reverse osmosis wave energy converter (HERO WEC), was intended to de-risk the installation activities planned for the Waves to Water Prize sponsored by the Water Power Technologies Office. The NREL team was given approximately 18 months to design, build, bench test, and deploy the HERO WEC prototype. Since the initial HERO WEC development, it has been used for two in-lab test programs and three ocean deployments. The first in-lab test program focused on ensuring that the overall operation of the device occurred as expected and on validating the operation of safety systems such as pressure relief valves or electrical breakers for load mitigation. The second in-lab test program was the first time the NREL team leveraged NREL’s large-amplitude motion platform to characterize the performance of the HERO WEC. Of the three in-water deployments, the first deployment was effectively an installation and recovery practice with no meaningful wave activity during the time that it was installed. The second deployment was a 2-week effort that enabled both the electric and hydraulic configurations of the device to be in the water for approximately 5 days each. This deployment was also the first time that the team had the opportunity to perform a drivetrain swap on the Coastal Studies Institute research vessel. The third deployment had to be split into two separate installations due to minor damage incurred from the WEC spinning during the initial installation. This report summarizes the deployments, the challenges encountered with each deployment, and the lessons learned for future work.

16 TIDAL AND WAVE POWER

Advancing Understanding of Geothermal Representation in the Power Sector to Accelerate Deployment

Driven mostly by decarbonization goals, geothermal interest in the US power sector has grown considerably, gradually evolving from being considered a niche technology, to being recognized as a viable source of clean, baseload, grid-balancing power, and renewable electric power generation. Furthermore, recent technical advances that could greatly accelerate deployment in the near future, and US federal incentives for low-carbon generation technologies, including geothermal, can enable opportunities for integrating geothermal into utilities resource planning portfolios. However, in general, utilities do not have in-house expertise to evaluate geothermal technologies and its potential role in helping decarbonize the grid as well as help them achieve their individual decarbonization goals. To date, geothermal is rarely included in Capacity Expansion Models (CEM) which utilities use in their planning activities and resource/technologies prioritization. To this end, EPRI and NREL are working together in a DOE-GTO funded research project to improve geothermal understanding (opportunities, value, risks) among the power industry to help accelerate geothermal deployment. In the present paper we describe the approach and preliminary findings of this work, focused on two topics: 1) Expand the degree of understanding on the value, opportunity, and risk of geothermal technologies among utilities and related companies/groups, specifically around geothermal for power generation. 2) Improve representation of geothermal power technologies in capacity expansion models (CEM).

capacity expansion models

Guidance for Grid Resilience Decisions in Rural Minnesota

This report assesses the hazard landscape of the state of Minnesota, identifies weather hazards that are most impactful to the distribution system, includes a statewide assessment of household access to services dependent on reliable power, reviews resilience planning activities of electric utilities in Minnesota, and presents analysis of distribution grid performance in the face of extreme weather events with data from seven electric cooperatives dispersed throughout outstate Minnesota. This information is synthesized to provide considerations for resilience investment prioritization.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Electric Grid Reliability in an Era of Unprecedented Uncertainty: A Review of Advances in Electric Sector Resource Adequacy Assessment and Planning

Recent changes to the principal causes of energy shortage events on the electric grid have necessitated are thinking of paradigms for resource adequacy (RA) assessment and the related topic of procurement of a reliable portfolio. Prior studies have laid out elements of a modern paradigm for these planning activities, but there does not exist a comprehensive overview of the topic spanning academic and gray literature, and the relationship of these suggested paradigms to methods used in industry has also not been surveyed. In this paper we review recent literature establishing best practices for RA assessment and reliable portfolio procurement, and survey current practices used in industry in relation to these best practices. We establish seven key best practices for RA assessment, cover a modern methodology for capacity accreditation, and find that industry practices are not far behind the identified best practices, though some key gaps remain. We also present a suggested agenda for both academic research on the topic and opportunities for advancement in the industry.

24 POWER TRANSMISSION AND DISTRIBUTION

GE 1.5 ESS Wind Turbine Retrofit Controller Development (CRADA Final Report)

National Renewable Energy Laboratory (NREL) and Bachmann electronic corp. will collaborate on the development of a software application to be used on an existing aftermarket Bachmann controller, utilizing and existing Bachmann software platform, which will be used on the General Electric (GE) 1.5 ESS wind turbine. This retrofit will significantly enhance NREL’s ability to control experiments it is planning to conduct on the GE 1.5 wind turbine as part of the Gearbox Reliability Collaborative, Atmosphere to Electrons and other future R&D. The proposed work is leveraging ongoing Department of Energy (DOE) Annual Operating Plan activities on the GE 1.5 ESS wind turbine at the National Wind Technology Center.

17 WIND ENERGY

Design, Construction, and Installation of In-Glovebox Pumped Actinide Molten Salt Loops

This report summarizes the work conducted in FY25 to construct and install pumped actinide-bearing molten salt loopsin a radiological glovebox. The establishment of such a capability will provide a platform in which technologies developed for Gen. IV molten salt reactors may be tested under relevant operating conditions. A review of convective molten salt systems is provided to frame Argonne’s pumped actinide loop relative to contemporary and historical systems. Moreover, the infrastructure needed to operate the system is detailed to provide additional context as to design metrics of the loops and supporting equipment. The pumps’ performance in water testing is outlined and used to inform operational activities planned in FY26. Finally, electrochemical experiments investigating fundamental reaction mechanisms governing reactive oxygen species that promote corrosion of molten salt media is also reported. In total, these combined loop installation and sensor development tasks will serve to aid in the future commercial deployment of molten salt reactors in the U.S.

22 GENERAL STUDIES OF NUCLEAR REACTORS

Characterization of HRRR-simulated rotor layer wind speeds and clouds along the coast of California

Stratocumulus clouds, with their low cloud base and top, affect the atmospheric boundary layer wind and turbulence profile, thereby modulating wind energy resources. GOES satellite data reveal an abundance of stratocumulus clouds in the late spring and summer months off the coast of northern and central California, where there are active plans to deploy floating offshore wind farms at two lease areas (near Morro Bay and Humboldt). Since the fall of 2020, two buoys equipped with multiple instruments, including Doppler lidar, have been deployed for about 1 year in these wind farm lease areas to assess the rotor layer wind conditions in these locations. The objective of this study is to evaluate how well the High-Resolution Rapid Refresh (HRRR) model represents stratocumulus cloud characteristics and turbine-relevant rotor layer winds (surface to 300 m) by comparing HRRR simulations with buoy and satellite observations. We first find that the HRRR model reproduces the seasonal cycle of cloud top height reasonably well in these regions. However, during the warm season – especially at Morro Bay – the HRRR-simulated stratocumulus clouds tend to have lower tops by about 150 m and exhibit weaker diurnal cycles than satellite observations. Our analysis also shows that rotor layer wind speeds and vertical shear are stronger at Humboldt than at Morro Bay, and both are generally stronger under clear-sky conditions. Finally, the HRRR model bias in rotor layer wind speed is small under cloudy conditions but larger and dependent on observed wind speed under clear skies. Specifically, HRRR underestimates wind speeds at Morro Bay and overestimates them at Humboldt under clear-sky conditions.

17 WIND ENERGY

Exploring impacts of electricity tariff on charging infrastructure planning: An activity-based approach

In the past decade, electric vehicles (EVs) have gained popularity for their efficiency and environmental benefits. Advances in battery technology and charging equipment have yielded long-range EVs and fast-charging. However, many major cities lack adequate charging infrastructure for daily EV use. This study addresses this gap by integrating activity-based modeling, charging behavior simulation, and charging infrastructure optimization. The research utilizes the POLARIS agent-based transportation model to accurately capture user activities, trip patterns, and traffic flows. Additionally, the study investigates the impact of fixed and spatiotemporal electricity rate distributions on optimal charging infrastructure deployment. The framework is applied to the Chicago regional area network and analyzed under various EV ownership scenarios. Further, the results reveal significant impacts of the charging pricing strategy on user decision-making and charging demand distribution. There is also a need for consistent pricing policies in charging infrastructure planning and operational phases to avoid drops in service quality.

29 ENERGY PLANNING, POLICY, AND ECONOMY