Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WP3”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Wind Plant Performance Prediction Benchmark Phase 1 (Technical Report)

Financial risk resulting from the uncertainty associated with developing, owning, and operating wind power plants remains a barrier to reducing the levelized cost of energy (LCOE). On average, modern wind power plants in the U.S. underperform their expected annual energy output by 3.5-4.5% , with many underperforming by over 10%. To compensate for this uncertainty, investors require a larger return on investment (ROI) and apply "knock-down" factors that mask much of the underlying sources of uncertainty. Wind energy projects thus have reduced access to low-cost capital. Furthermore, operating wind plants often take a simple approach to estimating operations & maintenance (O&M) costs (e.g. straight-line estimates based on similar plants), which can eat into profits. To overcome these issues, the wind industry must improve the models they use for estimating wind plant performance and operations. An industry consortium (IC) requested that the National Renewable Energy Laboratory (NREL) lead a Department of Energy (DOE) working group to benchmark the accuracy of wind power plant energy predictions against real operational data. The IC was also motivated by DOE and NREL's potential to characterize systematic energy underperformance, identify sources of uncertainty, and explore root causes. The Wind Plant Performance Prediction (WP3) project was created out of this request, and this report represents the successful completion of Phase 1 of the WP3 project. During the project, wind plant owners provided both pre-construction and operational data to NREL. The pre-construction data was provided to wind resource assessment (WRA) consultants so they could conduct energy yield assessments (EYA). NREL took all of the completed EYAs, along with the operational data, and conducted an operational assessment to benchmark the EYA results against actual operational data. Given the large amounts of sensitive data required for this effort, as well as historical opposition to sharing data within industry, successful completion of Phase 1 represents an unprecedented milestone for industry data sharing. To improve the accuracy and confidence of pre-construction EYAs, wind plant owners and investors need better, more certain, energy yield predictions. The WP3 Benchmark Project is an industry-driven response to this reality. For the first time, industry has taken the important step of working together at scale, sharing valuable operational data with DOE and NREL in order to investigate the sources of bias and uncertainty in these energy estimates. This IC provides wind plant preconstruction and operational data to NREL in an organized and documented fashion and provides guidance and feedback as needed. The IC also provides introspection of the design of experiment, key metrics of success, data challenges, analysis best practices, and quality of results.

17 WIND ENERGY↗

Q-Fibre Quarterly Performance Progress Report

The project titled Quantitative Strain Monitoring for Well and Seal Integrity through Wellbore Fiber Optic Cable s, or Q-Fibre in short, is a multi-national collaborative project under the Clean Energy Transitional Partnership (CETP) program. The lead organization of the project is the Norwegian Geotechnical Institute (NGI), and the LLNL team joins as a beneficiary member. The LLNL team receives the funding from the U.S. Department of Energy with the amount of $\$$1 million across three years, and the budget is primarily allocated to Work Package 3 (WP3) of the project, which focuses on Numerical Modeling of Fiber Optic Cable Data . Figure 1 presents all work packages involved in the project and corresponding lead organization for each work package. The LLNL team leads WP3.

42 ENGINEERING↗

Forecasting for the Weather Driven Energy System - A New Task under IEA Wind

The energy system needs a range of forecast types for its operation in addition to the narrow wind power forecast that has been the focus of considerable recent attention. Therefore, the group behind the former IEA Wind Task 36 Forecasting for Wind Energy has initiated a new IEA Wind Task with a much broader perspective, which includes prospective interaction with other IEA Technology Collaboration Programmes such as the ones for PV, hydropower, system integration, hydrogen etc. In the new IEA Wind Task 51 (entitled "Foreacsting for the Weather Drive Energy System") the existing Work Packages (WPs) are complemented by work streams in a matrix structure. The Task is divided in three WPs according to the stakeholders: WP1 is mainly aimed at meteorologists, providing the weather forecast basis for the power forecasts. In WP2, the forecast service vendors are the main stakeholders, while the end users populate WP3. The new Task 51 started in January 2022. Planned activities include 4 workshops. The first will focus on the state of the art in forecasting for the energy system plus related research issues and be held during September 2022 in Dublin. The other three workshops will be held later during the 4-year Task period and address (1) seasonal forecasting with emphasis on Dunkelflaute, storage and hydro, (2) minute-scale forecasting, and (3) extreme power system events. The issues and conclusions of each of the workshops will be documented by a published paper. Additionally, the Recommended Practice on Forecast Solution Selection will be updated to reflect the broader perspective.

geophysics computing↗

Leading Edge Erosion Classification System

The leading edge erosion of wind turbine blades is a common issue that can have a range of implications for the operation and maintenance of the turbine. A variety of methods have attempted to determine the severity of erosion damage, applied in different academic, testing and in-situ settings. This paper describes the current state of the art in categorization, and the individual drivers in assessment. From this foundation, the IEA Wind Task 46 WP3 group collated key considerations from the process of categorizing erosion damage and a proposed erosion classification system was put forward. Trial assessments were performed using the initial system, which led to adjustments to the original proposition. The refined system defines discrete severity levels that concern the wind turbine blade: (1) Visual Condition (concerning blades with/without leading edge protection); (2) Mass Loss; (3) Aerodynamic Performance; and (4) Structural Integrity. The classification system presented is not intended to be a fixed entity. The Task 46 group has already identified specific challenges and opportunities that are applicable to individual use and the overall wind energy industry. The intention is for the system to evolve as improvements are identified, technology improves, and work progresses through other Task 46 activities. Several considerations and recommendations are discussed that could be applicable for future implementation of the system.

17 WIND ENERGY↗

Platform evolution studies

The polar orbiting platform (POP), being developed by the Work Package 3 (WP3) Project at the Goddard Space Flight Center, will play a key role in the NASA Leadership Initiative, Mission to Planet Earth (MPE). It becomes, with the addition of payloads, an Earth observation satellite observatory. Mission to Planet Earth also has geostationary platforms (GEOP) as part of its global observational system. A study was begun in March 1988 to assess the applicability of the POP orbital replacement units (ORUs) for a geostationary Earth observing mission. Two test cases, representative of MPE payloads, were studied. Case A was used to emphasize the GEOP configuration and design; it used a Titan/Centaur to achieve orbit. Case B, considered to be much further in the future, included some assembly at the Space Station Freedom manned base and use of an orbital transfer vehicle to achieve orbit; requirements on the manned base to support such a mission were emphasized. The study found the POP systems more than adequate to meet GEOP requirements. Two types of changes were required for the POP ORUs: (1) modification to use only one surface for heat rejection; for the battery ORU, this meant 'opening up' the ORU to retain the radiator area with a corresponding decrease in depth; and (2) deletion of equipment not needed. The Case A configuration was shown to be within the planned capability of the Titan IV/Centaur. Assembly requirements were included for the Case B configuration, which is driven by the large microwave antennas of two of the payloads. The final review was April 19, 1989.

Walton, Barbara A.↗

Technology

In this session, Session WP3, the discussion focuses on the following topics: Monitoring Physiological Variables With Membrane Probes; Real Time Confocal Laser Scanning Microscopy, Potential Applications in Space Medicine and Cell Biology; Optimum Versus Universal Planetary and Interplanetary Habitats; Application of Remote Sensing and Geographic Information System Technologies to the Prevention of Diarrheal Diseases in Nigeria; A Small G Loading Human Centrifuge for Space Station ERA; Use of the Bicycle Ergometer on the International Space Station and Its Influence On The Microgravity Environment; Munich Space Chair (MSC) - A Next Generation Body Restraint System for Astronauts; and Thermoelectric Human-Body Cooling Units Used By NASA Space Shuttle Astronauts.

Source record↗

Remotely Operated Aircraft (ROA) Impact on the National Airspace System (NAS) Work Package: Data Modeling and Sharing Perspective for Development of a Common Operating Picture

This report documents analyses that were performed in support of Task #3 of Work Package #3 (WP3), ROA Impact on the NAS. The purpose of the overall work package was to determine if there are any serious issues that would prevent or prohibit ROA's flying in the NAS on a routine basis, and if so, what actions should be taken to address them. The purpose of Task #3 was to look at this problem from the perspective of data modeling and sharing.

Source record↗

A Comparison of Preconstruction and Operational Wake Loss Estimates for Land-Based Wind Plants

Recent studies suggest that biases between wind plant pre-construction energy yield estimates and actual energy production are decreasing over time. However, variability in energy yield prediction accuracy across different projects and wind energy consultants remains high. Wake effects are one of the largest categories comprising the pre-construction energy yield assessment process. To assess the accuracy of wake loss predictions, we compare pre-construction wake loss estimates provided by 8 consultants to the estimated operational wake losses for 10 North American wind plants, as part of the Wind Plant Performance Prediction (WP3) Benchmark project. We estimate operational wake losses using supervisory control and data acquisition (SCADA) data by comparing total wind plant energy production to the potential energy production based on the power produced by freestream wind turbines. In the presentation, we will discuss the overall wake loss prediction bias as well as the project-to-project variability in the prediction accuracy. Further, we will highlight challenges encountered when estimating operational wake losses, including the impact of complex terrain and the presence of neighboring wind plants.

benchmark↗

Summary Report of the FY24 DOE Contributions to the GIF VHTR CMVB

The Generation-IV Forum (GIF) Very-High-Temperature Reactor-Computational Methods Validation and Benchmark (VHTR-CMVB) initiative, involving organizations from Korea Atomic Energy Research Institute (KAERI) (South Korea), Institute of Nuclear and New Energy Technology of Tsinghua University (INET) (China), U.S. Department of Energy (DOE) (U.S.), Joint Research Centre (JRC) (Europe), and Japan Atomic Energy Agency (JAEA) (Japan), is dedicated to the verification and validation of tools for High-Temperature Gas-Cooled Reactors (HTGRs) analysis, using data shared by Computational Methods Validation and Benchmark (CMVB) signatories. For FY24, the US DOE CMVB has committed to several critical activities. Under WP1, led by the US, the integration of the High Temperature Gas Cooled Reactor - Pebble-Bed Module (HTR-PM) Phenomena Identification and Ranking Table (PIRT) into the comparative PIRT is progressing, with a new draft of the comparison tables issued earlier this year and currently being utilized by INET for their contribution. Neutronic validation efforts under WP3 include the preparation of the burnup analysis benchmark, preliminary calculations, and the development of reference models and results. In WP2, a validation exercise for hot gas mixing in the lower plenum of HTR-PM is in progress, using experimental data from INET (China) to validate modeling approaches. A model of the experimental facility has been developed using StarCCM+, with initial calculations slated for presentation at the GIF CMVB meeting this fall. Another WP2 activity focuses on validating numerical models for air-cooled Reactor Cavity Cooling System (RCCS) with experimental data from the Wisconsin Madison RCCS facility. A high-fidelity model, developed using NEK-RS, is currently being validated with available data from a low power forced convection test. These efforts are aimed at enhancing and confirming the accuracy of HTGR analysis tools, ensuring their alignment with experimental data and regulatory requirements.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Visualization and Quantification of Wind Induced Variability in Hydrogen Clouds Following Releases of Liquid Hydrogen: Preprint

Well characterized experimental data for consequence model validation is important in progressing the use of liquid hydrogen as an energy carrier. In 2019, the Health and Safety Executive (HSE) undertook a series of liquid hydrogen dispersion and combustion experiments as a part of the Pre-normative Research into the Safe Use of Liquid Hydrogen (PRESLHY) project. In partnership between the National Renewable Energy Laboratory (NREL) and HSE, time and spatially varying hydrogen concentration measurements were made in 25 dispersion experiments and 23 congested ignition experiments associated with PRESLHY WP3 and WP5, respectively. These measurements were undertaken using the hydrogen wide area monitoring system developed by NREL. During the 23 congested ignition experiments, high variability was observed in the measured explosion severity during experiments with similar initial conditions. This led to the conclusion that wind, including localized gusts, had a large influence on the dispersion of the hydrogen, and therefore the quantity of hydrogen that was present in the congested region of the explosions. Using the hydrogen concentration measurements taken immediately prior to ignition, the hydrogen clouds were visualized in an attempt to rationalize the variability in overpressure between the tests. Gaussian process regression was applied to quantify the variability of the measured hydrogen concentrations. This analysis could also be used to guide modifications in experimental designs for future research on hydrogen combustion behavior.

HSR&D↗