Waste Retrieval Enhancements to Achieve Preliminary Cease Waste Removal in Savannah River Site Liquid Waste Tanks 9H and 10H – 25348

The Liquid Waste (LW) contractor at the Savannah River Site (SRS) is Savannah River Mission Completion (SRMC). The LW Mission is tasked with processing legacy nuclear waste stored in underground waste tanks for final disposition. The Concentration, Storage, and Transfer Facilities (CSTF) contain 43 active waste tanks and 8 closed waste tanks between the two tank farms, F-Area Tank Farm (FTF) and H-Area Tank Farm (HTF). The first steps in the Waste Retrieval and Tank Closure (WRTC) process are the waste removal campaigns, consisting of either salt dissolution or sludge mobilization. Two tanks that are rapidly approaching the final closure determination and have demonstrated considerable success with salt dissolution are Tanks 9 and 10. The closure of these tanks is a high priority for the LW Mission due to the greater environmental risk they pose since both tanks reside within the water table and contain active leak sites from the primary tank to the annulus space. Tanks 9 and 10 have each recently completed their respective salt dissolution campaigns and achieved the Preliminary Cease Waste Removal (PCWR) milestone.

Stetson, Jacqueline G.↗

UP2 400 High Activity Oxide Legacy Waste Retrieval Project Scope and Progress-13048

The High Activity Oxide facility (HAO) reprocessed sheared and dissolved 4500 metric tons of light water reactor fuel the fuel of the emerging light water reactor spent fuel between 1976 and 1998. Over the period, approximately 2200 tons of process waste, composed primarily of sheared hulls, was produced and stored in a vast silo in the first place, and in canisters stored in pools in subsequent years. Upon shutdown of the facility, AREVA D and D Division in La Hague launched a thorough investigation and characterization of the silos and pools content, which then served as input data for the definition of a legacy waste retrieval and reconditioning program. Basic design was conducted between 2005 and 2007, and was followed by an optimization phase which lead to the definition of a final scenario and budget, 12% under the initial estimates. The scenario planned for the construction of a retrieval and reconditioning cell to be built on top of the storage silo. The retrieved waste would then be rinsed and sorted, so that hulls could subsequently be sent to La Hague high activity compacting facility, while resins and sludge would be cemented within the retrieval cell. Detailed design was conducted successfully from 2008 until 2011, while a thorough research and development program was conducted in order to qualify each stage of the retrieval and reconditioning process, and assist in the elaboration of the final waste package specification. This R and D program was defined and conducted as a response and mitigation of the major project risks identified during the basic design process. Procurement and site preparatory works were then launched in 2011. By the end of 2012, R and D is nearly completed, the retrieval and reconditioning process have been secured, the final waste package specification is being completed, the first equipment for the retrieval cell is being delivered on site, while preparation works are allowing to free up space above and around the silo, to allow for construction which is scheduled to being during the first semester of 2013. The elaboration of the final waste package is still undergoing and expected to be completed by then end of 2013, following some final elements of R and D required to demonstrate the full compatibility of the package with deep geological repository. The HAO legacy waste retrieval project is so far the largest such project entering operational phase on the site of La Hague. It is on schedule, under budget, and in conformity with the delivery requirements set by the French Safety Authority, as well as other stakeholders. This project paves the way for the successful completion of AREVA La Hague other legacy waste retrieval projects, which are currently being drafted or already in active R and D phase. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TECHNOLOGY SUMMARY ADVANCING TANK WASTE RETRIEVAL AND PROCESSING

This technology overview provides a high-level summary of technologies being investigated and developed by Washington River Protection Solutions (WRPS) to advance Hanford Site tank waste retrieval and processing. Technology solutions are outlined, along with processes and priorities for selecting and developing them.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Handling Approach for Whiteshell Laboratories Standpipe and Bunker Legacy Waste Retrieval - 18417

Veolia Nuclear Solutions (VNS) has been contracted by Canadian Nuclear Laboratories (CNL) to design and delivery a system to retrieve and repackage legacy waste on-site. The waste has a variety of forms and conditions and requires a flexible and robust set of remote handling devices to complete the task. The focus of this paper is to highlight the remote handling philosophy being used on the project which can be applicable to other projects. This approach is based on past experience and uses a range of remote handling devices and techniques matched to the variety of tasks in the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Commissioning and Operation of a Robotic Arm for Waste Retrieval at Trawsfynydd NPP, North Wales - 12091

Trawsfynydd is one of the UK's first generation Magnox nuclear power plants. It started operation in 1965 and ceased generation in 1991. Before the site can enter the 'care and maintenance' phase a number of wet and dry waste stores around the site must be emptied and their contents made safe. Wet wastes include sludges and resins produced during the operating life of the NPP. The sludges and resins are stored in a number of different tanks that vary significantly in terms of size, shape, internal features and access. A dexterous long reach manipulator arm has been designed and built to facilitate tank clearance. Commissioning of the arm was carried out in parallel with Factory Acceptance Testing (FAT) at the manufacturer's site in Colorado, USA. In addition to basic functional testing this work included a full range of task based testing to ensure that the arm, tools, control system and support equipment were thoroughly exercised in representative conditions. Trawsfynydd is one of the lead sites in the UK's program for nuclear plant decommissioning. As such the lessons learned, both in terms of technology and process, will be applicable across the remainder of the fleet. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

COMPLIANCE FOR HANFORD WASTE RETRIEVAL RADIOACTIVE AIR EMISSIONS

{sm_bullet} Since 1970, approximately 38,000 suspect transuranic (TRU) and TRU waste cont{approx}iners have been placed in retrievable storage on the Hanford Site in the 200Area's burial grounds. {sm_bullet} TRU waste is defined as waste containing greater than 100 nanocuries/gram of alpha emitting transuranic isotopes with half lives greater than 20 years. {sm_bullet} The United States currentl{approx}permanently disposes of TRU waste at the Waste Isolation Pilot Plant (WIPP).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Retrieval and Inspection Operations in Hanford Tank 241-AY-102 - 18234

In August 2012, a periodic annulus inspection of tank 241-AY-102 (AY-102) identified a leak from the primary tank into the secondary containment. A pumping plan was developed in 2013 to provide a path forward for recommended remediation actions to be implemented as part of the AY-102 Recovery Project. On March 21, 2014, the Washington State Department of Ecology issued an Administrative Order requiring Washington River Protection Solutions and the United States Department of Energy to conduct actions related to and including the removal of waste from AY-102. The parties agreed to resolve the appeal of the Administrative Order through a Settlement Agreement which addressed the remaining requirements and implemented enforceable milestone dates, including completion of waste removal operations, and performance of an inspection aimed at determining the cause of the leak. The AY-102 Recovery Project was developed to address the Settlement Agreement requirements. While retrieval of waste from Single-Shell Tanks has been performed at Hanford for decades, retrieval from Double-Shell Tank AY-102 required adaptation of the existing technologies to a new environment on a larger scale than previously encountered. Despite countless challenges and obstacles encountered throughout, the project successfully completed system design, fabrication, installation, testing, and retrieval operations within a highly compressed, aggressive schedule. Waste removal activities in AY-102 completed in February 2017. Subsequent inspection activities were completed as part of a multi-step process aimed at determining the likely cause of failure and assessing the feasibility of repair. A variety of input data were used in evaluating the likely failure mechanism, such as video examinations that revealed numerous through-floor penetrations and significant degradation across the visible surface area. Based on the operational history of the tank, corrosion testing and analysis, and the visual appearance of the confirmed leak sites, service-induced pitting corrosion due to the historic waste composition and operating conditions appears to be the primary degradation mechanism leading to failure of the tank. The inspection data has demonstrated that repairing and returning AY-102 to service would likely introduce substantial technical, logistical, and financial challenges due to the extent of bottom-plate damage. As a result, tank AY-102 will ultimately be closed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Preliminary Performance Assessment to Support Single-Shell Tank Waste Retrieval - 19446

A preliminary Performance Assessment (PA) of Single-Shell Tank (SST) Waste Management Area A-AX (WMA A-AX) located at DoE's Hanford Site in southeastern Washington is being conducted to satisfy the requirements of the Hanford Federal Facility Agreement and Consent Order (HFFACO), as well as other Federal and State requirements of closure plans and permits. The WMA A-AX PA effort is assessing the fate, transport, and impacts of radionuclides and hazardous chemicals within residual wastes left in tanks, ancillary equipment, and facilities in their assumed closed configuration, and the subsequent risks to humans into the far future. WMA A-AX includes the 241-A Tank Farm (A Farm), the 241-AX Tank Farm (AX Farm), and the ancillary equipment associated with each Farm. There are six underground SSTs in A Farm, and four underground SSTs in AX Farm. Each of these SSTs have a storage capacity of 1,000,000 gallons. A complex waste transfer system of ancillary equipment supported the transfer and storage of waste within WMA A-AX SSTs. This ancillary equipment includes transfer lines, catch tanks, diversion boxes, vaults, valve pits, and other miscellaneous structures. This paper emphasizes the development of the PA effort focused on radiological impacts to meet the requirements for a closure authorization under DOE Order 435.1. Lessons learned from retrieval and development of a recently completed PA of the nearby Waste Management Area C (WMA C) led to the decision to develop a preliminary PA for WMA A-AX prior to initiation of retrieval efforts so that a site-specific risk management capability could be available to support anticipated retrieval decisions. The technical approach for the PA analysis includes developing both a process-level model using site-specific hydrogeological data, as well as a system-level model. The system model is being developed to facilitate uncertainty and sensitivity analyses being conducted in the PA effort. Preliminary results of the DOE Order 435.1 PA are evaluating potential impacts to the groundwater and air pathways to determine radiation exposure once radionuclides are released to the environment from residual waste after closure of the tank farm. To meet other analysis requirements in DOE Order 435.1, the PA effort must also evaluate potential radiological impacts from inadvertent intruder scenarios into the closed WMA A-AX facility. The results of the PA evaluation will be compared to performance objectives and measures in the DOE Order 435.1 to support retrieval and eventual closure decisions at WMA A-AX. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Start-up of Silo 130 Waste Retrieval at La Hague: first Step Towards Reducing Legacy Inventory - 20020

On June 25, 2019, the first grapple of waste and debris was lifted from Silo 130, one of the most challenging legacy waste storage silos at La Hague. This was the achievement of more than ten years of studies and efforts focused on solving some very unique technical and safety challenges, and on designing an innovative, efficient solution. The waste is from de-cladding materials from past Gas-Cooled Reactor fuel reprocessing operations. It is an unsorted mixture of magnesium cladding pieces, graphite debris, and various other metallic waste types. These materials can be chemically reactive and therefore need specific dispositions for handling and storing. The building is more than 40 years old and does not meet modern standards. French safety authorities have required the silo to be emptied. After about three years of operation, the bulk of this waste will be removed and placed in safe storage, pending the selection of a final conditioning solution. Removal of bottom debris will then be possible. When finished, this operation will bring a conclusion to a significant legacy-related hazard on the site. The silo will then be available for final cleaning and de-activation. This paper will describe the technical, safety, and economical challenges, and the various decisions and optimizations that led to the definition of the process and technology to be implemented. Several innovative features were developed and implemented, in all sections of the project: project organization, progressive approach for the waste disposition strategy, light building design, customized and robust retrieval technology, processing technologies involving the most modern robotic and sorting techniques, storage method... Several of these first-of-a-kind innovative features have been developed and qualified specifically for this application, using the detailed qualification procedure specified for all La Hague projects. The facility was built in less than five years, overcoming various difficulties along the line. Commissioning is now finished with the combined efforts of the project, engineering, start-up, and operating teams assisted by dedicated suppliers. The facility is now ramping-up. The paper will also report on the commissioning and start-up of the facility and describe the first operational results. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

From passive storage to daily waste retrieval; changing the working culture at Sellafield's pile fuel storage pond

The Pile Fuel Storage Pond (PFSP) was built in 1948/50 to treat materials from the Windscale Piles. Multiple operational regimes over the intervening 60 years have resulted in a complex inventory of spent nuclear fuels, solid and liquid intermediate level wastes. A coordinated programme of work, designed to retrieve and safely dispose of the pond contents, has been implemented to enable the decommissioning of the facility. The long period of passive storage operations which preceded the implementation of the programme meant that the operator was faced with a dual challenge of providing new technical capability and changing a working culture that was inappropriate for the dynamic environment required to successfully deliver the programme. It was recognised that the nature of the programme meant that implementing a standard manufacturing approach to operations would not be appropriate. In order to create a dynamic retrievals focussed working culture, the operator has vigorously embraced change programmes aimed at improving a number of working practices including encouraging innovation, managing integrated but flexible production schedules, and encouraging work-face problem solving. The combined impact of beginning to resolve the technical challenges and focussing on the delivery culture has resulted in the facility making a step change towards becoming fully retrievals operations focussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Technology to Retrieve Waste Below the 324 Building at the Hanford Site - 19622

The Waste Technology Engineering Laboratory (324 Building) is a Category 2 Nuclear Facility at Hanford. The 324 Building Disposition Project is responsible for the removal and remedial actions under CERCLA. Additionally, there are RCRA Dangerous Waste Management Units which the CERCLA actions are presumed to satisfy. The Radiochemical Engineering Complex (REC) is a group of four hot cells (A, B, C and D Cells) with an interconnecting airlock inside of the 324 Building. Underneath the REC B-Cell are contaminated soils that have an estimated 12,793 R/Hr dose rate and remediation is under CERCLA 300-FF-2 Operable Unit. The current action consists of debris removal from the floor of B-Cell, B-Cell floor removal, and excavation of the soils beneath the floor to a depth of up to twelve feet with four Remote Excavator Arms (REA). This paper provides insight into the preparation and performance of high tolerance core drilling into a hot cell complex. Installation of the REA Through Support (REA TS) mechanism through the 4'-6' concrete shield walls is a complex series of tasks with demanding tolerances at each of four locations around the perimeter of B-Cell. The use of training mock ups was included in the completion of this work. The REA TS is two 11 inch diameter high strength steel sleeves that have expandable collars at each end allowing the interstitial space between the outside of the sleeve and inside of the core drill to be grouted to form a substantial structural connection, and a 10 inch pipe with hydraulic hoses to power the REA. There are three cores required for each REA location. The REAs themselves are customized excavator arms, mounted on support columns to be used in the excavation and transfer of the contaminated soil into storage facilities. The tasks for the installation of the REA TSs are: 1) Characterization of B-Cell Cubicles. 2) Embedded Pipe Fill. 3) Interference Removal. a. Internal Walls, b. External Walls. 4) Core Drilling. 5) Go/No-Go gauge, and video inspection. 6) Installation of REA Through Support Assembly. The 324 Building REC Hot Cells have internal, external, and embedded utilities throughout the shield walls in conflict with the REA TS locations. Some of the embedded utilities have connection points inside of the B-Cell Cubicles. There were two separate issues at the conflicted locations. The first issue was the core drill cooling water would flow along the embedded utility potentially spreading legacy chemical and radiological contamination to areas of the facility that was unwanted. The second issue was that the REA TS required a substantial structural connection to the B-Cell wall, the cored diameter is larger than the REA TS and these interstitial areas required a full grouted connection. The embedded utilities posed a hazard that if unfilled, the interstitial grout would flow into the embedded utility and destabilize the required grouted structural connection. The B-Cell Cubicles had not been opened in over 10 years. A mockup was completed to install a glovebag over the cubicle opening and then to verify functionality and port requirements. The embedded utility pipe connections in the cubicles were then opened inside a glovebag to verify the correct connection points, connection method for future embedded pipe fill material delivery system, radiological characterization, and air flow to show that the embedded utility pipes were not blocked and would not pressurize. The embedded pipe fill material and grout system was mocked up and run several times to verify methodology and functionality. The B-Cell Cubicles were then reentered and the embedded utility pipe fill was completed using a hand pump. External interferences at the core drill locations were removed using standard interference removal techniques. Internal interferences at the core drill locations were removed using a remote cutting tool that was controlled through the use of the B-Cell crane, remote cameras and remote lighting. The core drilling was mocked up two separate times, the project's purpose built 'Mock Up Facility' was core drilled to verify tolerances and methodology prior to subcontract award, the core drill subcontractor built a 'dummy wall' to train and practice on achieving the demanding tolerances, coordinated alignments between the cores, short term and long term dose shielding techniques, and contamination control techniques. A core drill template, and additional anchoring techniques were used to maximize accuracy and precision of the REA TS core drills. A 'Go/No-Go' gauge was built and installed at each of the four REA TS locations to verify that the core drill met tolerances. The core drill locations were visually inspected using a boroscope. The REA TS installation was mocked up at the projects 'Mock Up Facility' beginning with basic hazard controls, then with intermediate hazard controls, and finally with full occupational safety, industrial hygiene, and radiological controls. The REA TSs were installed and grouted into place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Tank Waste - Near Source Treatment of Low Activity Waste

Abstract only. Treatment and disposition of Hanford Site waste as currently planned consists of 100+ waste retrievals, waste delivery through up to 8+ miles of dedicated, in-ground piping, centralized mixing and blending operations- all leading to pre-treatment combination and separation processes followed by vitrification at the Hanford Tank Waste Treatment and Immobilization Plant (WTP). The sequential nature of Tank Farm and WTP operations requires nominally 15-20 years of continuous operations before all waste can be retrieved from many Single Shell Tanks (SSTs). Also, the infrastructure necessary to mobilize and deliver the waste requires significant investment beyond that required for the WTP. Treating waste as closely as possible to individual tanks or groups- as allowed by the waste characteristics- is being investigated to determine the potential to 1) defer, reduce, and/or eliminate infrastructure requirements, and 2) significantly mitigate project risk by reducing the potential and impact of single point failures. The inventory of Hanford waste slated for processing and disposition as LAW is currently managed as high-level waste (HLW), i.e., the separation of fission products and other radionuclides has not commenced. A significant inventory of this waste (over 20M gallons) is in the form of precipitated saltcake maintained in single shell tanks, many of which are identified as potential leaking tanks. Retrieval and transport (as a liquid) must be staged within the waste feed delivery capability established by site infrastructure and WTP. Near Source treatment, if employed, would provide for the separation and stabilization processing necessary for waste located in remote farms (wherein most of the leaking tanks reside) significantly earlier than currently projected. Near Source treatment is intended to address the currently accepted site risk and also provides means to mitigate future issues likely to be faced over the coming decades. This paper describes the potential near source treatment and waste disposition options as well as the impact these options could have on reducing infrastructure requirements, project cost and mission schedule.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Finite Element Structural Analysis Evaluating New Retrieval Strategies in the Hanford Waste Tanks 1 - 19125

Several waste retrieval methods being considered for the Hanford underground single- and double-shell nuclear waste storage tanks would require changes to the equipment loads above the tanks or structural modifications to the tanks themselves. Detailed structural analysis has been used in the planning phase to ensure that the reinforced concrete tanks continue to meet structural design codes in the modified configuration of these waste retrieval options. The feasibility of installing new single and multiple large risers penetrating the tank dome was evaluated using this approach. This paper summarizes the structural analysis methods and design codes used to evaluate the introduction of new unreinforced penetrations in a single-shell tank dome. The anticipated equipment loads during current and future waste retrieval operations are evaluated to ensure the continued structural integrity of the tank under thermal, dead weight, and seismic loads. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

THE RETRIEVAL KNOWLEDGE CENTER EVALUATION OF LOW TANK LEVEL MIXING TECHNOLOGIES FOR DOE HIGH LEVEL WASTE TANK RETRIEVAL 10516

The Department of Energy (DOE) Complex has over two-hundred underground storage tanks containing over 80-million gallons of legacy waste from the production of nuclear weapons. The majority of the waste is located at four major sites across the nation and is planned for treatment over a period of almost forty years. The DOE Office of Technology Innovation & Development within the Office of Environmental Management (DOE-EM) sponsors technology research and development programs to support processing advancements and technology maturation designed to improve the costs and schedule for disposal of the waste and closure of the tanks. Within the waste processing focus area are numerous technical initiatives which included the development of a suite of waste removal technologies to address the need for proven equipment and techniques to remove high level radioactive wastes from the waste tanks that are now over fifty years old. In an effort to enhance the efficiency of waste retrieval operations, the DOE-EM Office of Technology Innovation & Development funded an effort to improve communications and information sharing between the DOE's major waste tank locations as it relates to retrieval. The task, dubbed the Retrieval Knowledge Center (RKC) was co-lead by the Savannah River National Laboratory (SRNL) and the Pacific Northwest National Laboratory (PNNL) with core team members representing the Oak Ridge and Idaho sites, as well as, site contractors responsible for waste tank operations. One of the greatest challenges to the processing and closure of many of the tanks is complete removal of all tank contents. Sizeable challenges exist for retrieving waste from High Level Waste (HLW) tanks; with complications that are not normally found with tank retrieval in commercial applications. Technologies currently in use for waste retrieval are generally adequate for bulk removal; however, removal of tank heels, the materials settled in the bottom of the tank, using the same technology have proven to be difficult. Through the RKC, DOE-EM funded an evaluation of adaptable commercial technologies that could assist with the removal of the tank heels. This paper will discuss the efforts and results of developing the RKC to improve communications and discussion of tank waste retrieval through a series of meetings designed to identify technical gaps in retrieval technologies at the DOE Hanford and Savannah River Sites. This paper will also describe the results of an evaluation of commercially available technologies for low level mixing as they might apply to HLW tank heel retrievals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Practical Approach of Mining Operational Risks in Cigeo - A field-test - 19349

Andra is currently completing the detailed engineering phase of the stepwise design development of Cigeo (the French HLW and IL-LLW Deep Geological Repository, aka DGR). Various technical issues are at stake, including the risk management requirements linked to the safety of 'Mining Operations' (i.e. occupational safety issues related to underground excavation/dismantling works at some 500 m of depth), at different stages of the DGR life cycle (i.e. from its construction start-up to its final closure and future monitoring/or conversely a decision of waste retrieval). These occupational safety requirements have a significant impact on Cigeo's design, its progressive construction and later closure. On a shorter term, one must demonstrate that the design bases are technically sound and that the solutions selected (to build, operate, close the DGR infrastructures or conversely retrieve the waste) are both feasible and safe. In that sense (and following an identification of operational risks during construction), Andra focused on two sensitive cases: - The construction of large diameter drift crossings, in particular those related to the connection between a transfer drift (main) and a IL-LLW disposal vault (i.e. during construction operations), - The partial dismantling of a drift concrete lining (made of concrete segment rings, erected and placed by a TBM) at time of construction of a horizontal seal (i.e. during closure operations). The discussion starts with a description of the geotechnical conditions prevailing at the (French) Bure site, in the Callovo-Oxfordian (COx) claystone formation. Then the paper presents the Cigeo underground architecture (at large) and the specific structural choices made (at the end of the detailed engineering phase) for drifts, disposal vaults and seals. The discussion on construction - deconstruction challenges for each of the critical issues cited above provides an opportunity to explain the operational sequences (and how the methodology selected enables to reduce the risks). The following part of the paper focuses the technological demonstration (an in-situ test to be planned in detail) of a partial dismantling of the concrete segments rings forming the support lining of two tunnels previously built in the Meuse/Haute-Marne URL (Underground Research Laboratory) infrastructures, combined with the construction of a specific drift crossing. In this dismantling and construction test, the technical demonstration objective is three-fold: - The capacity to lay down compressible arch segments and support (by bolts and mesh) the rock after the lining removal, - The capacity to excavate and line the drift crossing, - The structural / geomechanical behavior (evolution with time) of the rock and lining compared with that of 'neighboring' zones. This paper provides a timeline of the tests. Should the results obtained deliver some positive perspectives of technical feasibility (and convincing operational safety) Andra will incorporate this dismantling/construction solution in the 'design freeze' of the DGR underground infrastructures. The positive outcomes of this technical test campaign will also provide 'elements of proof' for the instruction of the Cigeo licensing (a process likely to take place between 2020 and 2024) by the French Nuclear Safety Authority (ASN). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗