Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WPTO”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

WPTO Navigator

Protecting hydroelectric plants from incidents that adversely impact their cyber-physical systems presents unique challenges due to the plants’ widely dispersed geographic locations and varied configurations as well as the relative nascent nature of the cyberattacks targeting these facilities. To help hydroelectric plants better respond to and mitigate cybersecurity incidents, this Department of Energy Water Power Technologies Office Navigator aligns the processes within the National Institute of Standards 800-61r2 Computer Security Incident Handling Guide with the emergency actions within the FEMA 64 Emergency Action Plan Framework. This work is to be used at a hydroelectric plant to quickly understand how the plant responds to a cyber incident in relationship to the actions involved in an emergency action plan involving a hydroelectric plant. In addition to this product, there are three other products meant to be distributed to a hydroelectric plant to assist in their cyber incident response and recovery. The first, a report on the processes of building a R&R flip book based on a large set of existing guidance. The second, a handy flip book meant to be distributed to hydroelectric plants to assist them during a cybersecurity incident occurring on a hydroelectic plant. And the third is a comprehensive set of resources to assist an operator in locating appropriate guidance during the recovery process.

13 HYDRO ENERGY↗

WPTO Comprehensive References [Poster]

Protecting hydroelectric plants from incidents that adversely impact their cyber-physical systems presents unique challenges due to the plants’ widely dispersed geographic locations and varied configurations as well as the relative nascent nature of the cyberattacks targeting these facilities. To help hydroelectric plants better respond to and mitigate cybersecurity incidents, this Department of Energy Water Power Technologies Office Cyber Comprehensive Reference list is to be used at a hydroelectric plant to quickly go to appropriate sources during the response and recovery of a cyber incident. In addition to this product, there are three other products meant to be distributed to a hydroelectric plant to assist in their cyber incident response and recovery. The first, a report on the processes of building a R&R flip book based on a large set of existing guidance. The second, a handy flip book meant to be distributed to hydroelectric plants to assist them during a cybersecurity incident occurring on a hydroelectic plant. And the third is a correlated alignment of the steps an hydroelectric plant operator would take for both a cyber incident as well as an emergency response process if the event rises to a cyber incident affecting the safe and reliable operations of a hydroelectric plant.

13 HYDRO ENERGY↗

DOE WPTO FY2021 Seedling End Report: Coupling Soil-Foundation Models to MHK Device Dynamic Models to Tighten the Design Envelope

The purpose of this Seedling project is to couple a marine renewable energy (MRE) dynamics simulation software with the soil-foundation models in the OC6 Phase II project [Bergua et al., 2021] and evaluate the software’s performance. This is a first step to accurately evaluating soil-foundation impacts on other types of MRE, like wave or current energy converters (WECs, CECs). OC6 Phase II compares offshore wind turbine (OWT) simulations using several different soil-foundation models to identify and fill key gaps in soil-foundation analyses. WEC-Sim was chosen to model the OC6 Phase II offshore wind turbine and various load cases because of its adaptability, accuracy of hydrodynamic loads, and ability to apply an arbitrary wind loading. Of the four methods used in OC6, the apparent fixity soil-foundation method was coupled with WEC-Sim. Technical challenges with flexible hydrodynamic bodies, added mass and external function libraries inhibited the ability to compare the WEC-Sim results to other OC6 participants. These challenges required that the WEC-Sim model of the OC6 OWT use a combination of rigid and flexible bodies to ensure a numerically stable solution. The rigid monopile creates a more stiff system and causes smaller amplitude motion under hydrodynamic loading and higher dominant frequency of motion under wind loading. These discrepancies are expected based on the increased stiffness of the WEC-Sim case.

16 TIDAL AND WAVE POWER↗

Next-Generation Marine Energy Software Needs Assessment

The U.S. Department of Energy (DOE) Water Power Technologies Office’s (WPTO) initial investment in marine energy software was driven by needs identified over a decade ago. WPTO-funded research was first launched because of a U.S. congressional mandate that called for the DOE to officially research marine energy technologies, which also established the DOE WPTO in 2008. A congressional mandate requested the WPTO to evaluate a variety of marine energy devices, establish baseline levelized cost of energy estimates, and provide an overall report to Congress. This congressional mandate led to the Reference Model Project (RMP), for which WPTO funded a national multi-laboratory team to develop these reference models, based on state-of-the-art designs of six marine energy converter archetypes that consisted of three current energy converters and three wave energy converters (WEC). Each device was designed to operate for a specific marine resource, thus allowing the devices to serve as reference models for future studies. The RMP congressional report cited the need for improved marine energy software to handle a variety of device designs, as well as a need to standardize performance outputs. Without validated software packages and established metrics, information presented to the WPTO by technology developers could be incorrect or inaccurate and result in misleading conclusions. The recommendation to coordinate WPTO investment in software for numerical modeling and analysis was given a high priority because it would directly fill needs at the time, and focused funding would amplify impact. By sponsoring software development, WPTO would provide industry developers, university researchers, and national laboratories software that could be used, customized, and advanced, thus supporting the overall advancement of marine energy.

16 TIDAL AND WAVE POWER↗

Water Power Technologies Office: Multi-Year Program Plan

The U.S. Department of Energy’s Water Power Technologies Office (WPTO) has released its first Multi-Year Program Plan (MYPP), which outlines the Office’s research priorities and plans through 2025. Cover of the WPTO MYPP 2022. The MYPP serves as both a strategic vision and an operational guide to help WPTO manage and coordinate its activities, as well as a vehicle to communicate WPTO’s mission, goals, and plans to water power stakeholders and the public. It details WPTO’s research, development, demonstration, and commercial activities across both hydropower and marine energy for the coming years and outlines how these efforts can help meet the nation’s energy and sustainability goals. The MYPP features key performance goals for 2025, as well as additional objectives running through 2030. All outlined goals contribute to the overarching mission of WPTO to enable research, development, and testing of new technologies to advance marine energy and hydropower systems for a flexible, reliable grid.

13 HYDRO ENERGY↗

Hydropower Supply Chain Gap Analysis

In 2022, DOE conducted supply chain "deep dives" for renewable energy technologies, including hydropower (Uria-Martinez, Hydropower Industry Supply Chain Deep Dive Assessment 2022). The deep dive identified several challenges in the current hydropower supply chain. In addition, Nguyen et. al (2022) conducted an analogous deep-dive assessment on large (> 100-MW) power transformers (LPTs), a critical component of hydropower installations, and concluded that the LPTs as well as several upstream components and materials also have domestic supply chain challenges. These deep dives were the initial high-level assessments of these supply chains and were focused on identifying the biggest issues. Both recommended further investigation. In the two years since the deep dives were published, the Water Power Technologies Office (WPTO) has focused on improving our understanding of the hydropower supply chain and developing strategies for addressing these challenges. Because the challenges outlined above are most acute for large hydropower systems, most of the report and specifically, this report concentrates on the larger > 100-MW hydropower systems. Early in 2023, DOE's Secretary of Energy asked the Water Power Technologies Office (WPTO) to engage the hydropower community and seek input on strategies to secure and encourage domestic manufacturing. WPTO has established three focus areas for engagement: 1) Define the market for planned rehabilitations and new construction of the domestic fleet, 2) Provide insights for policies, incentives, loan programs, and technology investments to encourage domestic content, and 3) Define the existing and required domestic hydropower manufacturing capabilities and workforce. This report summarizes these efforts and complements the earlier work by further exploring the identified challenges and identifying potential actions to address these challenges. Furthermore, we conducted a detailed gap analysis of the domestic hydropower supply chain, down to the component level. From this analysis, we then make specific, actionable recommendations for closing these gaps. Section 2 of the report summarizes recent (i.e., since 2021) legislation impacting hydropower deployment and/or its supply chain. It then describes the efforts of WPTO to assess and improve the hydropower supply chain since the publication of the deep-dive assessments. In Section 3, the report updates the earlier supply chain and market studies, identifying specific capabilities by company and location. Section 4 outlines the hydropower demand signal for both new builds due to clean energy goals as well as refurbishments and upgrading of the current domestic fleet. Section 5 is a detailed gap analysis while Section 6 provides actionable recommendations for closing the gaps. Section 7 concludes the report by linking the recommendations to the identified gaps and discusses future efforts.

13 HYDRO ENERGY↗

NREL Marine Energy Desalination R&D Portfolio

The National Renewable Energy Laboratory (NREL), in collaboration with the U.S. Department of Energy's (DOE's) Water Power Technologies Office (WPTO), has developed a unique R&D approach to advance marine energy desalination. Desalination is a foundational investment within WPTO's Powering the Blue EconomyTM portfolio [1], and was the first investment within this portfolio. NREL's marine energy desalination spans techno-economic feasibility studies, numerical modeling, and laboratory testing at the component and subsystem level, as well as development of the Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC). This multilayered approach enables an innovative feedback loop where the data and lessons learned from laboratory and field experiments are used to refine modeling tools and analysis techniques, prioritize out-year activities, and refine strategic directions within NREL and across the WPTO portfolio. The primary objective of the NREL-led research is to identify key barriers associated with the commercialization of wave-powered desalination and develop solutions that can be adopted by the marine energy industry. It should be noted, while WPTO's marine energy portfolio includes wave, tidal, ocean current, thermal gradients, and pressure gradients the bulk of the marine energy desalination work has been focused on wave powered desalination. In parallel, these R&D activities can help inform technical assistance and support of industry and academic technologies. These two tracks help build a common solver community approach, while also identifying key stakeholders, government agencies, and other organizations outside of the marine sector that will be necessary for developing a robust industry.

desalination↗

Deployment Readiness Framework Subtask 1.1 (Literature Review)

Island and remote coastal communities face some of the most challenging environments for building, operating, and maintaining energy infrastructure, as well as the highest costs for electricity, fuels, and other essential energy sources. As sea-levels rise and storms become more intense and frequent, these communities and the energy infrastructure that supports coastal lives and livelihoods are also at increasing risk from natural hazards. To address these challenges, many coastal communities are envisioning energy solutions that will support the triple bottom line goals of the blue economy: economic growth, environmental sustainability, and social equity. Yet, island and remote coastal communities often face limited resources and capacity to tackle complex energy and coastal resilience issues. To support community-driven energy transitions in island and remote communities, and to better understand relationships between energy, community, and ecosystem resilience, the Department of Energy’s Water Power Technologies Office (WPTO) has initiated the development of a Deployment Readiness Framework (DRF). The objective of the work is to co-produce and test practical tools and approaches that assess the readiness of coastal communities for marine energy demonstration, deployment, and operation. The DRF aims to build on and support the Energy Transitions Initiative Partnership Program (ETIPP) and other community-oriented energy transition programs. This project is jointly led by Pacific Northwest National Laboratory (PNNL) and the National Renewable Energy Laboratory (NREL). The development of the DRF includes three main phases: 1) a learning phase involving stakeholder engagement and literature review to synthesize metrics of community readiness to advance through an energy transition and to understand the state of the research and practice of participatory science-policy processes in various sectors, 2) a design phase to define readiness approaches and tools that will be developed as part of the DRF, and 3) an implementation phase to create the applications and interfaces for WPTO and the national laboratories to interact with the DRF. All three phases include close collaboration with communities and end-users of the framework, first to identify gaps in the science and tools needed to achieve community-driven energy transition goals and second, to test and improve the framework iteratively. Through technical assistance programs like ETIPP and utilizing the completed DRF to understand the influencing factors which motivate or deter energy transitions, WPTO hopes to engage a number of near-term marine energy demonstration opportunities. Here we report on the results from the literature review (Subtask 1.1) to inform the stakeholder engagement (Subtask 1.2) and design phase (Task 2) of the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Water Power Technologies Office: 2021-2022 Accomplishments Report

The report details key performance goals for each of WPTO’s activity areas until 2025 and includes long-term, follow-on objectives through 2030. This report serves as a strategic vision and operational guide to help WPTO manage and coordinate its future activities and communicate its mission, goals, and plans. The Multi-Year Program Plan was an integral part of the 2022 Peer Review, providing reviewers insight and guidance on the office’s strategy to which WPTO-funded projects must align.

13 HYDRO ENERGY↗

NREL Marine Energy Desalination Research and Development Portfolio: Preprint

The National Renewable Energy Laboratory (NREL), in collaboration with the U.S. Department of Energy's (DOE's) Water Power Technologies Office (WPTO), has developed a unique R&D approach to advance marine energy desalination. Desalination is a foundational investment within WPTO's Powering the Blue Economy portfolio, and was the first investment within this portfolio. NREL's marine energy desalination spans techno-economic feasibility studies, numerical modeling, and laboratory testing at the component and subsystem level, as well as development of the Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC). This multilayered approach enables an innovative feedback loop where the data and lessons learned from laboratory and field experiments are used to refine modeling tools and analysis techniques, prioritize out-year activities, and refine strategic directions within NREL and across the WPTO portfolio. The primary objective of the NREL-led research is to identify key barriers associated with the commercialization of wave-powered desalination and develop solutions that can be adopted by the marine energy industry. In parallel, these R&D activities can help inform technical assistance and support of industry and academic technologies. These two tracks help build a common solver community approach, while also identifying key stakeholders, government agencies, and other organizations outside of the marine sector that will be necessary for developing a robust industry. For the Spanish version of this report, see NREL/CP-5700-88483 (https://www.nrel.gov/docs/fy24osti/88483.pdf).

analysis↗

Cartera de Investigacion y Desarrollo Sobre Desalinizacion de Energia Marina del NREL: Preprint (Spanish Translation)

The National Renewable Energy Laboratory (NREL), in collaboration with the U.S. Department of Energy's (DOE's) Water Power Technologies Office (WPTO), has developed a unique R&D approach to advance marine energy desalination. Desalination is a foundational investment within WPTO's Powering the Blue EconomyTM portfolio [1], and was the first investment within this portfolio. NREL's marine energy desalination spans techno-economic feasibility studies, numerical modeling, and laboratory testing at the component and subsystem level, as well as development of the Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC). This multilayered approach enables an innovative feedback loop where the data and lessons learned from laboratory and field experiments are used to refine modeling tools and analysis techniques, prioritize out-year activities, and refine strategic directions within NREL and across the WPTO portfolio. The primary objective of the NREL-led research is to identify key barriers associated with the commercialization of wave-powered desalination and develop solutions that can be adopted by the marine energy industry. In parallel, these R&D activities can help inform technical assistance and support of industry and academic technologies. These two tracks help build a common solver community approach, while also identifying key stakeholders, government agencies, and other organizations outside of the marine sector that will be necessary for developing a robust industry. For the English version of this report, see NREL/CP-5700-86724 (https://www.nrel.gov/docs/fy24osti/86724.pdf).

analysis↗

Water Power Technologies Office: 2022 Project Peer Review

The Water Power Technologies Office (WPTO), part of the U.S. Department of Energy’s (DOE) Office of Energy Efficiency and Renewable Energy (EERE), held a virtual peer review on July 18–29, 2022. The purpose of peer review is to evaluate DOE-funded projects for their contributions to the mission and goals of the office, progress made against stated objectives, and the office’s overall management and performance. The peer review process enables external stakeholders to provide feedback on the most impactful use of taxpayer funding and develop recommendations for the most efficient and effective ways to accelerate industry development in power technologies. This report includes the results of WPTO’s 2022 Peer Review.

13 HYDRO ENERGY↗

Marine Energy Commercialization Review: Evaluation of the Transition From Public to Private Capital

The mission of the U.S. Department of Energy's Water Power Technologies Office (WPTO) is to advance marine energy technologies through research, testing, and commercialization. This paper explores the barriers and potential solutions for marine energy commercialization by evaluating publicly available literature, feedback from public and private actors, and historical WPTO actions. A key finding is the absence of standardized metrics to measure marine energy commercialization progress and the lack of targeted success goals. This paper aims to define those metrics, informed by public and private goals and the challenges developers experience, and to further evaluate targets offered by public funders and private capital providers. Recommendations to address barriers in marine energy commercialization include enhancing public-private communication, refining commercialization requirements, leveraging technology transfer programs, and exploring novel funding mechanisms like green bonds and contracts for difference. Addressing these challenges through proposed adjustments could facilitate the transition of marine energy technologies from public funding to sustainable private investment, ultimately advancing their commercialization.

13 HYDRO ENERGY↗

CMIP6-based Multi-model Streamflow Projections over the Conterminous US, Version 1.1

This dataset presents an ensemble of streamflow projections covering the conterminous United States (CONUS), developed to support the SECURE Water Act Section 9505 Assessment for the US Department of Energy (DOE) Water Power Technologies Office (WPTO). Multiple Coupled Models Intercomparison Project phase 6 (CMIP6) Global Climate Models (GCMs) were downscaled using either statistical (DBCCA) or dynamical (RegCM) downscaling methods, based on two meteorological reference datasets (Daymet and Livneh). Subsequently, the downscaled precipitation, temperature, and wind speed data were used to drive two calibrated hydrologic models (VIC and PRMS), with total runoff routed through the Routing Application for Parallel computatIon of Discharge (RAPID) routing model, producing an ensemble of streamflow projections across 2.7 million NHDPlusV2 stream reaches across the CONUS. Each ensemble member covers the 1980-2019 baseline and 2020-2059 near-future periods under the high-end (SSP585) emission scenario. Additionally, using only DBCCA and Daymet, the projections extend to the 2060-2099 far-future period and encompass three additional emission scenarios (SSP370, SSP245, and SSP126). This dataset is designed to support the SECURE Water Act Section 9505 Assessment for the US Department of Energy (DOE) Water Power Technologies Office (WPTO). For further details, refer to Kao et al. (2022), Rastogi et al. (2022), and Ghimire et al. (2023).

13 HYDRO ENERGY↗

CONUS-wide Projected Flood Frequency and Uncertainty Estimates, Version 1.0

This dataset presents a large-ensemble of CONUS-wide projected flood frequency and uncertainty estimates across ~2.7 million NHDPlusV2 river reaches over the CONUS. The framework producing this dataset leverages a multi-model, uncertainty-aware modeling framework that allows evaluating shifts in flood frequences at the stream reach level across the CONUS. CONUS-wide ensemble streamflow projections generated from hydrologic simulations driven by downscaled and bias-corrected Coupled Model Intercomparison Project Phase 6 (CMIP6) outputs are used to derive these flood frequency and uncertainty estimates over the period 1980 - 2099. A spatially consistent regional L-moment algorithm is applied across clusters defined by the US Hydrologic Unit Code Subregions (HUC4s and HUC8s) and NHDPlusV2 stream orders to estimate flood frequencies. The dataset also includes at-site based flood estimates that allow for the comparison between local and regional approach-based estimates, assess projected changes, and characterize their uncertainties. For more reliable estimation of rare flood frequencies such as 500 and 1000-year return periods, super-ensemble based estimates are also included in the dataset. This dataset is derived to support the "Impact-Informed Dam Safety Risk Assessment for Securing Hydropower Assests" project for the US Department of Energy (DOE) Hydropower and Hydrokinetic Office (H2O). For further details, refer to Kao et al. (2022), Ghimire et al. (2023), Ghimire et al. (2025), and Hosking and Wallis (1997).

Ghimire, Ganesh [ORNL] (ORCID:0000000242843941)↗

Dayflow-PR: High-Resolution Streamflow Reanalysis for Puerto Rico, Version 1.0

This dataset presents a high-resolution historical streamflow reanalysis for NHDPlusV2 stream reaches across Puerto Rico (PR) spanning 1950 - 2019. The reanalysis is generated using the calibrated VIC-RAPID hydrologic modeling framework at the Hydrologic Unit Code Sub-basin (HUC08) scale, forced with sub-daily and daily meteorological forcings from Daymet. Runoff is simulated on 1- and 6-km grids, and the resulting total runoff is routed through the NHDPlusV2 river network using the RAPID routing model to produce Naturalized Streamflow Reanalysis. Where complete observational records are available over 1980 - 2019, streamflows are assimilated (substituted) and subsequently routed downstream through the river network to produce Assimilated Streamflow Reanalysis. The dataset includes streamflow outputs from eight distinct hydrologic modeling configurations along with key performanc evaluation metrics at daily and monthly scales, supporting a wide range of water resource applications. This dataset is derived to support the Non-Powered Dam Assessment, as well as 9505 Secure Water Assessment projects for the US Department of Energy (DOE) Water Power Technologies Office (WPTO). For further details, refer to Ghimire et al. (2023), Kao et al. (2024), and Ghimire et al. (2025).

13 HYDRO ENERGY↗

CMIP6-based Dynamically Downscaled Hydroclimate Projection over the Conterminous US

This dataset presents a suite of downscaled hydro-climate projections over the conterminous United States (CONUS) based on multiple selected Global Climate Models (GCMs) from the Coupled Models Intercomparison Project phase 6 (CMIP6). The CMIP6 GCMs are downscaled dynamically using Regional Climate Model version 4 (RegCM4). Each ensemble member covers the 1980-2019 baseline and 2020-2059 near-future periods under the high-end (SSP585) emission scenario. This dataset is formulated to support the SECURE Water Act Section 9505 Assessment for the US Department of Energy (DOE) Water Power Technologies Office (WPTO). For further details on this dataset, please refer to Kao et al. (2022) and Rastogi et al. (2022).

13 HYDRO ENERGY↗