Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

On the Use of Smart Meter Data to Estimate the Voltage Magnitude on the Primary Side of Distribution Service Transformers

This paper develops a novel method to estimate the voltage magnitude on the primary side of distribution service transformers. The proposed method relies exclusively on smart meters, and therefore it is fully data-driven. This is an important feature because electric utilities have detailed models of only the primary network - that is, the network between the distribution substation and the primary side of service transformers that are installed closer to end-customer sites. The network that connects the secondary side of service transformers to end-customer sites, referred to as the secondary network, is simply represented by a lumped load. For each secondary network, the proposed method uses data acquired from only 2 smart meters: the closest and the farthest-in the sense of electrical distance - from the service transformer. As a reference to this feature, the proposed method is named SM2Vp. To our knowledge, this is the first time a method is shown to provide actionable information for realtime operation and control of power distribution grids using only two smart meters per secondary network. This is important because utilities have experienced barriers in managing and using large data sets for real-time operation and control. SM2Vp is primarily intended to provide pseudo-measurements for distribution system state estimation, but it can also be used directly for voltage control schemes. The performance of SM2Vp is demonstrated by numerical simulations carried out on three secondary network synthetic models and by using field data provided by a utility partner serving customers in southwestern California. A maximum relative error of approximately 3.9% or less is observed for the primary voltage magnitude estimates in all numerical experiments.

distribution service transformer↗

On the Use of Smart Meter Data to Estimate the Voltage Magnitude on the Primary Side of Distribution Service Transformers: Preprint

This paper develops a novel method to estimate the voltage magnitude on the primary side of distribution service transformers. The proposed method relies exclusively on smart meters, and therefore it is fully data-driven. This is an important feature because electric utilities have detailed models of only the primary network--that is, the network between the distribution substation and the primary side of service transformers that are installed closer to end-customer sites. The network that connects the secondary side of service transformers to end-customer sites, referred to as the secondary network, is simply represented by a lumped load. For each secondary network, the proposed method uses data acquired from only 2 smart meters: the closest and the farthest--in the sense of electrical distance--from the service transformer. As a reference to this feature, the proposed method is named SM2Vp. To our knowledge, this is the first time a method is shown to provide actionable information for real-time operation and control of power distribution grids using only two smart meters per secondary network. This is important because utilities have experienced barriers in managing and using large data sets for real-time operation and control. SM2Vp is primarily intended to provide pseudo-measurements for distribution system state estimation, but it can also be used directly for voltage control schemes. The performance of SM2Vp is demonstrated by numerical simulations carried out on three secondary network synthetic models and by using field data provided by a utility partner serving customers in southwestern California. A maximum relative error of approximately 3.9% or less is observed for the primary voltage magnitude estimates in all numerical experiments.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Net Load Redistribution Attacks on Nodal Voltage Magnitude Estimation in AC Distribution Networks

A high penetration level of smart devices and communication networks increases the threat of cyber-attacks in the distribution system. In this paper, we model a hidden, coordinated, net load redistribution attack (NLRA) in an AC distribution system. Based on local information of an attack region, the attacker’s goal is to create violations in nodal voltage magnitude estimation. Acting as a system operator equipped with global AC state estimation and bad data detection, we validate the stealthiness of the hidden NLRA in multiple attack cases. Simulation results on a modified PG&E 69-node distribution system show the validity of the proposed NLRA. The influence of NLRA on the distribution system is assessed and the impact of attack regions, attack timing, and system observability is also revealed.

Zhang, Hang↗

Data-Driven Chance-Constrained Design of Voltage Droop Control for Distribution Networks: Preprint

This paper addresses the design of local control methods for voltage control in distribution networks with high level of distributed energy resources (DERs). The designed control methods adapt the active and reactive power output of distributed energy resources proportional to the deviation of the local measured voltage magnitudes from a reference voltage, which is referred to as droop control. Thus, the design focuses on determining the droop characteristics which satisfy network-wide voltage magnitude constraints. The uncertainty and variability of DERs renders the design of optimal droop controls very challenging. Hence, this paper proposes chance constraints to limit the risk from intermittent DERs, by designing droop control coefficients that guarantee the satisfaction of network operational constraints with a specific probability. In addition, the proposed approach relies entirely on historical data rather than assuming knowledge of the probability distributions that characterize the uncertainty of DERs. The efficacy of the proposed method is demonstrated on a 37-bus distribution feeder.

chance-constrained optimization↗

Blockchain for Fault-Tolerant Grid Operations

Radial topology and vast geographic coverage make distribution systems prone to widespread power outages upon the failure of a single (or multiple) upstream component. Fault-handling algorithms depend heavily on correct estimations of the system’s state to effectively isolate the affected area and reduce the number of affected customers while maintaining operational safety. The work described here leverages the core features of distributed, consensus-based decision-making processes and the immutability of blockchain, and demonstrates their value in improving fault-tolerant grid operations. In this work, blockchain was used to create a trusted data-sharing platform that enables independent actors to reconstruct the system state; this enables distributed resources to make intelligent decisions with limited knowledge. Although the process requires data sharing, its algorithms have been designed to limit the amount of private information that is exchanged, which helps preserve business-sensitive data and maintain customer privacy. In addition, by reducing the information that must be shared, the communication requirements are also reduced; (however, an in-depth analysis of the communication requirements is beyond the scope of this project). The proposed use cases are intended to represent a foundational basis for third parties to develop functional solutions that can eventually be deployed in the field. To further provide guidance, the envisioned use cases have incorporated design requirements that consider the blockchain characteristics and a need to limit information from surrounding resources, which preserve the assumption and the possibility that such resources could belong to different entities. This report presents a detailed design of the three use cases with the tools needed to enable the analysis being tested. The implemented gross error detection method can detect mismatches when the error exceeds 3.8 times the sensor’s rated accuracy. Detection of the circuit breaker state successfully identified the correct states across all simulation tests. A distribution-system power-flow solution in the simulator OpenDSS generally possesses a convergency tolerance of 0.01% on the voltage magnitude. The evaluation of possible reconnection using voltage magnitude—preserving the data ownership—has a voltage magnitude difference smaller than 0.001% from the OpenDSS result. The results preserving data ownership have a difference within the expected power flow tolerance with full knowledge of the system, which surpasses expectations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Inrush Current Suppression Circuit and Method for Controlling When a Load May Be Fully Energized

A circuit and method for controlling when a load may be fully energized includes directing electrical current through a current limiting resistor that has a first terminal connected to a source terminal of a field effect transistor (FET), and a second terminal connected to a drain terminal of the FET. The gate voltage magnitude on a gate terminal of the FET is varied, whereby current flow through the FET is increased while current flow through the current limiting resistor is simultaneously decreased. A determination is made as to when the gate voltage magnitude on the gate terminal is equal to or exceeds a predetermined reference voltage magnitude, and the load is enabled to be fully energized when the gate voltage magnitude is equal to or exceeds the predetermined reference voltage magnitude.

Schwerman, Paul↗

Online Detection of Low-Quality Synchrophasor Data Considering Frequency Similarity

Here, this letter proposes a new approach for online detection of low-quality synchrophasor data under both normal and event conditions. The proposed approach utilizes the features of synchrophasor data in time and frequency domains to distinguish multiple regional PMU signals and detect low-quality synchrophasor data. It is more effective to detect low-quality data with apparently indistinguishable profiles. Case studies from recorded synchrophasor measurements verify the effectiveness of the proposed approach for detecting low-quality synchrophasor data in frequency, voltage magnitude and voltage angle.

42 ENGINEERING↗

Performance characteristics of three-phase induction motors

An investigation into the characteristics of three phase, 400 Hz, induction motors of the general type used on aircraft and spacecraft is summarized. Results of laboratory tests are presented and compared with results from a computer program. Representative motors were both tested and simulated under nominal conditions as well as off nominal conditions of temperature, frequency, voltage magnitude, and voltage balance. Good correlation was achieved between simulated and laboratory results. The primary purpose of the program was to verify the simulation accuracy of the computer program, which in turn will be used as an analytical tool to support the shuttle orbiter.

Wood, M. E.↗

Three-phase induction motors

Program simulates performance characteristics of three-phase induction motors under normal conditions and extreme temperature, frequency, voltage magnitude, and voltage balance.

Wood, M. E.↗

Transient Voltage Recorder

A voltage transient recorder can detect lightning induced transient voltages. The recorder detects a lightning induced transient voltage and adjusts input amplifiers to accurately record transient voltage magnitudes. The recorder stores voltage data from numerous monitored channels, or devices. The data is time stamped and can be output in real time, or stored for later retrieval. The transient recorder, in one embodiment, includes an analog-to-digital converter and a voltage threshold detector. When an input voltage exceeds a pre-determined voltage threshold, the recorder stores the incoming voltage magnitude and time of arrival. The recorder also determines if its input amplifier circuits clip the incoming signal or if the incoming signal is too low. If the input data is clipped or too low, the recorder adjusts the gain of the amplifier circuits to accurately acquire subsequent components of the lightning induced transients.

Pedro J Medelius↗

Real time feedback-based optimization of distributed energy resources

An example device includes a processor configured to receive a plurality of voltage values representing respective voltage magnitudes at voltage nodes in a first portion of a power system and determine, for each voltage node, a respective value of first and second voltage-constraint coefficients. The processor is also configured to receive a power value corresponding to a connection point of the first portion of the power system with a second portion of the power system and determine for the connection point, a respective value of first and second power-constraint coefficients. The processor is also configured to cause at least one energy resource connected to the first portion of the power system to modify an output power of the at least one energy resource based on the value of the first and second voltage-constraint coefficients for each voltage node and the value of the first and second power-constraint coefficients.

Dall'Anese, Emiliano↗

Real time feedback-based optimization of distributed energy resources

An example device includes a processor configured to receive a plurality of voltage values representing respective voltage magnitudes at voltage nodes in a first portion of a power system and determine, for each voltage node, a respective value of first and second voltage-constraint coefficients. The processor is also configured to receive a power value corresponding to a connection point of the first portion of the power system with a second portion of the power system and determine for the connection point, a respective value of first and second power-constraint coefficients. The processor is also configured to cause at least one energy resource connected to the first portion of the power system to modify an output power of the at least one energy resource based on the value of the first and second voltage-constraint coefficients for each voltage node and the value of the first and second power-constraint coefficients.

Dall'Anese, Emiliano↗

Matrix Completion for Improved Observability in Low-Voltage Distribution Grids

This paper considers the problem of recovering missing entries in a partially observed matrix from relatively few measurements (i.e., the so-called matrix completion problem) with the aim of increasing the presently limited observability of low-voltage distribution grids. To this end, the partially observed matrix is formed using scarce voltage magnitude measurements while accounting for their spatial information. Voltage readings are assumed to be collected from distribution utility sensors and/or geographically-distributed cable television network sensors located in immediate proximity to distribution grid nodes. A matrix completion approach built on the parameter-less singular value shrinkage technique is used to estimate voltage magnitudes at otherwise non-observable low-voltage nodes using a small number of single- or multiple-snapshot data. The effectiveness of the proposed approach is demonstrated using a U.S.-style distribution test system from the synthetic SMART- DS data set under very low- to moderate-observability conditions.

low-rank matrix completion↗

A data-driven sensor placement approach for detecting voltage violations in distribution systems

Stochastic fluctuations in power injections from distributed energy resources (DERs) combined with load variability can cause constraint violations (e.g., exceeded voltage limits) in electric distribution systems. To monitor grid operations, sensors are placed to measure important quantities such as the voltage magnitudes. Here, in this paper, we consider a sensor placement problem which seeks to identify locations for installing sensors that can capture all possible violations of voltage magnitude limits. We formulate a bilevel optimization problem that minimizes the number of sensors and avoids false sensor alarms in the upper level while ensuring detection of any voltage violations in the lower level. This problem is challenging due to the nonlinearity of the power flow equations and the presence of binary variables. Accordingly, we employ recently developed conservative linear approximations of the power flow equations that overestimate or underestimate the voltage magnitudes. By replacing the nonlinear power flow equations with conservative linear approximations, we can ensure that the resulting sensor locations and thresholds are sufficient to identify any constraint violations. Additionally, we apply various problem reformulations to significantly improve computational tractability while simultaneously ensuring an appropriate placement of sensors. Lastly, we improve the quality of the results via an approximate gradient descent method that adjusts the sensor thresholds. We demonstrate the effectiveness of our proposed method for several test cases, including a system with multiple switching configurations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Harnessing distributed GPU computing for generalizable graph convolutional networks in power grid reliability assessments

Although machine learning (ML) has emerged as a powerful tool for rapidly assessing grid contingencies, prior studies have largely considered a static grid topology in their analyses. This limits their application, since they need to be re-trained for every new topology. Here, this paper explores the development of generalizable graph convolutional network (GCN) models by pre-training them across a range of grid topologies and contingency types. We found that a GCN model with auto-regressive moving average (ARMA) layers with a line graph representation of the grid offered the best predictive performance in predicting voltage magnitudes (VM) and voltage angles (VA). We introduced the concept of phantom nodes to consider disparate grid topologies with a varying number of nodes and lines. For pre-training the GCN ARMA model across a variety of topologies, distributed graphics processing unit (GPU) computing afforded us significant training scalability. The predictive performance of this model on grid topologies that were part of the training data is substantially better than the direct current (DC) approximation. Although direct application of the pre-trained model to topologies that are not part of the grid is not particularly satisfactory, fine-tuning with small amounts of data from a specific topology of interest significantly improves predictive performance. In general, this paper highlights the feasibility of training large-scale GNN models to assess the reliability of power grids by considering a wide variety of grid topologies and contingency types. With the advent of foundational models in ML and the exponential increase in GPU computing clusters, generalizable ML models will significantly enhance how utilities manage power systems and make decisions in real-time or near-real-time.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Voltage Estimation in Low-Voltage Distribution Grids with Distributed Energy Resources

Present distribution grids generally have limited sensing capabilities and are therefore characterized by low observability. Improved observability is a prerequisite for increasing the hosting capacity of distributed energy resources such as solar photovoltaics (PV) in distribution grids. In this context, this paper presents learning-aided low-voltage estimation using untapped but readily available and widely distributed sensors from cable television (CATV) networks. The cable broadband sensors offer timely local voltage magnitude sensing with 5-minute resolution and can provide an order of magnitude more data on the time-varying state of a secondary distribution system than currently deployed utility sensors. The proposed solution incorporates voltage readings from neighboring CATV sensors, taking into account spatio-temporal aspects of the observations, and estimates single-phase voltage magnitudes at all non-monitored low-voltage buses using random forests. The effectiveness of the proposed approach was demonstrated using a multi-phase 1572-bus feeder from the SMART-DS data set for two case studies passive distribution feeder (without PV) and active distribution feeder (with PV). The analysis was conducted on simulated data, and the results show voltage estimates with a high degree of accuracy, even at extremely low percentages of observable nodes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Methods and systems for detection of man-in-the-middle attacks for SCADA communication networks and applications of same

A system for detecting MITM for SCADA communication networks includes secure substation-substation communication links for providing secure and reliable paths to exchange OT data between substations for OT data consistency check; a SIB in each substation for sampling CT and PT measurements to calculate voltage magnitude and phase angle thereof; a S&C server in each substation coupled to the SIB for receiving the voltage magnitude and phase angle from the SIB and obtaining a packet carrying active power flow in transmission lines between two substations and a time stamp; an IDS server placed in a SCADA center for collecting the packet of each substation sent by the S&C server; analyzing the received packet from every adjacent substation; inspecting the payload of the received packet; and triggering an intrusion alarm to a SCADA operator when the power flow is not the same as the payload of the packets.

McCann, Roy A.↗

Magnetic Bearing Amplifier Output Power Filters for Flywheel Systems

Five power filters and two types of power amplifiers were tested for use with active magnetic bearings for flywheel applications. Filter topologies included low pass filters and low pass filters combined with trap filters at the PWM switching frequency. Two state and three state PWM amplifiers were compared. Each system was evaluated based on current magnitude at the switching frequency, voltage magnitude at 500 kHz, and power consumption. The base line system was a two state amplifier without a power filter. The recommended system is a three state power amplifier with a 50 kHz low pass filter and a 27 kHz trap filter. This system uses 5.57 W. It reduces the switching current by an order of magnitude and the 500 kHz voltage by two orders of magnitude. The relative power consumption varied depending on the test condition between 60 to 130 percent of the baseline.

Lebron-Velilla, Ramon C.↗