Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Verdant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Verdant Power: Thermoplastic Blade Validation at Full Scale

For the first time in history, thermoplastic composite blades, which have the potential to revolutionize the marine energy industry, are being validated on a large-scale tidal power turbine. Thanks to funding from the U.S. Department of Energy's Water Power Technologies Office and a collaboration with Verdant Power, NREL researchers constructed thermoplastic composite turbine blades and are validating their performance on one of Verdant Power's tidal turbines deployed in New York City's East River.

HYDRO ENERGY↗

Structural Characterization of Deployed Thermoplastic and Thermoset Composite Tidal Turbine Blades

The National Renewable Energy Laboratory worked with Verdant Power to manufacture, and characterize, novel thermoplastic composite blades on their Gen5d 5 m diameter turbines at the Roosevelt Island Tidal Energy (RITE) site in the East River in N.Y. to demonstrate a low-cost manufacturing process for marine energy structures. Verdant had designed, manufactured, and deployed epoxy thermoset composite blades on three Gen5d turbines in October 2020. At a maintenance cycle in May 2021, a Gen5d turbine equipped with the NREL thermoplastic blades was deployed and retrieved in October 2021. Modal, static and fatigue structural characterization was performed on both blade types before and after the deployment. The static and modal test results showed that the thermoplastic blades were slightly stiffer than the epoxy blades both dry and after the deployment. The epoxy blades had about 8% increase in strain at the applied load after the deployment, whereas the thermoplastic blade strains were not changed significantly. Ultimately the thermoplastic blade failed during fatigue testing due to a crack which is thought to have initiated between the internal foam and the laminate at the location of the internal instrumentation. The Verdant Power Gen5d epoxy blades did not have this internal instrumentation and did not have this failure, performing adequately through the operational period. A lack of design information and fatigue data for both the thermoplastic laminates and the adhesive used means that further work is needed to fully understand his failure and the root cause analysis is ongoing. This paper provides details on the thermoplastic blade manufacturing, materials, test methodology and results.

17 WIND ENERGY↗

TriFrame Mount Structural Performance - Period A

Long-Term TriFrame Monitoring System (LTTFMS) data collected during Period A (13 days - 10/22/20 - 11/4/20). The central component of the Verdant Power Free Flow System is a three-bladed horizontal-axis turbine. The turbine is equipped with a composite rotor with three fixed-pitch blades that rotate at a slow and regular rate (approx. 32 rpm), well below normal water vessel propeller speeds and conventional hydropower turbine blade speeds. The TriFrame mount is the structural mount that holds the three Verdant Power three-bladed horizontal-axis turbines.

16 TIDAL AND WAVE POWER↗

Accelerated Lifetime Testing of Main Shaft Seals for Tidal Turbine Rotors

This document will briefly discuss the observations and results from an NREL conducted accelerated lifetime testing of the main shaft seal for the Verdant Power fifth generation Gen5 underwater Tidal Energy Converter (TEC) turbine, which successfully performed at the RITE project in 2020-2021. In order to evaluate a 5-year Service Interval ( SI) for this component, testing at NREL operated the main shaft seal nearly continuously for over 135 (text says 130 days on page 5 and 125 days on page 7 and 137 days on page 11) days at a rotational velocity of 160 rpm while the test stand recorded water pressure, barrier fluid pressure, temperature, and number of cycles., representing ~ 40% of the SI. An additional separate test was conducted to measure the aging behavior of the rubber drive rings. The water pressure reservoir was held constant as 29 psi. Barrier fluid pressure remained relatively constant throughout the duration of the test but was seen to sink to as low as 10.1 psi. No barrier fluid leakage was observed throughout the test. A sudden failure occurred within the seal after the power to test machine was interrupted for a scheduled building maintenance procedure. Upon restarting, the main shaft seal lost all ability to prevent water ingress. The exact cause is not known but is believed to be either a seal assembly issue or a change in the alignment of the seal components during or following the power outage. Following seal disassembly, significant wear was seen on one of the graphite sealing rings. Based on these results it is recommended that a follow-on TEAMER be conducted to rectify protocol and assembly issues to further evaluate SI of this component. The support and participation of Verdant Power Inc, Dovetail Solutions LLC and Garlock Manufacturing Inc were instrumental in understanding the results. NREL thanks them for their significant effort.

13 HYDRO ENERGY↗

Resource Assessment Study of Long Island Sound Tidal Resource in New York State Waters Based on Numerical Modeling (Abstract)

To refine the understanding of the tidal energy resource in Long Island Sound (LIS), Verdant Power and PNNL will collaborate to conduct a numerical modeling campaign in accordance with a Stage 2 resource assessment according to IEC TC 62600-201. The work will develop a high resolution tidal hydrodynamic model using FVCOM in LIS, validate the model using NOAA C-MIST ADCP data, and conduct a Stage 2 array layout design study at selected hotspots within the project area. The teams will also model tidal energy extraction using the FVCOMTEC module at the hotspot sites, based on specific device technologies provided by Verdant Power. Model results from this study will inform additional resource assessment activities such as in situ water velocity measurements for further model validation and elucidate understanding of other key sites in Long Island Sound for commercial-scale tidal energy deployments.

16 TIDAL AND WAVE POWER↗

RITE Gen5 KHPS Levelized Cost of Energy

Levelized Cost of Energy analysis for Verdant Power Gen5 KHPS utilizing annualized AEP based on actual energy generation at the RITE Project during 2020-21. The WEC devices analyzed include attenuator, point absorber, oscillating wave surge converter, oscillating water column, overtopping/terminator device, submerged pressure differential, bulge wave, and rotating mass type wave energy converter devices. The CEC devices analyzed include horizontal axis turbine, vertical axis turbine, oscillating hydrofoil, enclosed tips (Venturi), Archimedes screw, and tidal kite type current energy converter devices.

16 TIDAL AND WAVE POWER↗

Post-Deployment Characterization of Glass Fiber-Reinforced Thermoset and Thermoplastic Composite Tidal Turbine Blades

In 2021, the National Renewable Energy Laboratory (NREL) supported Verdant Power with the most successful tidal energy deployment in U.S. history. Three of their Gen5d 5 m turbines were deployed as part of the Roosevelt Island Tidal Energy project. Initially, the three rotors initially deployed were manufactured from glass fiber-reinforced epoxy composites. Midway through the deployment, one rotor was replaced with one manufactured at NREL. The new rotor utilized a novel infusible thermoplastic resin system. Since the deployment, one epoxy rotor and one thermoplastic rotor were returned to NREL for continued materials and manufacturing research. The two rotors underwent full-scale structural testing before being sectioned and cut into specimens for a variety of manufacturing quality tests, thermomechanical characterization, and evaluation of material performance in marine environments to understand the key differences between the fiberglass-reinforced epoxy and Elium composites used for the respective rotors. Matrix burn-off tests showed that the Elium blades had a considerably higher fiber volume fraction compared to the epoxy blades (61% vs. 49%). Environmental aging of the specimens showed that the epoxy laminates absorbed more water over the conditioning period; however, it was determined that the Elium laminates had higher diffusion coefficients, so they initially absorbed water faster. Finally, one full epoxy blade and one full Elium blade were conditioned at ambient temperatures for up to 11 months, while periodic mass measurements were taken. The datasets were extrapolated to assume a full 20-year operational life span, and it was determined that the blades would not reach full saturation during that time span.

composite manufacturing↗

Toward the Instrumentation and Data Acquisition of a Tidal Turbine in Real Site Conditions

The National Renewable Energy Laboratory manufactured, instrumented, and deployed thermoplastic composite blades and a data acquisition system (NDAQ) on one of Verdant Power’s Gen5d 5 m diameter tidal turbines in New York’s East River. The thermoplastic blades had internal strain gages, and the NDAQ was a stand-alone system for monitoring and recording the strain and angular position of the blades. The turbine with thermoplastic blades operated and produced power successfully for 3 months, contributing energy to the New York City electric grid. The NDAQ hardware, instrumentation, and structure all survived the deployment and were still functional upon retrieval of the system, but no data were collected. Even though the data retrieval was not a success, data acquisition for deployed subsea marine renewable structures is a new undertaking, and it is critical to share lessons learned from national laboratory experiences. The successful deployment of thermoplastic composite blades marks a significant advancement toward improved materials for subsea components, as well as an advancement in recyclable composite materials. This article outlines the methodology and lessons learned for the instrumentation and data acquisition system.

16 TIDAL AND WAVE POWER↗

Offshore Hydrokinetic Energy Conversion for Onshore Power Generation

Design comparisons have been performed for a number of different tidal energy systems, including a fully submerged, horizontal-axis electro-turbine system, similar to Verdant Tidal Turbines in New York's East River, a platform-based Marine Current Turbine, now operating in Northern Ireland's Strangford Narrows, and the Rotech Lunar Energy system, to be installed off the South Korean Coast. A fourth type of tidal energy system studied is a novel JPL/Caltech hydraulic energy transfer system that uses submerged turbine blades which are mechanically attached to adjacent high-pressure pumps, instead of to adjacent electrical turbines. The generated highpressure water streams are combined and transferred to an onshore hydroelectric plant by means of a closed-cycle pipeline. The hydraulic energy transfer system was found to be cost competitive, and it allows all electronics to be placed onshore, thus greatly reducing maintenance costs and corrosion problems. It also eliminates the expenses of conditioning and transferring multiple offshore power lines and of building offshore platforms embedded in the sea floor.

hydraulic↗

2.2.2.405 - Verdant/NREL Research Measurement Campaign

The marine renewable energy industry primarily uses thermoset composite materials for blades and other hydrodynamic components, which can have up to 50% reduction in strength when exposed to seawater and are not recyclable. Thermoplastic composite materials have been shown at a coupon-scale to have improved seawater saturated properties but have not been validated at full scale. The primary goal of the project is to demonstrate the structural properties of thermoplastic-fiberglass composite blades compared to epoxy-fiberglass composite blades in seawater at a tidal energy site on an operational turbine. Through this work, NREL manufactured, tested and deployed thermoplastic blades and a data acquisition system on Verdant Power's turbine TriFrame in the East River, NYC. The thermoplastic blades and DAQ were retrieved after a 6-month deployment with no signs of degradation and all cable connections, structural supports and strain gages had a 100% survival rate. The blades are currently undergoing post-deployment structural validation to compare their performance to traditional epoxy blades that were deployed for the same amount of time. This will increase confidence in thermoplastic materials and move it closer to commercial adoption, as well as increase confidence in the design of a DAQ and instrumentation method for a tidal turbine. However, due to an error in the DAQ software that was introduced after the DAQ and software were validated, there was no loads data collected during the deployment.

blade testing↗

Post-Deployment Characterization of Glass Fiber-Reinforced Thermoset and Thermoplastic Composite Tidal Turbine Blades: Preprint

In 2021, the National Renewable Energy Laboratory (NREL) supported Verdant Power with the most successful tidal energy deployment in U.S. history. Three of their tidal turbines were deployed as part of the Roosevelt Island Tidal Energy project. Initially, the three rotors were manufactured from glass fiber-reinforced epoxy composites. Midway through the deployment, one rotor was replaced with one manufactured at NREL. Instead, it was infused with a novel, infusible thermoplastic resin system. Since the deployment, one epoxy rotor and one thermoplastic rotor were returned to NREL for continued materials and manufacturing research. The two rotors underwent full-scale structural testing before being sectioned and cut into specimens for a variety of manufacturing quality tests, thermos-mechanical characterization, and evaluation of material performance in marine environments, to understand the key differences between the fiberglass reinforced epoxy and Elium composites used for the respective rotors. Matrix burnoff tests showed that the Elium blades had a considerably higher fiber volume fraction compared to the epoxy blades (61% vs. 49%). Environmental aging of the specimens showed that the epoxy laminates absorbed more water over the conditioning period, however, it was determined that the Elium laminates had higher diffusion coefficients, so initially absorbed water faster. Finally, one full epoxy blade and one full Elium blade were conditioned at ambient temperatures for up to 11 months, while taking periodic mass measurements. The datasets were extrapolated out to assume a full 20 year operational life span and it was determined that the blades would not reach full saturation during that time span.

composite manufacturing↗

Post-Deployment Characterization of Glass Fiber-Reinforced Thermoset and Thermoplastic Composite Tidal Turbine Blades

In 2021, the National Renewable Energy Laboratory (NREL) supported Verdant Power with the most successful tidal energy deployment in U.S. history. Three of their Gen5d 5 m turbines were deployed as part of the Roosevelt Island Tidal Energy project. Initially, the three deployed rotors were manufactured from glass fiber-reinforced epoxy composites. Midway through the deployment, one rotor was replaced with one manufactured at NREL. The new rotor utilized a novel infusible thermoplastic resin system (Elium from Arkema). Since the deployment, one epoxy rotor and one thermoplastic rotor were returned to NREL for continued materials and manufacturing research. The two rotors underwent full-scale structural testing before being sectioned and cut into specimens for a variety of manufacturing quality tests, thermomechanical characterization, and evaluation of material performance in marine environments to understand the key differences between the fiberglass-reinforced epoxy and Elium composites used for the respective rotors. Matrix burn-off tests showed that the Elium blades had a considerably higher fiber volume fraction compared to the epoxy blades (61% vs. 49%). Environmental aging of the specimens showed that the epoxy laminates absorbed more water over the conditioning period; however, it was determined that the Elium laminates had higher diffusion coefficients, so they initially absorbed water faster. Finally, one full epoxy blade and one full Elium blade were conditioned at ambient temperatures for up to 11 months, while periodic mass measurements were taken. The datasets were extrapolated to assume a full 20-year operational life span, and it was determined that the blades would not reach full saturation during that time span.

composite manufacturing↗

RITE Gen5 KHPS Performance - Period B

Includes Kinetic Hydropower System (KHPS) Turbine performance data from the RITE Gen5 KHPS turbine at the 5 meter size. This data was collected over 16 days in May 2021 during Period B operation. Along with performance data, the data includes setup data, project metadata, and characteristic data for RITE Gen5 KHPS (5m) turbine.

16 TIDAL AND WAVE POWER↗

Testing and Expertise for Marine Energy (TEAMER) Program Support: MRE Dynamic Seals Performance Investigation (CRADA Final Report)

This TEAMER project allows NREL to use and augment a custom special-purpose testing system to perform accelerated-life testing of rotating seals for use in the Marine Renewable Energy (“MRE”) industry. The requirements of this industry are different from most applications including marine, and relevant performance information is lacking. In order to achieve low costs with extremely effective and reliable operation over long periods deployed underwater, more study of the best seals and arrangements of seals must be performed. By developing a rigorous framework for such testing, NREL hopes to greatly improve understanding of the relevant factors and provide significant data to the industry. Further, this work can inform standards developments for this critical component of MRE systems, leading to maturation and improved acceptance of the industry in commerce.

16 TIDAL AND WAVE POWER↗