Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Utility New Construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Verified! How Performance-Based Procurement Can Boost New Construction Program Savings and Empower Building Owners

Most utility new construction programs depend on modeled projections and deemed savings based on individual technologies. The industry has established ways to evaluate these programs based on the promise - not the actual performance - of these buildings post- occupancy. Deeper savings from a more integrated design with continuous performance monitoring are left on the table, locking out the higher performance for the lifetime of the building. This paper will demonstrate how performance-based procurement can empower utility incentive offerings to drive deep energy savings and reduce administrative costs. The key is to incentivize a change in the building owner's procurement process and reward actual building energy performance rather than incentivizing specific measures. The paper looks at strategies to transition new construction programs from technology-based verification to actual measurement of performance outcomes. Accelerate Performance, a U.S. Department of Energy (DOE) funded initiative, changes the building procurement approach, which spurs innovation and motivates the design and contracting industry to achieve deep energy savings in new construction - in the case of DOE's National Renewable Energy Laboratory Research Support Facility (NREL) in Golden, CO, 50% without increasing initial costs. Utility programs in three states, Illinois, Minnesota, and Connecticut, are actively piloting the approach with leading-edge owners. The paper will share savings results and lessons learned from the three different utility pilot programs. The paper provides practical guidance for utility program managers about how to apply the Accelerate Performance approach to supplement their current new construction program offerings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

New Construction and UESCs

Presentation at the Federal Utility Partnership Working Group Seminar held November 7-8, 2019, in Washington, DC, reviews the implementation of utility energy service contracts in new federal construction projects.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Construction Support for New Slab Creek Powerhouse Project (Final Technical Report)

The Sacramento Municipal Utility District (SMUD) has constructed a new powerhouse and Boating Flow Release Facility (BFRF) ¼ mile downstream of the existing Slab Creek Dam with the assistance of grant funding from the Department of Energy in the amount of $1.5 million. Slab Creek Dam impounds 16,600 acre-feet of storage and has a normal full pool elevation of 1850ft. Water is conveyed from Slab Creek Reservoir through a 4.9 mile power tunnel to the 224 MW White Rock Powerhouse which discharges into Chili Bar Reservoir. A small 450 kW powerhouse located at Slab Creek Dam utilizes the original license in-stream flow requirement. The new license (FERC Project No. 2101-084) requires significantly more instream flows immediately below the dam for aquatic preservation and recreational flows over the original license. The terms of the new license allow the Slab Creek Powerhouse to utilize the original required dam releases, while the new South Fork Powerhouse will use the new instream flow requirements above the original license requirement. The South Fork Powerhouse routes flows back to the South Fork of the American River via a new penstock that is tied into the White Rock Tunnel at Adit #3. This new penstock bifurcates at the Adit #3 portal with one leg going to the BFRF and the other to the new powerhouse. The South Fork Powerhouse is a single generating unit with a capacity of 2.98 kVA. The BFRF is valve house with an energy dissipation chamber for a 60” fixed cone valve capable of passing 1,300 cfs for meeting the recreational flow requirements of the license.

power tunnel↗

Utilization of mixed ligands to construct two new coordination polymers: Syntheses, structures and properties

The use of triazine and aromatic carboxylic acid as mixed chelating ligands in preparing two coordination polymers is described. Two new transition-metal coordination polymers, namely, [Co{sub 2}(bpdc){sub 4}(phdat){sub 2}] (1) and [Zn(bpdc)]{sub n} (2) (H{sub 2}bpdc=2,4-biphenyldicarboxylic acid, phdat=2,4-diamine-6-phenyl-1,3,5-triazine), have been hydrothermally synthesized and structurally characterized by IR, elemental analyses, X-ray single-crystal diffraction and TGA. Compound 1 is a 0D structure and extends to a 3D network by two different N–H···O and N–H···N hydrogen bonds. Compound 2 exhibits a 2D network with 4{sup 4}.6{sup 2} topological net, which contains two kinds of single helical chains. The interactions within each Co(II)–Co(II) pair of compound 1 are antiferromagnetic (g=2.19, J=−22 K, zj′=−0.00351 K). Furthermore, the photoluminescence property of 2 was also investigated in the solid state at room temperature. - Graphical abstract: Two polymeric metal compounds based on mixed-ligands were synthesized and characterized. The use of different metal ions results in distinct structures. The magnetic and fluorescent properties were also studied. - Highlights: • The first bpdc{sup 2−}/phdat-based 0D discrete coordination complex. • A new 2D architecture with two kinds of helical chains. • The structure-dependent magnetism and photoluminescence properties.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Accelerate Performance (Final Technical Report)

Encouraging commercial building owners to set measurable energy goals before design begins can drive design and contractor teams to develop innovative energy efficiency solutions within conventional building budgets. A federal building owner piloted this technique and created a large-scale zero-energy office building on a budget comparable to local market construction rates. The successes and lessons learned from this performance-based project formed the basis of Accelerate Performance, an expanded program using utilities as the primary outreach channel to replicate the approach. Four utilities partnered with Slipstream, a not-for-profit program implementer, to develop pilot incentive offerings to focus building owners on the whole building rather than on individual building components and systems. The original performance-based procurement process and its successful implementation in a federal building project informed all these efforts. The experiences and lessons learned in different new construction markets led to further process adaptations as well as the development of templates and tools to streamline outreach and technical support efforts. The approach can be adapted to utility new construction programs and is a powerful tool for engaging many building owners early in the project planning process as they make critical energy decisions that impact the performance of the building. The approach has led to real energy savings in building projects by encouraging cost-effective, low-risk, and creative design solutions. The performance-based approach was tested in a variety of applications including different building types and owner types, with many owners adopting performance-based procurement techniques, some with variations, but all maintaining the same core principles. Over the course of the project, nearly 100 building projects were impacted and additional projects will continue to be supported through ongoing program offerings with three leading utilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Economic Sizing of Batteries for the Smart Home: Preprint

This paper presents a methodology to economically size a home battery based on parametric analysis using home energy management system (HEMS) software to optimally dispatch the battery along with controllable loads under several use cases. We account for connected equipment, controls, renewable resources, and other factors such as building characteristics and utility tariffs. The paper defines an analytical pathway for such a sizing tool, develops initial sizing guidance, and clarifies technical and market opportunities for home batteries in the context of existing and emerging equipment and control technologies. A parametric analysis that included 132 scenarios has been performed based on different combinations of pertinent parameters. Results indicate that four variables dominate the decision-making process: application scenarios (new construction or retrofit), utility tariffs, existence of HEMS, and the anticipated payback time. Life-cycle cost analysis indicated that in the absence of utility incentives, batteries plus HEMS have a payback time of longer than 10 years for new construction under a time-of-use rate structure and feed-in tariff; larger batteries have a longer payback time but may provide more benefits to utilities on reducing power backfeed under certain circumstances.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Large-scale atomistic model construction of subbituminous and bituminous coals for solvent extraction simulations with reactive molecular dynamics

Large-scale atomistic models for complex polycyclic aromatic hydrocarbon systems help understand the chemical properties and behaviors of complex feedstocks such as coal or petroleum. However, the development and utilization of large-scale models remain limited due to the difficulty in achieving the varied structural characteristics necessary to capture stochastic nature of these feedstocks. Here we demonstrate a systematic workflow to construct stochastic molecular systems from a broad analytical suite: high-resolution transmission electron microscopy (HRTEM), carbon-13 nuclear magnetic resonance spectroscopy ( 13 C NMR), laser desorption ionization mass spectroscopy (LDI-MS), and elemental analysis. We present a model construction and analysis utility of a new Python-based module. We selected one subbituminous and three high-volatile bituminous coals to construct large-scale models (~40,000 atoms). The constructed models were utilized to examine the affinity for solvent extraction (naphthalene or tetralin) and the effect of structural properties (e.g., aromatic cluster size, functional groups, and cross-linking) in reactive molecular dynamics simulations. Complex chemical reactions were monitored with bond order transitions, intermediates formation, and mass distributions. Reactive molecular dynamics simulations suggest a plausible chemical extraction process and products for the complex fossil feedstocks. The results indicated that radical formations with bond breaking of bridging oxygens and carbons were required at high temperatures to facilitate hydrogeneration and extraction of gas molecules from radical-free molecules. We observed that aliphatic chains of tetralin were easily decomposed and combined with radicals to form small size of molecules with aryl bonding, mainly increasing molecules in the 500–1000 Da, while naphthalene had little impact on chemical extraction process.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Chapter 15: Commercial New Construction Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

This protocol is intended to describe the recommended method when evaluating the whole-building performance of new construction projects in the commercial sector. The protocol focuses on energy conservation measures (ECMs) or packages of measures where evaluators can analyze impacts using building simulation. These ECMs typically require the use of calibrated building simulations under Option D of the International Performance Measurement and Verification Protocol (IPMVP).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Data-driven variational multiscale reduced order models

We propose a new data-driven reduced order model (ROM) framework that centers around the hierarchical structure of the variational multiscale (VMS) methodology and utilizes data to increase the ROM accuracy at a modest computational cost. The VMS methodology is a natural fit for the hierarchical structure of the ROM basis: In the first step, we use the ROM projection to separate the scales into three categories: (i) resolved large scales, (ii) resolved small scales, and (iii) unresolved scales. In the second step, we explicitly identify the VMS–ROM closure terms, i.e., the terms representing the interactions among the three types of scales. In the third step, we use available data to model the VMS–ROM closure terms. Thus, instead of phenomenological models used in VMS for standard numerical discretizations (e.g., eddy viscosity models), we utilize available data to construct new structural VMS–ROM closure models. Specifically, we build ROM operators (vectors, matrices, and tensors) that are closest to the true ROM closure terms evaluated with the available data. We test the new data-driven VMS–ROM in the numerical simulation of four test cases: (i) the 1D Burgers equation with viscosity coefficient v = 10 -3 ; (ii) a 2D flow past a circular cylinder at Reynolds numbers, Re = 100, Re = 500, and Re= 1000; (iii) the quasi-geostrophic equations at Reynolds number Re = 450 and Rossby number Ro = 0.0036; and (iv) a 2D flow over a backward facing step at Reynolds number Re = 1000. The numerical results show that the data-driven VMS–ROM is significantly more accurate than standard ROMs.

42 ENGINEERING↗

Target Multiwire for the Fermilab Booster Neutrino Beamline

The Booster Neutrino Beamline experiment requested a new secondary electron emission multiwire profile monitor installation. The device had to be durable in high radiation conditions and mounted within a large 10 foot airtight steel fixture for installation near the beam target. Previous iterations of multiwire suffered radiation damage to both the connectors and wires. To ensure accurate horizontal and vertical beam profile measurements, an updated design was proposed, designed, and constructed. The new BNB multiwire utilizes 3 mil diameter gold-plated tungsten sense wires soldered to vertical and horizontal Alumina-96 ceramic planes, 50 wires per plane. Radiation hard Kapton insulated 30 gauge wires carry the output signals. Profiles are readout through charge integrator scanner electronics. This paper will detail the design and functionality of the BNB target multiwire and present relevant beam profile data.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Cost Model for Pumped Storage Hydropower Geomembrane Lining Systems

The Cost Model for Pumped Storage Hydropower Geomembrane Lining Systems offers an approximation of geomembrane lining system costs for pumped storage hydropower (PSH) reservoirs. Geomembrane lining systems have been used around the world for over 60 years for the construction of dams and reservoirs. Although geomembrane lining systems have found widespread use in the construction of canals and waste containment systems, they have not been utilized in the construction of new PSH facilities in the United States since the Mount Elbert PSH powerplant in Colorado. For this reason, PSH developers in the United States expressed the need for a tool that would allow them to estimate the costs of geomembrane lining systems for their PSH projects. To meet this need, the Cost Model for Pumped Storage Hydropower Geomembrane Lining Systems was developed by Oak Ridge National Laboratory with support from Argonne National Laboratory and Stantec, Inc. This Cost Model will enable PSH developers to develop a preliminary estimate of the cost of geomembrane lining systems and to better understand different reservoir lining options and their cost and performance characteristics, thus enabling them to make informed decisions related to preferred reservoir lining systems for their PSH projects.

DeNeale, Scott [Oak Ridge National Laboratory (ORN↗

Target Multiwire for the Fermilab Booster Neutrino Beamline

The Booster Neutrino Beamline experiment re-quested a new secondary electron emission multiwire profile monitor installation. The device had to be durable in high radiation conditions and mounted within a large 10-foot airtight steel fixture for installation near the beam target. Previous iterations of multiwire suffered radiation damage to both the connectors and wires. To ensure accurate horizontal and vertical beam profile measurements, an updated design was pro-posed, designed, and constructed. The new BNB multiwire utilizes 3 mil diameter gold-plated tungsten sense wires soldered to vertical and horizontal Alumi-na-96 ceramic planes, 50 wires per plane. Radiation hard Kapton insulated 30-gauge wires carry the output signals. Profiles are readout through charge integrator scanner electronics. This paper will detail the design and functionality of the BNB target multiwire and present relevant beam profile data.

43 PARTICLE ACCELERATORS↗

Definition of Capabilities Needed for a Single Event Effects Test Facility

The Federal Aviation Administration (FAA) is contemplating new regulations mandating testing of the vulnerability of flight-critical avionics to single event effects (SEE). A limited number of high-energy neutron test facilities currently serve the SEE industrial and institutional research community. The FAA recognizes that existing facilities have insufficient test capacity to meet new demand from such mandates; it desires more flexible irradiation capabilities to test complete, large systems and would like capabilities to address greater concerns for thermal neutrons. For this reason, the FAA funded this study by Spallation Neutron Source (SNS) staff with the ultimate aim of developing options for SEE test facilities using high-energy neutrons at the SNS complex. After an investigation of current SEE test practices and assessment of future testing requirements, three concepts were identified covering a range of test functionality, neutron flux levels, and fidelity to the atmospheric neutron spectrum. The costs and times required to complete each facility were also estimated. SEE testing is generally performed by accelerating the event rate to a point where the effects are still dominated by single events and double event causes of failures are negligible. In practice, acceleration factors of as high as 10 6 are applicable for component testing, whereas for systems testing acceleration factors of 10 4 seem to be the upper limit. It is strongly desirable that the irradiation facility be tunable over a large range of high-energy neutron fluxes of 10 2 - 10 4 n/cm²/s for systems testing and from 10 4 - 10 7 n/cm²/s for components testing. The most capable, most flexible, and highest-test-capacity option is a new stand-alone target station named the High-Energy neutron Test Station (HETS). It is also the most expensive option, with a cost to complete of approximately $100 million. Dual test enclosures would allow for simultaneous testing activity effectively doubling overall test capacity per HETS operating hour. Using about 1 kilowatt (kW) of proton power extracted from the accelerator before injection in the accumulator ring, its operation would be unnoticeable by neutron scattering users at the SNS target station. The H beam laser stripping technique would allow for control of beam power on the HETS target independent from power delivered to the SNS. Large systems with frontal areas of up to 1 x 2 m² could be accommodated with integral high-energy flux values (above 10 megaelectron-volt, or MeV) to at most 10 4 n/cm²/s; components could also be tested with flux levels to at most 10 7 n/cm²/s on beam sizes of up to 0.2 x 0.2 m². Selectable moderating material and neutron filters would allow tailoring of the neutron spectrum to user demands; charged particle deflectors could be switched to allow or deflect protons, pions, and muons. It is estimated that HETS would take 5 years to complete after award of contract, including engineering design and construction. Commissioning would take at least another 6 months. Interference with SNS principal operations was not considered in the construction time estimate; connection of the proton transport line and tunnel from the accelerator high energy beam transport (HEBT) and construction around existing site utilities would require careful planning and coordination with beam operations at the SNS. A high-energy (HE) neutron test facility using an available beam line on the SNS target station is a technically and financially attractive option. Inspired by the new ChipIR instrument on the ISIS TS 2 spallation source in the UK, a similar facility could be placed on an unused beam line in the SNS instrument hall [e.g., on beam line 8 (both A and B channels would be needed) or on beam line 10]. The performance would approach that of an HETS (~80%), but it would be operationally more limited, with only a single user at a time. Space is more limited, so the maximum system size would be about half of that in an HETS. Flexibility to tailor the spectrum would be somewhat more limited. While this concept was not as fully developed and characterized, preliminary work indicates very high HE flux levels should be possible, with ample thermal neutrons as well. Flux control would be more difficult than at HETS because proton power on target be whatever the SNS was operating at for neutron scattering. Neutron attenuation devices would have to be employed with as-yet undetermined control resolution. However, no new buildings would be needed, and the necessary utilities are already present in the SNS Experiment Hall. The estimated cost for a beam line option is around $15 million; the time to complete would be 3 years after award of contract, plus at least 6 months for commissioning. Interference of construction activities with SNS operations should be negligible. This option would require negotiation with the Department of Energy Basic Energy Sciences (BES) office -- the primary stakeholder of SNS -- for an application outside the usual scope of neutron scattering sciences. Furthermore, these presently open beam lines are highly desirable locations for proposed neutron scattering instruments and obtaining one of them for an SEE test facility will come only with persuasive and timely arguments to SNS leadership and the DOE BES. The third option is a tunnel extension/target cave facility providing the most basic system-level irradiation capability with minimal flexibility. Again not as well developed a concept as HETS, it would use a laser-stripping technique like an HETS, redirecting protons to a tunnel similar to the initial HETS proton transport tunnel. Indeed, this concept is intended to be upgradable to a full HETS facility. Only a small fraction of a watt of proton power would be used in this basic configuration, though. An uncooled target and primitive shielding arrangement would provide beam on modestly sized systems that must be placed in close proximity to the target. The neutron fluence would be less uniform over the system than with the HETS or the beam line option. A data acquisition room and support area would be located on the ground level; access to the target cave would be via elevator and/or stairway. As a result of the required excavation, new tunnel construction, shielding, data acquisition building, utilities, and other items, the estimated cost is $30 million. The time to complete is expected be more than 3 years; here again construction interference with SNS operations has not been accounted for, but it could have a significant impact.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Codes Don't Always Get Enforced, But Contracts Do: Changing the Procurement Paradigm to Drive Building Energy Performance

New construction could account for more than 25% of the U.S. energy consumption by 2030. Millions of square feet are built every year that will not perform as expected - despite advancing codes, rating systems, super-efficient technologies, and advanced utility programs. With retrofits of these under-performers decades away, savings potential will be lost for years to come. Only the building owner is in the driver's seat to demand - and verify - higher-performing buildings. Yet our current policy and market interventions really target the design team, not the owner. Accelerate Performance, a U.S. Department of Energy funded initiative, is changing the building procurement approach to drive deeper, verified savings in three pilot states: Illinois, Minnesota, and Connecticut. Performance-based procurement ties energy performance to design and contractor team compensation while freeing them to meet energy targets with strategies most familiar to them. The process teases out the creativity of the design and contracting teams to deliver energy performance - without driving up the construction cost. The paper will share early results and lessons learned from new procurement and contract approaches in government, public, and private sector building projects. The paper provides practical guidance for building owners, facilities managers, design, and contractor teams who wish to incorporate effective performance-based procurement for deeper energy savings in their buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of Hanford Supernatant Waste Evaporation

• Hanford site in Washington has 27 underground “double-shell” storage tanks containing radioactive waste. Storage space is utilized to max capacity. • Construction of new tanks is undesirable, but volume reduction is still possible by vacuum evaporation of liquid waste. • Excess evaporation may create additional problems in solids precipitation, waste density and corrosivity. • Evaporation of liquid waste was simulated to determine possible outcomes.

Barkai, Benjamin [Savannah River National Laborato↗

Measured Whole-House Performance of TaC Studios Test Home

As part of the NAHB Research Center Industry Partnership, Southface partnered with TaC Studios, an Atlanta-based architecture firm specializing in residential and light commercial design, on the construction of a new test home in Atlanta, GA, in the mixed humid climate. This home serves as a residence and home office for the firm's owners, as well as a demonstration of their design approach to potential and current clients. Southface believes the home demonstrates current best practices for the mixed-humid climate, including a building envelope featuring advanced air sealing details and low density spray foam insulation, glazing that exceeds ENERGY STAR requirements, and a high performance heating and cooling system. Construction quality and execution was a high priority for TaC Studios and was ensured by a third party review process. Post-construction testing showed that the project met stated goals for envelope performance, an air infiltration rate of 2.15 ACH50. The homeowners wished to further validate whole house energy savings through the project's involvement with Building America and this long-term monitoring effort. As a Building America test home, this home was evaluated to detail whole house energy use, end use loads, and the efficiency and operation of the ground source heat pump and associated systems. Given that the home includes many non-typical end use loads including a home office, pool, landscape water feature, and other luxury features not accounted for in Building America modeling tools, these end uses were separately monitored to determine their impact on overall energy consumption.

(team name)↗

Energy Recovery Hydropower: Prospects for Off-Setting Electricity Costs for Agricultural, Municipal, and Industrial Water Providers and Users; July 2017 - September 2017

Energy recovery hydropower is one of the most cost-effective types of new hydropower development because it is constructed utilizing existing infrastructure, and it is typically able to complete Federal Energy Regulatory Commission (FERC) review in 60 days. Recent changes in federal and state policy have supported energy recovery hydropower. In addition, some states have developed programs and policies to support energy recovery hydropower, including resource assessments, regulatory streamlining initiatives, and grant and loan programs to reduce project development costs. This report examines current federal and state policy drivers for energy recovery hydropower, reviews market trends, and looks ahead at future federal resource assessments and hydropower reform legislation.

13 HYDRO ENERGY↗

Understanding Ionizing Radiation-Induced Speciation, Chemistry, and Transport in Nuclear Materials

The research to be presented will cover an overview of three projects supported by the United States Department of Energy Office of Science Solar Photochemistry Program: (i) Radiation-Induced Late Actinide Redox Chemistry (2019–2022); (ii) Understanding Radiation-Induced Iodine Speciation, Chemistry, and Transport in High Temperature Molten Salts (2022–2025); and (iii) Radiation-Induced Chemistry of Nuclear Materials (2023–2026). The overarching aim of these distinct projects is to develop a deep fundamental mechanistic understanding of ionizing-radiation-induced processes occurring in solutions over multiple time and length scales. Investigated solutions range from aqueous to organic to molten salt liquids in the presence and absence of ligands and various redox-active ions and molecules, including the actinides. The ultimate goal of these projects is to utilize the new foundational knowledge gained to construct quantitative multiscale computer models with the capacity to predict radiation-induced behavior in complex systems of relevance to nuclear energy technologies and beyond.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗