Shandiin Solar Project Development

The project is located on CBN lands 20 miles west of Albuquerque, New Mexico and will consist of approximately 200 acres of solar photovoltaic (PV) panels and other equipment with a name plate capacity of 30 Megawatts. This project has recently been incorporated under the name Shandiin Solar, LLC. The goal of this project is to provide a vehicle for CBN economic development. The U.S. Department of Energy (DOE) funded aspect of the project will be to conduct development activities for the 30 Megawatt (MW) Shandiin Solar projects, including: complete final engineering and design, obtain an interconnect agreement, obtain lease agreement, finalize financing, complete business agreements and obtain a power purchase agreement.

14 SOLAR ENERGY↗

To'Hajiilee Economic Development, Inc. (TEDI) Feasibility Study for Utility-Scale Solar

To Hajiilee Economic Development, Inc. (TEDI) is the economic development entity representing the ToHajiilee Chapter of the Navajo Nation, also known as the Caoncito Band of Navajo (CBN). Using DOE funding, TEDI assembled a team of qualified advisors to conduct a feasibility study for a utility-scale 30 MW Photovoltaic (PV) solar power generation facility on TEDI trust lands. The goal for this project has been to gather information and practical business commitments to successfully complete the feasibility analysis. The TEDI approach was to successively make informed decisions to select an appropriate technology best suited to the site, determine environmental viability of the site, secure options for the sale of generated power, determine practicality of transmission and interconnection of power to the local grid, and secure preliminary commitments on project financing. The feasibility study has been completed and provides TEDI with a practical understanding of its business options in moving forward with developing a solar project on CBN tribal lands. Funding from DOE has allowed TEDI and its team of professional advisors to carefully select technology and business partners and build a business model to develop this utility-scale solar project. As a result of the positive feasibility findings, TEDI is moving forward with finalizing all pre-construction activities for its major renewable energy project.

14 SOLAR ENERGY↗