Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Transmission Expansion Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Cooperation in Transmission Expansion Planning: Enhancing Grid Reliability and Efficiency Under a Changing Climate

Electricity grids are challenged to maintain reliability during more intense and frequent extreme weather events due to climate change. This challenge is exacerbated by multi-sector electrification and power sector decarbonization through increased reliance on variable renewable energy, which necessitates the expansion of transmission infrastructure. However, transmission expansion planning is often complicated by intertwined planning authorities and jurisdictions, and allocation of large capital investment needs. These factors cause authorities to manage transmission investments individually (i.e., only/mostly intraregional planning), which can lead to suboptimal transmission networks. This study investigates the potential benefits of cooperative transmission expansion planning (i.e., both intraregional and interregional planning that optimizes transmission investments across the entire physical system). Using sectoral and economic optimization, and machine learning models, it analyzes the impact of different levels of cooperation among transmission planning regions within U.S. Western Interconnection in 2019 and 2059 via an iterative investment process. Furthermore, it examines the effects of future climate change on transmission cooperation by simulating historical heat waves from 2019 under conditions of 2059. The results indicate that cooperative transmission planning leads to lower wholesale electricity prices, decreased energy outages, and reduced greenhouse gas emissions. However, the advantages of collaboration diminish during widespread heat waves, despite remaining beneficial especially for regions like California Independent System Operator with substantial solar installations. The study underscores the importance of transmission cooperation in reducing costs and enhancing reliability, emphasizing the need for strategic investments in storage to address challenges posed by future extreme weather events with varying spatial scales.

Capacity Expansion Model

Investigating the effects of cooperative transmission expansion planning on grid performance during heat waves with varying spatial scales

There is growing recognition of the advantages of interregional transmission capacity to decarbonize electricity grids. A less explored benefit is potential performance improvements during extreme weather events. This study examines the impacts of cooperative transmission expansion planning using an advanced modeling chain to simulate power grid operations of the United States Western Interconnection in 2019 and 2059 under different levels of collaboration between transmission planning regions. Two historical heat waves in 2019 with varying geographical coverage are replayed under future climate change in 2059 to assess the transmission cooperation benefits during grid stress. The results show that cooperative transmission planning yields the best outcomes in terms of reducing wholesale electricity prices and minimizing energy outages both for the whole interconnection and individual transmission planning regions. Compared to individual planning, cooperative planning reduces wholesale electricity prices by 64.3 % and interconnection-wide total costs (transmission investments + grid operations) by 34.6 % in 2059. It also helps decrease greenhouse gas emissions by increasing renewable energy utilization. However, the benefits of cooperation diminish during the widespread heat wave when all regions face extreme electricity demand due to higher space cooling needs. Despite this, cooperative transmission planning remains advantageous, particularly for California Independent System Operator with significant diurnal solar generation capacity. This study suggests that cooperation in transmission planning is crucial for reducing costs and increasing reliability both during normal periods and extreme weather events. It highlights the importance of optimizing the strategic investments to mitigate challenges posed by wider-scale extreme weather events of the future.

24 POWER TRANSMISSION AND DISTRIBUTION

Cooperative Transmission Expansion Planning Experiment Data and Results

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within GO WEST framework. In this sense, TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. TEP minimizes the total cost of the system which comprises the operational cost of satisfying electricity demand (i.e., generation cost), cost of loss of load (i.e., unserved energy), cost of power flow, and cost of new transmission capacity additions (i.e., investment cost). In order to use TEP model, users need to create scenarios with GO WEST framework. In this analysis, outputs from several models are used to create future inputs to GO WEST and TEP models, including GCAM-USA, TELL, CERF and reV. This dataset includes experiment inputs and outputs from three different transmission expansion scenarios (cooperative, intermediate, and individual) for 2019 and 2059. For 2019, a base scenario to illustrate the default (i.e., historical) power grid operations is also included. This study utilizes rcp45hotter_ssp3 scenario from a previous version of GCAM-USA simulations. Sources of the shapefiles in supplementary data are HIFLD Open and U.S. Energy Atlas. Please see the README file for a detailed description of the main and supplementary data.

Capacity Expansion Model

IDAES GTEP 0.1 Release

The Institute for the Design of Advanced Energy Systems (IDAES) Generation and Transmission Expansion Planning (GTEP) package provides a Pyomo-based implementation of a modular, flexible, Generalized Disjunctive Programming (GDP) formulation for power infrastructure planning problems. This package is designed with the following goals in mind: - Abstract GTEP modeling away from any particular case study or fixed modeling assumptions (e.g., technologies, temporal resolution, spatial resolution, policy implications, etc.) - Admit flexible decision sets and heterogeneous parameterization - Allow high-level modeling options to be understood easily, chosen modularly, and changed rapidly

AS

Parallel computing for power system climate resiliency: Solving a large-scale stochastic capacity expansion problem with mpi-sppy

Here we propose a nodal stochastic generation and transmission expansion planning model that incorporates the output from high-resolution global climate models through load and generation availability scenarios. We implement our model in Pyomo and perform computational studies on a realistically-sized test case of the California electric grid in a high performance computing environment. We propose model reformulations and algorithm tuning to efficiently solve this large problem using a variant of the Progressive Hedging Algorithm. We utilize the parallelization capabilities and overall versatility of mpi-sppy, exploiting its hub-and-spoke architecture to concurrently obtain inner and outer bounds on an optimal expansion plan. Initial results show that instances with 360 representative days on a system with over 8,000 buses can be solved to within 5% of optimality in under 4 h of wall clock time, a first step towards solving a large-scale power system expansion planning problem across a wide range of climate-informed operational scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION

IM3 Projected U.S. Western Interconnection Grid Stress Dataset

This dataset provides projected grid stress and reliability results (including all model inputs and outputs from GO WEST and TEP) for Integrated Multisector, Multiscale Modeling (IM3) Phase 2 simulations across eight different scenarios for the U.S. Western Interconnection through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States from a set of Thermodynamic Global Warming (TGW) simulations. These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 GO WEST is an open-source power grid modeling framework for the U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BAs) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of the U.S. Western Interconnection (ACTIVSg10k). Users can select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on the GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within the GO WEST framework. The TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. In order to use TEP model, users need to create scenarios with the GO WEST framework. Please refer to README file for a detailed description of the dataset including individual files and references.

Capacity Expansion Model

Assessing the Reliability Benefits of Energy Storage as a Transmission Asset

Utilizing energy storage solutions to reduce the need for traditional transmission investments has been recognized by system planners and supported by federal policies in recent years. This work demonstrates the need for detailed reliability assessment for quantitative comparison of the reliability benefits of energy storage and traditional transmission investments. First, a mixed-integer linear programming expansion planning model considering candidate transmission lines and storage technologies is solved to find the least-cost investment decisions. Next, operations under the resulting system configuration are simulated in a probabilistic reliability assessment which accounts for weather-dependent forced outages. The outcome of this work, when applied to TPPs, is to further equalize the consideration of energy storage compared to traditional transmission assets by capturing the value of storage for system reliability.

co-optimization

Informing Transmission Supply Chain Needs from National Transmission Studies

Recent national studies indicate significant transmission expansion can provide the lowest-cost option to maintain grid reliability while meeting growing demand. However, constraints in domestic supply chains may limit grid expansion across the U.S., with higher costs and longer delays for required transmission equipment. Despite growing evidence of supply chain constraints for transmission components, transmission planning studies often assume transmission equipment is readily available for deployment or analyze future demand using historical trade and manufacturing data that may not capture evolving grid needs. This report aims to address this gap by demonstrating methods to quantify future demand for critical transmission components and input materials from national-scale planning models. These components include power transformers, generator step-up transformers, converter transformers, conductors, circuit breakers, and transmission towers and the materials include aluminum, steel, grain-oriented electrical steel (GOES), and copper. The analytical approach is applied to two nodal transmission expansion scenarios from the National Transmission Planning Study (NTP) to illustrate the methods. These scenarios represent different transmission expansion strategies for the contiguous U.S. to the year 2035: the Alternating Current (AC) scenario includes AC transmission expansion within each interconnection and the Multiterminal (MT) scenario includes interregional transmission expansion across the country using both AC and multiterminal HVDC options between neighboring zones. We also explore potential heuristics to derive transmission component demand from zonal capacity expansion models (CEMs) with coarse representation of the transmission grid.

24 POWER TRANSMISSION AND DISTRIBUTION

Informing Transmission Supply Chain Needs from National Transmission Studies

Recent national studies indicate significant transmission expansion can provide the lowest-cost option to maintain grid reliability while meeting growing demand. However, constraints in domestic supply chains may limit grid expansion across the U.S., with higher costs and longer delays for required transmission equipment. Despite growing evidence of supply chain constraints for transmission components, transmission planning studies often assume transmission equipment is readily available for deployment or analyze future demand using historical trade and manufacturing data that may not capture evolving grid needs. This report aims to address this gap by demonstrating methods to quantify future demand for critical transmission components and input materials from national-scale planning models. These components include power transformers, generator step-up transformers, converter transformers, conductors, circuit breakers, and transmission towers and the materials include aluminum, steel, grain-oriented electrical steel (GOES), and copper. The analytical approach is applied to two nodal transmission expansion scenarios from the National Transmission Planning Study (NTP) to illustrate the methods. These scenarios represent different transmission expansion strategies for the contiguous U.S. to the year 2035: the Alternating Current (AC) scenario includes AC transmission expansion within each interconnection and the Multiterminal (MT) scenario includes interregional transmission expansion across the country using both AC and multiterminal HVDC options between neighboring zones. We also explore potential heuristics to derive transmission component demand from zonal capacity expansion models (CEMs) with coarse representation of the transmission grid.

24 POWER TRANSMISSION AND DISTRIBUTION

Adaptive Protection and Validated Models to Enable Deployment of High Penetrations of Solar PV (PV-MOD)

The availability and validation of various PV models in commercial tools differ, with some models not yet thoroughly validated for advanced inverter functionalities and reliable performance under weak system conditions. Many existing models do not fully incorporate new inverter control functions, which can affect system stability. The increasing deployment of solar PV and other inverter-based resources (IBRs), including distributed energy resources (DERs), is influencing the reliable operation of protection schemes in distribution systems and microgrids. Emerging adaptive protection schemes (APS) offer new opportunities for protecting these systems during varying configurations and DER operating conditions, though their demonstration and validation remain limited. Adaptive protection schemes face similar challenges, as they are typically designed for specific configurations. There is a growing need for tools and methodologies to streamline the deployment of adaptive protection for safe and reliable DER integration. The project main objective was to develop and validate high-fidelity generic models of solar PV facilities for stability, protection, EMT, and QSTS analyses. This objective was achieved, and these models can now be integrated into commercial software tools, enabling utilities, vendors, and developers to study high-penetration PV systems more confidently. The project also demonstrated advanced applications of these models, including the design and deployment of adaptive protection schemes in high-penetration field applications and microgrids, supporting grid safety and reliability. Several milestones were reached by the end of the project. A sophisticated inverter test plan was developed, and inverters representative of the North American marketplace were selected. EPRI and NREL tested various inverters, conforming to IEEE standards. Improvements were made to existing generic models of IBR units, IBR plants, and aggregated feeders for various analyses. The first generic electromagnetic transient (EMT) model for a solar PV plant was developed, conforming to IEEE Std 2800™-2022 and validated against laboratory measurements of a 2.2 MVA large-scale battery energy storage system (BESS) inverter. That model was then used to produce reference responses illustrating examples of validated and verified IBR plant models that pass or fail tests for technical minimum capability and performance as specified in the IEEE standard. The developed, tested, and validated generic models can be used for transmission planning, stability assessments, expansion planning, and evaluating potential future IBR interconnection requirements. They can also support interconnection screens and conformity assessments of IBR plants, including solar PV. The project significantly contributed to the ongoing standardization and model-based representation and verification of IBR responses. The project further addressed challenges of common distribution protection schemes with increasing deployment of DER by developing, validating, and demonstrating adaptive protection schemes (APS) that can improve the reliable and safe integration of DER into distribution systems. New APS were designed using improved DER models for three common distribution systems: a radial feeder, a meshed network, and a microgrid. Modeling and hardware-in-the-loop (HIL) testing of the APS were conducted, successfully showing their effectiveness and selectivity. Proof-of-concept field demonstration was achieved for two APS, i.e., one on a radial feeder and another one in a microgrid. Field demonstration could not be achieved for the APS on a meshed network, primarily due apprehension of one utility partner and also due to limited access to the protective algorithms in the network protectors. Guidelines developed from the lessons learned in the project lay out the general process followed in the design, installation, and commissioning of APS for various distribution systems. Distribution utility partners’ apprehension about field demonstration of the new APS were addressed—with varying success—by taking a stepped risk-management approach of modeling of a wide range of sensitivities first, performing in-depth proof-of-concept testing in the laboratory including HIL next, and finally deliberately implementing and commissioning the actual protection equipment and algorithms into parts of—or in parallel operation to—the three real distribution systems. Future work should include pilot projects that further show the acceptable performance of the developed APS before these schemes be rolled out more widely. Inclusion of both utility and original equipment manufacturers (OEMs) in future projects could increase chances of successful field demonstration. Despite challenges in achieving the field demonstration goal of the project for all three APS, the research significantly contributed to the innovation of adaptive protection solutions for scalable and reliable DER integration into distribution systems. This project significantly enhances the understanding of the impact of using appropriate inverter models on distribution and transmission (T&D) systems. By addressing the limitations of existing generic models, the project introduces high-fidelity models for stability, protection, electromagnetic transient (EMT), and quasi-static time series (QSTS) analyses. These models, integrated into commercial software tools, enable utilities, vendors, and developers to confidently study high-penetration PV systems. The project also demonstrates advanced applications, including adaptive protection schemes (APS) for distribution systems and microgrids, ensuring grid safety and reliability. The technical effectiveness and economic feasibility of the methods are evident through the development and validation of sophisticated inverter test plans and the selection of representative inverters. Testing by EPRI and NREL on retail, commercial, and utility-scale inverters, conforming to IEEE standards, underscores the robustness of the models. Improvements to existing generic models for various analyses further enhance their validity and applicability. The project also identifies gaps in common distribution protection schemes and designed new APS using improved DER models, demonstrating their effectiveness through modeling and hardware-in-the-loop (HIL) testing. The project’s benefits to the public are manifold. By advancing the standardization and model-based representation of IBR response, it supports transmission planning, stability assessments, and future IBR interconnection requirements. The generic models can facilitate better communication between transmission planners and developers, supporting expected IBR plant capability and performance. Additionally, the development of APS for radial feeders, meshed networks, and microgrids supports the integration of distributed energy resources (DERs) into distribution systems, enhancing grid reliability and safety. The project’s emphasis on thorough testing and simplicity in design ensures practical and scalable solutions for DER integration.

14 SOLAR ENERGY

GODEEEP-hydro: Historical and projected power system ready hydropower data for the United States

Hydropower is a critical electricity resource in the United States which, in addition to low-cost electricity generation, provides valuable ancillary grid services, and supports the integration of nondispatchable weather-dependent resources (e.g., wind and solar). Despite its value to the grid, there are very few comprehensive datasets available from which to study both historical and future impacts of climate, weather driven energy droughts, and integration of other weather driven generation. In this paper, we present a hydropower generation dataset covering 1,452 hydroelectric plants in the contiguous U.S. The dataset contains monthly and weekly hydropower generation estimates for both historical (1982–2019) and future (2020–2099) periods which includes 4 future climate scenarios. In addition, this dataset provides weekly and monthly constraints such as minimum and maximum power which are particularly useful in power system models which are used to study grid reliability, transmission planning and capacity expansion.

13 HYDRO ENERGY

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION

Energy storage planning for enhanced resilience of power systems against wildfires and heatwaves

Extreme weather events pose significant risks to power grid stability due to their severe consequences and potential for widespread failures. Energy storage systems hold great potential for enhancing grid resilience against such events by providing reliable power during peak demand periods. However, accurately quantifying the size, location, and investment costs of new energy storage assets is a complex task, as energy storage planning decisions depend on the investment choices of other generation technologies and the integration of new transmission projects. Here, this paper presents a novel capacity expansion planning framework that simultaneously optimizes investments in energy storage, generation, and transmission, determining their optimal size, location, and type, while incorporating extreme weather events into long-term planning. More specifically, our stress-event-informed planning framework integrates the impact of heatwaves and wildfires into the planning process, identifying least-cost investment solutions that comply with policy goals and enhance grid resilience. The proposed framework employs machine-learning-based modeling to project heatwave-induced loads and performance-based risk assessment to evaluate wildfire-driven transmission line derates. Using industry-standard datasets to accurately represent the transmission topology of the Western Interconnection (WI) system, the proposed framework is applied to the WI 40-zone system, with investment decisions reported for the years 2030, 2035, and 2040. Simulation results reveal that with just a 10% increase in investment costs, resilience against extreme events can be significantly improved, with investment decisions heavily favoring energy storage, particularly 4-hour energy storage systems.

25 ENERGY STORAGE

Powered By: Transmission Planning

Presented as part of the NREL Grid Planning and Analysis Center's (GPAC) "Powered By" Series, this iteration focuses not on a specific tool but instead on a domain of expertise/capability being built out at NREL: transmission planning. Various sets of tools are integrated together in this presentation to present a combination of transmission focus areas, case studies, tools and future directions of transmission research.

capacity expansion